CN209576613U - A kind of pre- heat drying mixing granulation furnace of wet mud - Google Patents

A kind of pre- heat drying mixing granulation furnace of wet mud Download PDF

Info

Publication number
CN209576613U
CN209576613U CN201920083119.8U CN201920083119U CN209576613U CN 209576613 U CN209576613 U CN 209576613U CN 201920083119 U CN201920083119 U CN 201920083119U CN 209576613 U CN209576613 U CN 209576613U
Authority
CN
China
Prior art keywords
mud
point
ash
pan
basin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920083119.8U
Other languages
Chinese (zh)
Inventor
崔巍巍
周志强
金建业
潘伟军
江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO DRAINAGE CO.,LTD.
Original Assignee
Ningbo Greenland Biomass Energy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Greenland Biomass Energy Development Co Ltd filed Critical Ningbo Greenland Biomass Energy Development Co Ltd
Priority to CN201920083119.8U priority Critical patent/CN209576613U/en
Application granted granted Critical
Publication of CN209576613U publication Critical patent/CN209576613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of wet pre- heat drying mixing granulation furnaces of mud, including a boiler, first point of mud pan is distributed in the boiler from the top down, the first ash-blowing tube, first connects a basin, second point of mud pan, the second ash-blowing tube, second connect a basin and heating device, is connected between first point of mud pan and second point of mud pan by vertical connecting tube;The advantage is that: the sludge quantity promoted every time is small, but several tons, No. tens sludge taken up, Yao Jieneng are had enough to meet the need than disc dryer;Also, present invention take advantage of that the self gravity of wet mud is as the sliding energy;The application carries out secondary use to the heat ash generated after burning, using its waste heat, and utilizes its physical features, is attached at wet mud surface so that the wet mud that squeezes out of strip will not conglomeration again, be conducive to burn.

Description

A kind of pre- heat drying mixing granulation furnace of wet mud
Technical field
The equipment that the utility model relates to a kind of in sludge handling process;Specifically a kind of pre- heat drying mixing of wet mud is made Grain furnace.
Background technique
The water content of sludge is very high, so needing to carry out drying and other treatment before sludge incineration, some are also needed in this rank Section mixing other materials, are more easier and sufficiently to burn.
Preheating method primarily now is disc dryer: wet mud is sent by feed inlet, in disk shell and hollow shaft Between flow, heat is transmitted by the hollow disc that welds on collet, hollow shaft and axis, material is heated indirectly desiccation, generates Water vapour be gathered in the dome of drying machine, drying machine is taken out of by cultivation gas;Hollow disc is completely vertical with axis, does not cut to material Play is mixed the effect of device by the propulsion of peripheral of disc/retouch, carries out propulsion stirring to material, dry face is constantly updated, to realize Dry purpose;The bearing part of whole drying machine, You Yigen hollow shaft and one group of hollow disk composition.
When work, what is be filled in this disc dryer is tens tons of sludge, stirs needs every time and consumes a large amount of electricity Can, conglomeration again is easy by the higher sludge of the humidity of pitch cutting, rear journey can only be continued to be heated to, when humidity is decreased obviously, It can accomplish not conglomeration.
Utility model content
The utility model is utilized again in view of the shortcomings of the prior art, providing and can generate hot powder ash to burning sludge, wet Mud is once granulated success, a kind of wet pre- heat drying mixing granulation furnace of mud of not conglomeration.
In order to solve the above-mentioned technical problem, the utility model is addressed by following technical proposals: a kind of wet mud preheating First point of mud pan, the first ash-blowing tube, is distributed in the boiler in desiccation mixing granulation furnace, including a boiler from the top down One connects a basin, second point of mud pan, the second ash-blowing tube, second connects a basin and heating device, first point of mud pan and described second Connected by vertical connecting tube between point mud pan, first point of mud pan and second point of mud pan are in tube body towards bottom surface It is provided with several mudholes, first ash-blowing tube and second ash-blowing tube are in body pipe towards following and be provided with towards inner face Several ash output openings, and be connected with the hot powder ash pipe discharged during sludge incineration;Described first, which connects a basin and described second, connects Grain basin is provided with discharge port;
First point of mud pan is circumscribed with enters mud pipe and pushes away mud cylinder, and the described first discharge port for connecing a basin is arranged in boiler Outside;In the effect for pushing away mud cylinder, the extruded wet mud in part is in long strip from the mudhole of first point of mud pan to be squeezed Out, and in dropping process it is mixed with the heat ash sprayed from the ash output opening of the first ash-blowing tube, the institute for finally connecing a basin from first It states in discharge port and is discharged outside boiler, complete mixed once and preheat granulation process;
Remaining wet mud in first point of mud pan is entered in second point of mud pan by the connecting tube;
Wet mud a part of second point of mud pan passes through extrusion in long strip in mudhole under the action of gravity and extruding force, And mixed in dropping process with the heat ash sprayed from the ash output opening of the second ash-blowing tube, in the discharge port for finally connecing a basin from second It is discharged outside boiler, completes secondary mixing and preheat granulation process;
Remaining wet mud in second point of mud pan enters next procedure.
The tube body of the first point of mud pan and second point of mud pan indent vortex shape downward in center.
The outermost circle pipe welding of first point of mud pan and second point of mud pan has mounting ring, and the mounting ring passes through several It is supported and fixed on the inside of boiler.
Compared with prior art, the sludge quantity for having the following beneficial effects: that 1 promotes every time is small for the utility model, but number Ton, tens tonnes taken up than disc dryer turnover want energy saving many times;Also, present invention take advantage of that itself weight of wet mud Power is as sliding kinetic energy;2 the application carry out secondary use to the heat ash generated after burning, using its waste heat, and utilize its object Manage feature, hot ash particle is attached at wet mud surface so that the wet mud that squeezes out of strip will not conglomeration again, be conducive to burn;3 have Two procedures are rotated forward plus are inverted, and just carry out once rubbing mud, so that wet mud can be with stone in secondary mixing preheating granulation process The hard object separation of class;It may separate out the stone of the bulks such as stone, glass.
Detailed description of the invention
Fig. 1 is the structural schematic diagram one of the utility model embodiment.
Fig. 2 is the working principle diagram of the utility model embodiment.
Fig. 3 is that the section of the utility model embodiment regards meaning.
Fig. 4 is the structural schematic diagram two of the utility model embodiment.
Fig. 5 is the structural schematic diagram three of the utility model embodiment.
Specific embodiment
The utility model is described in further detail with specific embodiment with reference to the accompanying drawing: as shown in Figs. 1-5, mark Infuse as follows: 01, first point of mud pan 02 of boiler, the first ash-blowing tube 03, first connect a basin 04, second point of mud pan 05, second ash-blowing tube 06, second connect a basin 07, heating device 08, connecting tube 09, mudhole 10, ash output opening 11, hot powder ash pipe 12, discharge port 13, into Mud pipe 14 pushes away mud cylinder 15, mounting ring 16, support 17.
A kind of pre- heat drying mixing granulation furnace of wet mud includes a boiler 01, and first point of mud is distributed with from the top down in boiler Disk 02, the first ash-blowing tube 03, first connect 04, second point of mud pan 05 of a basin, the second ash-blowing tube 06, second connect a basin 07 and heating dress 08 is set, is connected between first point of mud pan and second point of mud pan by vertical connecting tube 09, first point of mud pan and second point of mud pan Bottom surface is provided with several mudholes 10 in tube body, the first ash-blowing tube and the second ash-blowing tube are in body pipe towards following and court Inner face is provided with several ash output openings 11, and is connected with the hot powder ash pipe 12 discharged during sludge incineration;First connect a basin and Second, which connects a basin, is provided with discharge port 13;
First point of mud pan is circumscribed with enters mud pipe 14 and pushes away mud cylinder 15, and the first discharge port for connecing a basin is arranged outside boiler; In the effect for pushing away mud cylinder, the extruded wet mud in part extrusion in long strip from the mudhole of first point of mud pan, and falling It is mixed in the process with the heat ash sprayed from the ash output opening of the first ash-blowing tube, pot is discharged in the discharge port for finally connecing a basin from first Outside furnace, completes mixed once and preheat granulation process, can be considered herein and complete an operation cycle, can also be sprayed from ash output opening Other substances, such as combustion-supporting material or the substance of other anti-conglomerations.
Remaining wet mud in first point of mud pan is entered in second point of mud pan by connecting tube.
Wet mud a part of second point of mud pan passes through extrusion in long strip in mudhole under the action of gravity and extruding force, And mixed in dropping process with heat ash is sprayed from the ash output opening of the second ash-blowing tube, it is arranged in the discharge port for finally connecing a basin from second Out outside boiler, completes secondary mixing and preheat granulation process;It can be considered herein and complete an operation cycle, it can also be from ash output opening Other substances are sprayed, such as combustion-supporting material or the substance of other anti-conglomerations.
Remaining wet mud in second point of mud pan enters next procedure, and next procedure can be the boiler of repetition the application, It can be with burning facility.
The tube body of first point of mud pan and second point of mud pan in the downward indent vortex shape in center, allow wet mud spiral to Under, utilize gravity of walk itself.
The outermost circle pipe welding of first point of mud pan and second point of mud pan has mounting ring 16, and mounting ring passes through several supports 17 It is fixed on the inside of boiler.
The utility model can also have other a variety of specific embodiments, all to be formed using equivalent substitution or equivalent transformation Technical solution, all fall within the requires of the utility model protection within the scope of.

Claims (3)

1. a kind of pre- heat drying mixing granulation furnace of wet mud, it is characterised in that: including a boiler (01), in the boiler on to Under be distributed with first point of mud pan (02), the first ash-blowing tube (03), first connect a basin (04), second point of mud pan (05), second spray ash Pipe (06), second connect a basin (07) and heating device (08), by perpendicular between first point of mud pan and second point of mud pan To connecting tube (09) be connected, if first point of mud pan and second point of mud pan are done in being provided with towards bottom surface for tube body Mud hole (10), first ash-blowing tube and second ash-blowing tube are in body pipe towards following and inner face is provided with several ash discharges Hole (11), and be connected with the hot powder ash pipe (12) discharged during sludge incineration;Described first, which connects a basin and described second, connects Grain basin is provided with discharge port (13);
First point of mud pan is circumscribed with enters mud pipe (14) and pushes away mud cylinder (15), and the described first discharge port setting for connecing a basin exists Outside boiler;In the effect for pushing away mud cylinder, the extruded wet mud in part is in strip from the mudhole of first point of mud pan Shape squeezes out, and mixes in dropping process with the heat ash sprayed from the ash output opening of the first ash-blowing tube, finally connects a basin from first The discharge port in be discharged boiler outside, complete mixed once preheat granulation process;
Remaining wet mud in first point of mud pan is entered in second point of mud pan by the connecting tube;
Wet mud a part of second point of mud pan under the action of gravity and extruding force by extrusion in long strip in mudhole, and Dropping process is mixed with heat ash is sprayed from the ash output opening of the second ash-blowing tube, and pot is discharged in the discharge port for finally connecing a basin from second Outside furnace, completes secondary mixing and preheat granulation process;
Remaining wet mud in second point of mud pan enters next procedure.
2. a kind of wet pre- heat drying mixing granulation furnace of mud as described in claim 1, it is characterised in that: first point of mud pan and The tube body of the second point of mud pan indent vortex shape downward in center.
3. a kind of wet pre- heat drying mixing granulation furnace of mud as claimed in claim 2, it is characterised in that: first point of mud pan and The outermost circle pipe welding of second point of mud pan has mounting ring (16), and the mounting ring is fixed in boiler by several supports (17) Side.
CN201920083119.8U 2019-01-18 2019-01-18 A kind of pre- heat drying mixing granulation furnace of wet mud Active CN209576613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920083119.8U CN209576613U (en) 2019-01-18 2019-01-18 A kind of pre- heat drying mixing granulation furnace of wet mud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920083119.8U CN209576613U (en) 2019-01-18 2019-01-18 A kind of pre- heat drying mixing granulation furnace of wet mud

Publications (1)

Publication Number Publication Date
CN209576613U true CN209576613U (en) 2019-11-05

Family

ID=68353878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920083119.8U Active CN209576613U (en) 2019-01-18 2019-01-18 A kind of pre- heat drying mixing granulation furnace of wet mud

Country Status (1)

Country Link
CN (1) CN209576613U (en)

Similar Documents

Publication Publication Date Title
CN101813316B (en) Municipal sludge drying and incineration system and treatment process thereof
CN106380056B (en) The makeup of municipal sludge depth drying is set
CN201593014U (en) Sludge granulating and drying device
CN105399304A (en) Biological sludge drying and incineration cycle-treatment method and complete equipment
CN108993715A (en) A kind of refuse derived fuel grinding device for rural area Biomass Gasification & Power Generation
CN108856268A (en) A kind of getting fat type soil repair system and its restorative procedure
CN105371283A (en) Sludge drying and incinerating process
CN112555862A (en) Sludge incineration and hot gas entering outer kettle to be utilized and discharged again device
CN209576613U (en) A kind of pre- heat drying mixing granulation furnace of wet mud
CN101139093A (en) Method and device of fluidized carbonization moving bed activating of chemical legal wood activated charcoal
CN207035777U (en) A kind of fuel delivery system with drying device
CN109569429A (en) A kind of pre- heat drying mixing granulation furnace of wet mud
CN209322795U (en) A kind of carbonizing apparatus of sludge drying system
CN205088089U (en) A oar formula stirring drying device for mummification mud
CN201605216U (en) Sludge drying processing equipment
CN205909308U (en) Arrange sediment type sludge incineration system
CN109020144A (en) The inside and outside double kettles of rotation and energy ball heated at high speed sludge, excrement material drying device
CN209481452U (en) The hot powder ash blending tank of the wet mud of integral type
CN106669386A (en) Spray oxidization granulation technique and device
CN110160059A (en) Agricultural wooden waste incinerating method
CN207894257U (en) Heat exchange shaft kiln
CN207592717U (en) A kind of efficient forge furnace
CN106433711A (en) Device and method for production of machine-processed biomass charcoal
CN206755898U (en) A kind of aluminium material spiral pushing preheating machine
CN109553273A (en) The hot powder ash blending tank of the wet mud of integral type

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230915

Address after: No. 558 Jinshan West Road, Yinzhou District, Ningbo City, Zhejiang Province, 315100

Patentee after: NINGBO DRAINAGE CO.,LTD.

Address before: No. 228 Panqishan Road, Xiepu Town, Zhenhai District, Ningbo City, Zhejiang Province, 315200

Patentee before: NINGBO GREENLAND BIOMASS ENERGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right