CN209603262U - A kind of sedimentation pool structure of toilet - Google Patents

A kind of sedimentation pool structure of toilet Download PDF

Info

Publication number
CN209603262U
CN209603262U CN201822166376.6U CN201822166376U CN209603262U CN 209603262 U CN209603262 U CN 209603262U CN 201822166376 U CN201822166376 U CN 201822166376U CN 209603262 U CN209603262 U CN 209603262U
Authority
CN
China
Prior art keywords
layer
drainage
waterproof layer
screed
coat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822166376.6U
Other languages
Chinese (zh)
Inventor
黎华练
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Create Network Technology Co Ltd
Original Assignee
Shenzhen Create Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Create Network Technology Co Ltd filed Critical Shenzhen Create Network Technology Co Ltd
Priority to CN201822166376.6U priority Critical patent/CN209603262U/en
Application granted granted Critical
Publication of CN209603262U publication Critical patent/CN209603262U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a kind of sedimentation pool structures of toilet, it include: wall, basic waterproof layer, further include: the first screed-coat on the basis of being set to, first screed-coat upper end is provided with the first waterproof layer, drainage waterproof layer is provided between first screed-coat and first waterproof layer, the pervious bed for water penetration is provided between the drainage waterproof layer and first waterproof layer, topography is lower than both ends among the drainage waterproof layer, main drainpipe is provided in first screed-coat, the drainage waterproof layer lower end is provided with the collection water pipe being connected with main drainpipe.The pervious bed of the utility model, drainage waterproof layer and collect water pipe when in use, can pre- waterproof leak into downstairs, and have the characteristics that reduction peculiar smell.

Description

A kind of sedimentation pool structure of toilet
Technical field
The utility model relates to technical field of building construction more particularly to a kind of sedimentation pool structures of toilet.
Background technique
Toilet refers to the general name of lavatory, toilet and bathing pool, after a protracted use, if waterproof layer is broken It splits, flow into screed-coat in the settling tank for penetrating into back filled region, if can not arrange throughout the year to which ponding can be stitched through waterproof layer from ceramic tile Out, two be will lead to as a result, first is that waterproof shifts to an earlier date failure and causes to leak, cause to suffer disaster downstairs, second is to cause to defend There is peculiar smell between life, it would therefore be highly desirable to improve.
Utility model content
It can be effectively improved in background technique the purpose of this utility model is to provide one kind and leakage occur and peculiar smell is defended Sedimentation pool structure between life.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of sedimentation pool structure of toilet, comprising: wall, basic waterproof layer, further includes: first on the basis of being set to Screed-coat, first screed-coat upper end is provided with the first waterproof layer, between first screed-coat and first waterproof layer It is provided with drainage waterproof layer, the pervious bed for water penetration is provided between the drainage waterproof layer and first waterproof layer, Topography is lower than both ends among the drainage waterproof layer, is provided with main drainpipe, the drainage waterproof layer in first screed-coat Lower end is provided with the collection water pipe being connected with main drainpipe.
By adopting the above technical scheme, when water permeates, when through the first waterproof layer, at this time in the effect of drainage waterproof layer Under, the water that infiltration can be guided to get off is pooled to the low place of drainage waterproof layer topography, so as to which water is collected into collection water Guan Zhong is flowed into main drainpipe by collecting water pipe, is done so as to the water to leakage and is further collected discharge, further pre- On the other hand anti-a possibility that seeping water downstairs, reduces toilet due to the stink for overstocking and distributing that seeps water for a long time.
The utility model is further arranged to: the pervious bed is pervious concrete layer.
By adopting the above technical scheme, pervious concrete is mutually bonded by coarse aggregate surface cladding a thin layer cement slurry and is formed The equally distributed honeycomb structure in hole, thus have the characteristics that it is ventilative, permeable and light-weight, can quickly by water penetration to collect In water pipe, the water of infiltration is handled.
The utility model is further arranged to: the drainage waterproof layer includes being set to the first drainage collected on the left of water pipe Layer, is set to the second drainage layer for collecting water pipe, and the collection water pipe is described lower than the first drainage layer and the second drainage layer First drainage layer and the second drainage layer do not contact, and the first drainage layer and the second drainage layer are all towards collection water pipe direction Inclination, and the collection water pipe fits with the first drainage layer and the second drainage layer.
By adopting the above technical scheme, the first drainage layer and the second drainage layer are tilted towards water pipe direction is collected, so as to So that the water for penetrating into drainage waterproof layer is conveniently collected into and collects in water pipe, the first drainage layer and second drains layer not phase mutual connection Touching, in this way collection water pipe can be collected when being collected with less ponding through the time of drainage waterproof layer so as to improve The speed of ponding.
The utility model is further arranged to: the collection water pipe is in the top of the main drainpipe.
By adopting the above technical scheme, the top that water pipe is located at main drainpipe is collected, so that the ponding being collected into is in gravity Under the action of can be flowed into main draining, not will cause in main drainpipe water outflow.
The utility model is further arranged to: the upper end of first waterproof layer is provided with backfill layer, on the backfill layer End is provided with the reinforced rail silk screen layer for fitting fixed with backfill layer.
By adopting the above technical scheme, the whole load-bearing capacity of settling tank can be improved in the setting of reinforced rail silk screen layer, effectively Prevention settling tank ground heave or sink, What is more cracking the case where appearance.
The utility model is further arranged to: being provided with above the reinforced rail silk screen layer and is fitted with reinforced rail silk screen layer The second fixed screed-coat, second screed-coat are arranged close to the both ends inner corner trim of wall, the setting of second screed-coat upper end Have and fits the second fixed waterproof layer with the second screed-coat.
By adopting the above technical scheme, the second screed-coat is arranged close to the both ends inner corner trim of wall, so as to realize that the gradient is drawn Stream, setting that is convenient while facilitating the second waterproof layer of realization.
The utility model is further arranged to: the utility model is further arranged to: being provided with floor drain in the settling tank Mouthful, it is provided with communicating pipe on the drainage outlet, is connected with the upper end of the main drainpipe communicating pipe.
By adopting the above technical scheme, the setting of communicating pipe can make some total reservation of the water flow down in drainage outlet In communicating pipe, the peculiar smell come out by the water that the water in communicating pipe can isolate a part of main draining, so as to rise To the characteristics of peculiar smell in main draining is isolated.
The utility model is further arranged to: the snap-gauge that passes through of supplying water is provided in the communicating pipe, between the snap-gauge It is provided with the active carbon of adsorbable peculiar smell, the active carbon is limited in snap-gauge.
By adopting the above technical scheme, active carbon further can further go the different of distributing in main drainpipe It eliminates the unusual smell.
In conclusion the advantageous effects of the utility model are as follows:
1. the water that drainage waterproof layer can guide infiltration to get off is pooled to the low place of drainage waterproof layer topography, so as to Water is collected into collect in water pipe and is then discharged out, thus a possibility that prevention is seeped water downstairs.
2. pervious concrete have the characteristics that it is ventilative, permeable and light-weight, can quickly by water penetration to collect water pipe in; The whole load-bearing capacity of settling tank can be improved in the setting of reinforced rail silk screen layer, effectively prevent settling tank ground heave or under It is heavy, appearance the case where What is more cracking;The water that water in communicating pipe can isolate a part of main draining comes out different Taste, property charcoal further can further remove odors the different of distributing in main drainpipe.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram.
Appended drawing reference: 1, wall;2, basic waterproof layer;3, the first screed-coat;4, the first waterproof layer;5, waterproof layer is drained; 51, the first drainage layer;52, the second drainage layer;6, pervious concrete layer;7, main drainpipe;71, water pipe is collected;72, drainage outlet; 73, communicating pipe;74, snap-gauge;75, active carbon;8, layer is backfilled;81, reinforced rail silk screen layer;82, the second screed-coat;83, second is anti- Water layer;9, inner corner trim.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
The present embodiment: a kind of sedimentation pool structure of toilet, as shown in Figure 1, comprising: wall 1 is set to 1 bottom surface of wall Basic waterproof layer 2, basic waterproof layer 2 is that developer sets in advance;The first screed-coat 3 on the basis of being set to, first 3 upper end of screed-coat is provided with to fit the first fixed waterproof layer 4 with the first screed-coat 3;The upper end of first waterproof layer 4 is provided with The backfill layer 8 for fitting fixed with the first waterproof layer 4, backfill 8 upper end of layer is provided with to fit fixed reinforced rail with backfill layer 8 Silk screen layer 81;It is provided with above reinforced rail silk screen layer 81 and fits the second fixed screed-coat 82 with reinforced rail silk screen layer 81, Two screed-coats 82 are arranged close to the both ends inner corner trim 9 of wall 1, and 82 upper end of the second screed-coat is provided with to fit with the second screed-coat 82 The second fixed waterproof layer 83, the optimization structure that can improve seepage in toilet and peculiar smell are as follows:
It is provided with drainage waterproof layer 5 between first screed-coat 3 and the first waterproof layer 4, drains waterproof layer 5 and the first waterproof layer It is provided with the pervious bed for water penetration, permeable layer and the first waterproof layer 4 between 4 and drainage layer waterproof layer 5 fits fixation, draws It flows the intermediate topography of waterproof layer 5 and is lower than both ends, main drainpipe 7 is provided in the first screed-coat 3, drainage 5 lower end of waterproof layer is provided with The collection water pipe 71 being connected with main drainpipe 7.Wherein, pervious bed is pervious concrete layer 6, and drainage waterproof layer 5 includes setting In the first drainage layer 51 for collecting 71 left side of water pipe, it is set to the second drainage layer 52 for collecting water pipe 71, and the first drainage layer 51 and second drainage layer 52 do not contact, first drainage layer 51 and second drainage layer 52 all towards collect 71 direction of water pipe tilt, receive Collector pipe 71 collects water pipe 71 and the first drainage layer 51 and the second drainage layer lower than the first drainage layer 51 and the second drainage layer 52 52 fit.
In order to enable the water in main drainpipe 7 will not flow to collect water pipe 71 in, collect water pipe 71 main drainpipe 7 most Upper end.In addition, being provided with drainage outlet 72 in settling tank, such as the drainage outlet 72 in bathing pool, communicating pipe is provided on drainage outlet 72 73, so that water a part remained in communicating pipe 73, the aqueous reflux in main drainpipe 7 to communicating pipe 73 in order to prevent In, communicating pipe 73 is connected in the upper end of main drainpipe 7, and communicating pipe 73 is provided with water supply close to one end of drainage outlet 72 By snap-gauge 74, the active carbon 75 of adsorbable peculiar smell is provided between snap-gauge 74, active carbon 75 is limited in snap-gauge 74, into one Step absorbs the peculiar smell in main drainpipe 7.
Working principle: when the first waterproof layer 4 and the second waterproof layer 83 cannot play waterproof action completely, water can successively thoroughly The first waterproof layer 4, the first screed-coat 3, backfill layer 8 and the second waterproof layer 83 are crossed, water continuation penetrates pervious concrete down Layer 6 is flowed into and collects in water pipe 71 along the first drainage layer 51 and the second drainage layer 52, is finally imported into main drainpipe 7 real The discharge of existing ponding.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of sedimentation pool structure of toilet, comprising: wall (1), basic waterproof layer (2), which is characterized in that further include: it sets The first screed-coat (3) on the basis of being placed in, the first screed-coat (3) upper end are provided with the first waterproof layer (4), and described first looks for Drainage waterproof layer (5), the drainage waterproof layer (5) and described first are provided between leveling (3) and first waterproof layer (4) The pervious bed for water penetration is provided between waterproof layer (4), the intermediate topography of the drainage waterproof layer (5) is lower than both ends, described It is provided in first screed-coat (3) main drainpipe (7), drainage waterproof layer (5) lower end is provided with to be connected with main drainpipe (7) Logical collection water pipe (71).
2. a kind of sedimentation pool structure of toilet according to claim 1, it is characterised in that: the pervious bed is permeable mixed Solidifying soil layer (6).
3. a kind of sedimentation pool structure of toilet according to claim 1, it is characterised in that: the drainage waterproof layer (5) Including being set to the first drainage layer (51) collected on the left of water pipe (71), it is set to the second drainage layer for collecting water pipe (71) (52), the collection water pipe (71) is lower than first drainage layer (51) and the second drainage layer (52), the first drainage layer (51) it is not contacted with the second drainage layer (52), first drainage layer (51) and second drainage layer (52) are all towards collection water The inclination of (71) direction is managed, and the collection water pipe (71) fits with first drainage layer (51) and the second drainage layer (52).
4. a kind of sedimentation pool structure of toilet according to claim 3, it is characterised in that: collection water pipe (71) In The top of the main drainpipe (7).
5. a kind of sedimentation pool structure of toilet according to claim 1, it is characterised in that: first waterproof layer (4) Upper end be provided with backfill layer (8), described backfill layer (8) upper end is provided with and backfill layer (8) the reinforcing bar iron wire that fits fixed Stratum reticulare (81).
6. a kind of sedimentation pool structure of toilet according to claim 5, it is characterised in that: the reinforced rail silk screen layer (81) top is provided with the second screed-coat (82) for fitting fixed with reinforced rail silk screen layer (81), second screed-coat (82) Both ends inner corner trim (9) close to wall (1) is arranged, and the second screed-coat (82) upper end is provided with to be affixed with the second screed-coat (82) Close fixed the second waterproof layer (83).
7. a kind of sedimentation pool structure of toilet according to claim 6, it is characterised in that: be provided in the settling tank Drainage outlet (72) is provided with communicating pipe (73) on the drainage outlet (72), the communicating pipe (73) and the main drainpipe (7) Upper end is connected.
8. a kind of sedimentation pool structure of toilet according to claim 7, it is characterised in that: set in the communicating pipe (73) It is equipped with the snap-gauge (74) for supplying water and passing through, the active carbon (75) of adsorbable peculiar smell, the activity are provided between the snap-gauge (74) Charcoal is limited in snap-gauge (74).
CN201822166376.6U 2018-12-21 2018-12-21 A kind of sedimentation pool structure of toilet Expired - Fee Related CN209603262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822166376.6U CN209603262U (en) 2018-12-21 2018-12-21 A kind of sedimentation pool structure of toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822166376.6U CN209603262U (en) 2018-12-21 2018-12-21 A kind of sedimentation pool structure of toilet

Publications (1)

Publication Number Publication Date
CN209603262U true CN209603262U (en) 2019-11-08

Family

ID=68396673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822166376.6U Expired - Fee Related CN209603262U (en) 2018-12-21 2018-12-21 A kind of sedimentation pool structure of toilet

Country Status (1)

Country Link
CN (1) CN209603262U (en)

Similar Documents

Publication Publication Date Title
CN203546888U (en) Infiltration type rainwater filter well
CN206495262U (en) The sponge urban rainwater circulatory system
CN110219357A (en) Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology
CN206591382U (en) Assembled sponge walkway system
CN107012893A (en) A kind of basement bottom wall board post poured band waterproof construction and its construction method
CN109989474B (en) Construction method of rainwater collection system
CN209652669U (en) A kind of subgrade drainage structure
CN207376723U (en) A kind of subsided rest room
CN209603262U (en) A kind of sedimentation pool structure of toilet
KR20130028428A (en) Drain structure of ground and construction method thereof
CN209603202U (en) Basement anti-floating discharge structure
CN110284551A (en) A kind of sponge urban rainwater collection purification device
CN207620234U (en) A kind of reversed beam planted roof drainage system
CN214992793U (en) Concrete road surface structure permeates water
CN206174103U (en) District garage top road surface structure
CN214460937U (en) Rainwater garden structure of traffic hub
CN213896625U (en) Cavernosum gardens road structure that permeates water
CN109423937A (en) A kind of residential quarters system for reclaiming rainwater
CN208201900U (en) A kind of precipitation mechanism and raft plate water cut off device device
CN208250856U (en) Discharge structure and porous pavement drainage system
CN207314174U (en) A kind of urban rainwater storage and exhaust system
CN207597186U (en) Draining road dental structure
CN209652667U (en) Ecological permeable road structure
CN206396861U (en) A kind of secondary drainage structure of settling tank
CN216275089U (en) Terrace permeates water with water storage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191108