CN209653469U - A kind of interim dry type lavatory in Super High Core Walls Structure construction site - Google Patents

A kind of interim dry type lavatory in Super High Core Walls Structure construction site Download PDF

Info

Publication number
CN209653469U
CN209653469U CN201821854861.6U CN201821854861U CN209653469U CN 209653469 U CN209653469 U CN 209653469U CN 201821854861 U CN201821854861 U CN 201821854861U CN 209653469 U CN209653469 U CN 209653469U
Authority
CN
China
Prior art keywords
excrement
construction site
dry type
super high
structure construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821854861.6U
Other languages
Chinese (zh)
Inventor
韩亚新
单宏伟
赵春锋
敖显平
邓金婷
任烨军
孔松
冯禹农
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201821854861.6U priority Critical patent/CN209653469U/en
Application granted granted Critical
Publication of CN209653469U publication Critical patent/CN209653469U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
    • Y02A50/30Against vector-borne diseases, e.g. mosquito-borne, fly-borne, tick-borne or waterborne diseases whose impact is exacerbated by climate change

Landscapes

  • Residential Or Office Buildings (AREA)
  • Non-Flushing Toilets (AREA)

Abstract

The utility model improves a kind of interim dry type lavatory in Super High Core Walls Structure construction site, includes pedestal and excrement case;Base upper surface is provided with squatting position, and after-opening is provided with flip lid;Excrement case upper surface is provided with excrement hole, and side is provided with hanging ring;Flip lid is opened, excrement case enters from after-opening or exit the inner cavity of pedestal;When excrement case enters the inner cavity of pedestal, squatting position is located at right above excrement hole.It in the utility model, after excrement case collects excrement, recycles the vertical transport equipments such as elevator or the derrick crane at construction of super highrise building scene that will be transported to ground under it, then cleared up by blowdown vehicle it, then places in situ continue to use;The process for removing water supply and the dismounting of blow-off line from, lengthening, plugging into, it is easy to install and use.

Description

A kind of interim dry type lavatory in Super High Core Walls Structure construction site
Technical field
The utility model relates to Construction Technology of Super Tall Buildingin field more particularly to a kind of Super High Core Walls Structure construction sites Interim dry type lavatory.
Background technique
Although the temporary toilet that current construction site uses has been accomplished removable and has been had enough to meet the need, but its affiliated facility is excessively It is many and diverse, for example need to connect flushing system, it needs that interim septic tank is arranged at the scene, there are following deficiencies: lavatory and septic tank Cleaning is inconvenient, water system is more easily damaged, septic tank occupied ground and consumable material, toilet hygiene difficult management, entire lavatory Institute's system causes certain destruction to the environmental sanitation of construction site.
In the Super High main body construction stage, it is applied to this system of intelligent jacking steel platform, the period is presented in top layer work surface Property constantly jack upwards, and there is currently this factory process temporary toilet, because its needs is plugged into water supply and vertical, horizontal Blow-off line, as top layer work surface constantly jacks, corresponding water supply and blow-off line also exist simultaneously dismounting, lengthen, connect The process refuted, it is extremely inconvenient.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of Super High core according to above-mentioned the deficiencies in the prior art The interim dry type lavatory in tube construction scene, the process that can remove water supply and the dismounting of blow-off line from, lengthen, plug into, facilitates peace Dress and use.
The technical solution of the utility model is as follows:
A kind of interim dry type lavatory in Super High Core Walls Structure construction site, includes pedestal and excrement case;The base upper surface It is provided with squatting position, after-opening is provided with flip lid;Excrement case upper surface is provided with excrement hole, and side is provided with hanging ring;It opens described Flip lid, the excrement case enter from the after-opening or exit the inner cavity of the pedestal;The excrement case enters the inner cavity of the pedestal When, the squatting position is located at right above the excrement hole.
Further, the pedestal is led to by iron sheet, steel plate and side and is built;The side is logical to be welded into a frame, institute It states steel plate and is installed on the frame upper surface, the iron sheet is installed on the frame facet.
Further, the excrement case leading flank, trailing flank, left side and right side are provided with hanging ring, and lower surface is set It is equipped with universal wheel.
Further, the excrement case is welded by steel plate.
It further, further include the room that goes to the toilet, the room of going to the toilet is installed on the base upper surface, the room of the going to the toilet setting There is front door, the side of the room that goes to the toilet is equipped with exhaust blower.
Further, the room that goes to the toilet is led to by iron sheet, steel plate and side builds;The side is logical to be welded into a frame, The steel plate is installed on the frame upper surface, and the iron sheet is installed on the frame facet.
It further, further include having step frame, the step frame is installed on the pedestal leading flank.
Further, the step frame is welded by angle bar.
Compared with prior art, the utility model has the following beneficial effects: being recycled super after (1) excrement case collection excrement The vertical transport equipments such as the elevator or derrick crane at high-building construction scene will be transported to ground under it, then by blowdown vehicle It is cleared up, then places in situ continue to use;The process for removing water supply and the dismounting of blow-off line from, lengthening, plugging into, it is convenient Installation and use;(2) hanging ring not only can be convenient vertical transport equipment and transport to excrement case, can also regard handle, with ten thousand Cooperate to wheel, worker is facilitated to push and pull excrement case;(3) steel plate, iron sheet, angle steel and side are logical, these are that construction site is normal The material seen can gather materials on the spot from construction site and be built, and welding is also the common technical ability of construction worker, and materials are easy, Production is simple, and cost is relatively low.
Detailed description of the invention
Fig. 1 is the perspective view of embodiment.
Fig. 2 is the exploded view (having hidden front door) of embodiment.
Appended drawing reference
10- pedestal, the squatting position 11-, 12- flip lid, 20- excrement case, 21- excrement hole, 22- hanging ring, 23- universal wheel, 30- go to the toilet room, 31- exhaust blower, 40- step frame.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type is described in further detail.
As depicted in figs. 1 and 2, embodiment provided by the utility model, a kind of Super High Core Walls Structure construction site are temporarily done Formula lavatory includes pedestal 10 and excrement case 20.
10 upper surface of pedestal is provided with squatting position 11, and after-opening is provided with flip lid 12;20 upper surface of excrement case is provided with excrement hole 21, Side is provided with hanging ring 22;Flip lid 12 is opened, excrement case 20 enters from after-opening or exit the inner cavity of pedestal 10;Excrement case 20 enters bottom When the inner cavity of seat 10, squatting position 11 is located at right above excrement hole 21.Wherein, 21 diameter of excrement hole is greater than 11 diameter of squatting position, keeps excrement whole Excrement hole 21 is fallen into squatting position 11.
Pedestal 10 is led to by iron sheet, steel plate and side to build;Side is logical to be welded into a frame, and steel plate is installed on table on frame Face, iron sheet are installed on frame facet.Wherein, the upper surface of frame is arranged in steel plate, may be implemented to prevent pounding function.
20 leading flank of excrement case, trailing flank, left side and right side are provided with hanging ring 22, and lower surface is provided with universal wheel 23.Excrement case 20 is welded by steel plate.
The present embodiment further includes the room 30 that goes to the toilet, and the room 30 that goes to the toilet is installed on 10 upper surface of pedestal, before the room 30 that goes to the toilet is provided with Door, the side for the room 30 that goes to the toilet is equipped with exhaust blower 31.Wherein, exhaust blower 31 is able to achieve ventilation effect.
Going to the toilet, room 30 is by iron sheet, steel plate and side is logical builds;Side is logical to be welded into a frame, and steel plate is installed on frame Surface, iron sheet are installed on frame facet.Wherein, steel plate is checkered steel plate, and antiskid function not only may be implemented, and also improves carrying Power.
The present embodiment further includes having step frame 40, and step frame 40 is installed on 10 leading flank of pedestal.Further, step frame 40 It is welded by angle bar.Wherein, angle bar intensity with higher improves the bearing capacity of step frame 40.
Above disclosures are merely preferred embodiments of the utility model, the utility model cannot be limited with this certainly Interest field, therefore equivalent variations made according to the claim of the utility model still fall within the scope of the utility model.

Claims (8)

1. a kind of interim dry type lavatory in Super High Core Walls Structure construction site, includes pedestal and excrement case;It is characterized by: the bottom Seat upper surface is provided with squatting position, and after-opening is provided with flip lid;Excrement case upper surface is provided with excrement hole, and side is provided with hanging ring; The flip lid is opened, the excrement case enters from the after-opening or exit the inner cavity of the pedestal;The excrement case enters the bottom When the inner cavity of seat, the squatting position is located at right above the excrement hole.
2. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: the bottom Seat is led to by iron sheet, steel plate and side to build;The side is logical to be welded into a frame, and the steel plate is installed on table on the frame Face, the iron sheet are installed on the frame facet.
3. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: the excrement Case leading flank, trailing flank, left side and right side are provided with hanging ring, and lower surface is provided with universal wheel.
4. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: the excrement Case is welded by steel plate.
5. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: further include Go to the toilet room, and the room of going to the toilet is installed on the base upper surface, and the room of going to the toilet is provided with front door, the side of the room that goes to the toilet Exhaust blower is installed.
6. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 5, it is characterised in that: it is described such as Lavatory room is led to by iron sheet, steel plate and side to build;The side is logical to be welded into a frame, and the steel plate is installed on the frame Surface, the iron sheet are installed on the frame facet.
7. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: further include There is step frame, the step frame is installed on the pedestal leading flank.
8. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 7, it is characterised in that: described Rank frame is welded by angle bar.
CN201821854861.6U 2018-11-12 2018-11-12 A kind of interim dry type lavatory in Super High Core Walls Structure construction site Expired - Fee Related CN209653469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821854861.6U CN209653469U (en) 2018-11-12 2018-11-12 A kind of interim dry type lavatory in Super High Core Walls Structure construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821854861.6U CN209653469U (en) 2018-11-12 2018-11-12 A kind of interim dry type lavatory in Super High Core Walls Structure construction site

Publications (1)

Publication Number Publication Date
CN209653469U true CN209653469U (en) 2019-11-19

Family

ID=68506410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821854861.6U Expired - Fee Related CN209653469U (en) 2018-11-12 2018-11-12 A kind of interim dry type lavatory in Super High Core Walls Structure construction site

Country Status (1)

Country Link
CN (1) CN209653469U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851674A (en) * 2020-07-24 2020-10-30 武汉一冶建筑安装工程有限责任公司 Temporary toilet for construction site

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851674A (en) * 2020-07-24 2020-10-30 武汉一冶建筑安装工程有限责任公司 Temporary toilet for construction site

Similar Documents

Publication Publication Date Title
CN201695681U (en) Integral self-elevating type elevator hoistway tube mold
CN209653469U (en) A kind of interim dry type lavatory in Super High Core Walls Structure construction site
CN104399696B (en) Coal Mechanical equipment overhaul stand rinse-system
CN108773363B (en) Intelligent car washing system for construction site
CN205421928U (en) From upset strutting arrangement
CN206418751U (en) One kind can freely lift flexible assembled hoistway operation platform
CN202596150U (en) Scaffold pedal
CN216949411U (en) Be used for inserted lift scaffold to hang and establish protection pocket net device
CN203846587U (en) Mobile toilet for high-rise buildings
CN215670889U (en) Building engineering safety construction platform
CN106193609B (en) High-rise concrete pump pipe tailing recycling and reusing system and method for recycling high-rise concrete pump pipe tailing
CN114852729A (en) Construction waste treatment device based on building engineering
CN110206331B (en) Trolley type elevator shaft mouth and well protection device and construction method
CN211472031U (en) Highway cement asphalt concrete mixing arrangement
CN204111207U (en) Environment-friendly type filter core extracts car
CN211435524U (en) Automatic dust pelletizing system of domestic waste incineration slag factory
CN205894641U (en) Elevartor shaft lifting platform
CN204401619U (en) precast pile fixing device
CN206888141U (en) A kind of well lid with anti-drop net
CN211177654U (en) Muck drainage device
CN201447871U (en) Device for processing architectural working refuse
CN205839916U (en) A kind of toilet inner bag
CN206569911U (en) A kind of simple lifting appliance for coordinating jack to use
CN205042872U (en) Medicament filling machine
CN207328399U (en) All-in-one machine is cleaned on a kind of chassis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191119