CN209653074U - A kind of civil engineering construction drainage arrangement - Google Patents

A kind of civil engineering construction drainage arrangement Download PDF

Info

Publication number
CN209653074U
CN209653074U CN201920053421.9U CN201920053421U CN209653074U CN 209653074 U CN209653074 U CN 209653074U CN 201920053421 U CN201920053421 U CN 201920053421U CN 209653074 U CN209653074 U CN 209653074U
Authority
CN
China
Prior art keywords
fixedly connected
atomizer
support case
civil engineering
fire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920053421.9U
Other languages
Chinese (zh)
Inventor
肖朝丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Chuan Chuan Network Technology Co Ltd
Original Assignee
Zhejiang Chuan Chuan Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Chuan Chuan Network Technology Co Ltd filed Critical Zhejiang Chuan Chuan Network Technology Co Ltd
Priority to CN201920053421.9U priority Critical patent/CN209653074U/en
Application granted granted Critical
Publication of CN209653074U publication Critical patent/CN209653074U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to civil engineering plant technical field, in particular a kind of civil engineering construction drainage arrangement, including support component and drain assembly, the support component includes support case, universal wheel, chamber door, pushes handle, containing box and battery, the universal wheel is fixedly connected on the bottom surface of the support case, and the chamber door and the support case are hinged;The utility model passes through support case when in use and stores the components such as water pump and hose, it can play the role of protecting the components such as water pump and hose, and by universal wheel and handle can be pushed to carry out short-distance movement to device, the labour of saving personnel, job site is replaced at any time convenient for device, and device is internally provided with battery, so that device can in the case where no external power supply emergency, device can carry out normal draining, the air of construction site can be purified, emergency extinguishment fire suppression can be carried out to construction site, so that the functional diversities of device.

Description

A kind of civil engineering construction drainage arrangement
Technical field
The utility model belongs to civil engineering plant technical field, and in particular to a kind of civil engineering construction draining dress It sets.
Background technique
The purpose of civil engineering is required for forming human being's production or life, function is good and the space of Comfortable attractive and Channel, it is both the needs in terms of substance, also has the demand of symbol spirit aspect, with the development of society, engineering structure is more next More enlarged, complication, super high-rise building, extra-large bridge, huge dam, complicated subway system continue to bring out, and meet people Life requirement, while the draining of civil engineering construction is particularly important.
Existing technology has the following problems:
1, the components such as water pump of existing civil engineering construction drainage arrangement are exposed in external environment, and are constructed Space enrironment is more severe and complicated, so that the service life of device is lower, it will by personnel when being moved to device It is lifted away from, and movement is got up more laborious.
2, existing civil engineering construction is more single with drainage arrangement function, single into having the function of draining, and applies The fugitive dust on workshop ground is more, is easy to cause to damage to the respiratory system of construction personnel, and the sundries of construction site is more, easily sends out It lights a fire calamity, causes the loss of personnel and property.
Utility model content
To solve the problems mentioned above in the background art.The utility model provides a kind of civil engineering construction draining Device, have the characteristics that protection and it is multi-functional.
To achieve the above object, the utility model provides the following technical solutions: a kind of civil engineering construction drainage arrangement, Including support component and drain assembly, the support component includes support case, universal wheel, chamber door, pushes handle, containing box and storage Battery, the universal wheel are fixedly connected on the bottom surface of the support case, and the chamber door and the support case are hinged, the promotion handle Hand is fixedly connected on the side wall of the support case, and the containing box is fixedly connected on the inner wall bottom end of the support case, the storage Battery is fixedly connected on the storage chamber interior wall bottom end, and the drain assembly includes water pump, the first tee tube, connecting tube, second Tee tube, drain valve, fire water monitor and atomizer, the water pump are fixedly connected on the inner wall bottom end of the support case, the water The output end of pump is fixedly connected with first tee tube, and one end of first tee tube is fixedly connected with the connecting tube, One end of the connecting tube is fixedly connected with second tee tube, and one end of second tee tube is fixedly connected with the row Water valve, the fire water monitor are fixedly connected on the top surface of the support case, and the bottom end of the fire water monitor is fixedly connected with fire-fighting Water valve, the fire-fighting water valve are fixedly connected with one end of first tee tube, and the atomizer is fixedly connected on the support The top surface of case, the bottom end of the atomizer are fixedly connected with atomizer water valve, the atomizer water valve and second tee tube One end be fixedly connected, the water pump, the fire water monitor and the atomizer with the battery be electrically connected.
Preferably, the two sidewalls of the support case are fixedly connected with water inlet and discharge outlet, the input terminal of the water pump with The water inlet is fixedly connected, and one end of the discharge outlet is fixedly connected with the drain valve.
Preferably, the quantity of the universal wheel is four, and the universal wheel is symmetrically in the bottom surface four of the support case Angle.
Preferably, the outer wall side middle position of the chamber door is fixedly connected with chamber door knob, the top of the containing box End is fixedly connected with hose containing box.
Preferably, the fire water monitor and the atomizer pass through rotating turret and are fixedly connected with the support case, described Fire water monitor and the atomizer can carry out axial rotation and pitch angle is adjusted.
Preferably, one end middle position of the atomizer is fixedly connected with fan, and the other end of the atomizer is solid Surely it is connected with atomizer.
Preferably, the quantity of the atomizer is multiple, is uniformly fixed on one week of described atomizer one end.
Compared with prior art, the utility model has the beneficial effects that
1, the utility model passes through support case when in use and stores the components such as water pump and hose, can play to water The effect of pump and the components protection such as hose, increases service using life, and can by universal wheel and push handle to device into Row short-distance movement saves the labour of personnel, replaces job site at any time convenient for device, and device is internally provided with electric power storage Pond so that device can in the case where no external power supply emergency.
2, in actual use, fire-fighting water valve and atomizer water valve are closed for the utility model, open drain valve, device can Carry out normal draining, close drain valve and fire-fighting water valve, under the action of atomizer, can air to construction site into Row purification, closes drain valve and atomizer water valve, and fire water monitor can be used to carry out emergency extinguishment fire suppression to construction site, so that dress The functional diversities set.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the support case schematic diagram of internal structure in the utility model;
Fig. 3 is the right side structure schematic diagram of the utility model;
Fig. 4 is the atomizer structure schematic diagram in the utility model;
In figure: 10, support component;11, case is supported;111, water inlet;112, discharge outlet;12, universal wheel;13, chamber door; 131, chamber door is shaken hands;14, handle is pushed;15, containing box;151, hose containing box;16, battery;20, drain assembly;21, water Pump;22, the first tee tube;23, connecting tube;24, the second tee tube;25, drain valve;26, fire water monitor;261, fire-fighting water valve; 27, atomizer;271, atomizer water valve;272, fan;273, atomizer.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment
Fig. 1-4 is please referred to, the utility model is the following technical schemes are provided: a kind of civil engineering construction drainage arrangement, packet Support component 10 and drain assembly 20 are included, support component 10 includes support case 11, universal wheel 12, chamber door 13, pushes handle 14, receives Receive case 15 and battery 16, universal wheel 12 is fixedly connected on the bottom surface of support case 11, and chamber door 13 and support case 11 are hinged, pushes handle Hand 14 is fixedly connected on the side wall of support case 11, and containing box 15 is fixedly connected on the inner wall bottom end of support case 11, and battery 16 is solid Surely it is connected to 15 inner wall bottom end of containing box, is when in use stored the components such as water pump 21 and hose by support case 11, It can play the role of protecting the components such as water pump 21 and hose, increase service using life, and by universal wheel 12 and can push away Dynamic handle 14 carries out short-distance movement to device, saves the labour of personnel, replaces job site, and device at any time convenient for device It is internally provided with battery 16, so that device can emergency, drain assembly 20 include water pump in the case where no external power supply 21, the first tee tube 22, connecting tube 23, the second tee tube 24, drain valve 25, fire water monitor 26 and atomizer 27, water pump 21 are solid Surely it is connected to the inner wall bottom end of support case 11, the output end of water pump 21 is fixedly connected with the first tee tube 22, the first tee tube 22 One end be fixedly connected with connecting tube 23, one end of connecting tube 23 is fixedly connected with the second tee tube 24, the second tee tube 24 One end is fixedly connected with drain valve 25, and fire water monitor 26 is fixedly connected on the top surface of support case 11, and the bottom end of fire water monitor 26 is solid Surely it is connected with fire-fighting water valve 261, fire-fighting water valve 261 is fixedly connected with one end of the first tee tube 22, and atomizer 27 is fixedly connected In the top surface of support case 11, the bottom end of atomizer 27 is fixedly connected with atomizer water valve 271, atomizer water valve 271 and the two or three One end of siphunculus 24 is fixedly connected, and in actual use, fire-fighting water valve 261 and atomizer water valve 271 are closed, and opens drain valve 25, device can carry out normal draining, close drain valve 25 and fire-fighting water valve 261 can be right under the action of atomizer 27 The air of construction site is purified, and drain valve 25 and atomizer water valve 271 are closed, and can be used fire water monitor 26 to construction site Carry out emergency extinguishment fire suppression so that the functional diversities of device, water pump 21, fire water monitor 26 and atomizer 27 with battery 16 It is electrically connected, the model PUM-200EH of water pump 21, the model PS30-50 of fire water monitor 26.
Specifically, the two sidewalls of support case 11 are fixedly connected with water inlet 111 and discharge outlet 112, the input terminal of water pump 21 It is fixedly connected with water inlet 111, ponding can be extracted out and be conveyed by water pump 21, one end of discharge outlet 112 and drain valve 25 are fixedly connected, and can discharge the water conveyed by water pump 21 by discharge outlet 112.
Specifically, the quantity of universal wheel 12 be four, and universal wheel 12 symmetrically support case 11 bottom surface quadrangle, can be real Firm support of the short-distance movement and guarantee of existing device to device.
Specifically, the outer wall side middle position of chamber door 13 is fixedly connected with chamber door knob 131, facilitate construction personnel logical Cross chamber door shake hands 131 pairs of chamber doors 13 switch, the top of containing box 15 is fixedly connected with hose containing box 151, device not In use, storage storage can be carried out to hose, prevent from losing.
Specifically, fire water monitor 26 and atomizer 27 are fixedly connected by rotating turret with support case 11, fire water monitor 26 Axial rotation can be carried out with atomizer 27 and pitch angle is adjusted, convenient for adjusting the sprinkling side of fire water monitor 26 and atomizer 27 To.
Specifically, one end middle position of atomizer 27 is fixedly connected with fan 272, the other end of atomizer 27 is fixed It is connected with atomizer 273, under the action of fan 272, the water mist that atomizer 273 sprays is blown off.
Specifically, the quantity of atomizer 273 be it is multiple, be uniformly fixed on one week of 27 one end of atomizer, increase is to water Nebulization efficiency, to improve to the depuration quality of air.
The working principle and process for using of the utility model: the utility model passes through support case 11 for water pump 21 when in use And the components such as hose are stored, and can be played the role of protecting the components such as water pump 21 and hose, can be passed through universal wheel 12 And push handle 14 to carry out short-distance movement to device, and device is internally provided with battery 16, so that device can be in no outside Emergency in the case where power supply starts water pump 21, fire-fighting water valve 261 and atomizer water valve 271 is closed, and opens drain valve 25, device can carry out normal draining, close drain valve 25 and fire-fighting water valve 261 can be right under the action of atomizer 27 The air of construction site is purified, and drain valve 25 and atomizer water valve 271 are closed, and can be used fire water monitor 26 to construction site Carry out emergency extinguishment fire suppression.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (7)

1. a kind of civil engineering construction drainage arrangement, it is characterised in that: including support component (10) and drain assembly (20), institute Support component (10) are stated to include support case (11), universal wheel (12), chamber door (13), push handle (14), containing box (15) and store Battery (16), the universal wheel (12) are fixedly connected on the bottom surface of support case (11), the chamber door (13) and the support Case (11) hingedly, fix by the side wall for pushing handle (14) to be fixedly connected on support case (11), the containing box (15) It is connected to the inner wall bottom end of support case (11), the battery (16) is fixedly connected on the containing box (15) inner wall bottom End, the drain assembly (20) include water pump (21), the first tee tube (22), connecting tube (23), the second tee tube (24), draining Valve (25), fire water monitor (26) and atomizer (27), the water pump (21) are fixedly connected on the inner wall bottom of support case (11) End, the output end of the water pump (21) are fixedly connected with first tee tube (22), one end of first tee tube (22) It is fixedly connected with the connecting tube (23), one end of the connecting tube (23) is fixedly connected with second tee tube (24), institute The one end for stating the second tee tube (24) is fixedly connected with the drain valve (25), and the fire water monitor (26) is fixedly connected on described The top surface of case (11) is supported, the bottom end of the fire water monitor (26) is fixedly connected with fire-fighting water valve (261), the fire-fighting water valve (261) it is fixedly connected with one end of first tee tube (22), the atomizer (27) is fixedly connected on the support case (11) bottom end of top surface, the atomizer (27) is fixedly connected with atomizer water valve (271), the atomizer water valve (271) It is fixedly connected with one end of second tee tube (24), the water pump (21), the fire water monitor (26) and the atomizer (27) it is electrically connected with the battery (16).
2. a kind of civil engineering construction drainage arrangement according to claim 1, it is characterised in that: the support case (11) Two sidewalls be fixedly connected with water inlet (111) and discharge outlet (112), the input terminal and the water inlet of the water pump (21) (111) it is fixedly connected, one end of the discharge outlet (112) is fixedly connected with the drain valve (25).
3. a kind of civil engineering construction drainage arrangement according to claim 1, it is characterised in that: the universal wheel (12) Quantity be four, and the universal wheel (12) symmetrically it is described support case (11) bottom surface quadrangle.
4. a kind of civil engineering construction drainage arrangement according to claim 1, it is characterised in that: the chamber door (13) Outer wall side middle position is fixedly connected with chamber door knob (131), and the top of the containing box (15) is fixedly connected with hose Containing box (151).
5. a kind of civil engineering construction drainage arrangement according to claim 1, it is characterised in that: the fire water monitor (26) it is fixedly connected by rotating turret with the support case (11) with the atomizer (27), the fire water monitor (26) and institute Axial rotation can be carried out by stating atomizer (27) and pitch angle is adjusted.
6. a kind of civil engineering construction drainage arrangement according to claim 1, it is characterised in that: the atomizer (27) One end middle position be fixedly connected with fan (272), the other end of the atomizer (27) is fixedly connected with atomizer (273).
7. a kind of civil engineering construction drainage arrangement according to claim 6, it is characterised in that: the atomizer (273) quantity be it is multiple, be uniformly fixed on one week of the atomizer (27) one end.
CN201920053421.9U 2019-01-14 2019-01-14 A kind of civil engineering construction drainage arrangement Expired - Fee Related CN209653074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920053421.9U CN209653074U (en) 2019-01-14 2019-01-14 A kind of civil engineering construction drainage arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920053421.9U CN209653074U (en) 2019-01-14 2019-01-14 A kind of civil engineering construction drainage arrangement

Publications (1)

Publication Number Publication Date
CN209653074U true CN209653074U (en) 2019-11-19

Family

ID=68521032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920053421.9U Expired - Fee Related CN209653074U (en) 2019-01-14 2019-01-14 A kind of civil engineering construction drainage arrangement

Country Status (1)

Country Link
CN (1) CN209653074U (en)

Similar Documents

Publication Publication Date Title
CN103410711B (en) Without blade fan
CN203935720U (en) The large flow of gathering type wind is except haze air cleaning system
CN104107592A (en) Wind-concentrating type large flow haze-removing air purifying system
CN208389667U (en) A kind of construction site dust-extraction unit
CN209653074U (en) A kind of civil engineering construction drainage arrangement
CN206018893U (en) A kind of air purifier being placed on windowsill
CN206500313U (en) Fog pool with fountain
CN208733720U (en) A kind of novel municipal garden landscape rain collector
CN213590020U (en) Dust removal spray set for construction
CN213870359U (en) Fire control smoke exhaust fan convenient to overturn fan blades
CN201603502U (en) Horizontal cyclone water film dust collector
CN214130892U (en) Dustproof divergent high-pressure fog gun for green construction site
CN109220394A (en) A kind of agricultural booth pesticide spraying device
CN109210762A (en) A kind of no blade profile air humidifier
CN206462131U (en) The ecological moistening and lowering temperature equipment that a kind of plant and spraying system are combined
CN208213462U (en) A kind of high efficiency dust-settling sprayer
CN207203733U (en) A kind of indoor device for reducing dust
CN202176555U (en) Fan
CN207933956U (en) Portable construction dedusting heat sink
CN207383159U (en) A kind of multi-functional microbubble irrigation equipment
CN210814452U (en) Building spray device that prevents dust convenient to remove
CN109396147A (en) A kind of architectural engineering dust guard
CN213100566U (en) Mobilizable fire control unit for power station
CN217004757U (en) Indoor humidification device for building
CN205586713U (en) Pressure -vaccum formula dust pelletizing system that underground space used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191119

Termination date: 20220114