CN209653022U - A landscaping circular water diversion structure - Google Patents
A landscaping circular water diversion structure Download PDFInfo
- Publication number
- CN209653022U CN209653022U CN201920208509.3U CN201920208509U CN209653022U CN 209653022 U CN209653022 U CN 209653022U CN 201920208509 U CN201920208509 U CN 201920208509U CN 209653022 U CN209653022 U CN 209653022U
- Authority
- CN
- China
- Prior art keywords
- water
- artificial
- artificial lake
- lake
- fountain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Aeration Devices For Treatment Of Activated Polluted Sludge (AREA)
Abstract
本实用新型涉及园林绿化技术领域,尤其为一种园林绿化循环式引水构造,包括人工湖,人工湖的左侧设有假山,假山的顶端设有蓄水池,假山靠近人工湖的一侧面上设有溢流槽,人工湖的后侧设有喷泉池,喷泉池与人工湖之间设有人造渠。本实用新型通过设置人工湖、假山和喷泉池,人工湖内设置若干水泵和水管,假山顶端的蓄水池通过水泵和溢流槽与人工湖形成循环流动,喷泉池通过水泵和人造渠与人工湖形成循环流动,使多个水景互相连通,且多个水景内的水均可循环流动,使水景内的水接近活水,给水景内饲养的水生动物提供更良好的生长环境,既能节省建造景观以及水景运行时的成本耗费,也能使水质保持清洁卫生。
The utility model relates to the technical field of landscaping, in particular to a circular water diversion structure for landscaping, comprising an artificial lake, a rockery is arranged on the left side of the artificial lake, a water storage pool is arranged on the top of the artificial lake, and a side surface of the rockery is close to the artificial lake. An overflow tank is provided, a fountain pool is provided on the rear side of the artificial lake, and an artificial channel is provided between the fountain pool and the artificial lake. The utility model is provided with artificial lakes, artificial hills and fountain pools. Several water pumps and water pipes are arranged in the artificial lakes. The reservoir on the top of the artificial hills forms a circulation flow with the artificial lake through the water pumps and overflow tanks. The lake forms a circular flow, so that multiple water features are connected to each other, and the water in multiple water features can circulate, so that the water in the water feature is close to the running water, providing a better growth environment for the aquatic animals raised in the water feature, which can save construction The cost of landscape and waterscape operation can also keep the water quality clean and hygienic.
Description
技术领域technical field
本实用新型涉及园林绿化技术领域,具体为一种园林绿化循环式引水构造。The utility model relates to the technical field of landscaping, in particular to a circular water diversion structure for landscaping.
背景技术Background technique
园林绿化是在一定的地域运用工程技术和艺术手段,通过改造地形(如筑山、叠石、理水)、种植树木花草、营造建筑和布置园路等途径创作而成的美的自然环境和游憩境域。园林装饰上最常见的景观主要有植物景观、建筑景观以及水景。园林景观休闲空间中的水景大致可以分为水池喷泉、假山瀑布以及人工湖三种,水景作为主要景观之一,在营造环境方面能满足人们喜水亲水的心理,对城市而言具有储水、防洪的作用,使集审美与实用功能为一体的、动静相结合的人工景观。Landscaping is the use of engineering technology and artistic means in a certain area to create a beautiful natural environment and recreation by transforming the terrain (such as building mountains, stacking stones, water management), planting trees and flowers, building buildings, and arranging garden roads. territory. The most common landscapes in garden decoration mainly include plant landscapes, architectural landscapes and waterscapes. The water features in the garden landscape leisure space can be roughly divided into three types: pool fountains, rockery waterfalls and artificial lakes. As one of the main landscapes, water features can satisfy people's psychology of loving water and being close to water in terms of creating an environment. , The role of flood control, so that the collection of aesthetic and practical functions as one, the combination of dynamic and static artificial landscape.
但是,现有技术中,各种类型的水景一般都是独立设置的,每个水景在建造时都需耗费大量人力和物力,且动态的水景在运行过程中也会耗费大量能耗和水量,同时,大部分的水景内的水一般都是死水,长时间不进行换水会导致水质变差甚至滋生大量细菌,也不利于水内饲养的水生动物的生长。鉴于此,我们提出一种园林绿化循环式引水构造。However, in the prior art, various types of waterscapes are generally set independently, and each waterscape requires a lot of manpower and material resources in construction, and dynamic waterscapes also consume a lot of energy and water during operation. At the same time, the water in most of the water features is generally stagnant water. If the water is not changed for a long time, the water quality will deteriorate and even a large number of bacteria will grow, which is not conducive to the growth of aquatic animals raised in the water. In view of this, we propose a landscaping circular water diversion structure.
实用新型内容Utility model content
本实用新型的目的在于提供一种园林绿化循环式引水构造,以解决上述背景技术中提出的水景独立设置耗费大量人力物力以及死水容易变质的问题。The purpose of this utility model is to provide a landscaping circular water diversion structure to solve the problems that the independent setting of waterscapes in the above-mentioned background technology consumes a lot of manpower and material resources and the stagnant water is easy to deteriorate.
为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above object, the utility model provides the following technical solutions:
一种园林绿化循环式引水构造,包括人工湖,所述人工湖的中间设有第一喷泉泵,所述人工湖的左端设有第一水泵,所述第一水泵上设有第一水管,所述人工湖的后端设有第二水泵,所述第二水泵上设有第二水管,所述人工湖的右侧壁上端设有第一槽口,所述人工湖的前端设有第三水泵,所述第三水泵上设有第三水管,所述人工湖的左侧设有假山,所述假山的顶端设有蓄水池,所述假山靠近所述人工湖的一侧面上设有溢流槽,所述人工湖的后侧设有喷泉池,所述喷泉池的中间设有第二喷泉泵,所述喷泉池的一侧壁上端设有第二槽口,所述第二槽口与所述第一槽口之间设有人造渠。A landscaping circular water diversion structure, comprising an artificial lake, a first fountain pump is provided in the middle of the artificial lake, a first water pump is provided at the left end of the artificial lake, and a first water pipe is provided on the first water pump, The rear end of the artificial lake is provided with a second water pump, the second water pump is provided with a second water pipe, the upper end of the right side wall of the artificial lake is provided with a first notch, and the front end of the artificial lake is provided with a second water pipe. Three water pumps, the third water pump is provided with a third water pipe, the left side of the artificial lake is provided with a rockery, the top of the rockery is provided with a reservoir, and the side of the rockery near the artificial lake is provided with There is an overflow tank, a fountain pool is provided on the rear side of the artificial lake, a second fountain pump is provided in the middle of the fountain pool, a second notch is provided at the upper end of the side wall of the fountain pool, and the second An artificial channel is provided between the notch and the first notch.
优选的,所述人工湖固定嵌设在地面内,所述第一喷泉泵通过螺栓固定在所述人工湖的底面上。Preferably, the artificial lake is fixedly embedded in the ground, and the first fountain pump is fixed on the bottom surface of the artificial lake by bolts.
优选的,所述第一水泵通过螺栓固定在所述人工湖的左侧壁上,所述第一水管穿过所述人工湖的左侧壁后固定嵌设在地面内,所述第一水管的上端穿过所述假山后延伸到所述蓄水池内。Preferably, the first water pump is fixed on the left side wall of the artificial lake by bolts, the first water pipe passes through the left side wall of the artificial lake and is fixedly embedded in the ground, and the first water pipe The upper end of the rockery extends into the reservoir after passing through the rockery.
优选的,所述溢流槽的顶端水平高度低于所述假山的顶端水平高度,所述溢流槽的顶端水平高度高于所述蓄水池的底端水平高度,所述溢流槽的底端连通到所述人工湖内。Preferably, the top level of the overflow tank is lower than the top level of the rockery, the top level of the overflow tank is higher than the bottom level of the reservoir, and the overflow tank The bottom end is connected to the artificial lake.
优选的,所述第二水泵通过螺栓固定在所述人工湖的后侧壁上,所述第二水管穿过所述人工湖的后侧壁后固定嵌设在地面内,所述第二水管的后端穿过所述喷泉池的侧壁后延伸到池内。Preferably, the second water pump is fixed on the rear side wall of the artificial lake by bolts, the second water pipe passes through the rear side wall of the artificial lake and is fixedly embedded in the ground, and the second water pipe The rear end of the fountain extends into the pool after passing through the side wall of the fountain pool.
优选的,所述喷泉池固定嵌设在地面内,所述第二喷泉泵通过螺栓固定在所述喷泉池的底面上。Preferably, the fountain pool is fixedly embedded in the ground, and the second fountain pump is fixed on the bottom surface of the fountain pool by bolts.
优选的,所述人造渠固定嵌设在地面内,所述人造渠的两端分别连通到所述人工湖与所述喷泉池内。Preferably, the artificial canal is fixedly embedded in the ground, and the two ends of the artificial canal are respectively connected to the artificial lake and the fountain pool.
优选的,所述第三水泵通过螺栓固定在所述人工湖的前侧壁上,所述第三水管穿过所述人工湖的前侧壁后固定嵌设在地面内。Preferably, the third water pump is fixed on the front side wall of the artificial lake by bolts, and the third water pipe is fixedly embedded in the ground after passing through the front side wall of the artificial lake.
与现有技术相比,本实用新型的有益效果是:本实用新型通过设置人工湖、假山和喷泉池,人工湖内设置若干水泵和水管,假山顶端的蓄水池通过水泵和溢流槽与人工湖形成循环流动,喷泉池通过水泵和人造渠与人工湖形成循环流动,使多个水景互相连通,且多个水景内的水均可循环流动,使水景内的水接近活水,给水景内饲养的水生动物提供更良好的生长环境,既能节省建造景观以及水景运行时的成本耗费,也能使水质保持清洁卫生。Compared with the prior art, the beneficial effects of the utility model are: the utility model is provided with an artificial lake, a rockery and a fountain pool, and several water pumps and water pipes are arranged in the artificial lake, and the reservoir at the top of the rockery is connected with the water pump and the overflow tank. The artificial lake forms a circular flow, and the fountain pool forms a circular flow with the artificial lake through water pumps and artificial canals, so that multiple water features are connected to each other, and the water in multiple water features can circulate, so that the water in the water features is close to the running water, giving water features The raised aquatic animals provide a better growth environment, which can not only save the cost of building landscapes and waterscape operations, but also keep the water quality clean and hygienic.
附图说明Description of drawings
图1为本实用新型园林绿化循环式引水构造的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the utility model landscaping circulation type water diversion structure;
图2为本实用新型的半剖结构示意图;Fig. 2 is a schematic diagram of a half-section structure of the utility model;
图3为本实用新型的半剖结构示意图。Fig. 3 is a schematic diagram of a half-section structure of the utility model.
图中:1、人工湖;11、第一喷泉泵;12、第一水泵;121、第一水管;13、第二水泵;131、第二水管;14、第一槽口;15、第三水泵;151、第三水管;2、假山;21、蓄水池;22、溢流槽;3、喷泉池;31、第二喷泉泵;32、第二槽口;321、人造渠。In the figure: 1, artificial lake; 11, first fountain pump; 12, first water pump; 121, first water pipe; 13, second water pump; 131, second water pipe; 14, first notch; 15, third Water pump; 151, the third water pipe; 2, rockery; 21, reservoir; 22, overflow tank; 3, fountain pool; 31, the second fountain pump; 32, the second notch; 321, artificial canal.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
在本实用新型的描述中,需要理解的是,术语“中间”、“上”、“下”、“前”、“后”、“左”、“右”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In describing the present invention, it should be understood that the terms "middle", "upper", "lower", "front", "rear", "left", "right", "horizontal", "top", The orientation or positional relationship indicated by "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying No device or element must have a specific orientation, be constructed and operate in a specific orientation, and thus should not be construed as limiting the invention.
此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”、“第三”的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,“若干”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, a feature defined as "first", "second" and "third" may explicitly or implicitly include one or more of these features. In the description of the present utility model, "several" means at least two, such as two, three, etc., unless otherwise specifically defined.
请参阅图1-3,本实用新型提供一种技术方案:Please refer to Figure 1-3, the utility model provides a technical solution:
一种园林绿化循环式引水构造,包括人工湖1,人工湖1的中间设有第一喷泉泵11,人工湖1的左端设有第一水泵12,第一水泵12上设有第一水管121,人工湖1的后端设有第二水泵13,第二水泵13上设有第二水管131,人工湖1的右侧壁上端设有第一槽口14,人工湖1的前端设有第三水泵15,第三水泵15上设有第三水管151,人工湖1的左侧设有假山2,假山2的顶端设有蓄水池21,假山2靠近人工湖1的一侧面上设有溢流槽22,人工湖1的后侧设有喷泉池3,喷泉池3的中间设有第二喷泉泵31,喷泉池3的一侧壁上端设有第二槽口32,第二槽口32与第一槽口14之间设有人造渠321。A landscaping circular water diversion structure, comprising an artificial lake 1, a first fountain pump 11 is provided in the middle of the artificial lake 1, a first water pump 12 is provided at the left end of the artificial lake 1, and a first water pipe 121 is provided on the first water pump 12 The rear end of the artificial lake 1 is provided with a second water pump 13, the second water pump 13 is provided with a second water pipe 131, the upper end of the right side wall of the artificial lake 1 is provided with a first notch 14, and the front end of the artificial lake 1 is provided with a second water pipe 131. Three water pumps 15, the third water pump 15 is provided with a third water pipe 151, the left side of the artificial lake 1 is provided with a rockery 2, the top of the rockery 2 is provided with a reservoir 21, and the side of the rockery 2 near the artificial lake 1 is provided with The overflow tank 22, the rear side of the artificial lake 1 is provided with a fountain pool 3, the middle of the fountain pool 3 is provided with a second fountain pump 31, the upper end of the side wall of the fountain pool 3 is provided with a second notch 32, and the second notch An artificial channel 321 is provided between 32 and the first notch 14 .
本实施例中,人工湖1固定嵌设在地面内,人工湖1采用砖石和混凝土堆砌制成,使人工湖1结实稳固。In this embodiment, the artificial lake 1 is fixedly embedded in the ground, and the artificial lake 1 is made of masonry and concrete, so that the artificial lake 1 is firm and stable.
进一步地,第一喷泉泵11通过螺栓固定在人工湖1的底面上,使第一喷泉泵11结实稳固,在人工湖1的中间制造喷泉,既可以提高人工湖1的美观,也可以通过拨动水面来增大水中的含氧量,可以给人工湖1内饲养的鲤鱼、乌龟等水生动物提供更舒适的生长环境。Further, the first fountain pump 11 is fixed on the bottom surface of the artificial lake 1 by bolts, so that the first fountain pump 11 is strong and stable, and a fountain is made in the middle of the artificial lake 1, which can improve the appearance of the artificial lake 1, and can also be achieved by dialing Moving the water surface increases the oxygen content in the water, which can provide a more comfortable growth environment for aquatic animals such as carp and turtles raised in the artificial lake 1.
本实施例中,第一水泵12通过螺栓固定在人工湖1的左侧壁上,使第一水泵12结实稳固。In this embodiment, the first water pump 12 is fixed on the left side wall of the artificial lake 1 by bolts, so that the first water pump 12 is strong and stable.
进一步地,第一水管121穿过人工湖1的左侧壁后固定嵌设在地面内,使第一水管121结实稳固、不易断裂。Furthermore, the first water pipe 121 is fixedly embedded in the ground after passing through the left side wall of the artificial lake 1, so that the first water pipe 121 is firm and stable and not easy to break.
进一步地,第一水管121的上端穿过假山2后延伸到蓄水池21内,第一水管121将人工湖1和蓄水池21连接起来,通过第一水泵12和第一水管121可以将人工湖1内的水抽吸到蓄水池21内。Further, the upper end of the first water pipe 121 extends into the reservoir 21 after passing through the rockery 2, the first water pipe 121 connects the artificial lake 1 and the reservoir 21, and the first water pump 12 and the first water pipe 121 can The water in the artificial lake 1 is pumped into the reservoir 21 .
本实施例中,溢流槽22的顶端水平高度低于假山2的顶端水平高度,溢流槽22的顶端水平高度高于蓄水池21的底端水平高度,使蓄水池21内的水不会从假山顶端溢出,且使蓄水池21内的水量保持稳定。In this embodiment, the top level of the overflow tank 22 is lower than the top level of the rockery 2, and the top level of the overflow tank 22 is higher than the bottom level of the reservoir 21, so that the water in the reservoir 21 Can not overflow from the rockery top, and make the water quantity in the reservoir 21 keep stable.
进一步地,溢流槽22的底端连通到人工湖1内,蓄水池21内溢出的水量会从溢流槽22流回到人工湖1内,形成人造瀑布的景观,通过第一水泵12、第一水管121以及溢流槽22使人工湖1与蓄水池21之间的水形成循环流动。Further, the bottom of the overflow tank 22 is connected to the artificial lake 1, and the overflowed water in the reservoir 21 will flow back to the artificial lake 1 from the overflow tank 22 to form an artificial waterfall landscape. , the first water pipe 121 and the overflow tank 22 make the water between the artificial lake 1 and the reservoir 21 form a circulating flow.
本实施例中,第二水泵13通过螺栓固定在人工湖1的后侧壁上,使第二水泵13结实稳固。In this embodiment, the second water pump 13 is fixed on the rear side wall of the artificial lake 1 by bolts, so that the second water pump 13 is strong and stable.
进一步地,第二水管131穿过人工湖1的后侧壁后固定嵌设在地面内,使第二水管131结实稳固,且不会占据地面上的空间,保持地面平整。Further, the second water pipe 131 passes through the rear side wall of the artificial lake 1 and is fixedly embedded in the ground, so that the second water pipe 131 is strong and stable, and does not occupy space on the ground, keeping the ground flat.
进一步地,第二水管131的后端穿过喷泉池3的侧壁后延伸到池内,通过第二水泵13和第二水管131可以将人工湖1内的水抽吸到喷泉池3内。Further, the rear end of the second water pipe 131 passes through the side wall of the fountain pool 3 and extends into the pool, and the water in the artificial lake 1 can be sucked into the fountain pool 3 through the second water pump 13 and the second water pipe 131 .
本实施例中,喷泉池3固定嵌设在地面内,喷泉池3采用砖石和混凝土堆砌制成,使喷泉池3结实稳固。In this embodiment, the fountain pool 3 is fixedly embedded in the ground, and the fountain pool 3 is made of masonry and concrete, so that the fountain pool 3 is firm and stable.
进一步地,第二喷泉泵31通过螺栓固定在喷泉池3的底面上,使第二喷泉泵31结实稳固。Further, the second fountain pump 31 is fixed on the bottom surface of the fountain pool 3 by bolts, so that the second fountain pump 31 is strong and stable.
具体地,本实施例中涉及到的第一喷泉泵11、第二喷泉泵31均采用的是上海辛巴水泵有限公司生产提供的型号为QJ型的喷泉泵,其配套的电源和配件也均由该厂商提供;此外,本实施例中涉及到的第一喷泉泵11、第二喷泉泵31均为现有技术,本领域的技术人员完全可以实现,无需赘言,本实用新型保护的内容也不涉及对第一喷泉泵11、第二喷泉泵31的结构和工作原理的改进。Specifically, the first fountain pump 11 and the second fountain pump 31 involved in this embodiment are all QJ type fountain pumps produced and provided by Shanghai Simba Water Pump Co., Ltd. Provided by the manufacturer; in addition, the first fountain pump 11 and the second fountain pump 31 involved in this embodiment are all prior art, and those skilled in the art can fully realize it. Needless to say, the content protected by the utility model is also Improvements to the structure and working principle of the first fountain pump 11 and the second fountain pump 31 are not involved.
本实施例中,人造渠321固定嵌设在地面内,人造渠321采用砖石和混凝土堆砌制成,使人造渠321结实稳固。In this embodiment, the artificial canal 321 is fixedly embedded in the ground, and the artificial canal 321 is made of masonry and concrete, so that the artificial canal 321 is strong and stable.
进一步地,人造渠321的两端分别连通到人工湖1与喷泉池3内,喷泉池3内溢出的水量会经由人造渠321流回到人工湖1内,形成流水潺潺的景观,且通过第二水泵13、第二水管131以及人造渠321使人工湖1与喷泉池3之间的水形成循环流动。Further, the two ends of the artificial canal 321 are respectively connected to the artificial lake 1 and the fountain pool 3, and the overflowing water in the fountain pool 3 will flow back to the artificial lake 1 through the artificial canal 321, forming a landscape of gurgling water. The two water pumps 13 , the second water pipe 131 and the artificial canal 321 make the water between the artificial lake 1 and the fountain pool 3 form a circulating flow.
本实施例中,第三水泵15通过螺栓固定在人工湖1的前侧壁上,使第三水泵15结实稳固。In this embodiment, the third water pump 15 is fixed on the front side wall of the artificial lake 1 by bolts, so that the third water pump 15 is strong and stable.
进一步地,第三水管151穿过人工湖1的前侧壁后固定嵌设在地面内,使第三水管151结实稳固。Further, the third water pipe 151 is fixedly embedded in the ground after passing through the front side wall of the artificial lake 1, so that the third water pipe 151 is strong and stable.
进一步地,第三水管151的后端连接有草坪喷灌喷头,便于直接取用人工湖1内的水对园林内的植株进行喷灌操作,既可以充分利用人工湖1内的水,也可以加快人工湖1内水量的循环和更新速度,使人工湖1更接近活水,进而使人工湖1保持清洁。Further, the rear end of the third water pipe 151 is connected with a lawn sprinkling nozzle, which is convenient to directly use the water in the artificial lake 1 to perform sprinkling and irrigation operations on the plants in the garden, so that the water in the artificial lake 1 can be fully utilized, and the artificial The circulation and renewal speed of the water in the lake 1 make the artificial lake 1 closer to running water, thereby keeping the artificial lake 1 clean.
具体地,第一水泵12、第二水泵13以及第三水泵15均采用的是上海辛巴水泵有限公司生产提供的型号为QY25-17-2.2S的不锈钢潜水泵,其配套的电源和配件也均由该厂商提供;此外,本实施例中涉及到的第一水泵12、第二水泵13以及第三水泵15均为现有技术,本领域的技术人员完全可以实现,无需赘言,本实用新型保护的内容也不涉及对第一水泵12、第二水泵13以及第三水泵15的结构和工作原理的改进。Specifically, the first water pump 12, the second water pump 13, and the third water pump 15 all use stainless steel submersible pumps of the model QY25-17-2.2S produced by Shanghai Simba Water Pump Co., Ltd., and the supporting power supplies and accessories are also All provided by this manufacturer; In addition, the first water pump 12, the second water pump 13 and the third water pump 15 involved in this embodiment are all prior art, and those skilled in the art can realize it completely, needless to say, the utility model The protected content also does not involve improvements to the structures and working principles of the first water pump 12 , the second water pump 13 and the third water pump 15 .
此外,人工湖1内还应设有进水管和排水管,便于对人工湖1进行灌水以及排水清洁等操作。In addition, the artificial lake 1 should also be provided with water inlet pipes and drainage pipes, so as to facilitate operations such as watering and drainage cleaning of the artificial lake 1 .
本实施例的园林绿化循环式引水构造在使用时,首先根据园林布局的需求在合适的位置开凿并修砌好人工湖1和喷泉池3,在人工湖1的一侧妥善放置好假山2,再将各个水泵和喷泉泵稳固安装在人工湖1和喷泉池3内,并将各个水管妥善安装好,最后分别将各个水泵接通外界电源使其工作即可。When the landscaping circulating water diversion structure of the present embodiment is in use, at first the artificial lake 1 and the fountain pool 3 are excavated and built at a suitable location according to the requirements of the garden layout, and the rockery 2 is properly placed on one side of the artificial lake 1. Then install each water pump and fountain pump firmly in the artificial lake 1 and fountain pool 3, and install each water pipe properly, and finally connect each water pump to an external power source to make it work.
以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的仅为本实用新型的优选例,并不用来限制本实用新型,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the industry should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions are only preferred examples of the utility model, and are not used to limit the utility model. Without departing from the utility model Under the premise of the spirit and scope, the utility model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920208509.3U CN209653022U (en) | 2019-02-19 | 2019-02-19 | A landscaping circular water diversion structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920208509.3U CN209653022U (en) | 2019-02-19 | 2019-02-19 | A landscaping circular water diversion structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209653022U true CN209653022U (en) | 2019-11-19 |
Family
ID=68524404
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920208509.3U Expired - Fee Related CN209653022U (en) | 2019-02-19 | 2019-02-19 | A landscaping circular water diversion structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209653022U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112150301A (en) * | 2020-09-16 | 2020-12-29 | 河北华天环保园林工程有限公司 | Wisdom gardens management system |
| CN113863207A (en) * | 2021-10-26 | 2021-12-31 | 王长新 | Water flow energy-saving system based on stepped artificial lake |
-
2019
- 2019-02-19 CN CN201920208509.3U patent/CN209653022U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112150301A (en) * | 2020-09-16 | 2020-12-29 | 河北华天环保园林工程有限公司 | Wisdom gardens management system |
| CN113863207A (en) * | 2021-10-26 | 2021-12-31 | 王长新 | Water flow energy-saving system based on stepped artificial lake |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209653022U (en) | A landscaping circular water diversion structure | |
| CN205546789U (en) | Art pergola | |
| CN201813692U (en) | Root water supply flowerpot | |
| CN217184186U (en) | Afforestation soil water retaining system | |
| CN215857492U (en) | Ecological bank protection of good engineering | |
| CN210976733U (en) | An ecological garden landscape building | |
| CN209473132U (en) | A kind of rice fish farming system | |
| CN202127683U (en) | Serial water-saving irrigation device for planting of plurality of seedlings | |
| CN201303538Y (en) | Pool-type green house micro-irrigation system | |
| CN216839258U (en) | Ecological bank dyke for hydraulic engineering | |
| CN213548847U (en) | Gardens retaining irrigation equipment | |
| CN217487032U (en) | Ecological landscape based on light greening building | |
| CN113396732B (en) | Park city intelligent view bench chair | |
| CN216339913U (en) | Three-dimensional landscape structure with water body circulation | |
| CN210328693U (en) | Gardens are with afforestation cultivation device | |
| CN209995042U (en) | greening landscape architecture for urban planning and design | |
| CN103636463A (en) | Plant-irrigating and pest-killing system and method | |
| CN210067292U (en) | Ecological landscape stair handrail | |
| CN216605802U (en) | A water storage device for landscaping engineering with automatic water storage function | |
| CN220284722U (en) | Hydraulic engineering river course slope protection structure | |
| CN220476397U (en) | Landscape plant cultivation device | |
| CN216123554U (en) | Green building greening wall surface capable of automatically watering | |
| CN206791288U (en) | A kind of pipeline solid cultivation equipment | |
| CN211745987U (en) | Landscaping Irrigation System | |
| CN212464157U (en) | Novel gardens plant groove |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191119 Termination date: 20210219 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |