CN209656289U CN201920389499.8U CN201920389499U CN209656289U CN 209656289 U CN209656289 U CN 209656289U CN 201920389499 U CN201920389499 U CN 201920389499U CN 209656289 U CN209656289 U CN 209656289U
Authority
CN
China
Prior art keywords
compressor
test
turbine
gas turbine
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920389499.8U
Other languages
Chinese (zh)
Inventor
辛小鹏
杨晶晶
隋永枫
陈佩
孔建强
李冬青
丁骏
戴斌
张伟
吕荣阳
潘亦宁
詹长庚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Steam Turbine Power Group Co Ltd
Original Assignee
Hangzhou Steam Turbine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Steam Turbine Co Ltd filed Critical Hangzhou Steam Turbine Co Ltd
Priority to CN201920389499.8U priority Critical patent/CN209656289U/en
Application granted granted Critical
Publication of CN209656289U publication Critical patent/CN209656289U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Engines (AREA)

Abstract

The utility model discloses a kind of modular multi-function test bench for gas turbine, including at least gear-box, compressor installation station, turbine installation station and combustion chamber, wherein gear-box includes at least a high speed shaft and at least one slow-speed shaft, one end of the high speed shaft is used for joint test compressor for connecting turning motor, the other end;The slow-speed shaft starts power source or driving power source or load for connecting;Compressor installs station and is provided with gas handling system and inlet plenum for installing test compressor, the compressor installation station;Turbine installation station is provided with exhaust casing, exhaust chamber and exhaust system for installing turbine, the turbine installation station;Combustion chamber is equipped with flange-interface, and the flange-interface includes at least burner inner liner and fuel nozzle for connecting bored plate flange or fuel assembly, the fuel assembly.Compressor test, complete machine no load test, the test of complete machine full load and the operation test in follow-up test power station are carried out by the above-mentioned same testing stand.

Description

A kind of multifunctional modular test bench for gas turbine
Technical field
The utility model relates to a kind of testing stands for gas turbin test, for realizing on the same test bench location Carry out Compressor test, complete machine no load test, the test of complete machine full load and the operation test in follow-up test power station.
Background technique
Experimental study is to carry out the important method of turbomachine fluidal texture and performance evaluation, it can comprehensively consider influence stream Dynamic various factors, it is as a result objective reliable.Compressor test can be used for instructing, study and designing compressor, and identification target is calmed the anger The validity of machine;After combustion engine is completed, need to carry out combustion engine complete machine no load test, main purpose is to examine unit fortune Row, vibration and thermodynamic property;For the type newly developed, need to test by complete machine full speed full load to investigate combustion comprehensively The runnability of machine obtains the operating status and heating power data of true reflection complete machine by online experimental study, whole to assess Machine performance;The long-term reliability of unit can be verified by experimental power station.
Test is an essential link in gas turbine design, and the type needs newly developed are carried out The case where test for stating several stages generally requires to build multiple test platforms, and there are some equipment and system repeated construction.
Summary of the invention
The technical problems to be solved in the utility model is the multiple experimental stage needs for solving gas turbine in the prior art Multiple test platforms are built, the defect of some equipment and system repeated construction is caused.
In order to solve the above-mentioned technical problem, a kind of the technical scheme that the utility model is provided is as follows: multifunctional modular combustion Gas-turbine testing stand, includes at least:
Gear-box, the gear-box include at least a high speed shaft and at least one slow-speed shaft, one end of the high speed shaft For connecting turning motor, the other end is used for joint test compressor;The slow-speed shaft starts power source or driving for connecting Power source or load;
Compressor installs station, and the compressor installation station is for installing test compressor, the compressor erector Position is provided with gas handling system and inlet plenum;
Turbine installs station, and the turbine installation station is provided with exhaust for installing turbine, the turbine installation station Cylinder, exhaust chamber and exhaust system;
Combustion chamber, the combustion chamber are equipped with flange-interface, and the flange-interface is used to connect bored plate flange or fuel assembly, The fuel assembly includes at least burner inner liner and fuel nozzle.
A kind of preferred embodiment, Compressor test state, the compressor installation station are equipped with test compressor, institute It states turbine installation station and aerodynamic turbine is installed, the test compressor and air force worm gear are coaxially connected, the combustion The flange-interface and bored plate flanged joint, the slow-speed shaft of the gear-box for burning room are connected with driving power source.
A kind of preferred embodiment, the driving power source are variable-frequency motor or generator, the variable-frequency motor or power generation Machine is respectively connected with static frequency converter.
A kind of preferred embodiment, the test compressor has multistage variable stator blade and multistage bleeding point, described in every grade The anti-asthma valve of adjustable aperture is provided on the corresponding exhaust pipe of bleeding point;It is adjustable that the air force worm gear is equipped with the first order Stator blade.
A kind of preferred embodiment, gas turbine complete machine no load test state, the compressor installation station are equipped with Compressor is tested, the turbine installation station is equipped with aerodynamic turbine, and the test compressor and air force worm gear are same Axis connection, the flange-interface of the combustion chamber are connected with fuel nozzle and burner inner liner, and the slow-speed shaft of the gear-box has been connected with Dynamic power source.
A kind of preferred embodiment, the slow-speed shaft of the gear-box are connected with generator, and the generator is connected with static state Frequency converter, the generator is by the adjustment of static frequency converter as starting power source.
A kind of preferred embodiment, gas turbine complete machine full load trystate, in the gas turbine complete machine airport logistic park On the basis of trystate, when starting gas turbine, the generator is by the adjustment of static frequency converter as starting power Source;After gas turbine operation, fuel engine power generation power is absorbed by load equipment.
A kind of preferred embodiment, gas turbine complete machine full load trystate, in the gas turbine complete machine airport logistic park On the basis of trystate, the output end of the aerodynamic turbine is connected with load compressor.
A kind of preferred embodiment, gas turbine complete machine full load trystate, in the gas turbine complete machine airport logistic park On the basis of trystate, the gear-box is additionally provided with load connecting shaft, is connected with hydraulic dynamometer in the load connecting shaft.
A kind of preferred embodiment, gas turbine complete machine full load trystate, in the gas turbine complete machine airport logistic park On the basis of trystate, the generator is connect with dry type load cabinet.
A kind of preferred embodiment, after the test compressor, combustion chamber and aerodynamic turbine installation, in each test Axial distance and interface ruler under state, between the left side flange of the test compressor and the right flange of aerodynamic turbine It is very little consistent.
The modular multi-function test bench for gas turbine of the present embodiment, by needing to use to each experimental stage of gas turbine The equipment arrived carries out modularization decomposition, and immobilizes setting to shared device, ensures that each experimental stage can be same A testing stand is completed, and is kept the utilization rate of test platform and shared device higher, is avoided unnecessary repeated construction, save Space requirement and equipment cost.
Detailed description of the invention
Fig. 1 is the structural representation of the modular multi-function test bench for gas turbine in embodiment two under Compressor test state Figure;
Fig. 2 is the modular multi-function gas turbin test under five Middle combustion engine turbine complete machine full load trystate of embodiment The structural schematic diagram of platform;
Fig. 3 is the modular multi-function gas turbin test under six Middle combustion engine turbine complete machine full load trystate of embodiment The structural schematic diagram of platform;
Fig. 4 is the modular multi-function gas turbin test under seven Middle combustion engine turbine complete machine full load trystate of embodiment The structural schematic diagram of platform;
Fig. 5 is the modular multi-function gas turbin test under eight Middle combustion engine turbine complete machine full load trystate of embodiment The structural schematic diagram of platform;
Fig. 6 is the modular multi-function gas turbin test under ten Middle combustion engine turbine complete machine full load trystate of embodiment The structural schematic diagram of platform;
Fig. 7 is the modular multi-function gas turbin test under nine Middle combustion engine turbine complete machine full load trystate of embodiment The structural schematic diagram of platform;
Fig. 8 is gas handling system, the connection schematic diagram of inlet plenum and gas turbine in the present embodiment;
Fig. 9 is the knot for testing compressor, combustion chamber and aerodynamic turbine in embodiment two under Compressor test state Structure and connection schematic diagram;
Figure 10 is that compressor, combustion chamber and air are tested under three Middle combustion engine turbine complete machine no load test state of embodiment The structure and connection schematic diagram of power turbine;
Figure 11 is that compressor, combustion chamber and air are tested under example IV Middle combustion engine turbine complete machine no load test state The structure and connection schematic diagram of power turbine.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "inner", "outside" etc. The orientation or positional relationship of instruction is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model It is described with simplifying, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation structure It makes and operates, therefore should not be understood as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, are integrally connected, are also possible to detachably connect It connects;It can be the connection inside two elements;It can be directly connected, it can also indirectly connected through an intermediary, for this For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment one
As shown in figs. 1-7, a kind of modular multi-function test bench for gas turbine of the present embodiment is provided with compressor and installs Station and turbine install station, wherein the shared device being fixedly installed includes gear-box 3, combustion chamber 7, is installed on compressor installation The gas handling system 4 and inlet plenum 5 of station, and it is installed on exhaust casing 9, exhaust chamber 10 and the exhaust system of turbine installation station 11.Wherein, compressor installation station is for installing test compressor 6, and turbine installation station is for installing turbine 8, to be used for At corresponding test.
In the present embodiment, gear-box 3 includes at least one high speed shaft and at least one slow-speed shaft, wherein one end of high speed shaft For connecting turning motor 1, the other end is used for joint test compressor 6.Slow-speed shaft on gear-box 3 starts power for connecting Source or driving power source or load.
In the present embodiment, wherein the structure of gas handling system 11 is as shown in fig. 7, comprises vertical air plenums 18 and horizontal duct 20, Wherein horizontal duct 20 is connect by air inlet elbow 6 with inlet plenum 5.In the gas handling system of the structure, vertical air plenums 18 close into The position in air port is equipped with air inlet louvers 19, and the position of close vertical air plenums is equipped with air intake filter 22 in horizontal duct 20, leans on The position of nearly air inlet elbow 21 is equipped with admission air silencer 24, and air inlet is equipped between air intake filter 22 and admission air silencer 24 and is measured Section 23.
The gas handling system of above structure has following technical advantage: (1) air inlet louvers is adjustable louver structure, is had Charge flow rate can be adjusted in certain angle adjustable range, and air inlet measuring section is provided with flow nozzle, enter pressure for measuring The flow of mechanism of qi, by measuring and adjusting the pressure and flow of air inlet, convenient for calculating and testing Capability of Compressor;(2) by into The aerodynamic noise that compressor is reversely spread out of can be effectively reduced in the setting of gas muffler 24;(3) setting by air intake filter 22 It sets and foreign matter entrance can be effectively prevented, protect compressor;(4) pass through the air inlet of vertical air plenums and horizontal duct and air inlet elbow Route setting, it is possible to reduce the temperature change of air inlet;(5) reduce the leaf inlet pressure field distortion of compressor variable stator vane angle and reduction The inlet air flow angle of attack.
In the present embodiment, the structure of combustion chamber 7 as shown in figs. 9-11, has flange-interface 25, which both may be used Can be used for connection fuel assembly, wherein fuel assembly generally includes burner inner liner 30 and combustion for connecting bored plate flange 28 Expect nozzle 29.The combustion chamber of the structure can carry out flexible assembling, for carrying out by connecting bored plate flange or fuel assembly Different types of test can avoid combustion chamber equipment with the high technical advantage of applied widely, testing stand and utilization rate of equipment and installations Repeated construction.
Embodiment two
As shown in Figure 1, modular multi-function test bench for gas turbine is used for Compressor test in the present embodiment.In the examination It tests under state, compressor installation station is equipped with test compressor 6, and turbine installation station is equipped with aerodynamic turbine 8.Its In, test compressor and aerodynamic turbine it is coaxially connected, test compressor connect with inlet plenum, by gas handling system provide into Gas;Aerodynamic turbine is connect with exhaust casing, and exhaust gas is discharged via exhaust chamber and exhaust system.
In the present embodiment, as shown in figure 9, the flange-interface 25 of combustion chamber is connect with bored plate flange 28, the work of combustion chamber With compressed gas is only introduced aerodynamic turbine by test compressor, do not have combustion function.
In the present embodiment, as shown in figure 9, the multistage variable stator vane angle 26 of test compressor 6 and multistage bleeding point, the pumping The anti-asthma valve 17 of adjustable aperture is provided on the corresponding exhaust pipe of port, each anti-asthma valve 17 is connect with control system respectively, By control system independent control, it opens quantity and aperture, and the size of bleeding point and the diameter of exhaust pipe should be than under design discharges Corresponding size is big, there are being adjusted up surplus, the settable several grades of valve seat openings of anti-asthma valve, for example, 20%, 40%, 60%, 80%, 100%, it is design discharge when valve is opened to 80%.
In the present embodiment, as shown in figure 9, aerodynamic turbine 8 is provided with first order variable stator vane angle 27, which can Stator blade 27 is adjusted to connect with control system, the aperture by adjusting first order variable stator vane angle tests compressor to difference when realizing test The working medium of the demand of back pressure, aerodynamic turbine is air, since aerodynamic turbine has carried out power recovery at this time, output The power of a part of driving test compressor of power contribution, reduces the power of the external power source of driving test compressor.
In the present embodiment, the slow-speed shaft of gear-box is connected with driving power source, for driving the power source of test compressor Wasted work and the at this time difference of aerodynamic turbine power of the power when should be greater than test 110% rated speed of compressor, Ke Yixuan High-power frequency conversion motor 2 is selected as driving power source, SFC (static frequency converter 13) can also be used by generator 2 as motor It uses.Make to test stable operation under any revolving speed of the compressor between 0~110% rated speed by gear-box again.Pass through It drives mutual between power source, test compressor multistage entry guide vane, aerodynamic turbine first stage stator blades and anti-asthma valve Cooperation, the Compressor test platform may be implemented in different rotating speeds, different compressor back pressures, different the case where being evacuated sum of series flow Test compressor is tested.If it is excessive to test compressor power, power recovery is carried out by air turbine and is also not enough to The power of power source needed for reducing can save charge flow rate by the angle of air inlet louvers in adjusting gas handling system Stream further decreases the power of driving compressor.
In the present embodiment, the power of variable-frequency motor 2 is according to testing power input to compressor when 110% rated speed under design condition The power for subtracting aerodynamic turbine carries out type selecting multiplied by safety coefficient.Specific formula is as follows:
P1=(PC-PT)×δ
Wherein:
P1: variable-frequency motor power;
PC: 110% rated speed power input to compressor under design condition;
PT: 110% rated speed turbine power under design condition;
δ: safety coefficient.
Embodiment three
In the present embodiment, modular multi-function test bench for gas turbine carries out complete machine no load test, the complete machine idling Lotus is tested by carrying out adjustment appropriate on the basis of the Compressor test of embodiment two.Specifically, as shown in Figure 10, The bored plate flange connected on the flange-interface of combustion chamber is replaced with by fuel nozzle and burner inner liner
A kind of preferred embodiment, gas turbine complete machine no load test state, the compressor installation station are equipped with Compressor is tested, the turbine installation station is equipped with aerodynamic turbine, and the test compressor and aerodynamic turbine are same Axis connection, the flange-interface of the combustion chamber are connected with the fuel assembly that fuel nozzle 29 and burner inner liner 30 are constituted.Wherein fuel Nozzle 29 and burner inner liner 30 are connected with fuel conduit, fuel system, and improve lubricating oil system, cooling water system, motor control The other equipment such as cabinet and component, so that the combustion chamber has ignition function.It should be noted that this has ignition function The combustion chamber and its component of energy belong to the ordinary skill in the art, do not repeat them here at this to its specific structure.
In the present embodiment, first order variable stator vane angle 27 and the control system of aerodynamic turbine 8 are disconnected, and make the first order Variable stator vane angle 27 no longer has regulatory function.
In the complete machine airport logistic park experiment of the present embodiment, the driving power source in embodiment two makes as power source is started With.According to the starting curve of unit, modifying SFC parameter makes driving power source and startup of unit process in embodiment two match .In the present embodiment, the effect for starting power source is starter group, after startup of unit, by test compressor, combustion chamber with And the gas turbine that constitutes of aerodynamic turbine will under airport logistic park state continuous service, it is corresponding to obtain under airport logistic park state Parameter.
When the low speed axis connection generator of gear-box, according to gas turbine starting characteristic curve, the defeated of the SFC is adjusted Parameter out is defeated by the revolving speed of the power frequency change generator of generator by changing, passes through control exciting current, stator terminal electricity The control generator output torque such as pressure, can become motor starting unit for the generator in this way.It should be noted that this kind Adjustment also belongs to the ordinary skill in the art with change.
In the present embodiment, it wherein test compressor can be the test compressor in embodiment two, can also be changed to New test compressor.In replacement process, it is only necessary to the left side flange of guarantee test compressor and the right side of aerodynamic turbine Axial distance between side flange is consistent with connection size.
Example IV
In the present embodiment, modular multi-function test bench for gas turbine still carries out complete machine no load test, with reality The difference for applying example three is, as shown in figure 11, aerodynamic turbine 8 is changed to new aerodynamic turbine, the new air The first stage stator blades 31 of power turbine are non-adjustable stator blade.During replacing aerodynamic turbine, it is only necessary to guarantee test Axial distance and connection size between the left side flange of compressor and the right flange of aerodynamic turbine is consistent.
Embodiment five
In the present embodiment, progress complete machine is complete after modular multi-function test bench for gas turbine carries out complete machine no load test Load test.
As shown in Fig. 2, the present embodiment is on the basis of embodiment three and example IV, the output end of aerodynamic turbine 8 It is connected to load compressor 12, the power of gas turbine is absorbed using load compressor 12.
As shown in Fig. 2, connecting generator 2 on the slow-speed shaft of gear-box in the present embodiment, which is connected with SFC. In the present embodiment, generator 2 uses under the adjustment of SFC as starting power source.After startup of unit, calmed the anger by test The gas turbine that machine, combustion chamber and aerodynamic turbine are constituted will persistently be transported under the load condition with load compressor Row, to obtain corresponding parameter in the loaded state.
Embodiment six
In the present embodiment, progress complete machine is complete after modular multi-function test bench for gas turbine carries out complete machine no load test Load test.
As shown in figure 3, the present embodiment and the difference of embodiment five are, starting power source is to connect with the slow-speed shaft of gear-box The variable-frequency motor connect, the variable-frequency motor are connected with SFC.
Embodiment seven
In the present embodiment, progress complete machine is complete after modular multi-function test bench for gas turbine carries out complete machine no load test Load test.
As shown in figure 4, the present embodiment and the difference of embodiment five are, the output end of aerodynamic turbine 8 and load are pressed Mechanism of qi disconnects, and gear-box 3 is changed to new gear-box, and new gear-box not only includes for connecting turning motor High speed shaft and for connect start power source slow-speed shaft, further include for connect load load connecting shaft.Wherein, described It is connected with hydraulic dynamometer 14 in load connecting shaft, which is used to absorb the power of gas turbine.
In the present embodiment, generator 2 is connected on the slow-speed shaft of gear-box, which is connected with SFC.In this embodiment party In formula, generator 2 is used under the adjustment of SFC as starting power source.After startup of unit, by test compressor, combustion chamber with And aerodynamic turbine constitute gas turbine by the continuous service under the load condition with hydraulic dynamometer 14, to obtain Corresponding parameter under load condition.
Embodiment eight
In the present embodiment, progress complete machine is complete after modular multi-function test bench for gas turbine carries out complete machine no load test Load test.
As shown in figure 5, the present embodiment and the difference of embodiment seven are, starting power source is to connect with the slow-speed shaft of gear-box The variable-frequency motor connect, the variable-frequency motor are connected with SFC.
Embodiment nine
In the present embodiment, progress complete machine is complete after modular multi-function test bench for gas turbine carries out complete machine no load test Load test.
As shown in fig. 7, the present embodiment and the difference of embodiment five are, the output end of aerodynamic turbine 8 and load are pressed Mechanism of qi disconnects, and generator 2 is connect with dry type load cabinet 32, which is used to absorb the power of gas turbine.
Embodiment ten
In the present embodiment, progress complete machine is complete after modular multi-function test bench for gas turbine carries out complete machine no load test Load test.
As shown in fig. 6, the present embodiment, on the basis of embodiment five, output end and the load of aerodynamic turbine 8 are calmed the anger Machine 12 disconnects, and generator 2 is connect with power grid.
In the complete machine full load test of the present embodiment, under starting state, generator 2 is used as under the corrective action of SFC Dynamic power source uses.After startup of unit, gas turbine operate normally, generator 2 restores the function of generator itself, will issue Electricity be delivered directly to power grid, carry out on-line operation test.
It should be noted that on-line operation test is generally directed to lower-powered gas turbine unit.
To sum up, the modular multi-function test bench for gas turbine of the application can complete combustion gas in the same testing stand The test of each experimental stage of turbine, keeps the utilization rate of test platform and shared device higher, avoids unnecessary repetition Construction, saves space requirement and equipment cost.
Modular multi-function test bench for gas turbine in the application after the completion of the test of complete machine full load, improves auxiliary system System and electric utility, such as increase combustion engine housing, housing ventilation and gas detection system, fire-fighting system, generator protection cabinet, The equipment such as neutral point cabinet, outgoing line cabinet, synchronization device can be used as experimental power station longtime running, to verify the reliability of unit.
In short, the above is only the preferred embodiment of the utility model only, it is not intended to limit the utility model, it is all Any modifications, equivalent replacements, and improvements made within spirit of the present utility model and principle etc. should be included in practical Within novel protection scope.

Claims (10)

1. a kind of multifunctional modular test bench for gas turbine, which is characterized in that include at least:
Gear-box, the gear-box include at least a high speed shaft and at least one slow-speed shaft, and one end of the high speed shaft is used for Turning motor is connected, the other end is used for joint test compressor;The slow-speed shaft starts power source or driving power for connecting Source or load;
Compressor installs station, and the compressor installation station is set for installing test compressor, the compressor installation station It is equipped with gas handling system and inlet plenum;
Turbine installs station, and the turbine installation station is provided with exhaust casing, row for installing turbine, the turbine installation station Gas chamber and exhaust system;
Combustion chamber, the combustion chamber are equipped with flange-interface, and the flange-interface is described for connecting bored plate flange or fuel assembly Fuel assembly includes at least burner inner liner and fuel nozzle.
2. multifunctional modular test bench for gas turbine described in accordance with the claim 1, which is characterized in that Compressor test shape State, the compressor installation station are equipped with test compressor, and the turbine installation station is equipped with aerodynamic turbine, described It tests compressor and aerodynamic turbine is coaxially connected, the flange-interface of the combustion chamber and bored plate flanged joint, the gear The slow-speed shaft of case is connected with driving power source.
3. multifunctional modular test bench for gas turbine according to claim 2, which is characterized in that the driving power source For variable-frequency motor or generator, the variable-frequency motor or generator are respectively connected with static frequency converter.
4. multifunctional modular test bench for gas turbine according to claim 2, which is characterized in that the test compressor With multistage variable stator blade and multistage bleeding point, adjustable aperture is provided on the corresponding exhaust pipe of every grade of bleeding point Anti-asthma valve;The aerodynamic turbine is equipped with first order variable stator vane angle.
5. multifunctional modular test bench for gas turbine described in accordance with the claim 1, which is characterized in that gas turbine complete machine is empty Load test state, the compressor installation station are equipped with test compressor, and it is dynamic that the turbine installation station is equipped with air Power turbine, the test compressor and air force worm gear are coaxially connected, and the flange-interface of the combustion chamber is connected with fuel spray Mouth and burner inner liner, the slow-speed shaft of the gear-box are connected with starting power source.
6. multifunctional modular test bench for gas turbine according to claim 5, which is characterized in that the gear-box it is low Fast axis connection has generator, and the generator is connected with static frequency converter, and the generator is made by the adjustment of static frequency converter To start power source.
7. multifunctional modular test bench for gas turbine according to claim 6, which is characterized in that gas turbine complete machine is complete Load test state, on the basis of the gas turbine complete machine no load test state, when starting gas turbine, the hair Motor is by the adjustment of static frequency converter as starting power source;After gas turbine operation, pass through gear-box low speed axis connection Load equipment or generator connection dry type load cabinet or generator be directly connected with power grid absorption gas turbine power generation function Rate.
8. multifunctional modular test bench for gas turbine according to claim 5, which is characterized in that gas turbine complete machine is complete Load test state, on the basis of the gas turbine complete machine no load test state, the output of the aerodynamic turbine End is connected with load compressor.
9. multifunctional modular test bench for gas turbine according to claim 5, which is characterized in that gas turbine complete machine is complete Load test state, on the basis of the gas turbine complete machine no load test state, the gear-box is additionally provided with load and connects Spindle is connected with hydraulic dynamometer in the load connecting shaft.
10. according to the described in any item multifunctional modular test bench for gas turbine of claim 2-9, which is characterized in that described After testing compressor, combustion chamber and aerodynamic turbine installation, under each trystate, the left side method of the test compressor Axial distance and connection size between the blue and right flange of aerodynamic turbine is consistent.
CN201920389499.8U 2019-03-26 2019-03-26 A kind of multifunctional modular test bench for gas turbine Active CN209656289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920389499.8U CN209656289U (en) 2019-03-26 2019-03-26 A kind of multifunctional modular test bench for gas turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920389499.8U CN209656289U (en) 2019-03-26 2019-03-26 A kind of multifunctional modular test bench for gas turbine

Publications (1)

Publication Number Publication Date
CN209656289U true CN209656289U (en) 2019-11-19

Family

ID=68528138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920389499.8U Active CN209656289U (en) 2019-03-26 2019-03-26 A kind of multifunctional modular test bench for gas turbine

Country Status (1)

Country Link
CN (1) CN209656289U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109827779A (en) * 2019-03-26 2019-05-31 杭州汽轮动力集团有限公司 A kind of multifunctional modular test bench for gas turbine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109827779A (en) * 2019-03-26 2019-05-31 杭州汽轮动力集团有限公司 A kind of multifunctional modular test bench for gas turbine

Similar Documents

Publication Publication Date Title
CN109827779A (en) A kind of multifunctional modular test bench for gas turbine
EP3318743B1 (en) Intercooled cooled cooling integrated air cycle machine
US20190249599A1 (en) Closed Cycle Heat Engine for a Gas Turbine Engine
US9239007B2 (en) Gas turbine compressor inlet pressurization having a torque converter system
US7681402B2 (en) Aeroengine oil tank fire protection system
CN113310701B (en) Complete machine tester for mechanical system of military turbofan engine
EP3228836A1 (en) Conditioned low pressure compressor compartment for gas turbine engine
EP2808493B1 (en) Two-shaft gas turbine
JP2017008937A (en) Gas turbine engine
CN209656289U (en) A kind of multifunctional modular test bench for gas turbine
Aschenbruck et al. MAN’s new gas turbines for mechanical drive and power generation applications
CN116181518B (en) Interstage duct aeroengine
EP2623751B1 (en) Method and apparatus to control part-load performance of a turbine
RU2707105C2 (en) Turbojet double-flow engine
Wiedermann et al. Component testing and prototype commissioning of man’s new gas turbine in the 6 mw-class
RU144434U1 (en) GAS TURBINE ENGINE
RU2319024C1 (en) Gas turbine locomotive
RU2312239C1 (en) Power plant of gas-turbine locomotive
RU144431U1 (en) TURBOJET
RU142920U1 (en) TURBOJET
Campbell et al. Some Advantages and Limitations of Centrifugal and Axial Aircraft Compressors
Rocha et al. Field and application experience of the Titan 130 industrial gas turbine
CN115822811A (en) Turbofan engine and airflow guiding method therefor
Hosking et al. The PWlOO engine: 20 years of gas turbine technology evolution
Gusso et al. The PGT 10 Heavy Duty 10 MW Gas Turbine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 357 Shiqiao Road, Xiacheng District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Steam Turbine Holding Co.,Ltd.

Address before: 357 Shiqiao Road, Xiacheng District, Hangzhou City, Zhejiang Province

Patentee before: HANGZHOU TURBINE POWER GROUP CO.,LTD.

CP01 Change in the name or title of a patent holder