CN209633622U - A kind of new-energy automobile sealing ring production mould - Google Patents
A kind of new-energy automobile sealing ring production mould Download PDFInfo
- Publication number
- CN209633622U CN209633622U CN201920431656.7U CN201920431656U CN209633622U CN 209633622 U CN209633622 U CN 209633622U CN 201920431656 U CN201920431656 U CN 201920431656U CN 209633622 U CN209633622 U CN 209633622U
- Authority
- CN
- China
- Prior art keywords
- groups
- sealing ring
- link block
- isocon
- lower die
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 title claims abstract description 29
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 25
- 238000013016 damping Methods 0.000 claims description 18
- 239000000463 material Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 claims description 4
- 239000000084 colloidal system Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000000465 moulding Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001746 injection moulding Methods 0.000 description 1
- 239000010721 machine oil Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Landscapes
- Vibration Prevention Devices (AREA)
Abstract
The utility model discloses a kind of new-energy automobile sealing ring production moulds, including connecing sebific duct, described connect is connected with isocon on the outside of sebific duct, and check valve is provided on the outside of isocon, the bottom end of the isocon is connected with connecting column, and the bottom end of connecting column is provided with upper mold, link block is connected on the outside of the upper mold, and link block is internally provided with internal screw thread, the link block is rotatably connected to bolt by internal screw thread, is provided with lower die immediately below the upper mold.The utility model connects sebific duct, isocon, check valve, connecting column, upper die and lower die, link block, internal screw thread and bolt by what is be arranged, it realizes and distributes three groups of isocons on the outside of sebific duct from connecing, three groups of isocons are correspondingly connected with three groups of upper molds and three groups of lower dies, three groups of molds are connected with bolt by link block, it is more high-efficient than traditional mold work, the sealing ring of same time production is more, reduces the frequent labour of machine, so that the service life of machine extends.
Description
Technical field
The utility model relates to new-energy automobile sealing ring production mould field, specially a kind of new-energy automobile sealing ring
Production mould.
Background technique
New-energy automobile refer to using unconventional vehicle fuel as a source of power (or using conventional vehicle fuel,
Using new vehicle-mounted power plant), the dynamic Control of comprehensive vehicle and the advanced technology of driving aspect, the technical principle elder generation of formation
Into, the automobile with new technology, new construction.
New-energy automobile sealing ring is to avoid machine oil from leaking, aequum for seal automobile internal pipeline connector
Greatly, but existing new-energy automobile sealing ring production mould has that production efficiency is low, existing new-energy automobile
Sealing ring production mould molds production every time and only produces one group of gasket, and the production time is long, and frequently running be easy to cause machine
Strain, and the vibration of existing new-energy automobile sealing ring production mould molding is larger, for the bad at fruit is imitated of mold,
It is also possible to the problem of causing machine parts to relax
Utility model content
The purpose of this utility model is that: there is production effect to solve existing new-energy automobile sealing ring production mould
The vibration of the low problem of rate and molding is larger, for mold at the bad problem of fruit is imitated, provides a kind of new-energy automobile
Sealing ring production mould.
To achieve the above object, the utility model provides the following technical solutions: a kind of new-energy automobile sealing ring production mould
Tool, including sebific duct is connect, described connect is connected with isocon on the outside of sebific duct, and check valve is provided on the outside of isocon, and described point
The bottom end of flow tube is connected with connecting column, and the bottom end of link block column is provided with upper mold, is connected with link block on the outside of the upper mold,
And link block is internally provided with internal screw thread, the link block is rotatably connected to bolt by internal screw thread, the upper mold just under
Side is provided with lower die, and the top of the inside of lower die is connected with vibration damper plate, and the top of the vibration damper plate is connected with resilient cushion, and subtracts
The bottom end of shake pad is connected with connecting plate, and the bottom end of the connecting plate is provided with damping spring, and the bottom end of damping spring is provided with
Bottom plate, the lower die are internally connected with forming cavity.
Preferably, the quantity of the isocon is three groups, and the outside of isocon described in three groups is all connected with check valve,
And isocon described in three groups is all hose construction.
Preferably, the quantity of the upper mold is three groups, and upper mold described in three groups is all bottomless rectangular configuration, and described in three groups
The inside of upper mold is all connected with forming cavity, and the forming cavity is cirque structure.
Preferably, the outside of the lower die is all connected with link block, and link block is hollow rectangular configuration, the bolt
Outside be provided with the external screw thread to match with internal screw thread.
Preferably, the top on the inside of the lower die is connected with sealing ring, and sealing ring is made of rubber material, the damping
Pad is made of rubber material.
Preferably, the bottom end of the lower die is provided with connecting rod, and connecting rod is detachably connected with lower die.
Compared with prior art, the utility model has the beneficial effects that the utility model connects sebific duct, shunting by what is be arranged
Pipe, check valve, connecting column, upper die and lower die, link block, internal screw thread and bolt realize and distribute three components on the outside of sebific duct from connecing
Flow tube, three groups of isocons are correspondingly connected with three groups of upper molds and three groups of lower dies, are connected three groups of molds with bolt by link block, than tradition
Mold work it is high-efficient, same time sealing ring of production is more, reduces the frequent labour of machine, so that machine
Service life extends, and also by setting vibration damper plate, resilient cushion, damping spring and bottom plate, realizes, when upper mold and lower die combination system
When making mold, vibration damper plate can effectively reduce the vibration that two groups of molds are subject to, so that internal press mold effect is more preferable, it will not
There is the thing that mold is damaged because of vibration, and damping can also reduce the vibration that machine is subject to, and part is avoided to relax.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the vibration damper plate structural schematic diagram of the utility model;
Fig. 3 is the upper mold schematic diagram of internal structure of the utility model.
In figure: 1, connecing sebific duct;2, isocon;3, check valve;4, connecting column;5, upper mold;6, link block;7, internal screw thread;8,
Bolt;9, lower die;10, vibration damper plate;11, forming cavity;12, connecting rod;13, resilient cushion;14, connecting plate;15, damping spring;16,
Bottom plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, a kind of new-energy automobile sealing ring production mould are please referred to, including connects sebific duct 1, the outside for connecing sebific duct 1 connects
It is connected to isocon 2, and the outside of isocon 2 is provided with check valve 3, the bottom end of isocon 2 is connected with connecting column 4, and connecting column 4
Bottom end be provided with upper mold 5, the outside of upper mold 5 is connected with link block 6, and link block 6 is internally provided with internal screw thread 7, connection
Block 6 is rotatably connected to bolt 8 by internal screw thread 7, and the underface of upper mold 5 is provided with lower die 9, and the top of the inside of lower die 9 connects
It is connected to vibration damper plate 10, the top of vibration damper plate 10 is connected with resilient cushion 13, and the bottom end of resilient cushion 13 is connected with connecting plate 14, connection
The bottom end of plate 14 is provided with damping spring 15, and the bottom end of damping spring 15 is provided with bottom plate 16, and lower die 9 is internally connected with into
Type chamber 11.
The utility model connects sebific duct 1, isocon 2, check valve 3, connecting column 4, upper mold 5, lower die 9, connection by what is be arranged
Block 6, internal screw thread 7 and bolt 8 realize and distribute three groups of isocons 2 on the outside of sebific duct 1 from connecing, and three groups of isocons 2 are correspondingly connected with three
Group upper mold 5 and three groups of lower dies 9, are connected three groups of molds with bolt 8 by link block 6, more high-efficient than traditional mold work, equally
The time sealing ring of production is more, reduces the frequent labour of machine, so that the service life of machine extends.
Please emphatically refering to fig. 1, the quantity of isocon 2 is three groups, and the outside of three groups of isocons 2 is all connected with check valve
3, and three groups of isocons 2 are all hose construction, three groups of check valves 3 can be controlled separately the work of three groups of isocons 2, if be not required to
Three groups of upper molds 5 and lower die 9 press mold simultaneously are wanted, the check valve 3 of wherein one group or two groups can be closed.
It please focus on refering to Fig. 3, the quantity of upper mold 5 is three groups, and three groups of upper molds 5 are all bottomless rectangular configuration, and on three groups
The inside of mould 5 is all connected with forming cavity 11, and forming cavity 11 is cirque structure, and forming cavity 11 is circular ring structure, that is, new energy
The ring structure that source automobile uses, isocon 2 are connect with forming cavity 11, and raw material is directly allowed to enter inside forming cavity 11.
It please focus on refering to figure, the outside of lower die 9 is all connected with link block 6, and link block 6 is hollow rectangular configuration, spiral shell
The outside of bolt 8 is provided with the external screw thread to match with internal screw thread 7, is by link block respectively between three groups of upper molds 5 and three groups of lower dies 9
6 and bolt 8 connect, disassembly is same simple when maintenance.
Please be emphatically referring to Fig.2, the top of 9 inside of lower die be connected with sealing ring, and sealing ring is made of rubber material, damping
Pad 13 is made of rubber material, and seismaesthesia is transmitted to damping spring 15 by resilient cushion 13, and damping spring 15 is again by elastic by seismaesthesia
It springs back to the resilient cushion 13 on top, plays the function of damping, so that the formation effect of mold is more preferable.
Please emphatically refering to fig. 1, the bottom end of lower die 9 is provided with connecting rod 12, and connecting rod 12 is detachably connected with lower die 9,
Connecting rod 12 is arranged in order to which lower die 9 and injection molding machine to be attached.
Working principle: it in use, ensuring that three groups of upper molds 5 have connected, is revolved between three groups of upper molds 5 by bolt 8 and link block 6
Turn, internal screw thread 7 is matched with the screw thread in 8 outside of bolt and connect, and then can will connect sebific duct 1 connect with machine, connects sebific duct 1 from note
Colloid is received inside molding machine, then colloid is branched to the inside of three groups of upper molds 5 by three kinds of isocons 2, and colloid enters upper mold 5
Inside when can be gathered in the inside of forming cavity 11 because squeezing, forming cavity 11 is circular ring structure, that is, new-energy automobile makes
The ring structure used, when three groups of upper molds 5 push, the vibration damper plate 10 of upper mold 5 and 9 junction of lower die can be to two groups of molds
Vibration mitigates, and seismaesthesia is transmitted to damping spring 15 by resilient cushion 13, and damping spring 15 is again sprung back seismaesthesia to top by elasticity
Resilient cushion 13, thus damping, so that molding effect is more preferable, colloid enters in lower die 9 from upper mold 5 when two groups of molds merge
Portion, forming cavity 11 overlap, to produce qualified sealing ring, after use, if necessary to overhaul, can be reversed stubborn
Dynamic bolt 8, bolt 8 is produced from the internal helicoid of link block 6, so that three groups of upper molds 5 and three groups of lower dies 9 separate, then
Maintenance.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
Claims (6)
1. a kind of new-energy automobile sealing ring production mould, including connect sebific duct (1), it is characterised in that: it is described to connect the outer of sebific duct (1)
Side is connected with isocon (2), and check valve (3) are provided on the outside of isocon (2), and the bottom end of the isocon (2) is connected with
Connecting column (4), and the bottom end of connecting column (4) is provided with upper mold (5), is connected with link block (6) on the outside of the upper mold (5), and
Link block (6) is internally provided with internal screw thread (7), and the link block (6) is rotatably connected to bolt (8), institute by internal screw thread (7)
It states and is provided with immediately below upper mold (5) lower die (9), and the top of the inside of lower die (9) is connected with vibration damper plate (10), the damping
The top of plate (10) is connected with resilient cushion (13), and the bottom end of resilient cushion (13) is connected with connecting plate (14), the connecting plate
(14) bottom end is provided with damping spring (15), and the bottom end of damping spring (15) is provided with bottom plate (16), the lower die (9)
It is internally connected with forming cavity (11).
2. a kind of new-energy automobile sealing ring production mould according to claim 1, it is characterised in that: the isocon
(2) quantity is three groups, and the outside of isocon described in three groups (2) is all connected with check valve (3), and isocon described in three groups
It (2) is all hose construction.
3. a kind of new-energy automobile sealing ring production mould according to claim 1, it is characterised in that: the upper mold (5)
Quantity be three groups, upper mold described in three groups (5) is all bottomless rectangular configuration, and the inside of upper mold described in three groups (5) all connects
Have forming cavity (11), the forming cavity (11) is cirque structure.
4. a kind of new-energy automobile sealing ring production mould according to claim 1, it is characterised in that: the lower die (9)
Outside be all connected with link block (6), and link block (6) is hollow rectangular configuration, be provided on the outside of the bolt (8) with
The external screw thread that internal screw thread (7) matches.
5. a kind of new-energy automobile sealing ring production mould according to claim 1, it is characterised in that: the lower die (9)
The top of inside is connected with sealing ring, and sealing ring is made of rubber material, and the resilient cushion (13) is made of rubber material.
6. a kind of new-energy automobile sealing ring production mould according to claim 1, it is characterised in that: the lower die (9)
Bottom end be provided with connecting rod (12), and connecting rod (12) is detachably connected with lower die (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920431656.7U CN209633622U (en) | 2019-04-02 | 2019-04-02 | A kind of new-energy automobile sealing ring production mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920431656.7U CN209633622U (en) | 2019-04-02 | 2019-04-02 | A kind of new-energy automobile sealing ring production mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209633622U true CN209633622U (en) | 2019-11-15 |
Family
ID=68497206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920431656.7U Active CN209633622U (en) | 2019-04-02 | 2019-04-02 | A kind of new-energy automobile sealing ring production mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209633622U (en) |
-
2019
- 2019-04-02 CN CN201920431656.7U patent/CN209633622U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209633622U (en) | A kind of new-energy automobile sealing ring production mould | |
CN204748866U (en) | Zirconium dioxide ceramic microballon blank apparatus for producing | |
CN208081851U (en) | A kind of quick cotton-filling equipment of down toy processing | |
CN203307101U (en) | Novel sewage flocculation and purification treatment tank | |
CN209176225U (en) | Save the stretching-machine of power source | |
CN203925781U (en) | Chain saw engine fuel oil enriching system | |
CN208346264U (en) | Dephosphorization apparatus is used in bolt processing | |
CN208364231U (en) | A kind of cooling component of engine piston | |
CN108251581B (en) | A kind of device cleaning leather | |
CN202070205U (en) | Fiber beam filter equipment | |
CN209310865U (en) | The gas outlet check valve of gas meter, flow meter counterflow-preventing | |
CN208684528U (en) | It is a kind of for anaerobic fluidized bed pulse water distributing device | |
CN202971164U (en) | Plunger pump device with exhaust function in spray cleaning machine | |
CN204984674U (en) | Pair fuel oil filter | |
CN108772183A (en) | Aqueous vapor cylinder diaphragm jig | |
CN204627960U (en) | For water purifier suction booster assembly and there is its water purifier | |
CN203974110U (en) | The self-enclosed open biomass moulding device of briquetting | |
CN205533533U (en) | Interior differential cylinder structure | |
CN207907362U (en) | A kind of air purifier | |
CN204107157U (en) | A kind of Novel filtering net cleaning structure | |
CN210585491U (en) | Glass water spraying device for mine explosion-proof locomotive | |
CN203620355U (en) | Vibrator of vibrating deslagging vertical type leaf filter | |
CN209704955U (en) | A kind of hydraulic system of framing shaping machine | |
CN218542781U (en) | Large-pressure quick hydraulic cylinder for hydraulic coal press | |
CN207728467U (en) | A kind of delivery valve structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200430 Address after: 210000 Huashu Sanying, Xigang street, Qixia District, Nanjing City, Jiangsu Province Patentee after: Nanjing Luanhua seal Co., Ltd Address before: 322205 Shao House, Lantang Village, Baima Town, Pujiang County, Jinhua City, Zhejiang Province Patentee before: Shao Lidan |