CN209621352U - A kind of positioning slip casting anchoring prestress anchor tube rope - Google Patents

A kind of positioning slip casting anchoring prestress anchor tube rope Download PDF

Info

Publication number
CN209621352U
CN209621352U CN201920322008.8U CN201920322008U CN209621352U CN 209621352 U CN209621352 U CN 209621352U CN 201920322008 U CN201920322008 U CN 201920322008U CN 209621352 U CN209621352 U CN 209621352U
Authority
CN
China
Prior art keywords
anchor tube
anchor
slip casting
grouting
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920322008.8U
Other languages
Chinese (zh)
Inventor
马祯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Resources and Environment Voc Tech College
Original Assignee
Lanzhou Resources and Environment Voc Tech College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Resources and Environment Voc Tech College filed Critical Lanzhou Resources and Environment Voc Tech College
Priority to CN201920322008.8U priority Critical patent/CN209621352U/en
Application granted granted Critical
Publication of CN209621352U publication Critical patent/CN209621352U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of positioning slip casting anchoring prestress anchor tube rope, including anchor tube and anchor cable, anchor tube is provided with supporting plate close to country rock outer end, anchor tube end is provided with strong steel ring, grouting port is set on anchor tube between strong steel ring and supporting plate, the drilling inner end of anchor tube is provided with level pressure stop grouting plug, anchor cable passes through strong steel ring and level pressure stop grouting plug, foot of hole is goed deep into inner end, and anchorage head is arranged in anchor cable inner end;Multiple through-holes are set on the anchor tube wall, setting grouting bag is surrounded outside through-hole, the grouting bag is close to being geotextiles at the wall of a borehole, the suture connection elastic capsule skin around geotextiles, the capsule skin be fixed on around multiple through-holes and with anchor tube fixed seal connection;Anchor cable outer end is provided with nut and carries out prestressd anchor cable anchoring;Realize quickly, facilitate construction, positioning slip casting improves the country rock that drills to positioning grouting and reinforcing is carried out at the zone of fracture or crack, ensure that the firm implementation of subsequent prestressed permanent supporting and slip casting.

Description

A kind of positioning slip casting anchoring prestress anchor tube rope
Technical field
The present invention relates to a kind of tunnel of coal mine, tunnel and underground engineering field/tunnel breaking surrounding rock reinforcement technique, tools Body designs a kind of positioning slip casting anchoring prestress anchor tube rope.
Background technique
The undergrounds field such as coal mine, tunnel country rock situation is complicated, and geological conditions is severe, opens especially in recent years into deeps mines Adopt, wall rock geology situation is increasingly complex, the surrouding rock stresses such as crustal stress situation also with Subsurface country rock there are a great difference, There is extremely broken situation in deep tunnel/tunnel surrounding, for regions such as these crushed zones, karst collapse col umns, using anchor pole, anchor cable branch It when shield, is often not enough to play the role of stabilizing surrounding rock, therefore, the prior art also mostly uses composite support mode, such as anchor net branch Shield, bolt-spary supports, the collaboration supporting of shotcrete pylon etc., but for the supporting inside country rock, be not further improved, ground When getting off to press, it tends to be difficult to safeguard adjoining rock stability.
In order to improve, there are the country rock in the increasingly complex geology area such as crushed zone or karst collapse col umn is steady inside the country rock of underground It is fixed, it is necessary to while anchor pole or cable bolting, grouting and reinforcing can be carried out to broken region, meanwhile, it also to integrate pre- Stress overlaps supporting, and prestressing force support technology can be preferably used for underground complex surrounding rock body supporting in this way.And such as Fruit first improves whole country rock wall-like condition using punching slip casting, then carries out the structural supports such as anchor pole or anchor cable, can bring so more More project amounts, waste of manpower, material resources, and trivial operations, and delay the duration.
Summary of the invention
For above-mentioned technical problem of the existing technology, the present invention provides a kind of positioning slip casting anchoring prestress anchor tubes Rope can be realized to underground engineering breaking surrounding rock band high efficiency, quick, simple supporting, and can be fine by prestressing force supporting Supporting to complex surrounding rock on, improve inside country rock existing for complex surrounding rock state, and realize prestressing force combined supporting.
In order to solve the above technical problems, a kind of positioning slip casting anchoring prestress anchor tube Cable Structure of the invention is as follows:
Anchor tube rope includes anchor tube and anchor cable, and anchor tube is provided with supporting plate close to country rock outer end, and anchor tube end is provided with strength Steel loop circle is arranged grouting port on the anchor tube between strong steel ring and supporting plate, the drilling inner end of anchor tube is provided with level pressure and stops Slurry plug, anchor cable pass through strong steel ring and level pressure stop grouting plug, and foot of hole is goed deep into inner end, and anchorage head is arranged in anchor cable inner end; Multiple through-holes are set on the anchor tube wall, setting grouting bag are surrounded outside through-hole, the grouting bag is close at the wall of a borehole Geotextiles, the suture connection elastic capsule skin around geotextiles, and the capsule skin be fixed on around multiple through-holes it is solid with anchor tube It is fixed to be tightly connected;Anchor cable outer end is provided with nut and carries out prestressd anchor cable anchoring;
It needs to be arranged many places through-hole in anchor tube outer wall foundation and is correspondingly arranged multiple grouting bags;
Prestressing force load is carried out using prestressd anchor cable machine;
Anchor tube rope grouting support is carried out after prestressing force load using slip casting machine.
The present invention solves the prior art and there is construction complexity, and slip casting and prestressing force load process are many and diverse, and cannot be very Carry out positioning slip casting prestressing force loading problem well, realize quickly, facilitate construction, positioning slip casting is to progress at the zone of fracture or crack Positioning grouting and reinforcing improves drilling country rock, and realizes prestressing force and load firm anchor tube, comes while prestressing force load real Now position grouting and reinforcing, ensure that the firm implementation of subsequent prestressed permanent supporting and slip casting, realize it is quick, simple, And the technical effect of grouting support country rock can be positioned very well.
Detailed description of the invention
Fig. 1 is anchor tube Cable Structure main view of the present invention.
Specific embodiment
Fig. 1 shows a kind of positioning slip casting anchoring prestress anchor tube rope, which includes anchor tube 1 and anchor cable 3, anchor cable 3 Inside anchor tube 1, anchorage head 6 is arranged in end, and through-hole 4 is arranged in the outer wall of anchor tube 1, setting slip casting is surrounded outside through-hole 4 Pouch 2, the grouting bag 2 is close to being geotextiles at the wall of a borehole, suture connection elastic capsule skin, the capsule around geotextiles Skin be fixed on around multiple through-holes 4 and with anchor tube fixed seal connection, multiple grouting bags 2 are set on anchor tube 1, corresponding slip casting It is country rock rupture or cranny development position at the wall of a borehole of pouch 2, when slip casting, slurries will be from the geotextiles of grouting bag 2 Locate vectored injection at crack, when grout cures, in the borehole by 1 positioning and anchoring of anchor tube, plays positioning anchor tube rope and propped up Protect the effect of tunnel or tunnel surrounding.
The anchor tube rope stream line 3 passes through anchor tube 1 and is fixed on foot of hole by anchorage head 6, when anchor tube rope deeply drills When middle, anchorage head 6 is rolled up the resin that foot of hole is pre-placed is stirred, and after resin volume stirs and dissipates solidification, anchor cable 3 is fixedly secured In the borehole;The one end of anchor cable 1 outside country rock passes through the elastic strong steel ring 9 of 1 outside end of anchor tube setting, and passes through spiral shell Mother 10 carries out preload fixation, and anchor cable 3 is carried out drawing preload by pretightening machine in tunnel or tunnel, applies prestressing force, is anchor Rope 1 plays prestressing force support action, and passes through the prestress application of anchor cable 3, and the more strong fix of anchor tube 1 is being bored Supporting is carried out in hole, and provides stable supporting and the fixed effect of anchor tube 1 for 1 slip casting process of anchor tube.
Anchor tube 1 still has supporting plate 7 close to country rock wall outer end, and sets on the anchor tube 1 between strong steel ring 9 and supporting plate 7 Grouting port 8 is set, the drilling inner end of anchor tube 1 is provided with level pressure stop grouting plug 5, anchor cable 3 passes through the level pressure stop grouting plug 5, when anchor cable 3 is pre- After stress has applied, grouting equipment injects slurries in anchor tube 3 by grouting port 8, and slurries enter grouting bag 2, and are split Gap band positioning slurries are reinforced and positioning and anchoring anchor tube 1 can choose slurries slip casting and add according to field geology conditions and supporting needs Solid overflow degree and whether forced shock stop grouting plug 5, with decide whether further to reinforce anchor tube rope bottom hole reinforce.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (4)

1. a kind of positioning slip casting anchoring prestress anchor tube rope, it is characterised in that: including anchor tube and anchor cable, anchor tube is close to country rock outer end It is provided with supporting plate, anchor tube end is provided with strong steel ring, slip casting is set on the anchor tube between strong steel ring and supporting plate Mouthful, the drilling inner end of anchor tube is provided with level pressure stop grouting plug, anchor cable passes through strong steel ring and level pressure stop grouting plug, inner end are deeply bored Hole bottom, and anchorage head is set in anchor cable inner end;Multiple through-holes are set on the anchor tube wall, setting slip casting is surrounded outside through-hole Pouch, the grouting bag is close to being geotextiles at the wall of a borehole, suture connection elastic capsule skin, the capsule skin around geotextiles Be fixed on around multiple through-holes and with anchor tube fixed seal connection;Anchor cable outer end is provided with nut and carries out prestressd anchor cable anchor Gu.
2. a kind of positioning slip casting anchoring prestress anchor tube rope according to claim 1, it is characterised in that: anchor tube outer wall according to Many places through-hole and multiple grouting bags are correspondingly arranged according to needing to be arranged.
3. a kind of positioning slip casting anchoring prestress anchor tube rope according to claim 1, it is characterised in that: answered in advance using anchor cable Power machine carries out prestressing force load.
4. a kind of positioning slip casting anchoring prestress anchor tube rope according to claim 1, it is characterised in that: existed using slip casting machine Anchor tube rope grouting support is carried out after prestressing force load.
CN201920322008.8U 2019-03-14 2019-03-14 A kind of positioning slip casting anchoring prestress anchor tube rope Expired - Fee Related CN209621352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920322008.8U CN209621352U (en) 2019-03-14 2019-03-14 A kind of positioning slip casting anchoring prestress anchor tube rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920322008.8U CN209621352U (en) 2019-03-14 2019-03-14 A kind of positioning slip casting anchoring prestress anchor tube rope

Publications (1)

Publication Number Publication Date
CN209621352U true CN209621352U (en) 2019-11-12

Family

ID=68456820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920322008.8U Expired - Fee Related CN209621352U (en) 2019-03-14 2019-03-14 A kind of positioning slip casting anchoring prestress anchor tube rope

Country Status (1)

Country Link
CN (1) CN209621352U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833493A (en) * 2021-09-29 2021-12-24 铁科院(深圳)研究设计院有限公司 Ground layer consolidates uses utricule pipe canopy
CN115341935A (en) * 2022-07-28 2022-11-15 中煤科工开采研究院有限公司 Method for improving anchoring force of small coal pillar
CN115749886A (en) * 2022-12-02 2023-03-07 西南交通大学 Pipe cable pre-stressing device for expanding surrounding rock supporting range and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833493A (en) * 2021-09-29 2021-12-24 铁科院(深圳)研究设计院有限公司 Ground layer consolidates uses utricule pipe canopy
CN115341935A (en) * 2022-07-28 2022-11-15 中煤科工开采研究院有限公司 Method for improving anchoring force of small coal pillar
CN115749886A (en) * 2022-12-02 2023-03-07 西南交通大学 Pipe cable pre-stressing device for expanding surrounding rock supporting range and construction method

Similar Documents

Publication Publication Date Title
CN209621352U (en) A kind of positioning slip casting anchoring prestress anchor tube rope
CN101603431B (en) Method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN105626112B (en) A kind of suspension device and its application method based on built-in constant-resistance device
CN105971640B (en) A kind of reinforcement means of gob side entry driving thin coal pillar
KR101245609B1 (en) Constructing Method of Steel Pile in Sea Ground
KR101332848B1 (en) Method for constructing micro pile using deformed or screw steel pipe and pressure grouting
CN103590845A (en) Impact-resistant interval grouting anchor cable and use method thereof
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
WO2014182074A1 (en) Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method
CN103774653B (en) Linear cavity energy explosion slip casting anchoring pipe anchor rod
CN103774649B (en) Anti-mouth prevents the prestressed anchor extracted from anchor hole
CN106050282A (en) Anchoring structure and reinforcing method of narrow coal pillar of gob-side entry retaining
CN203584447U (en) Anti-impact interval grouting anchor cable
CN103132515A (en) Calabash type anchor rod
KR101665516B1 (en) Construction method of duel tunnel using composite capable of bidirectional tensioning, pressure casting and tiebolting, and its duel tunnel
KR101066641B1 (en) Pre-stressing tunneling method using presupport concept and thereof apparatus
KR200381572Y1 (en) Paker can pressure with milk grouting
JP4782227B2 (en) Retaining wall structure
CN202936791U (en) Pre-stressed anchor rod prevented from being pulled out of anchor eye
KR100895770B1 (en) Inner member additional reinforcement assembly for preventing ground collapse and its construction method to be used therefor
CN102619218B (en) Rear slotting reinforcing cage CFG and piling method thereof
KR100710866B1 (en) Pressure Grouting Method using Milk Grouting and Paker
KR100667183B1 (en) Method of high grouting and that of packer
CN113605951A (en) Shallow tunnel supporting structure and construction method thereof
CN102080376B (en) Built-in composite anchor rod construction method and composite anchor rod drilling tool used by same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112

CF01 Termination of patent right due to non-payment of annual fee