CN209588673U - A kind of dual chamber aluminium processing melting furnace - Google Patents

A kind of dual chamber aluminium processing melting furnace Download PDF

Info

Publication number
CN209588673U
CN209588673U CN201920111726.0U CN201920111726U CN209588673U CN 209588673 U CN209588673 U CN 209588673U CN 201920111726 U CN201920111726 U CN 201920111726U CN 209588673 U CN209588673 U CN 209588673U
Authority
CN
China
Prior art keywords
heating kettle
melting furnace
dual chamber
fixedly installed
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920111726.0U
Other languages
Chinese (zh)
Inventor
薄夫磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Bester Aluminum Technology Co Ltd
Original Assignee
Shandong Bester Aluminum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Bester Aluminum Technology Co Ltd filed Critical Shandong Bester Aluminum Technology Co Ltd
Priority to CN201920111726.0U priority Critical patent/CN209588673U/en
Application granted granted Critical
Publication of CN209588673U publication Critical patent/CN209588673U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses a kind of dual chamber aluminium to process melting furnace, including pedestal, the side upper surface of pedestal is equipped with wild goose wing tracks, the inner surface of wild goose wing tracks is equipped with heating kettle, the Basolateral of heating kettle is surface-mounted support device, support device is assemblied in the upper surface of pedestal, the utility model is provided with a kind of with pedestal, wild goose wing tracks, the dual chamber aluminium of support device and heating kettle processes melting furnace, when in use, aluminium aluminium scrap is fed into inside the heating kettle of right end, by tentatively heating melting and adding additive purification, to left side after starting support device drives heating kettle to increase after the completion of purification, molten metal is flowed down from guide groove, flow into the inner wall of the heating kettle positioned at left side, carry out secondary purification melting, melting completes rear support device and heating kettle is pushed to topple over to the left upwards, aluminum melt is discharged, effective solution with Problem of the past dual chamber aluminium processing melting furnace using fixed heating kettle molten metal conduction trouble, clever structure, using reliable.

Description

A kind of dual chamber aluminium processing melting furnace
Technical field
The utility model relates to aluminium manufacture field, specifically a kind of dual chamber aluminium processes melting furnace.
Background technique
Aluminium is silvery white light metal, there is preferable ductility, commodity be often made rodlike, sheet, foil-like, powdery, it is band-like and It is Filamentous.One layer of oxidation film for preventing metal erosion can be formed in humid air.Relative density 2.70,660 DEG C of fusing point, boiling point 2327 DEG C, aviation, the development of building, the big essential industry of automobile three, it is desirable that material property has the peculiar property of aluminium and its alloy, This just greatly facilitates the production and application of this new metallic aluminium, therefore application is extremely wide, metallic aluminium melting preparation and During recycling melting, dual chamber melting furnace using relatively broad, dual chamber is used during waste aluminium material recycles melting Melting furnace is more, and previous dual chamber melting furnace uses fixed heating kettle, it has not been convenient to the mobile conduction of molten metal, in view of Problem above, spy propose a kind of dual chamber aluminium processing melting furnace.
Utility model content
In view of the deficiencies of the prior art, the purpose of the utility model is to provide a kind of dual chamber aluminium to process melting furnace, effectively Previous dual chamber aluminium processing melting furnace is solved the problems, such as using fixed heating kettle molten metal conduction trouble, structure is skilful It is wonderful, using reliable.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of dual chamber aluminium processes melting furnace, including Pedestal, the side upper surface of the pedestal are equipped with wild goose wing tracks, and the inner surface of the wild goose wing tracks is equipped with heating kettle, described The Basolateral of heating kettle is surface-mounted support device, and the support device is assemblied in the upper surface of pedestal, the wild goose wing rail Road includes straight rail, and the straight rail is fixedly mounted on the upper surface of pedestal, and the upper surface of the straight rail is fixedly installed with sliding rail, described The inner surface of sliding rail is equipped with guide rail, and the outer surface of the guide rail is fixedly installed with the first hydraulic stem.
Further, the pedestal includes fixed plate, and the upper surface of the fixed plate is fixedly installed with supporting table, the support The upper surface of platform offers installing port, and the lower surface of the fixed plate is fixedly mounted on the upper surface of fixed plate, the fixed plate Upper surface be fixedly installed with fixing body, the upper surface of the fixing body is fixedly mounted on the lower surface of the first hydraulic stem.
Further, the outer side edges radian of the guide rail and the outer side edges radian of sliding rail are identical.
Further, the support device includes the second hydraulic stem and pulley, the fixed peace in the upper surface of second hydraulic stem Equipped with fixing axle.
Further, the heating kettle includes heating kettle, and the interior pars intramuralis of the heating kettle is fixedly installed with resistance wire, and electricity Resistance silk is electrically connected with external power supply, and the side surface top of the heating kettle is fixedly installed with the first fixing axle, the heating kettle Side surface bottom end is fixedly installed with the second fixing axle, and second fixing axle is assemblied in the inner surface of fixing axle, and described first is solid Dead axle is assemblied in the inner surface of pulley.
Further, the sidewall surfaces top two sides of the heating kettle are fixedly installed with guide groove.
The beneficial effects of the utility model are: the utility model, which is provided with one kind, has pedestal, wild goose wing tracks, support device Melting furnace is processed with the dual chamber aluminium of heating kettle, when in use, aluminium aluminium scrap is fed into inside the heating kettle of right end, by tentatively adding Hot smelting simultaneously adds additive purification, starts support device after the completion of purification, drives the second fixing axle to move up, while first Fixing axle is by pulley in the sliding rail internal slide of right end, and to left side after driving heating kettle to increase, molten metal is from guide groove stream Under, the inner wall of the heating kettle positioned at left side is flowed into, secondary purification melting is then carried out, the first of left side is located at after the completion of melting Hydraulic stem drives corresponding rails to move outward, and left side sliding rail is unlocked, and pushes heating kettle upwards to the left with rear support device Topple over, be discharged the aluminum melt heated, the previous dual chamber aluminium processing melting furnace of effective solution uses fixed heating kettle The problem of molten metal conduction trouble, clever structure, using reliable.
Detailed description of the invention
Fig. 1 is the utility model structure diagram.
Fig. 2 is the utility model assembling schematic diagram.
Fig. 3 is the utility model wild goose wing tracks structural schematic diagram.
Fig. 4 is the utility model heating kettle structural schematic diagram.
Description of symbols: 1, pedestal, 11, fixed plate, 12, supporting table, 13, installing port, 14, fixed plate, 15, installation Body, 2, wild goose wing tracks, the 21, first hydraulic stem, 22, guide rail, 23, sliding rail, 24, straight rail, 3, support device, the 31, second hydraulic stem, 32, fixing axle, 33, pulley, 4, heating kettle, 41, heating kettle, 42, guide groove, the 43, first fixing axle, the 44, second fixing axle.
Specific embodiment
The present invention will be further illustrated below in conjunction with specific embodiments, it should be appreciated that these embodiments are merely to illustrate this Utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, in the content for having read the utility model instruction Later, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms also fall within application The appended claims limited range.
It is the utility model structure diagram 1-4 referring to figure, a kind of dual chamber aluminium processing melting furnace, including pedestal 1, pedestal 1 Side upper surface be equipped with wild goose wing tracks 2, the inner surface of wild goose wing tracks 2 is equipped with heating kettle 4, the Basolateral of heating kettle 4 Surface-mounted to have support device 3, support device 3 is assemblied in the upper surface of pedestal 1, and wild goose wing tracks 2 include straight rail 24, and straight rail 24 is solid Dingan County is mounted in the upper surface of pedestal 1, and the upper surface of straight rail 24 is fixedly installed with sliding rail 23, and the inner surface of sliding rail 23 is equipped with guide rail 22, the outer surface of guide rail 22 is fixedly installed with the first hydraulic stem 21;
The utility model is provided with a kind of dual chamber aluminium with pedestal 1, wild goose wing tracks 2, support device 3 and heating kettle 4 and adds Work melting furnace, when in use, aluminium aluminium scrap are fed into inside the heating kettle 4 of right end, by tentatively heating melting and adding addition Agent purification starts support device 3 after the completion of purification, drives the second fixing axle 44 to move up, while the first fixing axle 43 passes through Pulley 33 is in 23 internal slide of sliding rail of right end, and to left side after driving heating kettle 4 to increase, molten metal is flowed down from guide groove 42, The inner wall of the heating kettle 4 positioned at left side is flowed into, secondary purification melting is then carried out, first liquid in left side is located at after the completion of melting Compression bar 21 drives corresponding rails 22 to move outward, and left side sliding rail 23 is unlocked, and pushes heating kettle 4 upward with rear support device 3 Topple over to the left, be discharged the aluminum melt heated, the previous dual chamber aluminium processing melting furnace of effective solution is using fixed The problem of heating kettle molten metal conduction trouble, clever structure, using reliable.
Pedestal 1 includes fixed plate 11, and the upper surface of fixed plate 11 is fixedly installed with supporting table 12, the upper surface of supporting table 12 Installing port 13 is offered, the lower surface of fixed plate 14 is fixedly mounted on the upper surface of fixed plate 11, and the upper surface of fixed plate 14 is solid Dingan County is equipped with fixing body 15, and the upper surface of fixing body 15 is fixedly mounted on the lower surface of the first hydraulic stem 21, utilizes consolidating for pedestal 1 It is set for using, equipment other in present apparatus installation is integrated, so that the present apparatus stronger stabilization when in use.
The outer side edges radian of guide rail 22 and the outer side edges radian of sliding rail 23 are identical, pass through two symmetrical guide rails 22, In Different guide rails 22 is driven outward when use, to reserve interior side slideway, facilitates the movement and guiding of heating kettle 4, works as a left side When side rails 22 unlock, transmission of the heating kettle Jing Guo support device 3 positioned at left side can be toppled over, discharge processing conjunction to the left The molten metal of lattice, when right rail 22 unlocks, the heating kettle positioned at left side is driven by support device 3, can be to the right Topple over, by parameter molten metal not up to standard from the new heating kettle 4 for being located at right side that returns from new processing, structure is simple, user Just.
Support device 3 includes the second hydraulic stem 31 and pulley 33, and the upper surface of the second hydraulic stem 31 is fixedly installed with fixation Axis 32, using the guiding role of pulley 33, meanwhile, the inner wall spacing of sliding rail 23 and straight rail 24 is slightly larger than the diameter of pulley 33, In In use, roll inside of the pulley 33 in sliding rail 23 and straight rail 24, reduces the friction of the first fixing axle 43 in the process of running Power improves the hue of equipment operation.
Heating kettle 4 includes heating kettle 41, and the interior pars intramuralis of heating kettle 41 is fixedly installed with resistance wire, and resistance wire and outside Power electric connection, the side surface top of heating kettle 41 are fixedly installed with the first fixing axle 43, and the side surface bottom end of heating kettle 41 is solid Dingan County is equipped with the second fixing axle 44, and the second fixing axle 44 is assemblied in the inner surface of fixing axle 32, and the first fixing axle 43 is assemblied in cunning The inner surface of wheel 33.
The sidewall surfaces top two sides of heating kettle 41 are fixedly installed with guide groove 42, pass through the guide groove at 41 both ends of heating kettle 42, when molten metal is toppled over, effectively molten metal is avoided to splash down, improve the stability of equipment, reduces molten metal loss.
When utility model works, when in use, aluminium aluminium scrap is fed into inside the heating kettle 4 of right end, by tentatively adding Hot smelting simultaneously adds additive purification, starts support device 3 after the completion of purification, drives the second fixing axle 44 to move up, simultaneously First fixing axle 43 passes through pulley 33 in 23 internal slide of sliding rail of right end, to left side, metal after driving heating kettle 4 to increase Liquid is flowed down from guide groove 42, flows into the inner wall of the heating kettle 4 positioned at left side, secondary purification melting is then carried out, after the completion of melting The first hydraulic stem 21 positioned at left side drives corresponding rails 22 to move outward, left side sliding rail 23 is unlocked, with rear support device 3 It pushes heating kettle 4 to topple over to the left upwards, the aluminum melt heated is discharged.

Claims (6)

1. a kind of dual chamber aluminium processes melting furnace, it is characterised in that: including pedestal, the side upper surface of the pedestal is equipped with the wild goose wing Track, the inner surface of the wild goose wing tracks are equipped with heating kettle, and the Basolateral of the heating kettle is surface-mounted support device, The support device is assemblied in the upper surface of pedestal, and the wild goose wing tracks include straight rail, and the straight rail is fixedly mounted on pedestal Upper surface, the upper surface of the straight rail are fixedly installed with sliding rail, and the inner surface of the sliding rail is equipped with guide rail, the guide rail it is outer Side surface is fixedly installed with the first hydraulic stem.
2. a kind of dual chamber aluminium according to claim 1 processes melting furnace, it is characterised in that: the pedestal includes fixed plate, The upper surface of the fixed plate is fixedly installed with supporting table, and the upper surface of the supporting table offers installing port, the fixed plate Lower surface be fixedly mounted on the upper surface of fixed plate, the upper surface of the fixed plate is fixedly installed with fixing body, the installation The upper surface of body is fixedly mounted on the lower surface of the first hydraulic stem.
3. a kind of dual chamber aluminium according to claim 1 processes melting furnace, it is characterised in that: the outer side edges radian of the guide rail It is identical as the outer side edges radian of sliding rail.
4. a kind of dual chamber aluminium according to claim 1 processes melting furnace, it is characterised in that: the support device includes second The upper surface of hydraulic stem and pulley, second hydraulic stem is fixedly installed with fixing axle.
5. a kind of dual chamber aluminium according to claim 1 processes melting furnace, it is characterised in that: the heating kettle includes heating Pot, the interior pars intramuralis of the heating kettle is fixedly installed with resistance wire, and resistance wire is electrically connected with external power supply, the heating kettle Side surface top is fixedly installed with the first fixing axle, and the side surface bottom end of the heating kettle is fixedly installed with the second fixing axle, institute The inner surface that the second fixing axle is assemblied in fixing axle is stated, first fixing axle is assemblied in the inner surface of pulley.
6. a kind of dual chamber aluminium according to claim 5 processes melting furnace, it is characterised in that: the sidewall surfaces of the heating kettle Top two sides are fixedly installed with guide groove.
CN201920111726.0U 2019-01-23 2019-01-23 A kind of dual chamber aluminium processing melting furnace Active CN209588673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920111726.0U CN209588673U (en) 2019-01-23 2019-01-23 A kind of dual chamber aluminium processing melting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920111726.0U CN209588673U (en) 2019-01-23 2019-01-23 A kind of dual chamber aluminium processing melting furnace

Publications (1)

Publication Number Publication Date
CN209588673U true CN209588673U (en) 2019-11-05

Family

ID=68379998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920111726.0U Active CN209588673U (en) 2019-01-23 2019-01-23 A kind of dual chamber aluminium processing melting furnace

Country Status (1)

Country Link
CN (1) CN209588673U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795578A (en) * 2020-07-22 2020-10-20 湖北大江环保科技股份有限公司 Energy-saving environment-friendly oxygen-enriched side-blown smelting furnace and smelting process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795578A (en) * 2020-07-22 2020-10-20 湖北大江环保科技股份有限公司 Energy-saving environment-friendly oxygen-enriched side-blown smelting furnace and smelting process
CN111795578B (en) * 2020-07-22 2021-04-16 湖北大江环保科技股份有限公司 Energy-saving environment-friendly oxygen-enriched side-blown smelting furnace and smelting process

Similar Documents

Publication Publication Date Title
CN100519787C (en) Plate blank electroslag furnace
CN201463505U (en) DC arc furnace
CN209588673U (en) A kind of dual chamber aluminium processing melting furnace
CN208872087U (en) A kind of novel copper scrap recycling smelting furnace
CN206656596U (en) Leading screw electric elevator furnace is used in noble metal extraction
CN206813901U (en) A kind of aluminum-alloy wheel is heat-treated automatic charging device
CN206523042U (en) A kind of swing type smelting furnace of gold refinement
CN204174077U (en) A kind of gear tin device of sheet glass Horizontal Exit molten tin bath
CN208631576U (en) A kind of quantitative molten metal material fetching mechanism
CN207447477U (en) A kind of tubing fixed-length cutting machine
CN104313342A (en) Metal electroslag remelting and smelting equipment
CN211782710U (en) Converter with good stability for metal smelting
CN205071331U (en) A water -cooling combined electrode that is used for direct current electric stove production mineral wool
CN102773643A (en) Intercooler welding tool
CN209326332U (en) A kind of semicontinuous vacuum induction casting furnace of industrial silicon
CN105618697A (en) Electric heating melt furnace of copper material up-drawing continuous casting machine
CN207891407U (en) Molten aluminum inoculating and refining handles all-in-one machine
CN207386485U (en) One kind edges up warm multisection type electrical heating drying tunnel
CN206956131U (en) Depassing unit after stove in aluminium alloy smelting production
CN206445189U (en) A kind of strand annealing process dries the device of iron scale
CN111023808A (en) Energy-saving kiln for aluminum melting
CN206546091U (en) A kind of new calcium carbide furnace discharging dolly
CN220039074U (en) Smelting furnace for railway contact net accessory processing
CN109306442A (en) One kind is quickly dissolved for copper chromium zirconium contact line and is quickly cooled down technique and its device
CN205011815U (en) Mixing apparatus for producing of complicated brass of high strength

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant