CN209619934U - A kind of safe shore protection - Google Patents

A kind of safe shore protection Download PDF

Info

Publication number
CN209619934U
CN209619934U CN201822166598.8U CN201822166598U CN209619934U CN 209619934 U CN209619934 U CN 209619934U CN 201822166598 U CN201822166598 U CN 201822166598U CN 209619934 U CN209619934 U CN 209619934U
Authority
CN
China
Prior art keywords
block
protection
shore protection
bank
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822166598.8U
Other languages
Chinese (zh)
Inventor
孙柳群
王凯峰
俞倩
陈国权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tianzi Garden Construction Co Ltd
Original Assignee
Zhejiang Tianzi Garden Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tianzi Garden Construction Co Ltd filed Critical Zhejiang Tianzi Garden Construction Co Ltd
Priority to CN201822166598.8U priority Critical patent/CN209619934U/en
Application granted granted Critical
Publication of CN209619934U publication Critical patent/CN209619934U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a kind of safe shore protections, belong to bank protection construction field, it includes the fixation shore protection fixed with bank slope ground and the building blocks for bank protection piled up along bank slope, be characterized in that: the building blocks for bank protection includes the fixation building block close to river and the greening block far from river, the side on the greening block towards ground is equipped with groove, and the greening block is equipped with multiple be connected with groove for the green notch for planting growth away from the side on ground.The utility model proposes a kind of safe shore protection, protection is fixed to bank slope by fixed shore protection and building blocks for bank protection, green plant to reduce influence of the setting to ecological environment of shore protection is planted in bank slope by setting greening block.

Description

A kind of safe shore protection
Technical field
The utility model relates to bank protection construction fields, more particularly, to a kind of safe shore protection.
Background technique
The engineering on slope or dam and reservoir for river and dykes and dams and generate cut ground etc place, not into Row bank-protection works and if placing, because of slope and cut the inclination on ground itself, the sandy soil for being deposited in plateau domain flow down, more sternly Weight is cause ground to collapse by the outflow because of heavy rain and a large amount of water and soil of strong wind flood, cannot not only play Li Shui and harness the river Function also destroys the natural environment and landscape of surrounding, therefore, the inclination of slope or various incisions for river and dykes and dams Face carries out the building blocks for bank protection construction of various forms, and the natural environment of the natural loss and heavy rain, snowfall etc that prevent sandy soil draws The pressure of the water and soil risen is lost, and makes effect of harnessing the river as maintenance.
Traditional bank protection structure mostly uses the hard materials such as armored concrete, concrete, cemented rock or placed rockfill, this A little structures can effectively prevent scour of the riverbank by water flow, but form the riverbank of " pleasing both parties ", block between water-soil Exchange of material and energy, seriously destroys the ecological integrality in river, and material impervious to water or structural shape become Riparian Zone One closed system, seriously affects the ecological environment on riverbank periphery.
Utility model content
The purpose of the utility model is to provide a kind of safe shore protection, by fixed shore protection and building blocks for bank protection to bank slope into Row fixed protection plants green plant in bank slope by setting greening block to reduce shadow of the setting to ecological environment of shore protection It rings.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of safe shore protection is built including the fixation shore protection fixed with bank slope ground and along the shore protection that bank slope is piled up Block, the building blocks for bank protection include the fixation building block close to river and the greening block far from river, greening block direction ground The side in face is equipped with groove, and the greening block is equipped with multiple be connected with groove for green plant growth away from the side on ground Notch.
By using above-mentioned technical proposal, the whole shore protection of guarantee is fixedly connected with the bottom surface of bank slope by fixed shore protection Stability;The slope surface of bank slope is covered by the way that building blocks for bank protection is arranged, avoids soil erosion;Due to close to river One end is not easy to plant green plant often by the impact of river water and immersion, by the way that fixed building block is arranged to close to the oblique of river Slope is protected, and the impact of river water is avoided to take away the soil on slope and cause to slip by slope;By setting greening block far from river The side in road avoids bank slope rushing in rainwater by planting green plant in greening block to protect to slope soil Brush lower soil erosion;It is green to plant plant and need growth time, reduce the rain being subject to when green plant is not grown by the way that multiple notches are arranged Water influences, and the side setting groove on greening block towards ground is convenient to place green plant material material, the green plant of groove in greening block Material root after since plant grows out of notch to the characteristic of light, while groove guarantees the biggish growth sky in the green portion that takes root Between, green plant is preferably taken root in the soil, to guarantee that the water and soil of bank slope will not be lost, enables the shore protection While enough guaranteeing the fastness on riverbank, bank slope soil is protected not to be damaged.
The utility model is further arranged to: the greening block two sides parallel with its length direction are respectively equipped with mutually The pressing plate and follow block of cooperation, the greening block two sides parallel with its width direction are respectively equipped with card slot and multiple and card slot card The fixture block connect.
By using above-mentioned technical proposal, by setting pressing plate and follow block adjacent two pieces of greening blocks are mutually compressed, By setting fixture block and card slot adjacent two pieces of greening blocks are mutually inserted so that the surrounding of each piece of greening block is equal It is fixed to each other with other greening blocks, to avoid being lifted off greening block in green plant growth course.
The utility model is further arranged to: the fixed shore protection includes closing on the preceding shore protection in river and being set on the bank Shore protection afterwards, the building blocks for bank protection are fixedly installed between preceding shore protection and rear shore protection.
By using above-mentioned technical proposal, since bank slope side is connected with river, the other side and the level land An Ding phase Connection is fixedly connected the soil for closing on river by shore protection before being arranged, and will receive river water punching to guarantee building blocks for bank protection not It hits and is subjected to displacement;Soil, which is pushed up, by shore protection opposite bank after setting is protected under rainwash soil layer along inclined-plane stream It loses, guarantees that building blocks for bank protection is fixedly connected with fixation shore protection while be fixedly connected with the ground by preceding shore protection and rear shore protection.
The utility model is further arranged to: the preceding shore protection includes the piling bar and muti-piece of more fixed implantation bank slopes The link block of building blocks for bank protection and piling bar is connected, is equipped with connector, the connector and two steel between adjacent two piling bars Stake is fixedly connected.
By using above-mentioned technical proposal, shore protection is fixed same with bank slope before being made by setting piling bar and link block When be fixedly connected with building blocks for bank protection, by be arranged connector be fixedly connected between adjacent two piling bars, guarantee piling bar it Between the stability that connects.
The utility model is further arranged to: the fixed building block includes ontology and is set to ontology away from ground side Multiple convex blocks, the two sides of the ontology along its length are respectively equipped with multiple fixing grooves and fixed block, the fixing groove and solid Determine block to be mutually inserted, the fixed block is identical as fixture block.
By using above-mentioned technical proposal, since fixed building block is arranged close to river, fixed building block can be often subject to river water Convex block is arranged by forming concave-convex rise and fall to weaken impact force and the punching of river water between convex block and ontology in impact, setting ontology side Hit sound;To be mutually inserted fixation between adjacent two pieces fixed building blocks by setting fixing groove and fixed block, to reduce coagulation The use of soil, protects the soil of bank slope;Pass through setting fixed block fixed building block and the greening block of enabling identical as fixture block It is enough mutually inserted, so that fixed building block and greening block are connected with each other transition.
The utility model is further arranged to: the bottom of the piling bar is integrally formed with anchoring bolt, and the piling bar is towards even The side for connecing block is fixed with bolt, and the link block is equipped with slot, the bolt and slot grafting, institute towards one end of piling bar Link block is stated to be fixedly connected away from one end of slot with building blocks for bank protection.
By using above-mentioned technical proposal, by the way that piling bar is arranged preceding shore protection is fixedly connected with bottom of river channel, by setting Setting anchoring bolt facilitates piling bar to be implanted into bottom of river channel, by the way that bolt is arranged link block is attached with piling bar, thus before guaranteeing The stability of shore protection entirety.
The utility model is further arranged to: shore protection includes muti-piece and the fixed protection slope panel contradicted of building blocks for bank protection after described Take root in the positioning column into ground, the more positioning columns run through protection slope panel more.
By using above-mentioned technical proposal, is protected, avoided by soil of the protection slope panel to the top of bank slope Soil slide, by positioning column, implantation ground is fixedly connected with the ground rear shore protection after protection slope panel.
The utility model is further arranged to: the link block is equipped with away from the side on ground and pours mouth, and the slot passes through Link block is worn, the mouth that pours is connected with slot.
By using above-mentioned technical proposal, mouth is poured by setting and makes link block building blocks for bank protection under the pouring of concrete It is fixedly connected, simultaneously because slot is interconnected with mouth is poured, so that link block is fixedly connected with piling bar, so that preceding shore protection It is fixedly connected with building blocks for bank protection.
In conclusion the advantageous effects of the utility model are as follows: by the way that fixed shore protection and building blocks for bank protection is arranged to riverbank Slope is protected, and the stability washed away downslope soil and by water flow taken away and caused riverbank in rainwater and river water is avoided;In So that the stable paving of building blocks for bank protection under preceding shore protection and the fixed function of rear shore protection and mutual being fixedly connected of building blocks for bank protection If, to reduce setting influence caused by the soil of slope of shore protection, avoiding soil on the slope, to reduce the use of concrete Solidification;Green plant is planted between greening block and slope by the way that greening block is arranged, and is growth in the soil using green take root So that soil is fixed, to guarantee the ecological environment of bank slope.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the part explosive view of the utility model, the connection relationship before mainly showing between each component of shore protection;
Fig. 3 is the partial sectional view of the utility model, mainly shows the company between link block and piling bar and building blocks for bank protection Connect relationship;
Fig. 4 is the part explosive view of the utility model, mainly shows the connection relationship between fixed building block and preceding shore protection;
Fig. 5 is the partial structure diagram of the utility model, mainly shows the structure of greening block;
Fig. 6 is the part explosive view of the utility model, mainly shows that the connection between fixed building block and greening block is closed System;
Fig. 7 is the part explosive view of the utility model, mainly shows the connection relationship between rear shore protection and greening block.
In figure, 1, fixed shore protection;11, preceding shore protection;111, piling bar;1111, through slot;1112, bolt;112, anchoring bolt; 113, connector;114, link block;1141, slot;1142, link slot;1143, mouth is poured;12, rear shore protection;121, slope protection face Plate;1211, slot;1212, locating slot;122, positioning column;2, building blocks for bank protection;21, fixed building block;211, ontology;212, convex block; 213, fixing groove;214, fixed block;22, greening block;221, groove;222, notch;223, pressing plate;224, follow block;225, rib Item;226, card slot;227, fixture block.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:
It referring to Fig.1, is a kind of safe shore protection disclosed by the utility model, including the fixed shield fixed with bank slope ground Bank 1 and the building blocks for bank protection 2 piled up along bank slope, fixed shore protection 1 include closing on the preceding shore protection 11 in river and being set on the bank Shore protection 12 afterwards, building blocks for bank protection 2 are fixedly installed between preceding shore protection 11 and rear shore protection 12;To guarantee the stability of shore protection entirety. According to the bank slope different location feature different by river water effect, building blocks for bank protection 2 includes the fixation building block 21 close to river With the greening block 22 far from river, the slope close to river is protected in fixed building block 21, and the impact of river water is avoided to take away Soil on slope and cause to slip by slope, by planted in greening block 22 it is green plant to protect slope soil, avoid Bank slope soil erosion under rainwash.
Referring to Fig. 2, wherein the piling bars 111 that preceding shore protection 11 includes more fixed implantation bank slopes connect shore protection block with muti-piece The link block 114 of block 2 and piling bar 111 is equipped with connector 113 between adjacent two piling bars 111 and connector 113 and two piling bars 111 are fixedly connected, to guarantee the stability connected between piling bar 111.The fixation of connector 113 is plugged into adjacent two piling bars Between 111, for the bonding strength for guaranteeing connector 113, the section of connector 113 is in I-shaped, therefore adjacent two piling bars 111 Competing side symmetrically offers through slot 1111 vertically, and the section of through slot 1111 is in convex;When adjacent two piling bars When 111 fixations are plugged into bottom of river channel, by the way that connector 113 is inserted into the through slot 1111 on adjacent piling bar 111, so that Adjacent two piling bars 111 are fixedly connected.
Referring to Figures 1 and 2, it is implanted into bottom of river channel for convenience of piling bar 111, the bottom of piling bar 111 is integrally formed with anchoring bolt 112, anchoring bolt 112 is tapered away from one end of piling bar 111;Since preceding shore protection 11 closes on river, the place that piling bar 111 is implanted into exists After shore protection is laid with completion recovery streamflow, piling bar 111 is immersed in river water, to avoid water currents piling bar 111 and river bottom The stability connected between portion, piling bar 111, which stretches out, is equipped with coagulation mound between the side and bottom of river channel soil layer of bottom of river channel.Steel The side of stake 111 bottoms towards link block 114 is fixed with bolt 1112, and link block 114 is inserted towards one end of piling bar 111 is corresponding Pin 1112 is equipped with slot 1141, with 1141 grafting of slot link block 114 is connect with piling bar 111 by bolt 1112;To protect The stability that shore protection 11 is connected before demonstrate,proving, therefore one piece of correspondence of link block 114 and two 111 grafting of piling bar.
Reference Fig. 2 and Fig. 3, since bank slope is in inclined-plane, for guarantee link block 114 away from one end of slot 1141 and admittedly Determine building block 21 to be fixedly connected, one end of link block 114 and fixed building block 21 contradict, link block 114 towards fixed building block 21 one End end face offers link slot 1142, and the end of fixed building block 21 and link slot 1142 are clamped.To guarantee link block 114 and piling bar The stability connected between 111 and fixed building block 21, link block 114 are equipped with away from the side on ground and pour mouth 1143, slot 1141 through link block 114 and pour mouth 1143 and are connected with slot 1141 and link slot 1142, by toward pouring in mouth 1143 Concrete perfusion, concrete is flowed pouring in mouth 1143, by bolt 1112 and slot 1141, link slot after concrete setting 1142 are fixedly connected with fixed building block 21, so that shore protection 11 is fixedly connected with fixed building block 21 before guaranteeing.
Referring to Fig. 4, fixed building block 21 includes the ontology 211 in rectangle and is set to ontology 211 away from the more of ground side Three are shown as in a convex block 212(figure), the two sides of ontology 211 along its length are respectively equipped with multiple fixing grooves 213 and consolidate Determine to be shown as two in block 214(figure), fixing groove 213 is mutually inserted with fixed block 214;To guarantee to connect between fixed building block 21 Stability, when along fixed 21 length direction of building block arrangement, two neighboring fixed block in competing two pieces fixed building blocks 21 Spacing between 214 is equal with the spacing of two fixed blocks 214 in same fixed building block 21, so that a fixed building block 21 exists It can be fixedly connected with the fixed building block 21 of its surrounding when piling up.Since fixed building block 21 is arranged close to river, fixed building block 21 can be through It is subjected to river water impact, by forming concave-convex rise and fall to weaken impact force and the impact of river water between convex block 212 and ontology 211 Sound.
Referring to Fig. 5, the side for the ecological environment for guaranteeing bank slope, greening block 22 towards ground is equipped with groove 221, Greening block 22 is equipped with multiple be connected with groove 221 for the green notch 222 for planting growth away from the side on ground;Due to planting Plant needs growth time, reduces the shadow of the rainwater being subject to when green plant is not grown or river water impact by the way that multiple notches 222 are arranged It rings.Setting groove 221 is convenient to place green plant material material in greening block 22, the green plant material material of groove 221 root after due to Plant grows out of notch 222 to the characteristic of light, while groove 221 guarantees the green biggish growing space in the portion that takes root, so that green plant It can preferably take root in the soil, to guarantee that the water and soil of bank slope will not be lost, the shore protection be enabled to guarantee riverbank Fastness while, protect bank slope soil not to be damaged.
Referring to figure 5 and figure 6, the stability connected between guarantee greening block 22, greening block 22 and its length direction Parallel two sides are respectively equipped with mutually matched pressing plate 223 and follow block 224, between pressing plate 223 and the opposite side of follow block 224 are equipped with Every being equipped with more cords 225, pass through the mutual friction contradicted between the adjacent two pieces of greening blocks 22 of increase between cord 225 Power.The two sides parallel with its width direction of greening block 22 are respectively equipped with card slot 226 and multiple fixture blocks being clamped with card slot 226 Two are shown as in 227(figure), for convenience of the connection of fixed building block 21 and greening block 22, fixture block 227 and 214 phase of fixed block Together, fixed block 214 is enabled to be plugged into card slot 226.
Referring to Fig.1 and Fig. 6, to avoid being lifted off greening block 22 in green plant growth course, each piece of greening block 22 Surrounding be fixed to each other with other greening blocks 22, when greening block 22 arranges along its length, setting mutually contradicting Two pieces of greening blocks 22 on the spacing of link slot 1142 be less than on same greening block 22 between two neighboring fixture block 227 Interval.Pressing plate 223 and follow block 224 of the greening block 22 when piling up along its length on adjacent two pieces of greening blocks 22 are mutual It contradicts, when piling up second row greening block 22, so that greening block 22 is mutually staggered with upper row greening block 22, so that together Two fixture blocks 227 on one piece of greening block 22 are snapped fit onto respectively in the card slot 226 on adjacent two pieces of greening blocks 22.
Referring to Fig.1 and Fig. 7, rear shore protection 12 include muti-piece and the fixed protection slope panel 121 and Duo Gen contradicted of greening block 22 It is implanted into the positioning column 122 on ground, protection slope panel 121 is arc-shaped, corresponds to fixture block 227 towards one end of greening block 22 and offers Slot 1211, by slot 1211 with the mutually clamping of fixture block 227 so that greening block 22 is fixedly connected with protection slope panel 121.It is logical It crosses protection slope panel 121 to protect the soil at the top of bank slope, avoids soil slide;For guarantee protection slope panel 121 with The intensity connected between bank slope, more positioning columns 122 run through protection slope panel 121, the corresponding positioning column 122 of protection slope panel 121 Locating slot 1212 is offered, and locating slot 1212 is greater than the diameter of positioning column 122 towards the opening on ground.When positioning column 122 is planted Enter ground and when top is close to protection slope panel 121, the concrete perfusion in locating slot 1212, so that positioning column 122 and slope protection Panel 121 is fixedly connected, and since the opening of locating slot 1212 is greater than the diameter of positioning column 122, concrete is simultaneously by ground It is fixedly connected with protection slope panel 121.
The implementation principle of the present embodiment are as follows: piling bar 111 is successively implanted into bottom of river channel and is guaranteed on adjacent two piling bars 111 Through slot 1111 symmetrically, and make piling bar 111 be equipped with bolt 1112 side towards bank slope, then by connector 113 are inserted into through slot 1111, so that being mutually permanently connected between more piling bars 111.Then concrete heap piling bar 111 4 is used Zhou Jinhang is poured, so that piling bar 111 is fixedly connected with bottom of river channel;Smooth slope surface is laid with link block 114 and link block 114 is equipped with The side for pouring mouth 1143 is set up, and makes the bolt 1112 on the slot 1141 and piling bar 111 on link block 114 fixed Grafting.
After link block 114 and 111 grafting of piling bar, smooth slope surface makes fixed building block 21 company of being laid on along its length Block 114 is connect away from 111 side of piling bar, while for convenience of the connection of fixed building block 21 and greening block 22, fixed building block 21 is equipped with The side of fixing groove 213 and the link slot 1142 on link block 114 contradict, and after the completion of fixed building block 21 is piled up, are poured by past Building concrete perfusion in mouth 1143 is fixedly connected with fixed building block 21 with link block 114 and 111 three of piling bar.It is solid piling up During determining building block 21, guarantee adjacent two rows of fixed interlaced settings of building block 21, the fixed block in one piece of fixed building block 21 214 can be connected to the fixing groove 213 in adjacent two pieces fixed building blocks 21.
After being laid with the fixation building block 21 of certain number of rows, greening block is laid with away from the side of preceding shore protection 11 in fixed building block 21 22, since the side that fixed building block 21 is equipped with fixed block 214 is equipped with the side of card slot 226 towards greening block 22 and fixes building block 21 contradict, and fixed block 214 are snapped fit onto card slot 226, while greening block 22 is laid with along its length.Greening Building block 22 is in process of deployment, and pressing plate 223 and follow block 224 on adjacent two pieces of greening blocks 22 mutually contradict, and adjacent two rows are green Change building block 22 to mutually stagger, so that two on same greening block 22 fixture block 227 snaps fit onto adjacent two pieces of greenings respectively and builds In card slot 226 on block 22.
When greening block 22 is routed to slope bottom, smooth slope surface simultaneously installs protection slope panel 121, so that protection slope panel 121 are equipped with one end of slot 1211 towards greening block 22 and slot 1211 and fixture block 227 are clamped;Then by positioning column 122 are plugged into respectively in locating slot 1212, and positioning column 122 is implanted into ground, when positioning column 122 is implanted into ground and when top is pasted When nearly protection slope panel 121, go out concrete perfusion toward 1212 notch 222 of locating slot, so that positioning column 122 and protection slope panel 121 are solid Fixed connection.Then make to carry out concreting to building blocks for bank protection 2 as needed, avoid to protect since slope surface area is excessive The stability connected between bank building block 2 reduces, and suitable green plant material material is placed into groove 221 finally by notch 222, when green Greening block 22 is stretched out by notch 222 after the germination of plant material material and is grown.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of safe shore protection, including with bank slope ground it is fixed fixation shore protection (1) and the shore protection piled up along bank slope Building block (2), it is characterised in that: the building blocks for bank protection (2) includes the fixation building block (21) close to river and the greening far from river The side of building block (22), the greening block (22) towards ground is equipped with groove (221), and the greening block (22) deviates from ground Side be equipped with it is multiple be connected with groove (221) for it is green plant grow notches (222).
2. a kind of safe shore protection according to claim 1, it is characterised in that: the greening block (22) and its length direction Parallel two sides are respectively equipped with mutually matched pressing plate (223) and follow block (224), the greening block (22) and its width direction Parallel two sides are respectively equipped with card slot (226) and multiple fixture blocks (227) with card slot (226) clamping.
3. a kind of safe shore protection according to claim 1, it is characterised in that: the fixed shore protection (1) includes closing on river Preceding shore protection (11) and be set to rear shore protection (12) on the bank, the building blocks for bank protection (2) be fixedly installed on preceding shore protection (11) and after Between shore protection (12).
4. a kind of safe shore protection according to claim 3, it is characterised in that: the preceding shore protection (11) includes more fixed plants Enter the piling bar (111) of bank slope and the link block (114) of muti-piece connection building blocks for bank protection (2) and piling bar (111), adjacent two institutes It states and is equipped with connector (113) between piling bar (111), the connector (113) is fixedly connected with two piling bars (111).
5. a kind of safe shore protection according to claim 3, it is characterised in that: the fixed building block (21) includes ontology (211) and multiple convex blocks (212) that ontology (211) deviate from ground side are set to, the ontology (211) is along its length Two sides are respectively equipped with multiple fixing grooves (213) and fixed block (214), the fixing groove (213) and fixed block (214) phase interfix It connects, the fixed block (214) is identical as fixture block (227).
6. a kind of safe shore protection according to claim 4, it is characterised in that: the bottom of the piling bar (111) is integrally formed Have anchoring bolt (112), the side of piling bar (111) towards the link block (114) is fixed with bolt (1112), the link block (114) slot (1141) are equipped with towards one end of piling bar (111), the bolt (1112) and slot (1141) grafting, the company Block (114) are connect to be fixedly connected away from the one end of slot (1141) with building blocks for bank protection (2).
7. a kind of safe shore protection according to claim 3, it is characterised in that: shore protection (12) includes muti-piece and shore protection after described Building block (2) fixes the protection slope panel (121) contradicted and takes root in the positioning column (122) into ground more, the more positioning columns (122) Through protection slope panel (121).
8. a kind of safe shore protection according to claim 6, it is characterised in that: the link block (114) deviates from the one of ground Side is equipped with and pours mouth (1143), and the slot (1141) runs through link block (114), described to pour mouth (1143) and slot (1141) It is connected.
CN201822166598.8U 2018-12-21 2018-12-21 A kind of safe shore protection Active CN209619934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822166598.8U CN209619934U (en) 2018-12-21 2018-12-21 A kind of safe shore protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822166598.8U CN209619934U (en) 2018-12-21 2018-12-21 A kind of safe shore protection

Publications (1)

Publication Number Publication Date
CN209619934U true CN209619934U (en) 2019-11-12

Family

ID=68446687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822166598.8U Active CN209619934U (en) 2018-12-21 2018-12-21 A kind of safe shore protection

Country Status (1)

Country Link
CN (1) CN209619934U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560918A (en) * 2020-05-21 2020-08-21 浙江道元工程技术有限公司 Riverbank reinforcing mechanism and riverbank reinforcing method using same
CN112211158A (en) * 2020-10-20 2021-01-12 福建中设工程咨询有限公司 Hydraulic engineering ecological bank protection structure and construction method
CN115323980A (en) * 2022-08-20 2022-11-11 江苏淮阴水利建设有限公司 Composite ecological landscape retaining wall and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560918A (en) * 2020-05-21 2020-08-21 浙江道元工程技术有限公司 Riverbank reinforcing mechanism and riverbank reinforcing method using same
CN112211158A (en) * 2020-10-20 2021-01-12 福建中设工程咨询有限公司 Hydraulic engineering ecological bank protection structure and construction method
CN115323980A (en) * 2022-08-20 2022-11-11 江苏淮阴水利建设有限公司 Composite ecological landscape retaining wall and construction method thereof
CN115323980B (en) * 2022-08-20 2023-08-25 江苏淮阴水利建设有限公司 Composite ecological landscape retaining wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN209619934U (en) A kind of safe shore protection
CN203530925U (en) Dam reinforcing and beautifying device
CN108677871A (en) A kind of construction method of assembled grass planting concrete precast block and its ecological revetment
KR100665965B1 (en) Vegetation mat for revetment block afforestation
CN109356090A (en) A kind of triangle module metaplasia state type sea wall
CN104164854A (en) Method for ecologically re-greening hardened slope
KR100889378B1 (en) Shore protection block with echo pocket and curve river shore protection making method therewith
CN202023175U (en) Omnibearing interlocked revetment block
CN206245283U (en) A kind of river course dykes and dams ecological revetment
CN204098045U (en) A kind of zoology green-recovery system for flinty slope
CN209603068U (en) A kind of landscape water channel
CN209508921U (en) A kind of triangle module metaplasia state type sea wall
CN102071665A (en) Omnidirectional interlocking slope protection building block and lapping interlocking method thereof
CN205954574U (en) Ecological bank protection of river course dykes and dams
RU2351708C1 (en) Method for erection of slope fixation of biopositive structure
CN205530127U (en) Ecological greening antiscour shore protection face
CN211340642U (en) Link plate formula shore protection structure that faces combination forever
KR100461664B1 (en) Structures and system of construction based on the use of plants growing block that protect a shore
KR200228757Y1 (en) The method of restorer for a mode of life in city river
JP2789435B2 (en) Revetment greening method
CN110306498A (en) The work earth dam that can be prevented erosion
KR100449585B1 (en) Vegetation revetment block and construction method using the same
KR100963989B1 (en) Vegetal coir block for revetment and afforestation method using the same
KR100446815B1 (en) Bank protection block for fish house having sawtooth for connecting upper and lower block, and bank protection block for vegetation and construction method thereof
CN214169104U (en) Novel water conservancy ecological protection slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant