CN209608779U - A kind of monitoring system at highway engineering construction scene - Google Patents
A kind of monitoring system at highway engineering construction scene Download PDFInfo
- Publication number
- CN209608779U CN209608779U CN201920704560.3U CN201920704560U CN209608779U CN 209608779 U CN209608779 U CN 209608779U CN 201920704560 U CN201920704560 U CN 201920704560U CN 209608779 U CN209608779 U CN 209608779U
- Authority
- CN
- China
- Prior art keywords
- information
- unit
- monitoring system
- chip
- release
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 57
- 238000012544 monitoring process Methods 0.000 title claims abstract description 26
- 238000000034 method Methods 0.000 claims abstract description 20
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 13
- 239000000428 dust Substances 0.000 claims description 10
- 238000001514 detection method Methods 0.000 claims description 6
- 238000007493 shaping process Methods 0.000 claims description 3
- 230000003321 amplification Effects 0.000 claims 1
- 238000003199 nucleic acid amplification method Methods 0.000 claims 1
- 230000007613 environmental effect Effects 0.000 abstract description 2
- 230000010365 information processing Effects 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 206010057190 Respiratory tract infections Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000034994 death Effects 0.000 description 1
- 231100000517 death Toxicity 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Alarm Systems (AREA)
Abstract
The utility model discloses a kind of monitoring systems at highway engineering construction scene, belong to supervisory information system technical field, its key points of the technical solution are that including information acquisition unit, information receiving unit, information storage unit, information process unit and information output unit, information output unit includes field computer terminal, monitoring system further includes the release for being distributed to each worker, identity chip is provided in release, information acquisition unit further includes the calculating punch of identity chip for identification.The monitoring system can not only monitor the concrete condition of construction personnel, and the environment of construction site can also be monitored, the concrete condition that worker occurs can be handled timely, the problem of avoiding the occurrence of relief not in time, for environmental problem, it can be handled in source, avoid further expansion, and cause heavy losses.
Description
Technical field
The utility model belongs to supervisory information system technical field, refers in particular to a kind of monitoring system at highway engineering construction scene
System.
Background technique
The supervision at engineering construction scene is helped to guarantee the safety of construction, promote construction site in construction in an orderly manner into
Row will not leave security risk once going wrong can solve in first time.The dress at existing supervision engineering construction scene
Mostly video monitoring camera is set, administrative staff check staff and construction in scene by the monitored picture on display
The working condition of equipment.But video monitoring inevitably has dead angle, if safety problem occurs at dead angle for construction personnel, therefore can not
Security department is arrived in first time feedback, can occur to make because succouring not in time often so as to cause present engineering construction scene
The phenomenon that at worker's injures and deaths.
Utility model content
The purpose of the utility model is to provide a kind of monitoring systems at highway engineering construction scene, can be effectively to construction
Scene is monitored, and pays close attention to the specific real time information of construction personnel.
Purpose of the utility model is realized as follows: a kind of monitoring system at highway engineering construction scene, wherein including
Information acquisition unit, information receiving unit, information storage unit, information process unit and information output unit, the information are adopted
Collecting unit includes video acquisition unit, and the information output unit includes field computer terminal, and the video acquisition unit will
The information of acquisition is sent on the information receiving unit, and the information receiving unit will be received after information shaping is amplified and be inputed to
The information process unit, the information process unit are stored by the information storage unit, the information processing list
Processor in member decodes the reception information and is fed back in the field computer terminal, and the monitoring system is also wrapped
The release for being distributed to each worker is included, the identity chip for having recorded each worker's brief information is provided in the release, it is described
Information acquisition unit further includes setting at the gate and for identification calculating punch of the identity chip at the construction field (site), described
Worker's concrete condition of construction site can be shown in field computer terminal.
By using above-mentioned technical proposal, construction personnel needs to pass in and out construction site by release, so as to supervise
The real time information of worker is measured, and then knows the specific number of construction site, feelings can timely be understood for the personnel not shown up
Condition is simultaneously handled, and can understand in time whether construction personnel all leaves construction site when next.Information receiving unit receives
To information after information process unit is handled, in final feedback to field computer terminal, Security Personnel is calculated by scene
Machine terminal monitors the concrete condition of construction site.
The utility model is further arranged to: positioning chip is additionally provided in the release, the positioning chip passes through
The specific location of the release is sent to the information receiving unit by built-in wireless transmitter, and the final scene calculates
Machine terminal shows location information.
Temperature sensing chip is connected on the positioning chip, the temperature information of the temperature sensing chip detection is by described
Wireless transmitter on positioning chip is sent to the information receiving unit together.
It is connected with audio alert chip on the positioning chip, stores alarm calls sound in the audio alert chip,
The timing trigger pulse output end of the alarm calls sound is connected with the wireless transmitter on the positioning chip, on the release
It is additionally provided with the alarm button for opening and closing the audio alert chip sequence circuit.
By using above-mentioned technical proposal, positioning chip can detect the particular geographic location of the release, occur in worker
After accident, by starting audio alert chip, to make its signal an alert and be sent to information by wireless transmitter to receive list
Member is eventually displayed in field computer terminal, and Security Personnel can quickly look for the wounded by the location information, can
The problem of preventing relief not in time, temperature sensing chip is passed through for detecting the temperature conditions around construction personnel
The numerical value of temperature sensing chip detection, can timely discover whether that worker is at the fire source after fire occurs, Jin Erke
Relief in time.
The utility model is further arranged to: the video acquisition unit is by being arranged multiple camera structures at the construction field (site)
At the camera shoots construction site, and the information of shooting is sent to the information receiving unit.
By using above-mentioned technical proposal, camera is presently the most common and maximally efficient video acquisition device, leads to
The photos and videos of camera shooting is crossed come the case where monitoring construction site, and is timely feedbacked.
The utility model is further arranged to: the monitoring system further includes engineering water sprinkler, the information acquisition unit
It further include the fugitive dust detector for being set to construction site, the air quality information of the fugitive dust detector detection is delivered to the letter
After ceasing on processing unit, after the specific value of the air quality information reaches the threshold value of setting, on the information process unit
Processor can control the opening and closing of the engineering water sprinkler.
By using above-mentioned technical proposal, the pollution the most serious of engineering construction scene is exactly dust pollution, construction personnel
It is easy infection respiratory disease after absorbing a large amount of dust, therefore is provided with engineering water sprinkler and fugitive dust detector, fugitive dust detection
After device detects air, when discovery pollution is more serious, can freely it be controlled by the processor on information process unit
The opening and closing of engineering water sprinkler, engineering water sprinkler can effectively reduce the small solid particles in air to the water droplet of air spray.
The utility model is using above-mentioned technical solution beneficial effect achieved: the monitoring system can not only monitor
The concrete condition of construction personnel, and the environment of construction site can also be monitored, the concrete condition that worker occurs can be timely
Processing avoids the occurrence of the problem of succouring not in time, for environmental problem, can be handled in source, avoid further expansion
Greatly, heavy losses are caused.
Detailed description of the invention
Fig. 1 is the illustrative view of functional configuration of the utility model;
Appended drawing reference in figure are as follows: 1, information acquisition unit;11, calculating punch;12, video acquisition unit;13, fugitive dust is examined
Survey device;2, information receiving unit;3, information storage unit;4, information process unit;5, field computer terminal;6, release;
61, identity chip;62, positioning chip;63, temperature sensing chip;64, audio alert chip;7, engineering water sprinkler.
Specific embodiment
In order to make those skilled in the art be better understood when the technical solution in the utility model, with reference to the accompanying drawing
The technical scheme in the utility model embodiment is clearly and completely described:
As shown in Figure 1, a kind of monitoring system at highway engineering construction scene, wherein including information acquisition unit 1, information
Receiving unit 2, information storage unit 3, information process unit 4 and information output unit, information acquisition unit 1 include video acquisition
Unit 12, information output unit include field computer terminal 5, and video acquisition unit 12 sends information for the information of acquisition and connects
It receives on unit 2, information receiving unit 2 will receive after information shaping is amplified and input to information process unit 4, information process unit 4
It is stored by information storage unit 3, the processor on information process unit 4 is decoded and fed back to the reception information
In field computer terminal 5, monitoring system further includes the release 6 for being distributed to each worker, is provided with and is had recorded respectively in release 6
The identity chip 61 of worker's brief information, information acquisition unit 1 further include setting at gate and for identification body at the construction field (site)
The calculating punch 11 of part chip 61 can show worker's concrete condition of construction site in field computer terminal 5.
Positioning chip 62 is additionally provided in release 6, positioning chip 62 passes through built-in wireless transmitter for release 6
Specific location is sent to information receiving unit 2, and final field computer terminal 5 shows location information.
Temperature sensing chip 63 is connected on positioning chip 62, the temperature information that temperature sensing chip 63 detects is by locating core
Wireless transmitter on piece 62 is sent to information receiving unit 2 together.
It is also connected with audio alert chip 64 on positioning chip 62, alarm calls sound is stored in audio alert chip 64,
The timing trigger pulse output end of the alarm calls sound is connected with the wireless transmitter on positioning chip 62, also sets on release 6
There is the alarm button for opening and closing 64 sequence circuit of audio alert chip.
Construction personnel needs to pass in and out construction site by release 6, so as to monitor the real time information of worker, into
And know the specific number of construction site, the personnel not shown up timely can be gone and found out what's going on and be handled, and when next
It can understand in time whether construction personnel all leaves construction site.Positioning chip 62 can detect the specific geographic position of the release 6
It sets, after worker's generation accident, by starting audio alert chip 64, to make its signal an alert and be sent out by wireless transmitter
Information receiving unit 2 is given, is eventually displayed in field computer terminal 5, Security Personnel can be quickly by the location information
The problem of looking for the wounded, can preventing relief not in time, temperature sensing chip 63 is then for detecting construction personnel
The temperature conditions of surrounding, the numerical value detected by the temperature sensing chip 63 can timely discover whether work after fire occurs
People is at the fire source, and then can succour in time.
It advanced optimizes, video acquisition unit 12 is made of the multiple cameras for being arranged at the construction field (site), and camera is to applying
Work scene is shot, and the information of shooting is sent to information receiving unit 2.By camera shoot photos and videos come
The case where monitoring construction site, in order to which Security Personnel is handled in time.
It advanced optimizes, monitoring system further includes engineering water sprinkler 7, and engineering water sprinkler 7 can have to the water droplet of air spray
The small solid particles of effect reduced in air, information acquisition unit 1 further includes the fugitive dust detector 13 for being set to construction site, is raised
After dirt detector 13 detects air, the air quality information that will test is delivered to information processing by information receiving unit 2
Processor meeting on unit 4, after the specific value of the air quality information reaches the threshold value of setting, on information process unit 4
Control the opening and closing of engineering water sprinkler 7.
Above-described embodiment is only the preferred embodiment of the utility model, rather than whole embodiments, the common skill of this field
Without making creative work, the other embodiments obtained based on the above embodiment should all belong to art personnel
In the range of the utility model protection, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be contained
It is placed within the protection scope of the utility model.
Claims (6)
1. a kind of monitoring system at highway engineering construction scene, it is characterised in that: received including information acquisition unit (1), information
Unit (2), information storage unit (3), information process unit (4) and information output unit, the information acquisition unit (1) include
Video acquisition unit (12), the information output unit include field computer terminal (5), and the video acquisition unit (12) will
The information of acquisition is sent on the information receiving unit (2), after the information receiving unit (2) will receive information shaping amplification
It inputing to the information process unit (4), the information process unit (4) is stored by the information storage unit (3),
Processor on the information process unit (4) decodes the reception information and feeds back the field computer terminal
(5) on, the monitoring system further includes the release (6) for being distributed to each worker, is provided with and is had recorded respectively in the release (6)
The identity chip (61) of worker's brief information, the information acquisition unit (1) further include setting at the construction field (site) at gate and use
It constructs now in that can be shown on the calculating punch (11) for identifying the identity chip (61), the field computer terminal (5)
Worker's concrete condition of field.
2. a kind of monitoring system at highway engineering construction scene according to claim 1, it is characterised in that: the release
(6) it is additionally provided with positioning chip (62) in, the positioning chip (62) passes through built-in wireless transmitter for the release (6)
Specific location be sent to the information receiving unit (2), the final field computer terminal (5) shows location information.
3. a kind of monitoring system at highway engineering construction scene according to claim 2, it is characterised in that: the locating core
It is connected on piece (62) temperature sensing chip (63), the temperature information of temperature sensing chip (63) detection is by the locating core
Wireless transmitter on piece (62) is sent to the information receiving unit (2) together.
4. a kind of monitoring system at highway engineering construction scene according to claim 2, it is characterised in that: the locating core
It is connected on piece (62) audio alert chip (64), stores alarm calls sound in the audio alert chip (64), the alarm
The timing trigger pulse output end of ring tone is connected with the wireless transmitter on the positioning chip (62), the release (6)
On be additionally provided with alarm button for opening and closing audio alert chip (64) sequence circuit.
5. a kind of monitoring system at highway engineering construction scene according to claim 1, it is characterised in that: the video is adopted
Collection unit (12) is made of the multiple cameras for being arranged at the construction field (site), and the camera shoots construction site, and will
The information of shooting is sent to the information receiving unit (2).
6. a kind of monitoring system at highway engineering construction scene according to claim 1, it is characterised in that: the monitoring system
System further includes engineering water sprinkler (7), and the information acquisition unit (1) further includes the fugitive dust detector for being set to construction site
(13), after the air quality information of fugitive dust detector (13) detection is delivered on the information process unit (4), in the sky
After the specific value of gas quality information reaches the threshold value of setting, the processor on the information process unit (4) can control described
The opening and closing of engineering water sprinkler (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920704560.3U CN209608779U (en) | 2019-05-16 | 2019-05-16 | A kind of monitoring system at highway engineering construction scene |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920704560.3U CN209608779U (en) | 2019-05-16 | 2019-05-16 | A kind of monitoring system at highway engineering construction scene |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209608779U true CN209608779U (en) | 2019-11-08 |
Family
ID=68406748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920704560.3U Expired - Fee Related CN209608779U (en) | 2019-05-16 | 2019-05-16 | A kind of monitoring system at highway engineering construction scene |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209608779U (en) |
-
2019
- 2019-05-16 CN CN201920704560.3U patent/CN209608779U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205140120U (en) | Long -range monitoring and forewarning system of thing networking image conflagration | |
CN103726879A (en) | Method for utilizing camera to automatically capture mine earthquakes and collapses of mine and timely record and alarm | |
CN103617699A (en) | Intelligent safety monitor system of electric power working site | |
CN204706130U (en) | Camera head and fire detection warning system | |
CN107526319A (en) | A kind of building safety defense monitoring system | |
CN109584494A (en) | A kind of hidden fire-fighting danger inspection system based on Internet of Things | |
CN107341943A (en) | A kind of fire disaster emergency system based on internet | |
CN211908987U (en) | Intelligent building electric control system with face recognition function | |
CN106846713A (en) | A kind of smart city warning system for public security | |
CN108131166B (en) | Mine explosion monitoring alarm system based on image | |
CN205281726U (en) | Laboratory security protection monitored control system based on video analysis | |
CN202563654U (en) | Novel community security system | |
CN209608779U (en) | A kind of monitoring system at highway engineering construction scene | |
CN201830395U (en) | Oil well monitoring system | |
CN202887370U (en) | Security and protection system | |
CN111726412A (en) | Intelligent building monitored control system based on big data | |
CN107396051A (en) | A kind of method that recognition of face monitoring is carried out using unmanned plane | |
CN207281960U (en) | A kind of fire disaster emergency system based on internet | |
CN207352429U (en) | A kind of building safety defense monitoring system | |
CN103949031B (en) | Fire pump coordinated control system based on radio sensing network and method of work thereof | |
CN206058456U (en) | It is a kind of for fire identification can monitor in real time image processing system | |
CN111127854A (en) | Fire extinguishing system based on dual-environment perception and intelligent processing | |
CN108361069A (en) | Mine explosion monitoring system based on coloured image monitoring device | |
CN206331546U (en) | Automatic fire alarm system based on RF wireless sensor networks | |
CN209962383U (en) | Warehouse fire alarm system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191108 |
|
CF01 | Termination of patent right due to non-payment of annual fee |