Prior art keywords
post
pvc pipe
cast strip
pivoted housing
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811384537.7A
Other languages
Chinese (zh)
Inventor
童天培
刘智泉
杨海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201811384537.7A priority Critical patent/CN109457952A/en
Publication of CN109457952A publication Critical patent/CN109457952A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of return back to top ruggedized construction and its construction methods for post-cast strip cantilever, can solve traditional post-cast strip cantilever design return back to top mode mostly use greatly steel pipe scaffold support way, the drawbacks of such way, is that, after original full hall support scaffolding is removed, post-cast strip region is not returned back to top or returned back to top in time is not in place, the problem of to cause beam slab cantilever end stress to change, even result in due to cantilever beam slab differential settlement and cause road surface crocking.Including pvc pipe, concrete, batten and pivoted housing, pouring inside the pvc pipe has the concrete, and the pvc pipe upper and lower ends pass through the batten and fix, the pivoted housing is socketed in the middle part of the pvc pipe outer wall, connector is welded in the middle part of the pivoted housing side wall, it is provided on the connector side wall for carrying out docking fixed clamping groove between steel pipe, and is embedded with power supply on the connector outer wall, be mounted on collet on the inner wall of two sides above and below the clamping groove.

Description

A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever
Technical field
The present invention relates to a kind of ruggedized constructions that returns back to top of post-cast strip cantilever, and in particular to a kind of returning for post-cast strip cantilever Push up ruggedized construction and its construction method.
Background technique
Currently, most of structure is designed as simple beams and slabs in construction site, due to the indwelling of post-cast strip, structure by Power is changed into cantilever beam slab, therefore support need to be added at post-cast strip, and the structure generated by factors such as concrete gravities is avoided to become Shape causes beam slab cantilever root to crack, and reduces the risk of leakage in structure plate face later period.In order to guarantee structure stress requirement, by beam Plate and alter-pouring strips mould plate support system are as same system.After waiting post-cast strip two sides beam slab concrete to reach strength of mould stripping, Support must remove at any time when removing post-cast strip region expires hall support scaffolding, at post-cast strip returns back to top at any time.
Traditional post-cast strip cantilever design mode that returns back to top mostly uses greatly steel pipe scaffold to support way, the drawbacks of such way It is that, after original full hall support scaffolding is removed, post-cast strip region is not returned back to top or returned back to top in time is not in place, to make Change at beam slab cantilever end stress, even results in due to cantilever beam slab differential settlement and cause road surface crocking.
Summary of the invention
It, can be with the purpose of the present invention is to provide a kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever Solving traditional post-cast strip cantilever design mode that returns back to top mostly uses greatly steel pipe scaffold to support way, and the drawbacks of such way just exists In post-cast strip region not being returned back to top or is returned back to top in time is not in place, to cause beam after original full hall support scaffolding is removed Plate cantilever end stress variation, the problem of even resulting in due to cantilever beam slab differential settlement and cause road surface crocking.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever, including pvc pipe, concrete, batten with And pivoted housing, the pvc pipe inside, which is poured, the concrete, and the pvc pipe upper and lower ends pass through the batten and fix, institute It states and is socketed with the pivoted housing in the middle part of pvc pipe outer wall;
It is welded with connector in the middle part of the pivoted housing side wall, is provided on the connector side wall for being docked between steel pipe Fixed clamping groove, and power supply is embedded on the connector outer wall, the clamping groove are mounted on collet on two sides inner walls up and down, and two The hydraulic telescopic rod for running through the connector side wall, two hydraulic telescopic rods one are respectively connected on a collet side wall End is connected with the hydraulic pump being located on the pivoted housing outer wall respectively, and fixation is respectively welded on the pivoted housing and the connector side wall There is a diagonal brace, two diagonal brace bottom ends are provided with a stabilizer blade, wear on two stabilizer blades and be connected to a bolt.
Preferably, it is connected between the pivoted housing and pvc pipe by two dismountable screws being located on pivoted housing outer wall, And pivoted housing is made of two semicolumns, is provided with the hinged of lower both ends disposed thereon on two semicolumn two sides outer walls Head is spliced to form pivoted housing by wearing the dismountable nut connect in articulated joint between two semicolumns.
Preferably, after the screw disassembling, in rotation connection between pivoted housing and pvc pipe outer wall.
Preferably, the arc-shaped structure of the collet, and collet is movably connected by hydraulic telescopic rod and inner nosepiece wall.
A kind of construction method of the ruggedized construction that returns back to top for post-cast strip cantilever, includes the following steps:
Step 1: when construction site basement post-pouring zone cantilever design is constructed, first at the template of cantilever beam slab as required Diameter is reserved with pvc pipe hole, before casting concrete, is sequentially arranged vertical pvc pipe according to template reserved opening, pvc pipe Height is high layer by layer with this, while being fixed to above and below pvc pipe with batten, prevents horizontal displacement, and is arranged at structural beams A piece standpipe;
Step 2: casting concrete, when pouring to concrete casting is also carried out in pvc pipe, to post-cast strip two sides beam slab After concrete reaches strength of mould stripping, when removing post-cast strip region expires hall support scaffolding, PVC standpipe keeps the state that returns back to top.
Preferably, the pvc pipe diameter be 150mm, and the height of pvc pipe according to live structure sheaf height determine, lay away from It is arranged from along post-cast strip direction 2m.
Preferably, the batten that the pvc pipe top and bottom surrounding are all made of wide 20mm is fixed.
Preferably, the batten is the strip that template is cut into, and batten bottom is fixed on structural slab by cement nail, and Batten end is fixed in template.
Beneficial effects of the present invention: the process of construction method is simple, strong operability, difficulty of construction are small, due to presetting PVC Concrete pours together with cast-in-situ beam slab in pipe, is linked to be entirety, before in post-cast strip, cantilever design concrete strength reaches 100% all Without removing, avoids and first removed using conventional method during support for shuttering returns back to top again, because the factors such as self weight are to cantilever design Malformation caused by end, to improve construction quality.
Compared with traditional steel pipe scaffold support returns back to top method, tube material is substantially increased using this construction method Turnover rate has saved engineering cost.
Construction site post-cast strip cantilever design is avoided after demoulding, using steel pipe frame return back to top it is not in place, return back to top not in time The phenomenon that not returning back to top even, reduces the risk of leakage of post-cast strip region.
By being socketed the pivoted housing using diagonal brace support on pvc pipe outer wall, and it is welded with and is used for and steel on pivoted housing side wall The fixed connector of pipe docking, due to being fixed between pivoted housing and pvc pipe by two dismountable screws, so that connector is needing to adjust Perfect square to when can rotate through knockout screw and on pvc pipe and to be adjusted so that pvc pipe always can during installation It is enough to carry out docking fixation between steel pipe.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the present invention will be further described below with reference to the drawings.
Fig. 1 is overall structure of the present invention;
Fig. 2 is plan view of the present invention;
Fig. 3 is pivoted housing structural schematic diagram of the present invention;
Fig. 4 is the a-quadrant details enlarged drawing in Fig. 3 of the present invention;
In figure: 1, pvc pipe;2, concrete;3, batten;4, pivoted housing;5, connector;6, diagonal brace;7, hydraulic pump;8, hydraulically extensible Bar;9, screw;10, stabilizer blade;11, bolt;12, collet;13, power supply;14, clamping groove;15, articulated joint.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with embodiment, it is clear that described reality Applying example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general Logical technical staff all other embodiment obtained without creative efforts belongs to what the present invention protected Range.
It please refers to shown in Fig. 1-4, a kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever, including PVC Pipe 1, concrete 2, batten 3 and pivoted housing 4 pour inside pvc pipe 1 and are inoculated with concrete 2, and 1 upper and lower ends of pvc pipe pass through batten 3 is fixed, is socketed with pivoted housing 4 in the middle part of 1 outer wall of pvc pipe;
It is welded with connector 5 in the middle part of 4 side wall of pivoted housing, is provided on 5 side wall of connector for carrying out docking fixation between steel pipe Clamping groove 14, and be embedded with power supply 13 on 5 outer wall of connector, be mounted on collet 12 on about 14 two sides inner wall of clamping groove, two Be respectively connected with the hydraulic telescopic rod 8 of 5 side wall of penetrator on 12 side wall of collet, two 8 one end of hydraulic telescopic rod respectively with Hydraulic pump 7 on 4 outer wall of pivoted housing is connected, and is respectively welded on pivoted housing 4 and 5 side wall of connector and is fixed with a diagonal brace 6, and two 6 bottom end of diagonal brace is provided with a stabilizer blade 10, wears on two stabilizer blades 10 and is connected to a bolt 11.
It is connected between pivoted housing 4 and pvc pipe 1 by two dismountable screws 9 being located on 4 outer wall of pivoted housing, so that turning Adjustment direction can be rotated on 1 outer wall of pvc pipe after removal by covering the screw 9 on 4 outer walls, and pivoted housing 4 is by two semicolumn structures At, be provided with the articulated joint 15 at lower both ends disposed thereon on two semicolumn two sides outer walls, two semicolumns it Between be spliced to form pivoted housing 4 by wearing the dismountable nut connect in articulated joint 15 so that the nut in disassembly articulated joint 15 Pivoted housing 4 is split in two semicolumns afterwards, so as to dismantle from pvc pipe 1.
After screw 9 is dismantled, in rotation connection between 1 outer wall of pivoted housing 4 and pvc pipe, so that turning in two rotations of screw 9 of disassembly After set 4, the clamping groove 14 on connector 5 is enabled to adjust to towards steel pipe.
The arc-shaped structure of collet 12, and collet 12 is movably connected by hydraulic telescopic rod 8 and 5 inner wall of connector, is being started Power supply 13 can start two hydraulic pumps 7 using power supply 13, to drive hydraulic telescopic rod 8 to drive collet using hydraulic pump 7 12 clamping steel pipes, it is ensured that stability.
A kind of construction method of the ruggedized construction that returns back to top for post-cast strip cantilever, which comprises the steps of:
Step 1: when construction site basement post-pouring zone cantilever design is constructed, first at the template of cantilever beam slab as required Diameter is reserved with 1 hole of pvc pipe, before casting concrete 2, is sequentially arranged vertical pvc pipe 1, pvc pipe according to template reserved opening 1 height is high layer by layer with this, while about 1 pvc pipe being fixed with batten 3, prevents horizontal displacement, and at structural beams A piece standpipe is set;
Step 2: casting concrete 2, when pouring to the pouring of concrete 2 is also carried out in pvc pipe 1, to two curb girder of post-cast strip After board concrete 2 reaches strength of mould stripping, when removing post-cast strip region expires hall support scaffolding, PVC standpipe 1 keeps the shape that returns back to top State, the process of construction method is simple, strong operability, difficulty of construction are small, due to concrete and cast-in-situ beam slab one in default pvc pipe With pouring, it is linked to be entirety, without removing before cantilever design concrete strength reaches 100% in post-cast strip, avoids using biography System method is first removed during support for shuttering returns back to top again, because the factors such as self weight are malformation caused by cantilever design end, from And improve construction quality.
1 diameter of pvc pipe is 150mm, and the height of pvc pipe 1 is determined according to live structure sheaf height, lays distance along post-cast strip Direction 2m arrangement.
The batten 3 that 1 top of pvc pipe and bottom surrounding are all made of wide 20mm is fixed.
Batten 3 is the strip that template is cut into, and 3 bottom of batten is fixed on structural slab by cement nail, and 3 end of batten It is fixed in template.
In the use of the present invention, in the construction of post-cast strip cantilever design, first being pressed at the template of cantilever beam slab referring to Fig. 1 It is required that reserved diameter hole identical with 1 diameter of pvc pipe, before casting concrete, according to template reserved opening successively cloth Vertical pvc pipe 1 is set, and the setting height of pvc pipe 1 is high layer by layer identical as this.
Then, referring to fig. 2, it while laying pvc pipe 1, is fixed to surrounding is carried out with batten 3 above and below standpipe, prevents water Prosposition moves, and batten 3 is the strip that template is cut into, and wide 20mm is fixed on structural slab in bottom by cement nail, solid in end It is scheduled in template.It using the pvc pipe 1 of diameter 150mm, is highly determined according to live structure sheaf height, lays distance along post-cast strip side It is arranged to 2m, and then, dismantles two screws 9 and rotate pivoted housing 4 to which 4 direction of pivoted housing be adjusted, so that on connector 5 Clamping groove 14 is adjusted to towards steel pipe, restarts power supply 13, starts two hydraulic pumps 7 using power supply 13, to utilize hydraulic pump 7 Hydraulic telescopic rod 8 is driven to drive the clamping steel pipe of collet 12, two bolts 11 of 6 bottom of diagonal brace is recycled to carry out fixing PVC pipe 1 Position, so that stabilization is docked between pvc pipe 1 and steel pipe.After after post-cast strip two sides, beam slab concrete reaches strength of mould stripping, removing When post-cast strip region expires hall support scaffolding, and PVC standpipe 1 then keeps the state that returns back to top, due in default pvc pipe 1 concrete 2 with Cast-in-situ beam slab pours together, is linked to be entirety, without removing before in post-cast strip, cantilever design concrete strength reaches 100%, keeps away Exempt from first to remove using conventional method during support for shuttering returns back to top again, because the factors such as self weight are tying caused by cantilever design end Structure deformation, to improve construction quality.It is big using this construction method compared with traditional steel pipe scaffold support returns back to top method The turnover rate for improving tube material greatly, has saved engineering cost.Construction site post-cast strip cantilever design is avoided after demoulding, Being returned back to top using steel pipe frame, not in place, return back to top the phenomenon that returning back to top not in time or even not, reduces the risk of leakage of post-cast strip region.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (8)

1. a kind of ruggedized construction that returns back to top for post-cast strip cantilever, including pvc pipe (1), concrete (2), batten (3) and pivoted housing (4), which is characterized in that pouring inside the pvc pipe (1) has the concrete (2), and the pvc pipe (1) upper and lower ends are logical It crosses the batten (3) to fix, is socketed with the pivoted housing (4) in the middle part of pvc pipe (1) outer wall;
Be welded with connector (5) in the middle part of pivoted housing (4) side wall, be provided on connector (5) side wall between steel pipe into The fixed clamping groove (14) of row docking, and be embedded with power supply (13) on the connector (5) outer wall, the clamping groove (14) two sides up and down It is mounted on inner wall collet (12), one is respectively connected on two collet (12) side walls through the connector (5) side wall Hydraulic telescopic rod (8), two described hydraulic telescopic rod (8) one end respectively be located at the pivoted housing (4) outer wall on hydraulic pump (7) it is connected, is respectively welded on the pivoted housing (4) and the connector (5) side wall and is fixed with a diagonal brace (6), two described oblique Support (6) bottom end is provided with a stabilizer blade (10), wears on two stabilizer blades (10) and is connected to a bolt (11).
2. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 1, which is characterized in that the pivoted housing (4) between pvc pipe (1) by be located at pivoted housing (4) outer wall on two dismountable screws (9) be connected, and pivoted housing (4) by Two semicolumns are constituted, and are provided with the articulated joint (15) at lower both ends disposed thereon on two semicolumn two sides outer walls, and two Pivoted housing (4) are spliced to form by wearing the dismountable nut connect on articulated joint (15) between a semicolumn.
3. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 2, which is characterized in that the screw (9) after dismantling, in rotation connection between pivoted housing (4) and pvc pipe (1) outer wall.
4. a kind of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 1, which is characterized in that the collet (12) arc-shaped structure, and collet (12) is movably connected by hydraulic telescopic rod (8) and connector (5) inner wall.
5. a kind of construction method of the ruggedized construction that returns back to top for post-cast strip cantilever, which comprises the steps of:
Step 1: it when construction site basement post-pouring zone cantilever design is constructed, is first reserved as required at the template of cantilever beam slab The same pvc pipe of diameter (1) hole is sequentially arranged vertical pvc pipe (1), PVC according to template reserved opening before casting concrete (2) The height for managing (1) is high layer by layer with this, while pvc pipe (1) being fixed with batten (3) up and down, and is arranged at structural beams A piece standpipe;
Step 2: casting concrete (2), when pouring to concrete (2) pouring is also carried out in pvc pipe (1), to post-cast strip two sides After beam slab concrete (2) reaches strength of mould stripping, when removing post-cast strip region expires hall support scaffolding, PVC standpipe (1) is kept back Dome-shaped state.
6. a kind of construction method of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 5, feature exist In pvc pipe (1) diameter is 150mm, and the height of pvc pipe (1) is determined according to live structure sheaf height, lays distance along rear Band direction 2m is poured to arrange.
7. a kind of construction method of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 5, feature exist It is fixed in the batten (3) that, pvc pipe (1) top and bottom surrounding are all made of wide 20mm.
8. a kind of construction method of ruggedized construction that returns back to top for post-cast strip cantilever according to claim 5, feature exist In the batten (3) is the strip that template is cut into, and batten (3) bottom is fixed on structural slab by cement nail, and batten (3) end is fixed in template.
CN201811384537.7A 2018-11-20 2018-11-20 A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever Pending CN109457952A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811384537.7A CN109457952A (en) 2018-11-20 2018-11-20 A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811384537.7A CN109457952A (en) 2018-11-20 2018-11-20 A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever

Publications (1)

Publication Number Publication Date
CN109457952A true CN109457952A (en) 2019-03-12

Family

ID=65611191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811384537.7A Pending CN109457952A (en) 2018-11-20 2018-11-20 A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever

Country Status (1)

Country Link
CN (1) CN109457952A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305596A (en) * 2019-11-28 2020-06-19 上海泾东建筑发展有限公司 Rapid dismounting and mounting reinforcing structure for beamless floor slab of basement and construction method thereof
CN114370070A (en) * 2021-12-23 2022-04-19 珠海华发人居生活研究院有限公司 Construction method for post-cast strip settlement back-to-top support

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1195366A (en) * 1966-07-06 1970-06-17 Mills Scaffold Co Ltd Improved Shuttering Prop and Assembly for use in Building Construction
KR20070051104A (en) * 2005-11-14 2007-05-17 깨뱉시스템주식회사 Support system for flying form
CN103603491A (en) * 2013-11-22 2014-02-26 中冶天工集团有限公司 Beam plate post-cast strip form plate support frame and setting up method thereof
CN103806646A (en) * 2014-02-18 2014-05-21 广东信海建筑有限公司 Formwork early-removal construction method allowing three-dimensional space size to be adjustable
CN104878922A (en) * 2015-05-13 2015-09-02 中建三局第三建设工程有限责任公司 Post-cast strip steel pipe top supporting system and construction method thereof
CN206233566U (en) * 2016-11-11 2017-06-09 中国建筑第八工程局有限公司 It is a kind of early to tear method alter-pouring strips mould plate supporting construction open
CN206844643U (en) * 2017-06-26 2018-01-05 常嘉建设集团有限公司 Post-cast strip independence braced wing support combination unit
CN209637208U (en) * 2018-11-20 2019-11-15 中建四局第六建筑工程有限公司 A kind of ruggedized construction that returns back to top for post-cast strip cantilever

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1195366A (en) * 1966-07-06 1970-06-17 Mills Scaffold Co Ltd Improved Shuttering Prop and Assembly for use in Building Construction
KR20070051104A (en) * 2005-11-14 2007-05-17 깨뱉시스템주식회사 Support system for flying form
CN103603491A (en) * 2013-11-22 2014-02-26 中冶天工集团有限公司 Beam plate post-cast strip form plate support frame and setting up method thereof
CN103806646A (en) * 2014-02-18 2014-05-21 广东信海建筑有限公司 Formwork early-removal construction method allowing three-dimensional space size to be adjustable
CN104878922A (en) * 2015-05-13 2015-09-02 中建三局第三建设工程有限责任公司 Post-cast strip steel pipe top supporting system and construction method thereof
CN206233566U (en) * 2016-11-11 2017-06-09 中国建筑第八工程局有限公司 It is a kind of early to tear method alter-pouring strips mould plate supporting construction open
CN206844643U (en) * 2017-06-26 2018-01-05 常嘉建设集团有限公司 Post-cast strip independence braced wing support combination unit
CN209637208U (en) * 2018-11-20 2019-11-15 中建四局第六建筑工程有限公司 A kind of ruggedized construction that returns back to top for post-cast strip cantilever

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305596A (en) * 2019-11-28 2020-06-19 上海泾东建筑发展有限公司 Rapid dismounting and mounting reinforcing structure for beamless floor slab of basement and construction method thereof
CN114370070A (en) * 2021-12-23 2022-04-19 珠海华发人居生活研究院有限公司 Construction method for post-cast strip settlement back-to-top support

Similar Documents

Publication Publication Date Title
CN100469995C (en) Construction method for after-pouring band beam-slab template
WO2018171119A1 (en) Hydraulic self-lifting truss-type heavy arch dam formwork system using cantilever
CN105888236B (en) frame template system
CN112523495B (en) Support capable of supporting wall formwork on single side
CN106592966A (en) Support-beam-plate-free post-cast strip formwork system and construction method thereof
CN108716283A (en) The construction method of big section cast-in-situ steel reinforced concrete construction of inclined column structure
CN109457952A (en) A kind of return back to top ruggedized construction and its construction method for post-cast strip cantilever
CN208346615U (en) Box girder inner formwork
CN209637208U (en) A kind of ruggedized construction that returns back to top for post-cast strip cantilever
CN111622482A (en) Simple support frame for steel structure overhanging plate edge and mounting method thereof
CN102900230B (en) Liftable reinforced concrete post-casting strip construction method
CN108589772B (en) Bench formwork system for pipe gallery top plate and early dismantling method of early dismantling formwork
CN213268587U (en) Concrete column's antidetonation strengthening mechanism
CN210396112U (en) Integrated cast-in-place concrete waterproof bank for kitchen and toilet
CN208379847U (en) A kind of building prefabrication wallboard concrete pouring structure
CN116065708A (en) Deviation prevention device for curtain wall embedded part
CN208088825U (en) A kind of mounting structure of superimposed sheet for assembled architecture
CN216865972U (en) Template structure is pour to column cap
CN212773372U (en) Simple support frame for steel structure overhanging plate edge
CN212249192U (en) Reinforced structure of board side form is encorbelmented to super thick
CN114809328A (en) Construction method for plugging floor pay-off hole
CN114215333A (en) Rapid construction method for outer cornice of high-rise building
CN212773478U (en) Arc-shaped formwork supporting device
KR20000018037A (en) Hanging form system
CN214460661U (en) Post-cast strip construction joint optimization processing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190312