CN209663420U - Civil engineering work waste material processing unit - Google Patents

Civil engineering work waste material processing unit Download PDF

Info

Publication number
CN209663420U
CN209663420U CN201920331531.7U CN201920331531U CN209663420U CN 209663420 U CN209663420 U CN 209663420U CN 201920331531 U CN201920331531 U CN 201920331531U CN 209663420 U CN209663420 U CN 209663420U
Authority
CN
China
Prior art keywords
mounting plate
compression box
broken case
bolted
waste material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920331531.7U
Other languages
Chinese (zh)
Inventor
赵文兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201920331531.7U priority Critical patent/CN209663420U/en
Application granted granted Critical
Publication of CN209663420U publication Critical patent/CN209663420U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

Originally practical to belong to waste treatment device field, specially civil engineering work waste material processing unit, including the first mounting plate, broken case, compression box, annular groove, support plate is bolted on first mounting plate upper surface, the support plate quantity is four, it is evenly distributed on the quadrangle of first mounting plate, the support plate upper end is provided with the second mounting plate, it is bolted between second mounting plate and the support plate, motor is bolted on second mounting plate upper end, the motor side is provided with the broken case, rotation axis is provided in the broken case, crushing cutter is provided on the outside of the rotation axis, it is connected by key between the crushing cutter and the rotation axis.Break process is carried out before being compressed by the utility model, facilitates subsequent crushing work, prevents some construction wastes due to per se with moisture content, and when storage can breed pernicious gas, with simple and convenient, the low in cost advantage of structure.

Description

Civil engineering work waste material processing unit
Technical field
The utility model belongs to waste treatment device field, is specifically related to civil engineering work waste material processing unit.
Background technique
Building waste refers to that construction, unit in charge of construction or individual build all kinds of buildings, structures, pipe network etc., spread If or removing, generated dregs, spoir, rejected material, mud and other wastes in reparative processes.
Currently, building waste one side land occupation, if the plurality of heavy metal moisture content contained in another aspect construction waste It is without processing, prolonged stack can reduce soil quality, with the increase of urban building waste amount, dumping Point is also increasing, and the area of place where the garage is piled up is also being gradually expanded, and goes down cause strong influence to ecological environment for a long time.
Utility model content
The purpose of this utility model, which is that, provides civil engineering work waste material processing unit.
Technical solution used by the utility model is as follows:
Civil engineering work waste material processing unit, including the first mounting plate, broken case, compression box, annular groove, support plate It is bolted on first mounting plate upper surface, the support plate quantity is four, is evenly distributed on first peace The quadrangle of loading board, the support plate upper end are provided with the second mounting plate, pass through between second mounting plate and the support plate It is bolted, motor is bolted on second mounting plate upper end, and the motor side is provided with described broken Case is provided with rotation axis in the broken case, crushing cutter, the crushing cutter and the rotation axis is provided on the outside of the rotation axis Between be connected by key, lower end is provided with bottom plate in the broken case, and first through hole is provided in the bottom plate, and funnel passes through spiral shell Bolt is fixed on the broken case upper surface, and the bottom plate lower end is provided with communicating pipe, and the communicating pipe other end is mounted on described Compression box side, the compression box top are provided with hydraulic cylinder, pass through bolt between the hydraulic cylinder and second mounting plate Connection, the hydraulic cylinder lower end are provided with piston, and pressing plate is bolted on the piston lower surface, the compression box front end It is provided with chamber door, is connected by a hinge between the chamber door and the compression box, bushing, the leakage are installed in the compression box It being integrally formed between plate and the compression box, the second through-hole is provided in the bushing, the bushing lower end is provided with support column, It is provided with efferent duct on the outside of the compression box, is connected through a screw thread between the efferent duct and the compression box, the compression box Surrounding is provided with the annular groove, and the annular groove side is connected with output magazine.
Preferably: the broken box shape is the hollow box body of upper end opening, between the motor and the rotation axis It is connected by shaft coupling, is connected between the rotation axis and the broken case by bearing, and the rotation axis is located at described break Broken case middle position.
So set, construction material to be treated is inputted from the funnel, fall in the broken case, it is described electronic The rotation that machine drives the rotation axis stable in the broken case, drives the crushing cutter to be crushed construction waste.
Preferably: the broken case is embedded in second mounting plate, and passes through spiral shell between second mounting plate It tethers and connects.
The broken case is more stably fixed in second mounting plate so set, being bolted, is broken Waste material after the completion of broken can enter the first through hole.
Preferably: the connection tube shape is L shape, is bolted between upper end and second mounting plate, and The lower end surface for wrapping up the broken case, is bolted between the other end and the compression box.
So set, being fallen therewith in the communicating pipe into the waste material in the first through hole.
Preferably: the communicating pipe inner hollow, and it is connected to the broken case and the compression box.
So set, the waste material of broken completion is inputted in the compression box by the communicating pipe.
Preferably: being integrally formed between the support column and the compression box, and be located at the compression box middle position.
So set, waste material is pressed on the upper of the bushing by the pressing plate when piston described in the Hydraulic Cylinder End, the support column can help the bushing to carry out resistance to compression.
Preferably: the output tube shape is inverted " L ", annular groove described in lower end aligned.
So set, the moisture content in waste material passes through the extruding of the pressing plate, it is precipitated from waste material, then from the efferent duct Output enters in the annular groove.
The utility model has the following beneficial effects:
1, the construction material with moisture content is poured into funnel, waste material can enter broken case, open motor, motor band Dynamic crushing cutter rotation, break process is carried out before being compressed, facilitates subsequent crushing work;
2, Hydraulic Cylinder pressing plate compresses the waste material in compression box, and the moisture content in waste material will be precipitated, then from Efferent duct outflow prevents some construction wastes due to per se with moisture content, and when storage can breed pernicious gas;
3, the sewage of efferent duct outflow, flows in annular groove, finally collects outflow by output magazine, utilizes annular groove and output The mode of slot, with simple and convenient, the low in cost advantage of structure.
Detailed description of the invention
Attached drawing is to be used to provide a further understanding of the present invention, and constitute part of specification, and following Specific embodiment be used to explain the utility model together, but do not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the schematic perspective view of civil engineering work waste material processing unit described in the utility model;
Fig. 2 is the main view of civil engineering work waste material processing unit described in the utility model;
Fig. 3 is the broken case cross-sectional view of civil engineering work waste material processing unit described in the utility model;
Fig. 4 is the second mounting plate partial sectional view of civil engineering work waste material processing unit described in the utility model;
Fig. 5 is the compression box cross-sectional view of civil engineering work waste material processing unit described in the utility model.
The reference numerals are as follows:
1, the first mounting plate;2, support plate;3, the second mounting plate;4, motor;5, it is crushed case;6, rotation axis;7, it is crushed Knife;8, bottom plate;9, first through hole;10, funnel;11, communicating pipe;12, compression box;13, hydraulic cylinder;14, piston;15, pressing plate; 16, chamber door;17, bushing;18, the second through-hole;19, support column;20, efferent duct;21, annular groove;22, output magazine.
Specific embodiment
The utility model is further illustrated below by embodiment combination attached drawing.
Embodiment
As Figure 1-Figure 5, civil engineering work waste material processing unit, including the first mounting plate 1, broken case 5, compression Case 12, annular groove 21, support plate 2 are bolted on 1 upper surface of the first mounting plate, and 2 quantity of support plate is four, uniformly divide For cloth in the quadrangle of the first mounting plate 1,2 upper end of support plate is provided with the second mounting plate 3, leads between the second mounting plate 3 and support plate 2 It crosses and is bolted, motor 4 is bolted on 3 upper end of the second mounting plate, and 4 side of motor is provided with broken case 5, is crushed The effect of case 5 is broken construction material, is provided with rotation axis 6 in broken case 5, crushing cutter 7 is provided on the outside of rotation axis 6, be crushed It is connected by key between knife 7 and rotation axis 6, lower end is provided with bottom plate 8 in broken case 5, and first through hole 9 is provided in bottom plate 8, leaks Bucket 10 is bolted on broken 5 upper surface of case, and 8 lower end of bottom plate is provided with communicating pipe 11, and the effect of communicating pipe 11 is to convey The broken construction material completed, communicating pipe, 11 other end was mounted on 12 side of compression box, and the effect of compression box 12 is to handle building Sewage in material is provided with hydraulic cylinder 13 above compression box 12, passes through bolt between hydraulic cylinder 13 and the second mounting plate 3 and connects It connects, 13 lower end of hydraulic cylinder is provided with piston 14, and pressing plate 15 is bolted on 14 lower end surface of piston, the setting of 12 front end of compression box There is chamber door 16, be connected by a hinge between chamber door 16 and compression box 12, installation and bushing 17, bushing 17 act in compression box 12 In the second through-hole 18 is arranged, it is integrally formed between bushing 17 and compression box 12, the second through-hole 18, bushing 17 is provided in bushing 17 Lower end is provided with support column 19, and efferent duct 20 is provided on the outside of compression box 12, passes through screw thread between efferent duct 20 and compression box 12 It connects, annular groove 21 is provided with around compression box 12, annular groove 21 acts on the sewage for being to collect output, and 21 side of annular groove connects It is connected to output magazine 22, the effect of output magazine 22 is to guide sewage.
Working principle: first pouring into the construction material with moisture content in funnel 10, and waste material can enter broken case 5, opens Motor 4, motor 4 drive crushing cutter 7 to rotate, and carry out break process to waste material, the waste material after the completion of being crushed is logical by first Hole 9 entered in communicating pipe 11, then enters in compression box 12 by communicating pipe 11, then opens hydraulic cylinder 13, hydraulic cylinder 13 pushes away Dynamic pressure plate 15 compresses the waste material in compression box 12, and the moisture content in waste material will be precipitated, and then flows out from efferent duct 20, It flows in annular groove 21, outflow is finally collected by output magazine 22, then chamber door 16 is opened, waste material is taken out.
Broken 5 shape of case is the hollow box body of upper end opening, is connected between motor 4 and rotation axis 6 by shaft coupling, is turned It is connected between moving axis 6 and broken case 5 by bearing, and rotation axis 6 is located at broken 5 middle position of case, Building wood to be treated Material is inputted from funnel 10, can be fallen in broken case 5, and the rotation that motor 4 drives rotation axis 6 stable in broken case 5 drives Crushing cutter 7 is crushed construction waste, and broken case 5 is embedded in the second mounting plate 3, and is passed through between the second mounting plate 3 It is bolted, is bolted and broken case 5 is more stably fixed in the second mounting plate 3, the waste material after the completion of being crushed First through hole 9 can be entered, 11 shape of communicating pipe is L shape, is bolted between upper end and the second mounting plate 3, and wrap up The lower end surface of broken case 5, is bolted between the other end and compression box 12, therewith can into the waste material in first through hole 9 Fall in communicating pipe 11, communicating pipe 11 inner hollow, and be connected to broken case 5 and compression box 12, will be crushed by communicating pipe 11 In the waste material input compression box 12 of completion, it is integrally formed between support column 19 and compression box 12, and be located at 12 interposition of compression box It sets, when hydraulic cylinder 13 pushes piston 14, waste material is pressed on the upper end of bushing 17 by pressing plate 15, and support column 19 can help bushing 17 carry out resistance to compressions, and 20 shape of efferent duct is inverted " L ", lower end aligned annular groove 21, and the moisture in waste material passes through the extruding of pressing plate 15, It is precipitated from waste material, then enters in annular groove 21 from the output of efferent duct 20.
Preferred embodiments of the present invention are elaborated in conjunction with attached drawing above, but the utility model and unlimited In above embodiment, skilled artisan within the scope of knowledge, can also do not depart from it is practical It is made a variety of changes under the premise of novel objective.

Claims (7)

1. civil engineering work waste material processing unit, it is characterised in that: including the first mounting plate (1), broken case (5), compression Case (12), annular groove (21), support plate (2) are bolted on the first mounting plate (1) upper surface, the support plate (2) quantity is four, is evenly distributed on the quadrangle of first mounting plate (1), support plate (2) upper end is provided with the second peace Loading board (3) is bolted between second mounting plate (3) and the support plate (2), and motor (4) is solid by bolt It is scheduled on the second mounting plate (3) upper end, motor (4) side is provided with the broken case (5), the broken case (5) It is inside provided with rotation axis (6), is provided with crushing cutter (7) on the outside of the rotation axis (6), the crushing cutter (7) and the rotation axis (6) it is connected by key between, the interior lower end of the broken case (5) is provided with bottom plate (8), and it is logical that first is provided in the bottom plate (8) Hole (9), funnel (10) are bolted on broken case (5) upper surface, and bottom plate (8) lower end is provided with communicating pipe (11), communicating pipe (11) other end is mounted on the compression box (12) side, is provided with liquid above the compression box (12) Cylinder pressure (13) is bolted between the hydraulic cylinder (13) and second mounting plate (3), hydraulic cylinder (13) lower end It is provided with piston (14), pressing plate (15) is bolted on the piston (14) lower end surface, and compression box (12) front end is set It is equipped with chamber door (16), is connected by a hinge between the chamber door (16) and the compression box (12), peace in the compression box (12) It equipped with bushing (17), is integrally formed between the bushing (17) and the compression box (12), the is provided in the bushing (17) Two through-holes (18), bushing (17) lower end are provided with support column (19), are provided with efferent duct on the outside of the compression box (12) (20), it is connected through a screw thread between the efferent duct (20) and the compression box (12), is provided with around the compression box (12) The annular groove (21), annular groove (21) side are connected with output magazine (22).
2. civil engineering work waste material processing unit according to claim 1, it is characterised in that: the broken case (5) Shape is the hollow box body of upper end opening, is connect between the motor (4) and the rotation axis (6) by shaft coupling, described It is connect between rotation axis (6) and the broken case (5) by bearing, and the rotation axis (6) is located among the broken case (5) Position.
3. civil engineering work waste material processing unit according to claim 2, it is characterised in that: the broken case (5) It is embedded in second mounting plate (3), and is bolted between second mounting plate (3).
4. civil engineering work waste material processing unit according to claim 3, it is characterised in that: the communicating pipe (11) Shape is L shape, is bolted between upper end and second mounting plate (3), and wraps up the lower end of the broken case (5) Face is bolted between the other end and the compression box (12).
5. civil engineering work waste material processing unit according to claim 4, it is characterised in that: the communicating pipe (11) Inner hollow, and it is connected to the broken case (5) and the compression box (12).
6. civil engineering work waste material processing unit according to claim 5, it is characterised in that: the support column (19) It is integrally formed between the compression box (12), and is located at the compression box (12) middle position.
7. civil engineering work waste material processing unit according to claim 6, it is characterised in that: the efferent duct (20) Shape is inverted " L ", annular groove described in lower end aligned (21).
CN201920331531.7U 2019-03-15 2019-03-15 Civil engineering work waste material processing unit Expired - Fee Related CN209663420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920331531.7U CN209663420U (en) 2019-03-15 2019-03-15 Civil engineering work waste material processing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920331531.7U CN209663420U (en) 2019-03-15 2019-03-15 Civil engineering work waste material processing unit

Publications (1)

Publication Number Publication Date
CN209663420U true CN209663420U (en) 2019-11-22

Family

ID=68571698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920331531.7U Expired - Fee Related CN209663420U (en) 2019-03-15 2019-03-15 Civil engineering work waste material processing unit

Country Status (1)

Country Link
CN (1) CN209663420U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113000132A (en) * 2021-03-23 2021-06-22 刘伯宁 Energy-concerving and environment-protective domestic waste shredding device that uses

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113000132A (en) * 2021-03-23 2021-06-22 刘伯宁 Energy-concerving and environment-protective domestic waste shredding device that uses

Similar Documents

Publication Publication Date Title
CN210146646U (en) House construction is with building rubbish compressor arrangement
CN107670353A (en) Multi-chamber sludge high-drying degree dehydration device
CN206902007U (en) The sludge dewatering equipment that a kind of flat is made an uproar and prevents spiral from damaging
CN110508368A (en) A kind of house refuse crushing compression set
CN211990230U (en) Solid-liquid separation device for household garbage
CN209663420U (en) Civil engineering work waste material processing unit
CN207222020U (en) One kind builds a bridge with building waste fast-crushing device
CN112144600A (en) Mucky soil dewatering device vehicle and using method thereof
CN207738625U (en) A kind of sludge dehydration device
CN101088944A (en) Enhanced sludge dewatering machine
CN204869735U (en) High -efficient rubbish wringing machine
CN111102824A (en) A dewatering device for preparing wood fiber
CN113289400A (en) Energy-saving domestic sewage treatment device for house construction site
CN107138215A (en) A kind of rock reducing mechanism
CN210223588U (en) Waste dehydration device for nuclear power plant
CN209702523U (en) A kind of sewage of the novel environment friendly of sewage treatment field desilts equipment
CN217262801U (en) Waste recovery device for valve processing
CN210070454U (en) Quartz crystal auxiliary type dewatering equipment
CN214746797U (en) Automatic hydraulic garbage dehydrator
CN108704704A (en) A kind of compression set convenient for being collected to industrial refuse
CN101164928A (en) Sludge strong force dewatering machine
CN210037368U (en) Sample pressing device for foundation reinforcing geotechnical experiment
CN212603584U (en) Rubbish solid-liquid separation broken handle device
CN207043008U (en) A kind of magnetic induction start device of food-trash treatment
CN208320908U (en) A kind of separate type building rubbish treatment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191122

Termination date: 20210315

CF01 Termination of patent right due to non-payment of annual fee