CN205634609U - A device for reinforcing bar hoist and mount - Google Patents
A device for reinforcing bar hoist and mount Download PDFInfo
- Publication number
- CN205634609U CN205634609U CN201620403357.9U CN201620403357U CN205634609U CN 205634609 U CN205634609 U CN 205634609U CN 201620403357 U CN201620403357 U CN 201620403357U CN 205634609 U CN205634609 U CN 205634609U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- lifting
- wire rope
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a device for reinforcing bar hoist and mount, include reinforcing bar and the lifting hook that is used for hoisting the lifting machine of reinforcing bar, the reinforcing bar carries on binding at 2 o'clock through wire rope, a pot head of reinforcing bar is equipped with the sleeve, wire rope one end is restricted and the muffjoint through being connected with hook connect, the other end. The utility model discloses operating efficiency is high for device hoist and mount reinforcing bar, can also protect the screw thread (silk bud) of straight thread reinforcing bar tip well, has guaranteed the quality of reinforcing bar effectively. So the utility model discloses a device is applicable to all reinforcing bar vertical hoisting, and is efficient, of high quality, safe and reliable, and technological improvement is simple moreover, not only economy but also practicality.
Description
Technical field
This utility model relates to building trade, is specifically related to a kind of device for reinforcing bar lifting.
Background technology
At present, in construction industry, what vertical transport lifting was commonly used is building tower crane, reinforcing bar is before lifting, a bundle reinforcing bar steel wire rope is manually tied up by Basic practice exactly firmly, the flat lifting of WAWQ, and reinforcing bar is sling after leaving ground, arrive high-altitude, wanted big and heavy reinforcing bar to erect and be put in post (in the framework pillar that scaffold is set up in advance).Owing to reinforcing bar is big and heavy and longer, being difficult to stood and be put in post, labor intensity is big, and dangerous, night works extra shifts or extra hours, in the case of illuminating effect is the best, more inconvenient, such as sleety weather, safety faces bigger challenge, delays the duration, unfavorable operation.
Construction site a bundle reinforcing bar is lifted with two ways, and one is level lifting, and one is vertical lifting.Wherein 2 tops being lifted into building of level, reinforcing bar is long, it is easy to collide with the rugged scaffold tube tube head on building.The reinforcing bar having in a bundle reinforcing bar of vertical lifting easily produces sliding, landing, hurts sb.'s feelings, hinders thing, and is lifted into high-altitude, and post muscle is difficult to stand and gets up to enter in pillar framework, is inconvenient for, and efficiency is low.
Utility model content
This utility model provides a kind of device for reinforcing bar lifting, thus efficiently solve the big and heavy reinforcing bar of traditional work high above the ground and be difficult to enter the problem in post, greatly reduce the problems such as work high above the ground is time-consuming, effort, speed are slow, danger is big, substantially increase lifting efficiency and safety.
The technical solution of the utility model is:
A kind of device for reinforcing bar lifting, including reinforcing bar with for lifting the suspension hook of the lifting machine of reinforcing bar, described reinforcing bar carries out 2 bindings by steel wire rope, and one end of described reinforcing bar is arranged with sleeve, and described steel wire rope one end is connected with suspension hook, the other end is restricted by connection and sleeve connection.
Scheme further, described sleeve includes that the cylinder that one end is closed, the sidewall symmetry of described cylinder are installed with hanger, and the top of described hanger offers the connecting hole for connecting rope.
Scheme further, described steel wire rope binding position is positioned at the 1/4 of reinforcing bar two ends.
In this utility model, 2 bindings refer to bundle steel wire rope respectively at the 1/4 of reinforcing bar two ends.
Reinforcing bar two to be lifted in use, is first piled up neatly by this device, carries out 2 bindings with steel wire rope at the 1/4 of reinforcing bar two ends;Then the termination, bottom of bundled reinforcing bar is loaded in sleeve;Then connecting rope in the connecting hole of sleeve, the other end connecting rope is connected with steel wire rope, thus is fixed with reinforcing bar by sleeve, prevents reinforcing bar therefrom sliding, landing, ensures safety.Finally the other end of steel wire rope is connected with the suspension hook of lifting machine, it is achieved single-point lifts by crane, thus by reinforcing bar vertical lifting to high-altitude, sheathed that end bar sleeved is put into post (or scaffold frame).Finally unclamp connection rope, unload reinforcing bar, very convenient, quick, efficient, the most safe and reliable.
This utility model device lifting reinforcing bar operating efficiency is high, and significantly larger than horizontal reinforcement is erected in entrance post by a bundle reinforcing bar WAWQ flat lifting lifting, manual operation.It addition, this device can also protect the screw thread (silk bud) of straight thread reinforced bar end well, it is effectively guaranteed the quality of reinforcing bar.
So device of the present utility model is applicable to all of reinforcing bar vertical lifting, efficiency is high, and quality is good, safe and reliable, and technological improvement is simple, not only economy but also practical.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings this lifting device is further illustrated.
Fig. 1 be this utility model for lifting reinforcing bar schematic diagram,
Fig. 2 is the structural representation of this utility model middle sleeve.
In figure: 1-sleeve, 11-cylinder, 12-hanger, 13-connecting hole;2-connects rope, 3-steel wire rope, 4-suspension hook, 5-reinforcing bar.
Detailed description of the invention
As shown in Figure 1, a kind of device for reinforcing bar lifting, including reinforcing bar 5 with for lifting the suspension hook 4 of the lifting machine of reinforcing bar 5, described reinforcing bar 5 carries out 2 bindings by steel wire rope 3, one end of described reinforcing bar 5 is arranged with sleeve 1, and described steel wire rope 3 one end is connected with suspension hook 4, the other end is connected with sleeve 1 by connecting rope 2.
As in figure 2 it is shown, sleeve 1 includes that the cylinder 11 closed one end, the sidewall symmetry of described cylinder 11 are installed with hanger 12, the top of described hanger 12 offers the connecting hole 13 for connecting rope 2.
Scheme further, described steel wire rope 3 bundlees position and is positioned at the 1/4 of reinforcing bar 5 two ends.
Reinforcing bar 5 two to be lifted in use, is first piled up neatly by this device, carries out 2 bindings with steel wire rope 3 at the 1/4 of reinforcing bar two ends;Then the termination, bottom of bundled reinforcing bar 5 is loaded in sleeve 1;Then connecting rope 2 in the connecting hole 13 of sleeve 1, the other end connecting rope 2 is connected with steel wire rope 3, thus is fixed with reinforcing bar 5 by sleeve 1, prevents reinforcing bar therefrom sliding, landing, ensures safety;Again the other end of steel wire rope 3 is connected with the suspension hook 4 of lifting machine, it is achieved single-point lifts by crane, thus by reinforcing bar vertical lifting to high-altitude, sheathed that end bar sleeved is put into post (or scaffold frame).Finally unclamping connection rope, unload reinforcing bar, lifting terminates.
This utility model device lifting reinforcing bar operating efficiency is high, moreover it is possible to protects the screw thread (silk bud) of straight thread reinforced bar end well, is effectively guaranteed the quality of reinforcing bar.
So device of the present utility model is applicable to all of reinforcing bar vertical lifting, efficiency is high, and quality is good, safe and reliable, and technological improvement is simple, not only economy but also practical.
The description of above-described embodiment is to be understood that for ease of those skilled in the art and apply this utility model; therefore; this utility model is not limited to above-described embodiment, and improvement and the amendment made without departing from scope all should be within protection domains of the present utility model.
Claims (3)
1. the device for reinforcing bar lifting, including reinforcing bar (5) be used for lifting the suspension hook (4) of the lifting machine of reinforcing bar (5), it is characterized in that: described reinforcing bar (5) carries out 2 bindings by steel wire rope (3), one end of described reinforcing bar (5) is arranged with sleeve (1), and described steel wire rope (3) one end is connected with suspension hook (4), the other end is connected with sleeve (1) by connecting rope (2).
A kind of device for reinforcing bar lifting the most according to claim 1, it is characterized in that: described sleeve (1) includes the cylinder (11) closed one end, the sidewall symmetry of described cylinder (11) is installed with hanger (12), and the top of described hanger (12) offers the connecting hole (13) for connecting rope (2).
A kind of device for reinforcing bar lifting the most according to claim 1, it is characterised in that: described steel wire rope (3) binding position is positioned at the 1/4 of reinforcing bar (5) two ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620403357.9U CN205634609U (en) | 2016-05-06 | 2016-05-06 | A device for reinforcing bar hoist and mount |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620403357.9U CN205634609U (en) | 2016-05-06 | 2016-05-06 | A device for reinforcing bar hoist and mount |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205634609U true CN205634609U (en) | 2016-10-12 |
Family
ID=57049625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620403357.9U Expired - Fee Related CN205634609U (en) | 2016-05-06 | 2016-05-06 | A device for reinforcing bar hoist and mount |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205634609U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227729A (en) * | 2020-09-28 | 2021-01-15 | 南京师范大学 | Rail car device and method for steel bar penetrating through silo |
-
2016
- 2016-05-06 CN CN201620403357.9U patent/CN205634609U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227729A (en) * | 2020-09-28 | 2021-01-15 | 南京师范大学 | Rail car device and method for steel bar penetrating through silo |
CN112227729B (en) * | 2020-09-28 | 2022-02-15 | 南京师范大学 | Rail car device and method for steel bar penetrating through silo |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204281108U (en) | A kind of transfer crane | |
CN104261246A (en) | Hoisting tool of rectangular pipe-jacking section and use method of hoisting tool | |
CN203474253U (en) | Umbrella-open type automatic positioning spreader | |
CN201801293U (en) | Automatically tightening lifting tool | |
CN205634609U (en) | A device for reinforcing bar hoist and mount | |
CN203998604U (en) | The be threaded vertical reinforcement erecting equipment of form of employing | |
CN105822132A (en) | Unit type assembly and erection method of extra-high-voltage power transmission iron pylon | |
CN205132903U (en) | Steel wire slings | |
CN203865929U (en) | Portable crane | |
CN207243306U (en) | Tower crane two sides jacks stock | |
CN204162284U (en) | A kind of lifting device of rectangular top pipe tube coupling | |
CN206680062U (en) | A kind of prefabricated part hanging instrument | |
CN207030735U (en) | Prefabricated balcony lifts servicing unit | |
CN212712478U (en) | Dismounting device for cargo boom and balance arm of tower crane | |
CN210973657U (en) | Marine crane with fixing device | |
CN203624932U (en) | Portable indoor material lifter | |
CN107628536B (en) | A kind of small aircraft hoisting and turnover device and hanging method | |
CN202575684U (en) | Prefabricated-slab hoisting tool | |
CN208916602U (en) | Cement electric pole boom hoisting | |
CN201980854U (en) | Semi-automatic brick-suspending clamp | |
CN103601065B (en) | A kind of steel wire coil hoisting clamp | |
CN202190023U (en) | Wire bracing device for overhead wire | |
CN205346622U (en) | Steel constructs component bikini and lifts by crane installation device | |
CN205687389U (en) | A kind of slipping tail suspension rod for the lifting of tower kind equipment | |
CN205257766U (en) | Adapter is binded in hoist and mount of ox leg column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20210506 |