CN209637208U - A kind of ruggedized construction that returns back to top for post-cast strip cantilever - Google Patents

A kind of ruggedized construction that returns back to top for post-cast strip cantilever Download PDF

Info

Publication number
CN209637208U
CN209637208U CN201821913381.2U CN201821913381U CN209637208U CN 209637208 U CN209637208 U CN 209637208U CN 201821913381 U CN201821913381 U CN 201821913381U CN 209637208 U CN209637208 U CN 209637208U
Authority
CN
China
Prior art keywords
post
pivoted housing
cast strip
pvc pipe
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821913381.2U
Other languages
Chinese (zh)
Inventor
童天培
刘智泉
杨海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201821913381.2U priority Critical patent/CN209637208U/en
Application granted granted Critical
Publication of CN209637208U publication Critical patent/CN209637208U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of ruggedized constructions that returns back to top for post-cast strip cantilever, can solve traditional post-cast strip cantilever design return back to top mode mostly use greatly steel pipe scaffold support way, the drawbacks of such way, is that, after original full hall support scaffolding is removed, post-cast strip region is not returned back to top or returned back to top in time is not in place, the problem of to cause beam slab cantilever end stress to change, even result in due to cantilever beam slab differential settlement and cause road surface crocking.Including pvc pipe, concrete, batten and pivoted housing, pouring inside the pvc pipe has the concrete, and the pvc pipe upper and lower ends pass through the batten and fix, the pivoted housing is socketed in the middle part of the pvc pipe outer wall, connector is welded in the middle part of the pivoted housing side wall, it is provided on the connector side wall for carrying out docking fixed clamping groove between steel pipe, and is embedded with power supply on the connector outer wall, be mounted on collet on the inner wall of two sides above and below the clamping groove.

Description

A kind of ruggedized construction that returns back to top for post-cast strip cantilever
Technical field
It returns back to top ruggedized construction the utility model relates to one kind, and in particular to a kind of reinforcing knot that returns back to top for post-cast strip cantilever Structure.
Background technique
Currently, most of structure is designed as simple beams and slabs in construction site, due to the indwelling of post-cast strip, structure by Power is changed into cantilever beam slab, therefore support need to be added at post-cast strip, and the structure generated by factors such as concrete gravities is avoided to become Shape causes beam slab cantilever root to crack, and reduces the risk of leakage in structure plate face later period.In order to guarantee structure stress requirement, by beam Plate and alter-pouring strips mould plate support system are as same system.After waiting post-cast strip two sides beam slab concrete to reach strength of mould stripping, In Support must remove at any time when removing post-cast strip region expires hall support scaffolding, at post-cast strip returns back to top at any time.
The mode that returns back to top of traditional post-cast strip cantilever design mostly uses greatly steel pipe scaffold to support way, the disadvantage of such way End is that, after original full hall support scaffolding is removed, post-cast strip region is not returned back to top or is returned back to top in time is not in place, thus It causes beam slab cantilever end stress to change, even results in due to cantilever beam slab differential settlement and cause road surface crocking.
Utility model content
The purpose of this utility model is to provide a kind of ruggedized constructions that returns back to top for post-cast strip cantilever, can solve tradition The post-cast strip cantilever design mode that returns back to top mostly use steel pipe scaffold to support way greatly, the drawbacks of such way, is that, originally Full hall support scaffolding remove after, post-cast strip region is not returned back to top or is returned back to top in time is not in place, to cause beam slab cantilever Stress variation is held, the problem of even resulting in due to cantilever beam slab differential settlement and cause road surface crocking.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of ruggedized construction that returns back to top for post-cast strip cantilever, including pvc pipe, concrete, batten and pivoted housing, it is described Pouring inside pvc pipe has the concrete, and the pvc pipe upper and lower ends pass through the batten and fix, the pvc pipe outer wall Middle part is socketed with the pivoted housing;
It is welded with connector in the middle part of the pivoted housing side wall, is provided on the connector side wall for being docked between steel pipe Fixed clamping groove, and power supply is embedded on the connector outer wall, the clamping groove are mounted on collet on two sides inner walls up and down, and two The hydraulic telescopic rod for running through the connector side wall, two hydraulic telescopic rods one are respectively connected on a collet side wall End is connected with the hydraulic pump being located on the pivoted housing outer wall respectively, and fixation is respectively welded on the pivoted housing and the connector side wall There is a diagonal brace, two diagonal brace bottom ends are provided with a stabilizer blade, wear on two stabilizer blades and be connected to a bolt.
Preferably, it is connected between the pivoted housing and pvc pipe by two dismountable screws being located on pivoted housing outer wall, And pivoted housing is made of two semicolumns, is provided with the hinged of lower both ends disposed thereon on two semicolumn two sides outer walls Head is spliced to form pivoted housing by wearing the dismountable nut connect in articulated joint between two semicolumns.
Preferably, after the screw disassembling, in rotation connection between pivoted housing and pvc pipe outer wall.
Preferably, the arc-shaped structure of the collet, and collet is movably connected by hydraulic telescopic rod and inner nosepiece wall.
Preferably, the pvc pipe diameter be 150mm, and the height of pvc pipe according to live structure sheaf height determine, lay away from It is arranged from along post-cast strip direction 2m.
Preferably, the batten that the pvc pipe top and bottom surrounding are all made of wide 20mm is fixed.
Preferably, the batten is the strip that template is cut into, and batten bottom is fixed on structural slab by cement nail, and Batten end is fixed in template.
The utility model has the beneficial effects that structure is simple, so that the process of construction is simple, strong operability, difficulty of construction It is small, since concrete pours together with cast-in-situ beam slab in default pvc pipe, it is linked to be entirety, in post-cast strip cantilever design strong concrete Degree reach 100% before without removing, avoid and first removed using conventional method during support for shuttering returns back to top again, because of self weight etc. Factor malformation caused by cantilever design end, to improve construction quality.
Compared with traditional steel pipe scaffold support returns back to top method, tube material is substantially increased using this construction method Turnover rate has saved engineering cost.
Construction site post-cast strip cantilever design is avoided after demoulding, using steel pipe frame return back to top it is not in place, return back to top not in time The phenomenon that not returning back to top even, reduces the risk of leakage of post-cast strip region.
By being socketed the pivoted housing using diagonal brace support on pvc pipe outer wall, and it is welded with and is used for and steel on pivoted housing side wall The fixed connector of pipe docking, due to being fixed between pivoted housing and pvc pipe by two dismountable screws, so that connector is needing to adjust Perfect square to when can rotate through knockout screw and on pvc pipe and to be adjusted so that pvc pipe always can during installation It is enough to carry out docking fixation between steel pipe.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the utility model will be further described below with reference to the accompanying drawings.
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model plan view;
Fig. 3 is the utility model pivoted housing structural schematic diagram;
Fig. 4 is the a-quadrant details enlarged drawing in the utility model Fig. 3;
In figure: 1, pvc pipe;2, concrete;3, batten;4, pivoted housing;5, connector;6, diagonal brace;7, hydraulic pump;8, hydraulically extensible Bar;9, screw;10, stabilizer blade;11, bolt;12, collet;13, power supply;14, clamping groove.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with embodiment, it is clear that described Embodiment be only the utility model a part of the embodiment, instead of all the embodiments.Based on the reality in the utility model Example is applied, all other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to In the range of the utility model protection.
Please refer to shown in Fig. 1-4, a kind of ruggedized construction that returns back to top for post-cast strip cantilever, including pvc pipe 1, concrete 2, Batten 3 and pivoted housing 4 pour inside pvc pipe 1 and are inoculated with concrete 2, and 1 upper and lower ends of pvc pipe fixed, the pvc pipe 1 that passes through batten 3 Pivoted housing 4 is socketed in the middle part of outer wall;
It is welded with connector 5 in the middle part of 4 side wall of pivoted housing, is provided on 5 side wall of connector for carrying out docking fixation between steel pipe Clamping groove 14, and be embedded with power supply 13 on 5 outer wall of connector, be mounted on collet 12 on about 14 two sides inner wall of clamping groove, two Be respectively connected with the hydraulic telescopic rod 8 of 5 side wall of penetrator on 12 side wall of collet, two 8 one end of hydraulic telescopic rod respectively with Hydraulic pump 7 on 4 outer wall of pivoted housing is connected, and is respectively welded on pivoted housing 4 and 5 side wall of connector and is fixed with a diagonal brace 6, and two 6 bottom end of diagonal brace is provided with a stabilizer blade 10, wears on two stabilizer blades 10 and is connected to a bolt 11.
It is connected between pivoted housing 4 and pvc pipe 1 by two dismountable screws 9 being located on 4 outer wall of pivoted housing, so that turning Adjustment direction can be rotated on 1 outer wall of pvc pipe after removal by covering the screw 9 on 4 outer walls, and pivoted housing 4 is by two semicolumn structures At, be provided with the articulated joint 15 at lower both ends disposed thereon on two semicolumn two sides outer walls, two semicolumns it Between be spliced to form pivoted housing 4 by wearing the dismountable nut connect in articulated joint 15 so that the nut in disassembly articulated joint 15 Pivoted housing 4 is split in two semicolumns afterwards, so as to dismantle from pvc pipe 1.
After screw 9 is dismantled, in rotation connection between 1 outer wall of pivoted housing 4 and pvc pipe, so that turning in two rotations of screw 9 of disassembly After set 4, the clamping groove 14 on connector 5 is enabled to adjust to towards steel pipe.
The arc-shaped structure of collet 12, and collet 12 is movably connected by hydraulic telescopic rod 8 and 5 inner wall of connector, is being started Power supply 13 can start two hydraulic pumps 7 using power supply 13, to drive hydraulic telescopic rod 8 to drive collet using hydraulic pump 7 12 clamping steel pipes, it is ensured that stability.
1 diameter of pvc pipe is 150mm, and the height of pvc pipe 1 is determined according to live structure sheaf height, lays distance along post-cast strip Direction 2m arrangement.
The batten 3 that 1 top of pvc pipe and bottom surrounding are all made of wide 20mm is fixed.
Batten 3 is the strip that template is cut into, and 3 bottom of batten is fixed on structural slab by cement nail, and 3 end of batten It is fixed in template.
When the utility model is used, referring to Fig. 1, in the construction of post-cast strip cantilever design, first in the template of cantilever beam slab Place as required reserve diameter hole identical with 1 diameter of pvc pipe, before casting concrete, according to template reserved opening according to The secondary vertical pvc pipe 1 of arrangement, and the setting height of pvc pipe 1 is high layer by layer identical as this.
Then, referring to fig. 2, it while laying pvc pipe 1, is fixed to surrounding is carried out with batten 3 above and below standpipe, prevents water Prosposition moves, and batten 3 is the strip that template is cut into, and wide 20mm is fixed on structural slab in bottom by cement nail, solid in end It is scheduled in template.It using the pvc pipe 1 of diameter 150mm, is highly determined according to live structure sheaf height, lays distance along post-cast strip side It is arranged to 2m, and then, dismantles two screws 9 and rotate pivoted housing 4 to which 4 direction of pivoted housing be adjusted, so that on connector 5 Clamping groove 14 is adjusted to towards steel pipe, restarts power supply 13, starts two hydraulic pumps 7 using power supply 13, to utilize hydraulic pump 7 Hydraulic telescopic rod 8 is driven to drive the clamping steel pipe of collet 12, two bolts 11 of 6 bottom of diagonal brace is recycled to carry out fixing PVC pipe 1 Position, so that stabilization is docked between pvc pipe 1 and steel pipe.After after post-cast strip two sides, beam slab concrete reaches strength of mould stripping, removing When post-cast strip region expires hall support scaffolding, and PVC standpipe 1 then keeps the state that returns back to top, due in default pvc pipe 1 concrete 2 with Cast-in-situ beam slab pours together, is linked to be entirety, without removing before in post-cast strip, cantilever design concrete strength reaches 100%, keeps away Exempt from first to remove using conventional method during support for shuttering returns back to top again, because the factors such as self weight are tying caused by cantilever design end Structure deformation, to improve construction quality.It is big using this construction method compared with traditional steel pipe scaffold support returns back to top method The turnover rate for improving tube material greatly, has saved engineering cost.Construction site post-cast strip cantilever design is avoided after demoulding, Being returned back to top using steel pipe frame, not in place, return back to top the phenomenon that returning back to top not in time or even not, reduces the risk of leakage of post-cast strip region.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this Utility model.The utility model is limited only by the claims and their full scope and equivalents.

Claims (7)

1. a kind of ruggedized construction that returns back to top for post-cast strip cantilever, including pvc pipe (1), concrete (2), batten (3) and pivoted housing (4), which is characterized in that pouring inside the pvc pipe (1) has the concrete (2), and the pvc pipe (1) upper and lower ends are logical It crosses the batten (3) to fix, is socketed with the pivoted housing (4) in the middle part of pvc pipe (1) outer wall;
Be welded with connector (5) in the middle part of pivoted housing (4) side wall, be provided on connector (5) side wall between steel pipe into The fixed clamping groove (14) of row docking, and be embedded with power supply (13) on the connector (5) outer wall, the clamping groove (14) two sides up and down It is mounted on inner wall collet (12), one is respectively connected on two collet (12) side walls through the connector (5) side wall Hydraulic telescopic rod (8), two described hydraulic telescopic rod (8) one end respectively be located at the pivoted housing (4) outer wall on hydraulic pump (7) it is connected, is respectively welded on the pivoted housing (4) and the connector (5) side wall and is fixed with a diagonal brace (6), two described oblique Support (6) bottom end is provided with a stabilizer blade (10), wears on two stabilizer blades (10) and is connected to a bolt (11).
2. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 1, which is characterized in that the pivoted housing (4) between pvc pipe (1) by be located at pivoted housing (4) outer wall on two dismountable screws (9) be connected, and pivoted housing (4) by Two semicolumns are constituted, and are provided with the articulated joint (15) at lower both ends disposed thereon on two semicolumn two sides outer walls, and two Pivoted housing (4) are spliced to form by wearing the dismountable nut connect on articulated joint (15) between a semicolumn.
3. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 2, which is characterized in that the screw (9) after dismantling, in rotation connection between pivoted housing (4) and pvc pipe (1) outer wall.
4. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 1, which is characterized in that the collet (12) arc-shaped structure, and collet (12) is movably connected by hydraulic telescopic rod (8) and connector (5) inner wall.
5. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 1, which is characterized in that the PVC Pipe (1) diameter is 150mm, and the height of pvc pipe (1) is determined according to live structure sheaf height, lays distance along post-cast strip direction 2m Arrangement.
6. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 1, which is characterized in that the PVC The batten (3) that pipe (1) top and bottom surrounding are all made of wide 20mm is fixed.
7. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 1, which is characterized in that the batten (3) strip being cut into for template, batten (3) bottom is fixed on structural slab by cement nail, and batten (3) end is fixed on In template.
CN201821913381.2U 2018-11-20 2018-11-20 A kind of ruggedized construction that returns back to top for post-cast strip cantilever Expired - Fee Related CN209637208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821913381.2U CN209637208U (en) 2018-11-20 2018-11-20 A kind of ruggedized construction that returns back to top for post-cast strip cantilever

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821913381.2U CN209637208U (en) 2018-11-20 2018-11-20 A kind of ruggedized construction that returns back to top for post-cast strip cantilever

Publications (1)

Publication Number Publication Date
CN209637208U true CN209637208U (en) 2019-11-15

Family

ID=68473056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821913381.2U Expired - Fee Related CN209637208U (en) 2018-11-20 2018-11-20 A kind of ruggedized construction that returns back to top for post-cast strip cantilever

Country Status (1)

Country Link
CN (1) CN209637208U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457952A (en) * 2018-11-20 2019-03-12 中建四局第六建筑工程有限公司 A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457952A (en) * 2018-11-20 2019-03-12 中建四局第六建筑工程有限公司 A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever

Similar Documents

Publication Publication Date Title
WO2018171119A1 (en) Hydraulic self-lifting truss-type heavy arch dam formwork system using cantilever
CN109736353A (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN105888236B (en) frame template system
CN101144328A (en) Construction method for after-pouring band beam-slab template
CN208346615U (en) Box girder inner formwork
CN110306774B (en) Method and device for installing socket type cantilever scaffold
CN102900230A (en) Liftable reinforced concrete post-casting strip construction method
CN109457952A (en) A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever
CN216865972U (en) Template structure is pour to column cap
CN209637208U (en) A kind of ruggedized construction that returns back to top for post-cast strip cantilever
CN109024987A (en) Construction method is poured after a kind of toilet shear wall
CN110485713B (en) Roofing cornice and escape canal once only pour template reinforcing apparatus
CN110158951B (en) Construction method of all-wood template with frame structure
CN111622482A (en) Simple support frame for steel structure overhanging plate edge and mounting method thereof
CN107916677A (en) Piping lane construction formwork system and its construction method
CN212773372U (en) Simple support frame for steel structure overhanging plate edge
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN208379847U (en) A kind of building prefabrication wallboard concrete pouring structure
CN210396112U (en) Integrated cast-in-place concrete waterproof bank for kitchen and toilet
CN111561150A (en) Post-cast strip supporting system
CN107100322A (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN208088825U (en) A kind of mounting structure of superimposed sheet for assembled architecture
CN116065708A (en) Deviation prevention device for curtain wall embedded part
CN109235709B (en) Full cast-in-place outer wall structure of building
CN212773478U (en) Arc-shaped formwork supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191115

Termination date: 20201120

CF01 Termination of patent right due to non-payment of annual fee