Prior art keywords
crossbeam
top plate
duty
heel post
light
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920214112.5U
Other languages
Chinese (zh)
Inventor
殷强
杨昌凤
冮大兴
雷洛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Original Assignee
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute filed Critical Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority to CN201920214112.5U priority Critical patent/CN209584881U/en
Application granted granted Critical
Publication of CN209584881U publication Critical patent/CN209584881U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The light-duty shed hole structure that the utility model one kind is quickly built, belongs to highway field, it is therefore an objective to which short construction period, construction period on the interference of existing traffic, small, the uninterrupted traffic of influence, reduce construction and protect logical pressure.Including column, crossbeam and top plate;Column is arranged in pairs, and every column includes the outer heel post of the interior heel post and the other side positioned at hangar tunnel side;Every column configures a crossbeam;Top plate is spliced along hangar tunnel longitudinal direction by multistage top plate unit, and one section of top plate unit is configured between adjacent two crossbeams.The light-duty shed hole structure, without the working procedure that stringer is connect with crossbeam, to save working procedure, the construction time is resolved in shortening.When the light-duty hangar tunnel structure construction, in the construction work of interior heel post and outer heel post, construct without disconnected road, only when installing crossbeam and top plate, disconnected road construction is carried out, and the structural beams and top plate can use prefabricated component, to provide chance to shorten the disconnected road construction time.

Description

A kind of light-duty shed hole structure quickly built
Technical field
The utility model belongs to highway field, particularly a kind of quickly to build, conducive to protecting logical a kind of quickly build Light-duty shed hole structure.
Background technique
Hangar tunnel is usually used in being subject to the tunnel portal or roadbed section of landslide, falling rocks or Debris Flow on Slope Surface harm, frequently as whole Control the effective means that the diseases such as falling rocks landslide occurs in cutting.Especially mountain highway, hangar tunnel is in regulation cutting disease, guarantee operation Secure context plays preferable effect.
Hole made of existing hangar tunnel is usually frame-type, arch-type structure or inner-outer wall support, constructs ceiling frame and backfill Body construction.Common skeleton hangar tunnel, the stringer generally used adds transverse direction to shelve plate (or beam), crossbeam adds longitudinal direction to shelve plate (or beam) type Formula, beam span is small in length and breadth, while being reinforcement structure rigidity and globality, and usually setting is indulged or transverse strut forms the side of frame Formula;Arch-type structure, generally monoblock type arch section.And the hangar tunnel of inner-outer wall support, ceiling frame is similar to stringer and adds lateral put Set the frame lookum of plate (or beam).Therefore either frame lookum or arcuately hangar tunnel etc., working procedure complexity, construction period Long, conventional hangar tunnel is both needed to disconnected road construction, and larger to the interference of existing road, driver and passenger's experience is poor, and the traffic impact time is long.
To sum up, section is limited for landform, geological conditions, if outside is bordered on the river, inside is high precipitous rock slope;Width of subgrade It is limited;Existing road Traffic Volume is big, protect it is logical require high, using conventional frame-type, arcuately hangar tunnel operational feasibility is small, construction Period is long, construction interference is big, protects logical difficulty.
Utility model content
The purpose of the utility model is to provide the light-duty shed hole structure that one kind is quickly built, short construction period, construction periods Smaller to traffic impact, uninterrupted traffic reduces construction and protects logical pressure.
The technical solution adopted in the utility model is: the light-duty shed hole structure quickly built of one kind, including column, crossbeam and Top plate;
The column is arranged in pairs, every column include positioned at hangar tunnel side interior heel post and the other side it is outer edge-on Column;And several interior heel posts, along hangar tunnel longitudinal direction spaced set, several outer heel posts are also along hangar tunnel longitudinal direction spaced set;It is each pair of Column configures a crossbeam, and the one end of the beam is installed on the top of interior heel post, and the other end is installed on corresponding outer heel post Top;
The top plate is spliced along hangar tunnel longitudinal direction by multi-disc top plate unit, configures a piece of top plate between adjacent two crossbeams Unit, and the both ends of the top plate unit are held on the top of corresponding crossbeam respectively.
The cross section of the crossbeam is T-shaped;The top of the outer heel post and interior heel post is reserved with opening upwards The T-slot mouth being adapted to crossbeam;One end of the crossbeam is installed in the T-slot mouth of outer heel post, and the other end is installed on inside In the T-slot mouth of column.
Further, the top plate unit is assembled along crossbeam extending direction by multi-disc prefabricated unit plate.
Further, the ribbet of opening upwards is formed between adjacent two pieces of prefabricated unit plates, and ribbet is using mixed Solidifying soil filling.
Further, the prefabricated unit plate is hollow structure.
Further, one-piece casting has concrete waterproof layer above top plate.
Further, buffer layer is provided with above concrete waterproof layer;Further, the interior heel post is located at where side slope Side;Barricade has been poured between adjacent two interior heel posts.
Further, the interior heel post is located at side where side slope;Each interior heel post is connected through anchor pole with the basement rock of side slope It connects.
Further, block is respectively arranged at the top of the crossbeam both ends, the top plate unit is located at the block at both ends Between, and top plate unit is constituted along crossbeam extending direction through block and is limited.
The beneficial effects of the utility model are: the light-duty shed hole structure that the one kind is quickly built, setting capital crossbeam is set up At the top of pairs of interior heel post and outer heel post, top plate is spliced along hangar tunnel longitudinal direction by multi-disc top plate unit, and each top plate Unit is overlapped on two adjacent crossbeams, without vertical linkage between each crossbeam and column.The one kind is quickly built light-duty Shed hole structure adds longitudinal pattern for shelving plate using column, crossbeam, and longitudinal relatively conventional frame of span is big, and no stringer connection is applied Working hour is not necessarily to disconnected road, only when installing crossbeam and top plate, can optionally short time control pass through, and the structural beams and top plate are adopted With prefabricated component, thus greatly shorten on-site construction time, effectively reduce the interference to existing road traffic, influence degree and when Between, to reduce construction investment and social cost.It is provided with buffer layer above top plate simultaneously, taking precautions against natural calamities for structure can be effectively improved and subtracted Calamity ability.
Detailed description of the invention
Fig. 1 is the utility model elevation;
Fig. 2 is the utility model plan view;
Fig. 3 is the A-A cross-sectional view of Fig. 2;
Fig. 4 is the right side view of Fig. 3;
Fig. 5 is the B-B cross-sectional view of Fig. 3.
It is interior heel post 1, outer heel post 2, crossbeam 3, block 31, bearing pad stone 32, top plate 4, top plate unit 41, pre- in figure Unit plate 411 processed, ribbet 412, concrete waterproof layer 5, foamed cushioning pads layer 6, waste tire layer 7, barricade 8, anchor pole 9, steel case Expand head 10, T-slot mouth 11.
Specific embodiment
The utility model is described further with reference to the accompanying drawings and examples as follows:
A kind of light-duty shed hole structure quickly built, as shown in Figure 1, Figure 2 and Figure 3, including column, crossbeam 3 and top plate 4; The column is arranged in pairs, and every column includes the outer heel post 2 of the interior heel post 1 and the other side positioned at hangar tunnel side;And Several interior heel posts 1 are along hangar tunnel longitudinal direction spaced set, and several outer heel posts 2 are also along hangar tunnel longitudinal direction spaced set;Every opposition Column configures a crossbeam 3, and described 3 one end of crossbeam is installed on the top of interior heel post 1, and the other end is installed on corresponding outer heel post 2 top;The top plate 4 is spliced along hangar tunnel longitudinal direction by multi-disc top plate unit 41, is configured between adjacent two crossbeams 3 a piece of Top plate unit 41, and the both ends of the top plate unit 41 are held on the top of corresponding crossbeam 3 respectively.
The light-duty shed hole structure that the one kind is quickly built is different from common skeleton hangar tunnel, is erected on by the way that crossbeam 3 is arranged Pair interior heel post 1 and the top of outer heel post 2, top plate 4 is spliced along hangar tunnel is longitudinal by multi-disc top plate unit 41, and each top Plate unit 41 is overlapped on two adjacent crossbeams 3, carries out vertical linkage without stringer between each column between each crossbeam 3, is indulged It is big to the relatively conventional frame of span;It can optionally short time control only when installing crossbeam 3 and top plate 4 without disconnected road when construction It is current;And prefabricated component can be used in the structural beams and top plate, to greatly shorten on-site construction time, reduce and hand over existing road Logical interference and influence;Moreover the investment due to being not necessarily to stringer, therefore, without the working procedure that stringer is connect with crossbeam, to save About working procedure, without disconnected road construction.
Wherein, interior heel post 1 can be reinforced concrete square column, can also all use anchor bar steel to inslope basement rock massif Muscle concrete barricade is protected, and plays the role of support beam 3 for basement rock massif as interior heel post 1.The general position of outer heel post 2 In the slope cliff side far from side slope neighbour river neighbour's cliff, it typically is the concrete filled steel tubular columns being fixed on reinforced concrete pile foundation.
In order to guarantee reliability that crossbeam 3 is connect with column, as shown in figure 5, the cross section of the crossbeam 3 is T-shaped;It is described The top of outer heel post 2 and interior heel post 1 is respectively provided with steel case and expands head 10, the steel case expand be reserved on head 10 opening upwards with The T-slot mouth 11 that crossbeam 3 is adapted to;One end of the crossbeam 3 is installed in the T-slot mouth 11 of outer heel post 2, and the other end is installed on In the T-slot mouth 11 of interior heel post 1.
When specific installation, column top and crossbeam 3 are affixed, and T shape is reserved in 10 factory of the Gang Xiangkuotou production that column top uses Notch 11 makes convenient and can be carried out standardized production, guarantees that steel case expands the dimensional accuracy of head 10.3 in-situ precast of crossbeam, end Both sides of head embedded bar, after lifting is in place, cast-in-place self-compacting concrete forms consolidation in the cabinet that steel case expands head 10.Certainly, The top of outer heel post 2 and interior heel post 1 can not use steel case to expand the structure of head 10, can be directly in outer heel post 2 and interior The T-slot mouth 11 of the top production opening upwards of heel post 1 being adapted to crossbeam 3, or its except head 10 is expanded using steel case Its connector etc..
In order to further shorten the construction time, it is preferred that as shown in figure 3, the top plate unit 41 is by multi-disc prefabricated unit Plate 411 is assembled along 3 extending direction of crossbeam.
Top plate unit 41 is made of multi-disc prefabricated unit plate 411, compared with full wafer top plate unit 41, prefabricated unit plate 411 transports, production and lifting etc. are easier, and difficulty of construction is low, is conducive to shorten the construction period.
Preferably, as shown in figure 3, forming the ribbet 412 of opening upwards between adjacent two pieces of prefabricated unit plates 411, And ribbet 412 uses concrete backfill.
After connecting adjacent two pieces of prefabricated unit plates 411 by ribbet 412, each prefabricated unit plate 411 connects entirety, The overall stiffness of top plate is enhanced, and spelling of the water of shed tunnel top between adjacent two pieces of prefabricated unit plates 411 is more avoided Seam is lower to be seeped to traffic space.
When construction, it will usually which side pours concrete waterproof layer 5 on the top plate 4, and the concrete filled in ribbet 412 can be anti-with concrete Water layer 5 is structure as a whole, to keep the concrete waterproof layer 5 of top closer in conjunction with top plate, keeps waterproof performance more preferable.
Prefabricated unit plate 411 can be solid construction, and T-type section or other section forms etc. can also be used, still, real The prefabricated unit plate 411 of the heart is heavier, and installation is inconvenient with lifting;And T-type depth of section is much larger than board-like section.As shown in figure 3, The prefabricated unit plate 411 is the cored slab structure of simple structure.
In order to meet waterproof requirement, it is preferred that as shown in figure 3, square one-piece casting has concrete waterproof layer 5 on the top plate 4.
In order to buffer impact of the top falling rocks to top plate 4, it is preferred that as shown in figure 3, being provided with above concrete waterproof layer 5 Buffer layer;The buffer layer includes foamed cushioning pads layer 6 and the waste tire layer 7 above foamed cushioning pads layer 6.
In order to increase the overall stability of hangar tunnel, it is preferred that as shown in Figure 2 and Figure 4, the interior heel post 1 is located at side slope Place side;Barricade 8 has been poured between adjacent two interior heel posts 1.
The setting of barricade 8 increases longitudinal globality of hangar tunnel, so that the overall stability of hangar tunnel is improved, meanwhile, it is also right Side slope plays protective action, and can prevent Falling Rocks, mudstone etc. from entering to be formed through the gap between adjacent two interior heel posts 1 The effect in space.
In order to increase longitudinal globality of hangar tunnel, it is preferred that as shown in figure 4, each interior heel post 1 is through anchor pole 9 and side slope Basement rock is connected.
Interior heel post 1 is fixed on side slope basement rock by anchor pole 9, the lateral stiffness of hangar tunnel is increased, to improve canopy The overall stability in hole.
In order to avoid top plate unit 41 is under the Vibration Conditions such as earthquake, slid along 3 extending direction of crossbeam, it is preferred that described Block 31 is respectively arranged at the top of 3 both ends of crossbeam, the top plate unit 41 is located between the block 31 at both ends, and through block 31 Top plate unit 41 is constituted along 3 extending direction of crossbeam and is limited.
In order to meet draining and play the role of it is certain avoid rock-drop accumulations in shed tunnel top, crossbeam 3 is usually along inside To lateral direction in tilting down setting, therefore, for installing the mounting surface of top plate for inclined surface, in order to guarantee to push up above crossbeam 3 The stability of plate installation, therefore, the bearing pad stone 32 of wedge shape is installed on the mounting surface above crossbeam 3, passes through bearing pad stone 32 Inclined mounting surface is converted to horizontal mounting surface by horizontal faulting of slab ends, to improve the stability of mounting of roof plate.

Claims (10)

1. the light-duty shed hole structure that one kind is quickly built, it is characterised in that: including column, crossbeam (3) and top plate (4);
The column is arranged in pairs, every column include positioned at hangar tunnel side interior heel post (1) and the other side it is outer edge-on Column (2);And several interior heel posts (1), along hangar tunnel longitudinal direction spaced set, several outer heel posts (2) are also longitudinally equidistant along hangar tunnel Setting;Every column configures a crossbeam (3), and described crossbeam (3) one end is installed on the top of interior heel post (1), other end peace Top loaded on corresponding outer heel post (2);
The top plate (4) is spliced along hangar tunnel longitudinal direction by multi-disc top plate unit (41), configures one between adjacent two crossbeams (3) Piece top plate unit (41), and the both ends of the top plate unit (41) are held on the top of corresponding crossbeam (3) respectively.
2. the light-duty shed hole structure that one kind as described in claim 1 is quickly built, it is characterised in that: the cross of the crossbeam (3) Section is T-shaped;The top of the outer heel post (2) and interior heel post (1) is reserved with being adapted to crossbeam (3) for opening upwards T-slot mouth (11);One end of the crossbeam (3) is installed in the T-slot mouth (11) of outer heel post (2), and the other end is installed on interior In the T-slot mouth (11) of heel post (1).
3. the light-duty shed hole structure that one kind as claimed in claim 1 or 2 is quickly built, it is characterised in that: the top plate unit (41) assembled along crossbeam (3) extending direction by multi-disc prefabricated unit plate (411).
4. the light-duty shed hole structure that one kind as claimed in claim 3 is quickly built, it is characterised in that: adjacent two pieces of prefabricated units The ribbet (412) of opening upwards is formed between plate (411), and ribbet (412) uses Concrete Filled.
5. the light-duty shed hole structure that one kind as claimed in claim 3 is quickly built, it is characterised in that: the prefabricated unit plate It (411) is hollow structure.
6. the light-duty shed hole structure that one kind as claimed in claim 1 or 2 is quickly built, it is characterised in that: above top plate (4) One-piece casting has concrete waterproof layer (5).
7. the light-duty shed hole structure that one kind as claimed in claim 6 is quickly built, it is characterised in that: on concrete waterproof layer (5) Side is provided with buffer layer.
8. the light-duty shed hole structure that one kind as claimed in claim 1 or 2 is quickly built, it is characterised in that: the interior heel post (1) side where being located at side slope;Barricade (8) have been poured between adjacent two interior heel posts (1).
9. the light-duty shed hole structure that one kind as claimed in claim 1 or 2 is quickly built, it is characterised in that: the interior heel post (1) side where being located at side slope;Each interior heel post (1) is connected through anchor pole (9) with the basement rock of side slope.
10. the light-duty shed hole structure that one kind as claimed in claim 1 or 2 is quickly built, it is characterised in that: the crossbeam (3) It is respectively arranged at the top of both ends block (31), the top plate unit (41) is located between the block (31) at both ends, and through block (31) top plate unit (41) are constituted along crossbeam (3) extending direction and is limited.
CN201920214112.5U 2019-02-19 2019-02-19 A kind of light-duty shed hole structure quickly built Active CN209584881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920214112.5U CN209584881U (en) 2019-02-19 2019-02-19 A kind of light-duty shed hole structure quickly built

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920214112.5U CN209584881U (en) 2019-02-19 2019-02-19 A kind of light-duty shed hole structure quickly built

Publications (1)

Publication Number Publication Date
CN209584881U true CN209584881U (en) 2019-11-05

Family

ID=68355825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920214112.5U Active CN209584881U (en) 2019-02-19 2019-02-19 A kind of light-duty shed hole structure quickly built

Country Status (1)

Country Link
CN (1) CN209584881U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305849A (en) * 2020-03-19 2020-06-19 重庆渝高科技产业(集团)股份有限公司 Construction method of anti-sinking shed tunnel structure for tunnel construction
CN111350376A (en) * 2019-12-22 2020-06-30 华东建筑设计研究院有限公司 Steel construction anti-collapse canopy frame of people's air defense access & exit motor way
CN111395213A (en) * 2020-03-10 2020-07-10 武汉大学 Construction method of energy-consuming and shock-absorbing combined shed tunnel structure resisting landslide collapse body impact

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350376A (en) * 2019-12-22 2020-06-30 华东建筑设计研究院有限公司 Steel construction anti-collapse canopy frame of people's air defense access & exit motor way
CN111395213A (en) * 2020-03-10 2020-07-10 武汉大学 Construction method of energy-consuming and shock-absorbing combined shed tunnel structure resisting landslide collapse body impact
CN111305849A (en) * 2020-03-19 2020-06-19 重庆渝高科技产业(集团)股份有限公司 Construction method of anti-sinking shed tunnel structure for tunnel construction

Similar Documents

Publication Publication Date Title
CN209584881U (en) A kind of light-duty shed hole structure quickly built
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
KR20100138122A (en) Base of arch rigid frame structure including composite covering arch structure and constructing method thereof
US5199819A (en) Semi-buried structure formed on a mountainside
JPH11152761A (en) Underground structure and construction method thereof
CN101215815A (en) Method for building integrated cantilever structure composite road adapted for precipitous mountainous area
CN102031785A (en) Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
KR101389285B1 (en) Pc girder shift of the chest wall with a block end integrated method
CN108103867A (en) A kind of hangar tunnel formula antiskid structure and construction method with roadnet
KR100876679B1 (en) Bridge soundproof structure and method of executing the same
CN204551491U (en) A kind of side slope protection greening structure
CN207452911U (en) A kind of multi-thread crossings on different level abnormal shape deep foundation pit supporting structure
CN109750825A (en) The construction method of foundation pit suspension type riding track
CN210104765U (en) High and large retaining structure of soft geological side slope
JPH10152998A (en) Earthquake-resistant reinforcing structure of existing building
CN215482973U (en) Frame type underground structure
CN104612728A (en) Roadway supporting method for forming cross point by penetrating through existing roadway
KR20190055392A (en) Precast mold for platform on piles system and concrete slab track construction method therewith
CN105133645B (en) The shaft main body structure of built-in lattice column and inverse make formula construction method
CN211498542U (en) Static crushing and dismantling construction structure of upper-span existing line arch bridge
CN104631474B (en) A kind of side slope protection greening structure
KR101483865B1 (en) Construction Method of Underground Structure using Composite Wale
JP2950325B1 (en) Construction method of seismic isolation building
JP5688039B2 (en) Partition structure
CN210636319U (en) Assembly type T-shaped cross beam structure suitable for rigid railway shed tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant