CN209654584U - Can on-site maintenance wind turbine gearbox - Google Patents
Can on-site maintenance wind turbine gearbox Download PDFInfo
- Publication number
- CN209654584U CN209654584U CN201920172565.6U CN201920172565U CN209654584U CN 209654584 U CN209654584 U CN 209654584U CN 201920172565 U CN201920172565 U CN 201920172565U CN 209654584 U CN209654584 U CN 209654584U
- Authority
- CN
- China
- Prior art keywords
- casing
- pipe axis
- wind turbine
- cabinet
- rear box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 13
- 238000007789 sealing Methods 0.000 claims description 3
- 239000003921 oil Substances 0.000 description 6
- GQWNECFJGBQMBO-UHFFFAOYSA-N Molindone hydrochloride Chemical compound Cl.O=C1C=2C(CC)=C(C)NC=2CCC1CN1CCOCC1 GQWNECFJGBQMBO-UHFFFAOYSA-N 0.000 description 1
- 210000003464 cuspid Anatomy 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 239000010687 lubricating oil Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Wind Motors (AREA)
Abstract
The utility model discloses it is a kind of can on-site maintenance wind turbine gearbox, cabinet and primary planet carrier, the level-one ring gear engagement opposite case that primary planet carrier connect by planetary gear with cabinet rotate;It is provided on primary planet carrier for storing cable or wire and through the pipe axis of cabinet, cabinet includes rear box, pipe axis positioned at rear box is nested with casing, casing is bolted to connection with pipe axis, Casing bearing is provided on casing, Casing bearing outer ring and rear box are interference fitted, and casing can be separated with pipe axis, to realize that the wind turbine gearbox replaces other parts in the case where not extracting pipe axis out, reduces disassembly difficulty and improve dismounting speed;With good leakproofness.
Description
Technical field
The utility model relates to wind turbine gearbox, be related to it is a kind of can on-site maintenance wind turbine gearbox.
Background technique
Wind energy is one of the most abundant renewable energy in the world.Blower rotates under the promotion of wind energy, continuously
Export electric energy.This reproducible using energy source mode has all obtained rapidly developing in the whole world in the past few years.Drive generator
The wind turbine gearbox of operating can be described as the heart of gear drive type blower, due to the normal operation to whole system to Guan Chong
It wants.
The many cable or wires of setting in wind turbine gearbox, therefore special setting pipe axis is used for the arrangement of cable or wire,
In this way cable or wire can not have to and gear-box in power mechanism and lubricating structure contact.Pipe axis and planet carrier are fixed on
Together, and pipe axis runs through entire cabinet, the bearing that setting is interference fitted for inner ring and pipe axis at the rear box of gear-box, pipe
Axis is rotated as planet carrier rotates.High revolving speed output mechanism is provided at the rear box of wind turbine gearbox, high revolving speed exports machine
The work of structure driven generator, finds in actual use, and the part of the high revolving speed output mechanism in wind turbine gearbox compares mechanism
Part be more easier to damage;But cabinet can only be dismantled axially, it can not be radially unfolded;Simultaneously pipe axis through entire cabinet and with
The bearing and rear box of pipe axis are interference fitted, and needing to extract out on pipe axis could continue to dismantle cabinet, cause to dismantle cabinet expense in this way
When it is laborious.
Utility model content
Purpose of utility model: the purpose of the utility model is to provide it is a kind of can on-site maintenance wind turbine gearbox, design knot
Structure is reasonable, reduces disassembly difficulty and improves the speed of disassembly.
Technical solution: it is described in the utility model can on-site maintenance wind turbine gearbox, cabinet and primary planet carrier, level-one
Planet carrier cooperates opposite case rotation by the level-one ring gear connecting with cabinet interference;It is provided on primary planet carrier for receiving
Receive and cable or wire and run through the pipe axis of cabinet, cabinet includes rear box, be nested with casing positioned at the pipe axis of rear box, casing with
Pipe axis is fixedly connected by pin shaft, and Casing bearing is provided on casing, and Casing bearing outer ring and rear box are interference fitted.
The axial retaining ring for the axial movement of limiting boot bearing is provided on casing.
Axial retaining ring uses in pairs, and is located at the axial ends of Casing bearing.
It is provided on rear box for the end cap one of sealing sleeve pipe and rear box and the end cap two being arranged on end cap one, end
Lid one and end cap two are all nested on casing, and are all fixed with rear box.
The outside framework oil seal for preventing oil seepage is provided in end cap two.
By using above-mentioned technical proposal, the high revolving speed mechanism in wind turbine gearbox include high speed grade gear wheel, jackshaft,
Jackshaft conical bearing, intergrade cylindrical bearing, high speed shaft cylindrical bearing, high speed shaft conical bearing and high speed level little gear shafting
Deng being removed between end cap one and end cap two first when finding high one or more part failure of revolving speed mechanism
Bolt successively dismantles end cap two, outside framework oil seal, shaft block ring and high speed level little gear shafting, then dismantles on casing and casing
Casing bearing and rear box.In this way it is not necessary that along axially withdrawn, the replacement of part in cabinet is can be completed in pipe axis.
The utility model has the advantages that the wind turbine gearbox replaces other parts in the case where not extracting pipe axis out, disassembly difficulty is reduced
Improve dismounting speed;With good leakproofness.
Detailed description of the invention
Fig. 1 is the wind turbine gearbox diagrammatic cross-section of the utility model;
Fig. 2 is enlarged drawing at A in Fig. 1.
Specific embodiment
As illustrated in fig. 1 and 2, it is a kind of can on-site maintenance wind turbine gearbox, cabinet 1 and primary planet carrier 2, primary planet carrier
2 engage the rotation of opposite case 1 with the level-one ring gear 3 that cabinet 1 is cooperatively connected by planetary gear;It is provided on primary planet carrier 2
For storing cable or wire and being provided on the pipe axis 4 of cabinet 1, pipe axis 4 for pipe axis 4 to be fixed on primary planet carrier
24 flange of pipe axis, 4 flange of pipe axis and pipe axis 4 are interference fitted.Cabinet 1 includes preceding cabinet 1 and rear box 5, positioned at rear box 5
Pipe axis 4 is nested with casing 6, and casing 6 is fixedly connected with pipe axis 4 by pin shaft, and Casing bearing 7, Casing bearing are provided on casing 6
7 outer rings and rear box 5 are interference fitted.The axial retaining ring 8 for limiting the axial movement of 4 bearing of pipe axis is provided on casing 6, it is axial
Retaining ring 8 uses in pairs, and is located at the axial ends of Casing bearing 7.
Easy to disassemble in order to facilitate the later period, rear box 5 is when handling the opening at casing 6, using being provided on rear box 5
For the end cap 1 of sealing sleeve pipe 6 and rear box 5 and the end cap 2 10 being arranged on end cap 1, end cap 1 and end cap 2 10
It is all nested on casing 6, and all fixed with rear box 5.Gap of the lubricating oil between end cap 2 10 and casing 6 is seeped in order to prevent
Leakage, is provided with the outside framework oil seal 11 for preventing oil seepage in end cap 2 10.
Jackshaft in preceding cabinet 1 extends rear box 5, is provided with high revolving speed mechanism in rear box 5, high revolving speed mechanism is used for
Driven generator rotation.High revolving speed mechanism includes jackshaft and further includes high speed grade gear wheel, jackshaft, jackshaft cone axis
It holds, intergrade cylindrical bearing, high speed shaft cylindrical bearing, high speed shaft conical bearing and high speed level little gear shafting etc..Jackshaft is logical
It crosses jackshaft cylindrical bearing and jackshaft conical bearing is supported in rear box 5;Interference fit has high speed grade canine tooth on jackshaft
Wheel, high speed grade gear wheel are engaged with high speed level little gear axis, and high speed level little gear axis passes through high speed shaft cylindrical bearing and high speed shaft
Conical bearing is supported in rear box 5;
When finding high one or more part failure of revolving speed mechanism, end cap 1 and end cap two are removed first
Bolt between 10 successively dismantles end cap two, outside framework oil seal 11, axial retaining ring 8 and high speed level little gear shafting, then disassembly set
Casing bearing 7 on pipe 6 and casing 6, thus not by pipe axis 4 along it is axially withdrawn in the case where, rear box 5 is dismantled, when tearing open
After unloading rear box 5, so that it may dismantle high revolving speed part within the organization, and replace the part of failure.
Claims (6)
1. one kind can on-site maintenance wind turbine gearbox, including cabinet (1) and primary planet carrier (2), primary planet carrier (2) pass through
Level-one ring gear (3) engagement opposite case (1) rotation that planetary gear is connect with cabinet (1);It is characterized in that primary planet carrier (2)
On be provided with for store cable or wire and run through cabinet (1) pipe axis (4), cabinet (1) includes rear box (5), after being located at
The pipe axis (4) of cabinet (5) is nested with casing (6), and casing (6) is fixedly connected with pipe axis (4) by pin shaft, and casing is arranged on (6)
Have Casing bearing (7), Casing bearing (7) outer ring and rear box (5) are interference fitted.
2. it is according to claim 1 can on-site maintenance wind turbine gearbox, it is characterised in that be provided with and be used on casing (6)
The axial retaining ring (8) of limiting boot bearing (7) axial movement.
3. it is according to claim 2 can on-site maintenance wind turbine gearbox, it is characterised in that axial retaining ring (8) makes in pairs
With, and it is located at the axial ends of Casing bearing (7).
4. it is according to claim 1 can on-site maintenance wind turbine gearbox, it is characterised in that be arranged on rear box (5) useful
In end cap two (10) of the end cap one (9) and setting of sealing sleeve pipe (6) and rear box (5) on end cap one (9), end cap one (9)
It is all nested on casing (6) with end cap two (10), and all fixed with rear box (5).
5. it is according to claim 4 can on-site maintenance wind turbine gearbox, it is characterised in that is provided in end cap two (10)
For preventing the outside framework oil seal (11) of oil seepage.
6. it is according to claim 1 can on-site maintenance wind turbine gearbox, it is characterised in that be provided with and be used on pipe axis (4)
Pipe axis (4) is fixed on to pipe axis (4) flange of primary planet carrier (2), pipe axis (4) flange and pipe axis (4) interference fit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920172565.6U CN209654584U (en) | 2019-01-31 | 2019-01-31 | Can on-site maintenance wind turbine gearbox |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920172565.6U CN209654584U (en) | 2019-01-31 | 2019-01-31 | Can on-site maintenance wind turbine gearbox |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209654584U true CN209654584U (en) | 2019-11-19 |
Family
ID=68523536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920172565.6U Active CN209654584U (en) | 2019-01-31 | 2019-01-31 | Can on-site maintenance wind turbine gearbox |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209654584U (en) |
-
2019
- 2019-01-31 CN CN201920172565.6U patent/CN209654584U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2012202813B2 (en) | Wind turbine nacelle | |
KR20120106611A (en) | Gear box, seal, and cover arrangements | |
CN103562546B (en) | For the rotor support means of motor | |
CN104500703B (en) | The outfan of wind driven generator yaw and variable propeller gearbox | |
CN109611533A (en) | Input structure suitable for wind power yawing gear-box | |
US11085421B2 (en) | Planet carrier of a wind turbine gearbox with improved lubricant path | |
CN209654584U (en) | Can on-site maintenance wind turbine gearbox | |
CN206246119U (en) | Continuous wave slurry pulse generator pressure equalization module | |
CN112601887B (en) | Tool chain and method for concentrically securing and replacing internal components of a gearbox and generator | |
CN201599143U (en) | Novel megawatt level wind power generation transmission system | |
CN205605796U (en) | Wind -powered electricity generation gear box with sectional type threading pipe | |
CN208442245U (en) | A kind of differential pinion gear with self-lubricating function | |
CN207195103U (en) | A kind of wind turbine transmission chain automatic maintenance system | |
CN108488366A (en) | A kind of wind turbine gearbox guiding axle sealing structure | |
CN205978086U (en) | Split type holder | |
CN109139718A (en) | A kind of low wind speed large size double-fed Ban Zhiqu base bearing mechanism | |
CN209671577U (en) | Input structure suitable for wind power yawing gear-box | |
CN209025796U (en) | A kind of barring gear and its wind power generating set of Wind turbines integrated form | |
CN203258034U (en) | Wind power gear box output stage structure facilitating maintenance on tower | |
CN208295052U (en) | A kind of double dynamical zero passage speed changer | |
CN109826757A (en) | A kind of wind power generation plant and its working method of sprocket wheel transmission | |
CN206785987U (en) | A kind of wind turbine gearbox carrier main-body sealing mechanism | |
CN101644238B (en) | Combined wind power speed increaser | |
CN205226294U (en) | Wind -power gearbox | |
CN201896703U (en) | Output structure for speed reducer of wind driven generator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: No.99 Furong Zhongsan Road, Xishan Economic and Technological Development Zone, Wuxi City, Jiangsu Province, 214000 Patentee after: Delijia Transmission Technology (Jiangsu) Co.,Ltd. Country or region after: China Address before: No.99 Furong Zhongsan Road, Xishan Economic and Technological Development Zone, Wuxi City, Jiangsu Province, 214000 Patentee before: DELIJIA TRANSMISSION TECHNOLOGY (JIANGSU) Co.,Ltd. Country or region before: China |
|
CP03 | Change of name, title or address |