CN209620674U - A kind of construction site furred ceiling support frame - Google Patents

A kind of construction site furred ceiling support frame Download PDF

Info

Publication number
CN209620674U
CN209620674U CN201822246323.5U CN201822246323U CN209620674U CN 209620674 U CN209620674 U CN 209620674U CN 201822246323 U CN201822246323 U CN 201822246323U CN 209620674 U CN209620674 U CN 209620674U
Authority
CN
China
Prior art keywords
support frame
block
welded
furred ceiling
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822246323.5U
Other languages
Chinese (zh)
Inventor
张振
王文利
王宝庆
李玉珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822246323.5U priority Critical patent/CN209620674U/en
Application granted granted Critical
Publication of CN209620674U publication Critical patent/CN209620674U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of construction site furred ceiling support frames, including the first support frame, the bottom end of first support frame is provided with kerve, and internal screw thread is provided on the inner wall of kerve, first support frame extends on the outer wall inside kerve and is provided with external screw thread, the bottom end of the kerve is welded with bottom plate, the top of first support frame is welded with jacking block, and the top of jacking block is equipped with sole piece, the top of the sole piece is welded with the second support frame, and second the top of support frame be welded with fixed block, fixing clamp is provided on the fixed block, and fixing clamp is fixed by the second fastening bolt.The construction site furred ceiling support frame makes apparatus structure stable, can be stable furred ceiling can be also supported while being placed on ground well, will not loosen easily, and by increase contact area make device not cause to damage to furred ceiling easily.

Description

A kind of construction site furred ceiling support frame
Technical field
The utility model relates to construction equipment technical field, specially a kind of construction site furred ceiling support frame.
Background technique
Existing construction site furred ceiling is composed with support frame only by support rod one by one, and structure is simply single One, furred ceiling cannot be supported well, and due to small with furred ceiling contact area, easily furred ceiling is damaged, is put simultaneously One end also less stable on ground is set, while traditional such device is all only to consolidate two or more support frames by screw It is scheduled on together, splicing is not firm enough, removes and is also more troublesome, therefore needs a kind of construction site furred ceiling and solved with support frame The certainly above problem.
Utility model content
The purpose of this utility model is to provide a kind of construction site furred ceiling support frames, to solve in above-mentioned background technique The existing construction site furred ceiling proposed is composed with support frame by support rod one by one, and structure is simply single, no Furred ceiling can be supported well, at the same two or when more support rods splicing it is not firm enough, remove and be also more troublesome The problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of construction site furred ceiling support frame, packet The first support frame is included, the bottom end of first support frame is provided with kerve, and internal screw thread is provided on the inner wall of kerve, and described One support frame, which extends on the outer wall inside kerve, is provided with external screw thread, and the bottom end of the kerve is welded with bottom plate, and described first The top of support frame is welded with jacking block, and the top of jacking block is equipped with sole piece, and the top of the sole piece is welded with the second support frame, And second the top of support frame be welded with fixed block, fixing clamp is provided on the fixed block, and fixing clamp passes through the second fastening Bolt is fixed, and the two sides of the fixing clamp are all symmetrically fixed with lower articulated shaft, and the outside of lower articulated shaft is all fixed with strut, institute The top for stating strut is all fixed with articulated shaft, and the top of upper articulated shaft is all fixed on the bottom end of top plate, the fixed block Top is welded with placing groove, and the bottom end of the top plate is welded with placement bar, and the bottom end for placing bar extends to inside placing groove.
Preferably, the bottom end of the bottom plate is pasted with frosted convex block by glue, and the top of the top plate is viscous by glue Post cushion.
Preferably, the inside of the jacking block and sole piece all symmetrically offers slot, the left side installation of the jacking block and sole piece There is left half to press from both sides, and the inside of left half folder is symmetrically welded with and the mutually matched left inserted block of slot, the right side of the jacking block and sole piece It is equipped with right half to press from both sides, and the inside of right half folder is symmetrically welded with and extends to the mutually matched right inserted block of slot, the right inserted block One end inside slot all offers interior fixture block, and one end that the left inserted block extends to inside slot all offers and interior fixture block phase The inner card cage mutually cooperated is fixed between left half folder and right half folder by the first fastening bolt, and left half folder and right half presss from both sides Outside be all welded with knob.
Preferably, the width of the left inserted block is equal to the width of right inserted block, and the length of the left inserted block is equal to right inserted block Length, the length of the inner card cage are equal to the length of interior fixture block.
Preferably, there are four first fastening bolt and the second fastening bolt are all arranged.
Preferably, the fixed block is set as " work " shape, and the diameter of the fixing clamp is equal to the diameter of fixed block.
Compared with prior art, the utility model has the beneficial effects that the construction site furred ceiling with support frame by kerve, It is internal screw thread, external screw thread, bottom plate, frosted convex block, fixed block, fixing clamp, the second fastening bolt, lower articulated shaft, strut, upper hinged Axis, top plate, cushion, placing groove and place bar and be used cooperatively so that apparatus structure stable, can be stable be placed on Also furred ceiling can be supported while ground well, will not be loosened easily, and makes device light by increasing contact area Easily furred ceiling is caused to damage, while the device is inserted by setting jacking block, sole piece, slot, half folder of a left side, right half folder, left inserted block, the right side Block, inner card cage, interior fixture block, the first fastening bolt and knob, so that the first support frame and the second support frame are operated in splicing Simply, it is fixed so that construction personnel is easily installed finally by the first fastening bolt by engaging the design that plugs, guarantees the One support frame and the second support frame stable connection, bring great convenience to construction personnel.
Detailed description of the invention
Fig. 1 is the structure schematic elevation view of the utility model;
Fig. 2 is that the structure of A in Fig. 1 faces diagrammatic cross-section;
Fig. 3 is the structure enlargement diagram of B in Fig. 1;
Fig. 4 is that the partial structurtes of the second support frame in the utility model, sole piece, left half folder and right half folder overlook signal Figure;
Fig. 5 is that the partial structurtes top view cross section of the second support frame in the utility model, sole piece, left half folder and right half folder shows It is intended to.
In figure: 1, the first support frame;2, kerve;3, internal screw thread;4, external screw thread;5, bottom plate;6, frosted convex block;7, jacking block; 8, the second support frame;9, sole piece;10, slot;11, it left half presss from both sides;12, it right half presss from both sides;13, left inserted block;14, right inserted block;15, interior card Slot;16, interior fixture block;17, the first fastening bolt;18, it shakes hands;19, fixed block;20, fixing clamp;21, the second fastening bolt;22, Lower articulated shaft;23, strut;24, upper articulated shaft;25, top plate;26, cushion;27, placing groove;28, bar is placed.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, a kind of embodiment provided by the utility model:
A kind of construction site furred ceiling support frame, including the first support frame 1, the bottom end of the first support frame 1 are provided with kerve 2, and internal screw thread 3 is provided on the inner wall of kerve 2, external screw thread is provided on the outer wall that the first support frame 1 extends to inside kerve 2 4, the bottom end of kerve 2 is welded with bottom plate 5, and the bottom end of bottom plate 5 is pasted with frosted convex block 6 by glue, and effect is to pass through frosted The design of convex block 6 increases the frictional force of device and ground, so that device places more stable, the top welding of the first support frame 1 There is a jacking block 7, and the top of jacking block 7 is equipped with sole piece 9, the top of sole piece 9 is welded with the second support frame 8, and the second support frame 8 Top is welded with fixed block 19, fixing clamp 20 is provided on fixed block 19, and fixing clamp 20 is fixed by the second fastening bolt 21, Fixed block 19 is set as " work " shape, and the diameter of fixing clamp 20 is equal to the diameter of fixed block 19, and effect is designed by " work " shape So that fixing clamp 20 can be very good to clamp fixed block 19, structure is more firm, and the two sides of fixing clamp 20 are all symmetrically fixed with down Articulated shaft 22, and the outside of lower articulated shaft 22 is all fixed with strut 23, the top of strut 23 are all fixed with articulated shaft 24, and on The top of articulated shaft 24 is all fixed on the bottom end of top plate 25, and the top of top plate 25 is pasted with cushion 26 by glue, and effect is By the design of cushion 26 so that device and furred ceiling contact surface are relatively soft, easily furred ceiling will not be caused to damage, fixed block 19 Top is welded with placing groove 27, and the bottom end of top plate 25, which is welded with, places bar 28, and the bottom end for placing bar 28 extends to placing groove 27 It is internal.
Preferably, be used cooperatively by above structure so that apparatus structure stable, can be stable be placed on ground Also furred ceiling can be supported while face well, will not be loosened easily, and makes device will not be easily by increasing contact area Furred ceiling is caused to damage.
The inside of jacking block 7 and sole piece 9 all symmetrically offers slot 10, and the left side of jacking block 7 and sole piece 9 is equipped with left half and presss from both sides 11, and the inside of left half folder 11 is symmetrically welded with and the mutually matched left inserted block 13 of slot 10, the right side peace of jacking block 7 and sole piece 9 Inside equipped with right half folder 12, and right half folder 12 is symmetrically welded with prolongs with the mutually matched right inserted block 14 of slot 10, right inserted block 14 Extend to one end inside slot 10 and all offer interior fixture block 16, one end that left inserted block 13 extends to inside slot 10 all offer with The mutually matched inner card cage 15 of interior fixture block 16, it is fixed by the first fastening bolt 17 between left half folder 11 and right half folder 12, left half The outside of folder 11 and right half folder 12 is all welded with knob 18, and the width of left inserted block 13 is equal to the width of right inserted block 14, left inserted block 13 Length be equal to the length of right inserted block 14, the length of inner card cage 15 is equal to the length of interior fixture block 16, and effect is by length Design is so that left inserted block 13, right inserted block 14 can be very good to inject in slot 10, while interior fixture block 16 being made to can be very good to insert Structurally reasonable into inner card cage 15, there are four the first fastening bolt 17 and the second fastening bolt 21 are all arranged, effect is to pass through Four the first fastening bolts 17 are set, so that 12 fix stablies of left half folder 11 and right half folder, similarly tight by setting four second Fixing bolt 21 facilitates fixed fixing clamp 20 so that fixing clamp 20 steadily clamp fixed block 19, will not loosen easily.
Preferably, making the first support frame 1 and the second support frame 8 easy to operate in splicing by above structure, lead to The design that engaging plugs is crossed, so that construction personnel is easily installed, it is fixed finally by the first fastening bolt 17, guarantee the first support 8 stable connection of frame 1 and the second support frame, brings great convenience to construction personnel.
Working principle: when in use, the first support frame 1 is passed through to the interaction precession of internal screw thread 3 and external screw thread 4 first In kerve 2, then the bar 28 of placing of 25 bottom end of top plate is injected in the placing groove 27 of 8 top fixed block 19 of the second support frame, is connect Under the action of lower articulated shaft 22 and upper articulated shaft 24 rotate fixing clamp 20 so that fixing clamp 20 clamps fixed block 19, then lead to It crosses the second fastening bolt 21 to be fixed, and then by the bottom of 8 bottom end of the jacking block 7 on 1 top of the first support frame and the second support frame Block 9 is aligned, then left half folder 11 and right half folder 12 are passed through slot 10, left inserted block 13, right inserted block 14, inner card cage 15 and interior fixture block It is injected in jacking block 7 and sole piece 9 under the action of 16, then by tightening the first fastening bolt 17, so that the first support frame 1 and second Support frame 8 splicing complete, at this time guarantee top plate 25 on cushion 26 and furred ceiling flat contact, the frosted convex block 6 of 5 bottom end of bottom plate with The contact of ground water bottle, so that apparatus structure stable, can be stable can also support well while being placed on ground is hung Top, will not loosen easily, and make device not cause to damage to furred ceiling easily by increase contact area, while making the One support frame 1 and the second support frame 8 are easy to operate in splicing, by engaging the design plugged, so that construction personnel is convenient for peace Dress, it is fixed finally by the first fastening bolt 17, guarantee the first support frame 1 and 8 stable connection of the second support frame, gives construction personnel It brings great convenience, operation leaves it at that.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of construction site furred ceiling support frame, including the first support frame (1), it is characterised in that: first support frame (1) Bottom end be provided with kerve (2), and internal screw thread (3) are provided on the inner wall of kerve (2), first support frame (1) extends to It being provided with external screw thread (4) on the internal outer wall of kerve (2), the bottom end of the kerve (2) is welded with bottom plate (5), and described first The top of support (1) is welded with jacking block (7), and the top of jacking block (7) is equipped with sole piece (9), the top welding of the sole piece (9) Have the second support frame (8), and the top of the second support frame (8) is welded with fixed block (19), is provided on the fixed block (19) Fixing clamp (20), and fixing clamp (20) is fixed by the second fastening bolt (21), the two sides of the fixing clamp (20) are all symmetrically solid Surely have lower articulated shaft (22), and the outside of lower articulated shaft (22) is all fixed with strut (23), the top of the strut (23) is all solid Surely have upper articulated shaft (24), and the top of upper articulated shaft (24) is all fixed on the bottom end of top plate (25), the fixed block (19) Top is welded with placing groove (27), and the bottom end of the top plate (25), which is welded with, places bar (28), and the bottom end for placing bar (28) is prolonged It is internal to extend to placing groove (27).
2. a kind of construction site furred ceiling support frame according to claim 1, it is characterised in that: the bottom plate (5) Bottom end is pasted with frosted convex block (6) by glue, and the top of the top plate (25) is pasted with cushion (26) by glue.
3. a kind of construction site furred ceiling support frame according to claim 1, it is characterised in that: the jacking block (7) and The inside of sole piece (9) all symmetrically offers slot (10), and left half folder (11) is equipped on the left of the jacking block (7) and sole piece (9), And it is symmetrically welded with and slot (10) mutually matched left inserted block (13), the jacking block (7) and sole piece on the inside of left half folder (11) (9) right half folder (12) is installed on the right side of, and is symmetrically welded with and slot (10) mutually matched right side on the inside of right half folder (12) Inserted block (14), the right inserted block (14) extend to the internal one end of slot (10) and all offer interior fixture block (16), the left inserted block (13) the internal one end of slot (10) is extended to all to offer and interior fixture block (16) mutually matched inner card cage (15), the left side half Pass through the first fastening bolt (17) between half folder (12) of folder (11) and the right side to fix, half folder (11) of a left side and the right side partly press from both sides the outer of (12) Side is all welded with knob (18).
4. a kind of construction site furred ceiling support frame according to claim 3, it is characterised in that: the left inserted block (13) Width be equal to the width of right inserted block (14), the length of the left inserted block (13) is equal to the length of right inserted block (14), the interior card The length of slot (15) is equal to the length of interior fixture block (16).
5. a kind of construction site furred ceiling support frame according to claim 3, it is characterised in that: the first fastening spiral shell There are four bolt (17) and the second fastening bolt (21) are all arranged.
6. a kind of construction site furred ceiling support frame according to claim 1, it is characterised in that: the fixed block (19) It is set as " work " shape, the diameter of the fixing clamp (20) is equal to the diameter of fixed block (19).
CN201822246323.5U 2018-12-29 2018-12-29 A kind of construction site furred ceiling support frame Expired - Fee Related CN209620674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822246323.5U CN209620674U (en) 2018-12-29 2018-12-29 A kind of construction site furred ceiling support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822246323.5U CN209620674U (en) 2018-12-29 2018-12-29 A kind of construction site furred ceiling support frame

Publications (1)

Publication Number Publication Date
CN209620674U true CN209620674U (en) 2019-11-12

Family

ID=68448029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822246323.5U Expired - Fee Related CN209620674U (en) 2018-12-29 2018-12-29 A kind of construction site furred ceiling support frame

Country Status (1)

Country Link
CN (1) CN209620674U (en)

Similar Documents

Publication Publication Date Title
CN209165969U (en) A kind of processing of crude drugs raw material sunning equipment
CN209620674U (en) A kind of construction site furred ceiling support frame
CN106437136B (en) A kind of scaffold connector
CN208433128U (en) A kind of Portable type art teaching aid
CN208709024U (en) A kind of Multifunctional hanging chart rack applied to English teaching
CN109452086A (en) A kind of afforestation tree support device
CN206060047U (en) A kind of line construction scissors crossing take-up instrument
CN206571162U (en) Structure support frame adjustment device in a kind of transformer station
CN204862222U (en) Mattress with mosquito net bracing piece
CN208039886U (en) Protect rope fixing and limiting structure
CN207196039U (en) Safety monitoring device location fixing device
CN208563181U (en) A kind of adjustable fence unit of setting angle
CN208329299U (en) A kind of glass curtain wall connection structure
CN207079901U (en) A kind of simple trivet on scaffold
CN206134127U (en) Rod number board fixing device
CN105926226B (en) Tooth plate regulating device on a kind of framing shaping machine edge spreader
CN205383344U (en) Pipe strap is fixed in cable conductor piping erection
CN205776939U (en) A kind of glass curtain wall supporting mechanism
CN206834436U (en) A kind of wiring the end of a thread protection device
CN209162463U (en) Combine clothes hanger
CN210402954U (en) Display board
CN210608463U (en) Suspension clamp
CN210439644U (en) Detachable convenient construction frame
CN207031846U (en) A kind of foldable external hanging type clothes hanger
CN108374551A (en) A kind of site construction scaffold easy to carry

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112

Termination date: 20201229