CN209653469U - A kind of interim dry type lavatory in Super High Core Walls Structure construction site - Google Patents
A kind of interim dry type lavatory in Super High Core Walls Structure construction site Download PDFInfo
- Publication number
- CN209653469U CN209653469U CN201821854861.6U CN201821854861U CN209653469U CN 209653469 U CN209653469 U CN 209653469U CN 201821854861 U CN201821854861 U CN 201821854861U CN 209653469 U CN209653469 U CN 209653469U
- Authority
- CN
- China
- Prior art keywords
- excrement
- construction site
- dry type
- super high
- structure construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 17
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 229910052742 iron Inorganic materials 0.000 claims description 13
- 238000000034 method Methods 0.000 abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 6
- 238000011065 in-situ storage Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
- Y02A50/30—Against vector-borne diseases, e.g. mosquito-borne, fly-borne, tick-borne or waterborne diseases whose impact is exacerbated by climate change
Landscapes
- Residential Or Office Buildings (AREA)
- Non-Flushing Toilets (AREA)
Abstract
The utility model improves a kind of interim dry type lavatory in Super High Core Walls Structure construction site, includes pedestal and excrement case;Base upper surface is provided with squatting position, and after-opening is provided with flip lid;Excrement case upper surface is provided with excrement hole, and side is provided with hanging ring;Flip lid is opened, excrement case enters from after-opening or exit the inner cavity of pedestal;When excrement case enters the inner cavity of pedestal, squatting position is located at right above excrement hole.It in the utility model, after excrement case collects excrement, recycles the vertical transport equipments such as elevator or the derrick crane at construction of super highrise building scene that will be transported to ground under it, then cleared up by blowdown vehicle it, then places in situ continue to use;The process for removing water supply and the dismounting of blow-off line from, lengthening, plugging into, it is easy to install and use.
Description
Technical field
The utility model relates to Construction Technology of Super Tall Buildingin field more particularly to a kind of Super High Core Walls Structure construction sites
Interim dry type lavatory.
Background technique
Although the temporary toilet that current construction site uses has been accomplished removable and has been had enough to meet the need, but its affiliated facility is excessively
It is many and diverse, for example need to connect flushing system, it needs that interim septic tank is arranged at the scene, there are following deficiencies: lavatory and septic tank
Cleaning is inconvenient, water system is more easily damaged, septic tank occupied ground and consumable material, toilet hygiene difficult management, entire lavatory
Institute's system causes certain destruction to the environmental sanitation of construction site.
In the Super High main body construction stage, it is applied to this system of intelligent jacking steel platform, the period is presented in top layer work surface
Property constantly jack upwards, and there is currently this factory process temporary toilet, because its needs is plugged into water supply and vertical, horizontal
Blow-off line, as top layer work surface constantly jacks, corresponding water supply and blow-off line also exist simultaneously dismounting, lengthen, connect
The process refuted, it is extremely inconvenient.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of Super High core according to above-mentioned the deficiencies in the prior art
The interim dry type lavatory in tube construction scene, the process that can remove water supply and the dismounting of blow-off line from, lengthen, plug into, facilitates peace
Dress and use.
The technical solution of the utility model is as follows:
A kind of interim dry type lavatory in Super High Core Walls Structure construction site, includes pedestal and excrement case;The base upper surface
It is provided with squatting position, after-opening is provided with flip lid;Excrement case upper surface is provided with excrement hole, and side is provided with hanging ring;It opens described
Flip lid, the excrement case enter from the after-opening or exit the inner cavity of the pedestal;The excrement case enters the inner cavity of the pedestal
When, the squatting position is located at right above the excrement hole.
Further, the pedestal is led to by iron sheet, steel plate and side and is built;The side is logical to be welded into a frame, institute
It states steel plate and is installed on the frame upper surface, the iron sheet is installed on the frame facet.
Further, the excrement case leading flank, trailing flank, left side and right side are provided with hanging ring, and lower surface is set
It is equipped with universal wheel.
Further, the excrement case is welded by steel plate.
It further, further include the room that goes to the toilet, the room of going to the toilet is installed on the base upper surface, the room of the going to the toilet setting
There is front door, the side of the room that goes to the toilet is equipped with exhaust blower.
Further, the room that goes to the toilet is led to by iron sheet, steel plate and side builds;The side is logical to be welded into a frame,
The steel plate is installed on the frame upper surface, and the iron sheet is installed on the frame facet.
It further, further include having step frame, the step frame is installed on the pedestal leading flank.
Further, the step frame is welded by angle bar.
Compared with prior art, the utility model has the following beneficial effects: being recycled super after (1) excrement case collection excrement
The vertical transport equipments such as the elevator or derrick crane at high-building construction scene will be transported to ground under it, then by blowdown vehicle
It is cleared up, then places in situ continue to use;The process for removing water supply and the dismounting of blow-off line from, lengthening, plugging into, it is convenient
Installation and use;(2) hanging ring not only can be convenient vertical transport equipment and transport to excrement case, can also regard handle, with ten thousand
Cooperate to wheel, worker is facilitated to push and pull excrement case;(3) steel plate, iron sheet, angle steel and side are logical, these are that construction site is normal
The material seen can gather materials on the spot from construction site and be built, and welding is also the common technical ability of construction worker, and materials are easy,
Production is simple, and cost is relatively low.
Detailed description of the invention
Fig. 1 is the perspective view of embodiment.
Fig. 2 is the exploded view (having hidden front door) of embodiment.
Appended drawing reference
10- pedestal, the squatting position 11-, 12- flip lid, 20- excrement case, 21- excrement hole, 22- hanging ring, 23- universal wheel, 30- go to the toilet room,
31- exhaust blower, 40- step frame.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer
Type is described in further detail.
As depicted in figs. 1 and 2, embodiment provided by the utility model, a kind of Super High Core Walls Structure construction site are temporarily done
Formula lavatory includes pedestal 10 and excrement case 20.
10 upper surface of pedestal is provided with squatting position 11, and after-opening is provided with flip lid 12;20 upper surface of excrement case is provided with excrement hole 21,
Side is provided with hanging ring 22;Flip lid 12 is opened, excrement case 20 enters from after-opening or exit the inner cavity of pedestal 10;Excrement case 20 enters bottom
When the inner cavity of seat 10, squatting position 11 is located at right above excrement hole 21.Wherein, 21 diameter of excrement hole is greater than 11 diameter of squatting position, keeps excrement whole
Excrement hole 21 is fallen into squatting position 11.
Pedestal 10 is led to by iron sheet, steel plate and side to build;Side is logical to be welded into a frame, and steel plate is installed on table on frame
Face, iron sheet are installed on frame facet.Wherein, the upper surface of frame is arranged in steel plate, may be implemented to prevent pounding function.
20 leading flank of excrement case, trailing flank, left side and right side are provided with hanging ring 22, and lower surface is provided with universal wheel
23.Excrement case 20 is welded by steel plate.
The present embodiment further includes the room 30 that goes to the toilet, and the room 30 that goes to the toilet is installed on 10 upper surface of pedestal, before the room 30 that goes to the toilet is provided with
Door, the side for the room 30 that goes to the toilet is equipped with exhaust blower 31.Wherein, exhaust blower 31 is able to achieve ventilation effect.
Going to the toilet, room 30 is by iron sheet, steel plate and side is logical builds;Side is logical to be welded into a frame, and steel plate is installed on frame
Surface, iron sheet are installed on frame facet.Wherein, steel plate is checkered steel plate, and antiskid function not only may be implemented, and also improves carrying
Power.
The present embodiment further includes having step frame 40, and step frame 40 is installed on 10 leading flank of pedestal.Further, step frame 40
It is welded by angle bar.Wherein, angle bar intensity with higher improves the bearing capacity of step frame 40.
Above disclosures are merely preferred embodiments of the utility model, the utility model cannot be limited with this certainly
Interest field, therefore equivalent variations made according to the claim of the utility model still fall within the scope of the utility model.
Claims (8)
1. a kind of interim dry type lavatory in Super High Core Walls Structure construction site, includes pedestal and excrement case;It is characterized by: the bottom
Seat upper surface is provided with squatting position, and after-opening is provided with flip lid;Excrement case upper surface is provided with excrement hole, and side is provided with hanging ring;
The flip lid is opened, the excrement case enters from the after-opening or exit the inner cavity of the pedestal;The excrement case enters the bottom
When the inner cavity of seat, the squatting position is located at right above the excrement hole.
2. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: the bottom
Seat is led to by iron sheet, steel plate and side to build;The side is logical to be welded into a frame, and the steel plate is installed on table on the frame
Face, the iron sheet are installed on the frame facet.
3. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: the excrement
Case leading flank, trailing flank, left side and right side are provided with hanging ring, and lower surface is provided with universal wheel.
4. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: the excrement
Case is welded by steel plate.
5. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: further include
Go to the toilet room, and the room of going to the toilet is installed on the base upper surface, and the room of going to the toilet is provided with front door, the side of the room that goes to the toilet
Exhaust blower is installed.
6. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 5, it is characterised in that: it is described such as
Lavatory room is led to by iron sheet, steel plate and side to build;The side is logical to be welded into a frame, and the steel plate is installed on the frame
Surface, the iron sheet are installed on the frame facet.
7. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 1, it is characterised in that: further include
There is step frame, the step frame is installed on the pedestal leading flank.
8. the interim dry type lavatory in a kind of Super High Core Walls Structure construction site according to claim 7, it is characterised in that: described
Rank frame is welded by angle bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821854861.6U CN209653469U (en) | 2018-11-12 | 2018-11-12 | A kind of interim dry type lavatory in Super High Core Walls Structure construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821854861.6U CN209653469U (en) | 2018-11-12 | 2018-11-12 | A kind of interim dry type lavatory in Super High Core Walls Structure construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209653469U true CN209653469U (en) | 2019-11-19 |
Family
ID=68506410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821854861.6U Expired - Fee Related CN209653469U (en) | 2018-11-12 | 2018-11-12 | A kind of interim dry type lavatory in Super High Core Walls Structure construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209653469U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111851674A (en) * | 2020-07-24 | 2020-10-30 | 武汉一冶建筑安装工程有限责任公司 | Temporary toilet for construction site |
-
2018
- 2018-11-12 CN CN201821854861.6U patent/CN209653469U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111851674A (en) * | 2020-07-24 | 2020-10-30 | 武汉一冶建筑安装工程有限责任公司 | Temporary toilet for construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201695681U (en) | Integral self-elevating type elevator hoistway tube mold | |
CN209653469U (en) | A kind of interim dry type lavatory in Super High Core Walls Structure construction site | |
CN104399696B (en) | Coal Mechanical equipment overhaul stand rinse-system | |
CN108773363B (en) | Intelligent car washing system for construction site | |
CN205421928U (en) | From upset strutting arrangement | |
CN206418751U (en) | One kind can freely lift flexible assembled hoistway operation platform | |
CN202596150U (en) | Scaffold pedal | |
CN216949411U (en) | Be used for inserted lift scaffold to hang and establish protection pocket net device | |
CN203846587U (en) | Mobile toilet for high-rise buildings | |
CN215670889U (en) | Building engineering safety construction platform | |
CN106193609B (en) | High-rise concrete pump pipe tailing recycling and reusing system and method for recycling high-rise concrete pump pipe tailing | |
CN114852729A (en) | Construction waste treatment device based on building engineering | |
CN110206331B (en) | Trolley type elevator shaft mouth and well protection device and construction method | |
CN211472031U (en) | Highway cement asphalt concrete mixing arrangement | |
CN204111207U (en) | Environment-friendly type filter core extracts car | |
CN211435524U (en) | Automatic dust pelletizing system of domestic waste incineration slag factory | |
CN205894641U (en) | Elevartor shaft lifting platform | |
CN204401619U (en) | precast pile fixing device | |
CN206888141U (en) | A kind of well lid with anti-drop net | |
CN211177654U (en) | Muck drainage device | |
CN201447871U (en) | Device for processing architectural working refuse | |
CN205839916U (en) | A kind of toilet inner bag | |
CN206569911U (en) | A kind of simple lifting appliance for coordinating jack to use | |
CN205042872U (en) | Medicament filling machine | |
CN207328399U (en) | All-in-one machine is cleaned on a kind of chassis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191119 |