CN209618239U - Pulling and moving equipment - Google Patents

Pulling and moving equipment Download PDF

Info

Publication number
CN209618239U
CN209618239U CN201822097951.1U CN201822097951U CN209618239U CN 209618239 U CN209618239 U CN 209618239U CN 201822097951 U CN201822097951 U CN 201822097951U CN 209618239 U CN209618239 U CN 209618239U
Authority
CN
China
Prior art keywords
rectangle frame
pulling
connect
moving equipment
support portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822097951.1U
Other languages
Chinese (zh)
Inventor
丁震
郭帅
温建军
孟广瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Investment Corp Ltd
Original Assignee
China Energy Investment Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Investment Corp Ltd filed Critical China Energy Investment Corp Ltd
Priority to CN201822097951.1U priority Critical patent/CN209618239U/en
Application granted granted Critical
Publication of CN209618239U publication Critical patent/CN209618239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Framework For Endless Conveyors (AREA)

Abstract

The utility model embodiment discloses a kind of pulling and moving equipment, it includes winch, connection chain, lifting pulley, conveyer and slideway, the lifting pulley is mounted on predetermined position, the connection chain around the lifting pulley by the winch with wait draw shifting object connect, the winch pulling is described wait draw shifting object to be moved on the conveyer along the slideway, and the conveyer is by described wait draw shifting object to be moved to predetermined position.It can be realized the conveyorization of track using the utility model embodiment, improve handling efficiency, reduce labor intensity, but also can avoid accident of colliding with caused by manual handling in the prior art, improve the safety coefficient of operation, while structure is simple, it is easy to use.

Description

Pulling and moving equipment
Technical field
The utility model relates to technical field of coal mine, and in particular to a kind of pulling and moving equipment.
Background technique
With the back production of working face, primary shifting changing train will be drawn to return channel every 3 days.Before moving changing train drawing shifting, Need first to carry the track for moving changing train.Track is carried using manual type in the prior art.It moves changing train and moves 70 meters every time, Need to carry 24 section tracks, time-consuming about 3 hours.Every section track weighs about 175Kg, needs 8 people to be carried to destination, not only takes When laborious, large labor intensity often will appear and in the handling process and knock the phenomenon that hand touches foot, it is hidden to there is very big safety Suffer from.
Utility model content
In view of this, the utility model embodiment proposes a kind of pulling and moving equipment, to solve the above technical problems.
The utility model embodiment proposes a kind of pulling and moving equipment comprising: winch, connection chain, lifting pulley, conveyer and Slideway, the lifting pulley are mounted on predetermined position, and the connection chain moves the winch with wait draw around the lifting pulley Object connection, the winch pulling is described wait draw shifting object to be moved on the conveyer along the slideway, and the conveyer will be described Wait draw shifting object to be moved to predetermined position.
Optionally, the slideway includes pedestal, support portion and slipping part, and the support portion is vertically set on the pedestal On, the both ends of the slipping part length direction are connect with the support portion and pedestal respectively, described to move object along the sliding wait draw Portion is mobile.
Optionally, the slipping part includes the first sliding bar disposed in parallel and the second sliding bar, the first sliding bar Both ends connect respectively with the support portion and pedestal, the both ends of the second sliding bar connect with the support portion and pedestal respectively It connects.
It optionally, further include reinforcing rod, the both ends of the reinforcing rod are vertical with the first sliding bar and the second sliding bar respectively Connection.
Optionally, the pedestal includes the first rectangle frame, first connecting rod, the second connecting rod and the second rectangle frame, described First rectangle frame and the second rectangle frame are arranged in parallel, the both ends of the first connecting rod respectively with first rectangle frame and second Rectangle frame vertically connects, the both ends of second connecting rod respectively with first rectangle frame and the second rectangle frame is vertical connect, The support portion is vertically set on the first rectangle frame, and the first sliding bar and the second sliding bar connect with the second rectangle frame respectively It connects, it is ipsilateral that first rectangle frame, first connecting rod, the second connecting rod and support portion are respectively positioned on the second rectangle frame, the first rectangle Frame is between first connecting rod and support portion.
Optionally, the support portion includes first support bar and second support bar disposed in parallel, the first support bar Both ends respectively with the first rectangle frame and first sliding bar connect, the both ends of the second support bar respectively with the first rectangle frame and Second sliding bar connection.
It optionally, further include bending plate, the bending plate is separately positioned in first support bar and second support bar, described Bending plate forms slot with first support bar and second support bar respectively, and the slot is plugged in the rack of the conveyer.
It optionally, further include the first extension rod and the second extension rod, the first extension rod is vertical with first support bar to be connect, institute State that the second extension rod is vertical with second support bar to be connect, first extension rod and the second extension rod are directed away from the sliding The direction in portion extends, and is respectively positioned on above the conveyer.
It optionally, further include the first hook and the second hook, first hook and the second hook are symmetrically hung on institute Shifting object to be drawn is stated, the connection chain is drawn by first hook and the second hook and moves the shifting object to be drawn.
It optionally, further include locking phone, the latch buttons switch of the locking phone is connected on the control of the winch On circuit.
Pulling and moving equipment provided by the embodiment of the utility model passes through setting winch, connection chain, slideway, lifting pulley and conveying Machine, winch are dragged track on conveyer along slideway by connection chain, and track is transported to predetermined position again by conveyer, is realized The conveyorization of track, improves handling efficiency, reduces labor intensity, and avoids manual handling in the prior art and lead The accident of colliding with caused, improves the safety coefficient of operation, while structure is simple, easy to use.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the pulling and moving equipment of the utility model embodiment.
Specific embodiment
Below in conjunction with attached drawing and specific embodiment, the technical solution of the utility model is described in detail.Wherein phase Same components are presented with like reference characters.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from specific The direction at component geometry center.
Embodiment one
Fig. 1 shows the structural schematic diagram of the pulling and moving equipment of the utility model embodiment, as shown in Figure 1, the utility model The pulling and moving equipment that embodiment provides comprising: winch 1, connection chain 5, lifting pulley 2, conveyer 4 and slideway 3.
The lifting pulley 2 is mounted on predetermined position, such as the anchor pole of back.
The connection chain 5 bypasses the lifting pulley 2 for the winch 1 with wait draw shifting object 6 to connect, and the winch 1 pulls Described to move object 6 wait draw and be moved on the conveyer 4 along the slideway 3, the conveyer 4 moves described object 6 and is moved to wait draw Predetermined position.
In the present embodiment, the track that object 6 is shifting changing train is moved wait draw.Conveyer 4 uses belt conveyor.
Pulling and moving equipment provided by the embodiment of the utility model passes through setting winch, connection chain, slideway, lifting pulley and conveying Machine, winch are dragged track on conveyer along slideway by connection chain, and track is transported to predetermined position again by conveyer, is realized The conveyorization of track, improves handling efficiency, reduces labor intensity, and avoids manual handling in the prior art and lead The accident of colliding with caused, improves the safety coefficient of operation, while structure is simple, easy to use.
Only need operator 3 using pulling and moving equipment provided by the embodiment of the utility model, greatly reduce recruitment at This, draws 24 section tracks of shifting only to need 40 minutes, the working time is greatly saved, saves production cost.
Embodiment two
On the basis of the above embodiment 1, optionally, the slideway 3 is generally triangular in shape comprising pedestal, Support portion 34 and slipping part 33.
The support portion 34 is vertically arranged on the base, the both ends of 33 length direction of slipping part respectively with it is described Support portion 34 is connected with pedestal, described wait draw shifting object 6 to move along the slipping part 33.
By setting general triangular for slideway, the structure of slideway 3 can be simplified, reduces production cost.
Further, the slipping part 33 includes the first sliding bar disposed in parallel and the second sliding bar, and described first is sliding Move bar both ends connect respectively with the support portion and pedestal, it is described second slide bar both ends respectively with the support portion 34 and Pedestal connection, can further simplify the structure of pulling and moving equipment, reduce production cost.
It preferably, further include reinforcing rod, the both ends of the reinforcing rod are vertical with the first sliding bar and the second sliding bar respectively Connection, to increase the bonding strength of the first sliding bar and the second sliding bar.
Optionally, the quantity of reinforcing rod is more, and more reinforcing rods are uniformly arranged along the length direction of the first sliding bar, can Further reinforce the bonding strength of the first sliding bar and the second sliding bar.
Further, the pedestal is in " Z " type, including the first rectangle frame 31, first connecting rod, the second connecting rod and second Rectangle frame 32.
Second rectangle frame 31 is placed on the ground.First rectangle frame 31, first connecting rod, the second connecting rod and support portion 34 It is ipsilateral to be respectively positioned on the second rectangle frame 32.First rectangle frame 31 is between first connecting rod and support portion 34.
First rectangle frame 31 and the second rectangle frame 32 are arranged in parallel, the both ends of the first connecting rod respectively with it is described First rectangle frame 31 and the vertically connection of the second rectangle frame 32, the both ends of second connecting rod respectively with first rectangle frame 31 Vertically connection, the support portion are vertically set on the first rectangle frame 31 with the second rectangle frame 32, the first sliding bar and the Two sliding bars are connect with the second rectangle frame 32 respectively.
It by setting frame structure for pedestal, can further mitigate the weight of slipping part 33, be easy to use.
Further, the support portion 34 include first support bar disposed in parallel and second support bar, described first The both ends of support rod are connect with the first rectangle frame 31 and the first sliding bar respectively, and the both ends of the second support bar are respectively with first Rectangle frame 31 is connected with the second sliding bar, further to mitigate the self weight of slideway 3, is easy to use.
Further, first support bar is connected with second support bar also by more reinforcing rods, the both ends of every reinforcing rod It is vertical with first support bar and second support bar respectively to connect, to increase the bonding strength of first support bar and second support bar.
Preferably, the movable pulley 37 mobile for pedestal is provided on first rectangle frame 31, to be moved easily slideway 3.
In a preferred embodiment of the utility model, the quantity of movable pulley 37 is two, and a movable pulley 37 is located at Below first support bar, a movable pulley 37 is located at below second support bar.
Preferably, pulling and moving equipment further includes the first extension rod 35 and the second extension rod 36.
First extension rod 35 is vertical with first support bar to be connect, and second extension rod 36 is vertical with second support bar to be connected It connects.
The direction that first extension rod 35 and the second extension rod 36 are directed away from the slipping part 33 extends, and equal position Above the conveyer 4.
By the first extension rod 35 of setting and the second extension rod 36, track can be made steadily to fall on conveyer 4, avoid track It is slided on the conveyer belt of conveyer 4, reduces the damage to conveyer belt, reduce production cost.
In a preferred embodiment of the utility model, the material of slideway 3 is four steel splitting pipes, further reduces slideway 3 weight, so that 3 Portable durable of slideway is easy to carry.
Further, pulling and moving equipment further includes bending plate, is L-type plate, and bending plate is separately positioned on first support bar and the On two support rods, bending member and first support bar, bending member and second support bar are respectively formed slot, and slot is plugged on conveyer In 4 rack, to guarantee the installation fastness of slideway 3.
Further, pulling and moving equipment further includes the first hook and the second hook, and first hook and the second hook are symmetrical Ground is hung on the shifting object to be drawn, and the connection chain is drawn by first hook and the second hook and moves the shifting object to be drawn, protected When card draws shifting track, track stress balance on slideway 3 avoids turning on one's side.
In a preferred embodiment of the utility model, winch 1 is mounted on the final section track moved where changing train On, angle pulley 7 is additionally provided on final section track, connection chain 5 connect around 7 bottom of angle pulley with winch 1, with convenient 1 folding and unfolding connection chain 5 of winch.
Further, pulling and moving equipment further includes suspension hook 8, and connection chain 5 is connected by first hook of the difference of suspension hook 8 and the second hook It connects, suspension hook 8, to facilitate connection chain 5 with wait draw the connection for moving object 6, improves assembly between hanging pulley 2 and angle pulley 7 Efficiency.
In a preferred embodiment of the utility model, connection chain 5 uses wirerope, to reduce production cost.
Preferably, pulling and moving equipment further includes locking phone, the latch buttons switch of the locking phone is connected on the strand In the control circuit of vehicle, rail operation personnel and drumman can be made to converse, rail operation personnel are twisted by locking phone, commander How vehicle driver operates winch.
When pressing latch buttons switch call, winch 1 can not start.Once there is security risk, locking phone is pressed Latch buttons switch, be latched winch, winch can not work, and improve the safety coefficient of operation.In the present embodiment, it is latched phone The enclosed type hands free telephone of model KTC103.2 can be used.
More than, the technical solution of the utility model is described in detail in conjunction with specific embodiments, it is described specific Embodiment is used to help understand the thought of the utility model.Those skilled in the art are on the basis of the utility model specific embodiment On the derivation made and modification also belong within scope of protection of the utility model.

Claims (10)

1. a kind of pulling and moving equipment, which is characterized in that including winch, connection chain, lifting pulley, conveyer and slideway, the lifting Pulley is mounted on predetermined position, the connection chain around the lifting pulley by the winch with wait draw shifting object to connect, the strand Vehicle pulling is described wait draw shifting object to be moved on the conveyer along the slideway, and the conveyer is by described wait draw shifting object to be moved to Predetermined position.
2. pulling and moving equipment as described in claim 1, which is characterized in that the slideway includes pedestal, support portion and slipping part, institute It states support portion to be vertically arranged on the base, the both ends of the slipping part length direction connect with the support portion and pedestal respectively It connects, it is described wait draw shifting object to move along the slipping part.
3. pulling and moving equipment as claimed in claim 2, which is characterized in that the slipping part includes the first sliding bar disposed in parallel It is connect respectively with the support portion and pedestal with the both ends of the second sliding bar, the first sliding bar, the second sliding bar Both ends are connect with the support portion and pedestal respectively.
4. pulling and moving equipment as claimed in claim 3, which is characterized in that it further include reinforcing rod, the both ends difference of the reinforcing rod Bar is vertical connect with the first sliding bar and the second sliding.
5. pulling and moving equipment as claimed in claim 4, which is characterized in that the pedestal include the first rectangle frame, first connecting rod, Second connecting rod and the second rectangle frame, first rectangle frame and the second rectangle frame are arranged in parallel, and the two of the first connecting rod End is respectively with first rectangle frame and the second rectangle frame is vertical connect, and the both ends of second connecting rod are respectively with described first Rectangle frame and the second rectangle frame vertically connect, and the support portion is vertically set on the first rectangle frame, it is described first sliding bar and Second sliding bar is connect with the second rectangle frame respectively, and first rectangle frame, first connecting rod, the second connecting rod and support portion are equal Ipsilateral positioned at the second rectangle frame, the first rectangle frame is between first connecting rod and support portion.
6. pulling and moving equipment as claimed in claim 5, which is characterized in that the support portion includes first support bar disposed in parallel And second support bar, the both ends of the first support bar are connect with the first rectangle frame and the first sliding bar respectively, described second The both ends of strut are connect with the first rectangle frame and the second sliding bar respectively.
7. pulling and moving equipment as claimed in claim 6, which is characterized in that further include bending plate, the bending plate is separately positioned on In first support bar and second support bar, the bending plate forms slot with first support bar and second support bar respectively, described Slot is plugged in the rack of the conveyer.
8. pulling and moving equipment as claimed in claim 6, which is characterized in that it further include the first extension rod and the second extension rod, first Extension rod is vertical with first support bar to be connect, and second extension rod is vertical with second support bar to be connect, first extension rod The direction for being directed away from the slipping part with the second extension rod extends, and is respectively positioned on above the conveyer.
9. pulling and moving equipment a method as claimed in any one of claims 1-8, which is characterized in that further include the first hook and the second hook, institute It states the first hook and the second hook is symmetrically hung on the shifting object to be drawn, the connection chain passes through first hook and second Hook, which is drawn, moves the shifting object to be drawn.
10. pulling and moving equipment as claimed in claim 9, which is characterized in that it further include locking phone, the locking of the locking phone Button switch is connected in the control circuit of the winch.
CN201822097951.1U 2018-12-13 2018-12-13 Pulling and moving equipment Active CN209618239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822097951.1U CN209618239U (en) 2018-12-13 2018-12-13 Pulling and moving equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822097951.1U CN209618239U (en) 2018-12-13 2018-12-13 Pulling and moving equipment

Publications (1)

Publication Number Publication Date
CN209618239U true CN209618239U (en) 2019-11-12

Family

ID=68445694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822097951.1U Active CN209618239U (en) 2018-12-13 2018-12-13 Pulling and moving equipment

Country Status (1)

Country Link
CN (1) CN209618239U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113460733A (en) * 2021-07-06 2021-10-01 美巢集团股份公司 Material receiving device unloads

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113460733A (en) * 2021-07-06 2021-10-01 美巢集团股份公司 Material receiving device unloads

Similar Documents

Publication Publication Date Title
CN209618239U (en) Pulling and moving equipment
CN205604697U (en) Hook type high -place operation hanging basket
CN204096935U (en) Lifting mechanism and use the hoisting crane of this lifting mechanism
CN204778340U (en) Automatic couple device breaks off relations
CN207551862U (en) A kind of belt rolls up discharge mechanism
CN202152256U (en) Lifting hook
CN205527409U (en) Portable hoist
CN210029780U (en) Crane hanger for bridge construction
CN207608190U (en) A kind of major diameter surge shaft brill filling cantilever trolley
CN208932913U (en) A kind of flexible frock suspender
CN204893921U (en) All revolving racks of cross arm hook
CN202626840U (en) Hanging basket device used in construction of slag retaining wall of railway cast-in-situ edge beam
CN205634609U (en) A device for reinforcing bar hoist and mount
CN216971783U (en) Pipe body transportation hoisting structure
CN205275014U (en) I -shaped glass gallows
CN205270668U (en) Reinforcement cutting shear moving platform
CN205275132U (en) Forklift lifting tool
CN205740166U (en) Slidingtype expansion bracket
CN213387710U (en) Cutter transfer device of shield machine
CN210001437U (en) bridge crane hoisting device
CN205243038U (en) Simple and easy building block hoisting accessory
CN219909902U (en) Safety device is used in high altitude construction
CN218198311U (en) Lever type moving and transporting balance car
CN210712568U (en) Movable anti-collision body construction hanging basket
CN213231355U (en) Lifting machine for building engineering with protection mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant