CN209603280U - The end structure of steel construction girder - Google Patents

The end structure of steel construction girder Download PDF

Info

Publication number
CN209603280U
CN209603280U CN201920124232.6U CN201920124232U CN209603280U CN 209603280 U CN209603280 U CN 209603280U CN 201920124232 U CN201920124232 U CN 201920124232U CN 209603280 U CN209603280 U CN 209603280U
Authority
CN
China
Prior art keywords
main joist
false keel
fixed plate
sides
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920124232.6U
Other languages
Chinese (zh)
Inventor
范一峥
范六清
范舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jianglian Environmental Engineering Assembly Manufacturing Co Ltd
Original Assignee
Jiangxi Jianglian Environmental Engineering Assembly Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Jianglian Environmental Engineering Assembly Manufacturing Co Ltd filed Critical Jiangxi Jianglian Environmental Engineering Assembly Manufacturing Co Ltd
Priority to CN201920124232.6U priority Critical patent/CN209603280U/en
Application granted granted Critical
Publication of CN209603280U publication Critical patent/CN209603280U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of end structures of steel construction girder, including main joist, false keel, the main joist, false keel is that the two sides of length direction are equipped with the channel steel of fixed plate, in the false keel two sides fixed plate in T shape for being fixed on main joist, fixed plate on the false keel other side and right-angled trapezium fixing piece is equipped between the fixed plate of main joist two sides, two right-angle sides of the right-angled trapezium fixing piece are mutually fixed with the fixed plate on false keel and main joist by bolt respectively, female part is equipped in the groove of the false keel, two horizontal end faces of the female part and the two sides fixed plate of false keel lean, fixed plate in the vertical end face and main joist of the female part leans, the utility model proposes this steel construction girder end structure, can effectively optimize between main joist and false keel and to by Power distribution, improves the anti-pressure ability of main joist and false keel, prevents girder end section from generating deformation.

Description

The end structure of steel construction girder
Technical field
The utility model belongs to steel structure technology field, specifically a kind of end structure of steel construction girder.
Background technique
The structure that steel construction is made of steel material is one of main building construction types.Structure is mainly by fashioned iron With the components composition such as joist steel, steel column, steel truss made of steel plate etc., and using silanization, pure manganese phosphatization, washing drying, zinc-plated Equal derusting rust-proofings technique.Weld seam, bolt or rivet interlacement are generallyd use between each component or component.Because its self weight is lighter, and apply Work is easy, is widely used in the fields such as large-sized workshop, venue, Super High.
The general building using steel construction all has higher height, thus the stress of steel construction carrying mainly come from it is perpendicular Histogram upwards pressure, and steel construction middle girder is the key point for carrying stress, and wherein the joint of main joist and false keel is It is easiest to occur loosening the place with deformation, the end structure to steel construction middle girder is needed to optimize thus.
Utility model content
In order to solve the problems of the above-mentioned prior art, the utility model proposes a kind of termination knots of steel construction girder Structure can effectively optimize between main joist and false keel and to bearing distribution, improve the anti-pressure ability of main joist and false keel, Prevent girder end section from generating deformation.
The technical solution of the utility model is achieved in that
A kind of end structure of steel construction girder, including main joist, false keel, the main joist, false keel are length The two sides in direction are equipped with the channel steel of fixed plate, in the false keel two sides fixed plate in T shape for being fixed on main joist, feature It is, the fixed plate of the false keel side is flushed with the port in main joist short transverse, on the false keel other side Right-angled trapezium fixing piece, two right-angle sides of the right-angled trapezium fixing piece are equipped between fixed plate and the fixed plate of main joist two sides It is mutually fixed with the fixed plate on false keel and main joist by bolt respectively, a female part is equipped in the groove of the false keel, Two horizontal end faces of the female part and the two sides fixed plate of false keel lean, the vertical end face and main joist of the female part On fixed plate lean, be equipped with corner brace in the groove of the main joist, it is fixed on two end faces difference main joist of the corner brace The inner wall of plate and the outside wall surface of false keel upper mounted plate fit, the fixation in the vertical end face and main joist of the female part The side end that plate and corner brace are located in main joist groove is fastened by bolt, in the horizontal ends and false keel of the female part Another side end of fixed plate and corner brace is fastened by bolt.
In the present invention, the fixed plate that the false keel connects with main joist short transverse port is equipped with inclined plate, One end of the inclined plate is mutually fixed with the fixed plate on false keel, and main joist two sides inclined plate phase triangular in shape is fixed, the master The joint of the inclined plate inclined plate of two sides is equipped with lifting rope on keel, which is equipped with sash weight.
Compared with prior art, implement the end structure of this steel construction girder in the utility model with beneficial below Effect: it is mutually fixed together between major-minor keel by components such as right-angled trapezium part, female part, corner braces, wherein right-angled trapezium part The downward stress of false keel can be effectively accepted, the part of right-angled trapezium has better crushing resistance compared with common corner brace Can, avoid deformation;Female part is placed in the groove of false keel and leans with main joist simultaneously, can effectively prevent pair The fixed plate of keel two sides generates deformation, and the both ends of corner brace fit with the fixed plate on main joist, false keel respectively, it is ensured that main Right angle fixed relationship between false keel will not generate deviation;The inclined plate of main joist two sides connects in triangle, and what is restrained each other is same When also can judge whether false keel has occurred positional shift between main joist by observing the position of sash weight.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.
The end structure of this steel construction girder as shown in Figure 1, including main joist 1, false keel 2, main joist 1, secondary dragon Bone 2 is that the two sides of length direction are equipped with the channel steel of fixed plate 3, and the two sides in T shape for being fixed on main joist 1 of false keel 2 are fixed On plate, the fixed plate of 2 side of false keel is flushed with the port in 1 short transverse of main joist, the fixed plate on 2 other side of false keel Right-angled trapezium fixing piece 4, two right-angle sides point of the right-angled trapezium fixing piece 4 are equipped between the fixed plate of 1 two sides of main joist It is not fixed mutually with the fixed plate on false keel 2 and main joist 1 by bolt, female part 5 is equipped in the groove of false keel 2, this is recessed Two horizontal end faces of shape part 5 and the two sides fixed plate of false keel 2 lean, in the vertical end face and main joist 1 of female part 5 Fixed plate leans, and corner brace 6 is equipped in the groove of main joist 1, two end faces difference 1 upper mounted plate of main joist of the corner brace 6 The outside wall surface of 2 upper mounted plate of inner wall and false keel fits, the fixed plate in the vertical end face of female part 5 and main joist 1 with And the side end that corner brace 6 is located in 1 groove of main joist is fastened by bolt, the horizontal ends of female part 5 and the fixation on false keel 2 Another side end of plate and corner brace 6 is fastened by bolt.
In the present solution, being equipped with inclined plate 7, the inclined plate in the fixed plate that false keel 2 connects with 1 short transverse port of main joist 7 one end is mutually fixed with the fixed plate on false keel 2, and the phase triangular in shape of inclined plate 7 of 1 two sides of main joist is fixed, two on main joist 1 7 joints of skew back plate are equipped with lifting rope 8, which is equipped with sash weight 9.
In actual application process, mutually fixed between major-minor keel by components such as right-angled trapezium part, female part, corner braces Together, wherein right-angled trapezium part can effectively accept the downward stress of false keel, the part of right-angled trapezium and common corner brace Compared to better compressive property, deformation is avoided;Simultaneously female part be placed in the groove of false keel and with main joist phase Against, can effectively prevent false keel two sides fixed plate generate deformation, the both ends of corner brace are respectively and on main joist, false keel Fixed plate fit, it is ensured that the right angle fixed relationship between major-minor keel will not generate deviation;The inclined plate of main joist two sides is in Triangle connects, and also can judge whether false keel is sent out between main joist by observing the position of sash weight while containing each other Positional shift is given birth to.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, made any modification, equivalent replacement and improvement etc. should be included in the utility model Protection scope within.

Claims (2)

1. a kind of end structure of steel construction girder, including main joist, false keel, the main joist, false keel are length side To two sides be equipped with the channel steel of fixed plate, in the false keel two sides fixed plate in T shape for being fixed on main joist, feature exists In the fixed plate of the false keel side is flushed with the port in main joist short transverse, consolidating on the false keel other side Right-angled trapezium fixing piece, two right-angle sides point of the right-angled trapezium fixing piece are equipped between fixed board and the fixed plate of main joist two sides It is not fixed mutually with the fixed plate on false keel and main joist by bolt, a female part is equipped in the groove of the false keel, it should Two horizontal end faces of female part and the two sides fixed plate of false keel lean, in the vertical end face and main joist of the female part Fixed plate lean, corner brace is equipped in the groove of the main joist, main joist upper mounted plate is distinguished in two end faces of the corner brace Inner wall and the outside wall surface of false keel upper mounted plate fit, the fixed plate in the vertical end face and main joist of the female part And the side end that corner brace is located in main joist groove is fastened by bolt, consolidating in the horizontal ends and false keel of the female part Another side end of fixed board and corner brace is fastened by bolt.
2. the end structure of steel construction girder according to claim 1, which is characterized in that the false keel and main joist are high The fixed plate that degree direction port connects is equipped with inclined plate, and one end and the fixed plate on false keel of the inclined plate are mutually fixed, the master The inclined plate of keel two sides phase triangular in shape is fixed, and the joint of two sides inclined plate inclined plate is equipped with lifting rope, the lifting rope on the main joist It is equipped with sash weight.
CN201920124232.6U 2019-01-24 2019-01-24 The end structure of steel construction girder Active CN209603280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920124232.6U CN209603280U (en) 2019-01-24 2019-01-24 The end structure of steel construction girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920124232.6U CN209603280U (en) 2019-01-24 2019-01-24 The end structure of steel construction girder

Publications (1)

Publication Number Publication Date
CN209603280U true CN209603280U (en) 2019-11-08

Family

ID=68401963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920124232.6U Active CN209603280U (en) 2019-01-24 2019-01-24 The end structure of steel construction girder

Country Status (1)

Country Link
CN (1) CN209603280U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550000A (en) * 2020-06-03 2020-08-18 合肥皖兴建设工程有限公司 Construction method for installing building indoor keel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550000A (en) * 2020-06-03 2020-08-18 合肥皖兴建设工程有限公司 Construction method for installing building indoor keel
CN111550000B (en) * 2020-06-03 2021-07-16 江苏江中集团有限公司 Construction method for installing building indoor keel

Similar Documents

Publication Publication Date Title
CN105064503A (en) Steel tube and core tube mixed structure
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN104805958B (en) It is applied to double rank surrender power consumption steel coupling beam of Coupled Shear Wall structure
CN105064512A (en) Connecting structure of circular steel tube concrete column and steel beam
CN209603280U (en) The end structure of steel construction girder
KR20140098524A (en) Connecting structure and method between h-shaped steel column and beam
CN203531148U (en) Wing-expanding corrugated web plate H-shaped steel beam-column joint connecting component
CN103835434A (en) H-shaped steel with rib and concrete structure of H-shaped steel with rib
CN211548042U (en) Steel pipe column and steel beam connecting joint with internally inserted connecting piece
CN103061417B (en) Connection node of steel reinforced concrete composite beam and concrete-filled steel tubular column
CN216041728U (en) Steel construction beam column connected node structure
CN205688619U (en) A kind of steel coupling beam-double-layer plate Combined concrete Coupled Shear Wall
CN205446926U (en) Novel bearing support in truss
CN107489202A (en) A kind of truss connector
CN112095464B (en) Anchoring connection device for precast concrete bridge deck of steel-concrete composite beam
CN203867059U (en) Ribbed H-section steel and ribbed H-section steel concrete structure
CN210216729U (en) Node device for rigidly connecting assembled truss steel beam and steel column
CN208950059U (en) A kind of assembling type steel structure beam-column connection
CN209099556U (en) A kind of Novel supporting-type metal energy consumption coupling beam
CN207194178U (en) A kind of truss connector
CN208907255U (en) A kind of brace type metal energy consumption coupling beam built-in fitting of high-bearing capacity
CN203878779U (en) Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint
CN107119804B (en) The PBL that node tensile and compressive property can be improved simultaneously puts more energy into shape steel tube concrete joint
CN205171695U (en) Tenon fourth of twelve earthly branches node of girder steel and concrete shear force wall
CN216109022U (en) Connecting structure of steel truss and steel-concrete building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant