CN209568434U - A kind of earth anchor of assembling type steel structure elevator - Google Patents

A kind of earth anchor of assembling type steel structure elevator Download PDF

Info

Publication number
CN209568434U
CN209568434U CN201920129916.5U CN201920129916U CN209568434U CN 209568434 U CN209568434 U CN 209568434U CN 201920129916 U CN201920129916 U CN 201920129916U CN 209568434 U CN209568434 U CN 209568434U
Authority
CN
China
Prior art keywords
connecting tube
pipe
earth anchor
drilling
type steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920129916.5U
Other languages
Chinese (zh)
Inventor
段连存
王波
裴兆贞
李咸良
展元荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong quanshunda assembled Intelligent Elevator Technology Co.,Ltd.
Original Assignee
Shandong Quanshunda Assembly Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Quanshunda Assembly Building Co Ltd filed Critical Shandong Quanshunda Assembly Building Co Ltd
Priority to CN201920129916.5U priority Critical patent/CN209568434U/en
Application granted granted Critical
Publication of CN209568434U publication Critical patent/CN209568434U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of earth anchor of assembling type steel structure elevator, the utility model includes drilling through component and several extending parts, connection structure is provided between adjacent component, the component that drills through includes drilling through pipe and the spiral plate drilled through on pipe being arranged in.After the earth anchor of the utility model is squeezed into stratum, then concreting pit is used, the upper end of earth anchor is preset in concrete pit, keeps its ground more stable, greatly strengthen the stability and its shock resistance of upper layer elevator structure.

Description

A kind of earth anchor of assembling type steel structure elevator
Technical field
The utility model relates to assembling type steel structure elevator technology fields, and in particular to a kind of assembling type steel structure elevator Earth anchor.
Background technique
Economic continuous development since reforming and opening up to the outside world with China, requirement of the people to quality of life are also constantly mentioning It is high.The space and environment that house is directly survived as the mankind is lived the closest with people.And people are in housing room inner loop While border constantly improves, it is also desirable to which house traffic condition (i.e. the discrepancy of people usually is current) can be similarly obtained improvement.Elevator, As a kind of effective transport facility, the indispensable equipment of skyscraper is not only had become, and gradually Walking-replacing tool as low-rise building.But according to my GB50096-1999 " Code for design of dwelling houses " provide, 7 layers or more live Residence building should install elevator, and which forms 7 layers of house or more built up after 2000 just elevator, and complete before 2000 Multi-storey building (7 layers or less) is not set elevator, and namely live in these houses in the building in state's major part cities and towns Resident exactly enters the representative of astogeny at this stage, has quite a few the elderly just living in not no elevator in China at present In multi-storey building, and with the propulsion of barrier-free city work, the actual demand that multi-storey building installs elevator additional is increasingly prominent, How rationally, safely also just becoming some large- and-medium size cities coke of interest to the problem of existing apartment building installation elevator Point.
Present steel construction elevator generally comprises foundation pit, hoistway section and elevator assemblies, and the stability of hoistway section depends on base The construction in hole, present foundation pit mostly carry out coagulation body in underground and make, and antidetonation rank is relatively low.
Utility model content
Existing apartment is allowed to install the higher dress of elevator stability additional technical problem to be solved by the utility model is: providing one kind Earth anchor with formula steel construction elevator.
To solve the above-mentioned problems, the utility model includes drilling through component and several extending parts, is set between adjacent component It is equipped with connection structure, the component that drills through includes drilling through pipe and the spiral plate drilled through on pipe being arranged in.
As optimization, extending part described in the utility model includes the first connecting tube and the second connecting tube, the first connection It manages and is fixedly connected between the second connecting tube, the outer diameter of the first connecting tube matches with the outer diameter for drilling through pipe, the second connecting tube Internal diameter matches with the outer diameter for drilling through pipe.
As optimization, the first connecting tube described in the utility model part is stretched in the second connecting tube, and the first connection Weld together between pipe and the second connecting tube.
As optimization, the pipe lower end described in the utility model that drills through is provided with nose cone, and the spiral plate is provided with more Group.
As optimization, spiral plate described in the utility model is provided with two groups.
As optimization, described in the utility model drill through is provided with limit hole on pipe, in first connecting tube and the The end of two connecting tubes is provided with corresponding limit hole, and the connection structure includes limit pin shaft, when drilling through Guan Yujia When long component connects, second connecting tube, which is socketed in, to be drilled through on pipe, and the limit pin shaft is plugged in the second connecting tube Limit hole and drill through between limit hole on pipe;When the connection of adjacent extending part, the extending part positioned at upside The socket of the second connecting tube in place in the first connecting tube of the extending part of downside, the limit pin shaft be plugged on this second Between connecting tube and adjacent first connecting tube.
As optimization, there are three limit hole settings described in the utility model.
As optimization, the utility model further includes being drivingly connected component, and the drive connection component includes for connecting It drills through the casing of component and extending part and the connector for connecting torsion head, the casing and drills through component or lengthening part It is connected between part by bindiny mechanism.
The beneficial effects of the utility model are: the utility model constructs it in the melt pit for carrying out assembling type steel structure elevator Before, first by four earth anchor deep drillings into stratum, when drilling through, it will first drill through pipe and stand on ground, torsion head is passed through into drive connection Component is connected to the upper end for drilling through pipe, and the drive of starting torque head drills through pipe rotation, drills through pipe and be drilled by the effect of spiral plate In stratum, drills through pipe upper end when getting by drilling and remains with certain length, disassemble drive connection component, take one end extending part, Second connecting tube of extending part is socketed in the upper end for drilling through pipe, and the limit hole of the two is allowed to be aligned, is inserted into limit pin shaft, then Component will be drivingly connected to be connected in the first connecting tube of extending part, starting torque head carries out operation, and repeats above-mentioned step The rapid predetermined depth up to drilling through.After the earth anchor of the utility model is squeezed into stratum, then concreting pit is used, earth anchor Upper end is preset in concrete pit, keeps its ground more stable, is greatly strengthened the stability of upper layer elevator structure and its is resisted Shake ability.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for drilling through component;
Fig. 2 is the structural schematic diagram of extending part;
Fig. 3 is the structural schematic diagram for being drivingly connected component.
Wherein: 1, drilling through pipe, 2, extending part, 3, drive connection component, 1-1, limit hole, 1-2, spiral plate, 1-3, circle Conehead, 2-1, the first connecting tube, 2-2, limit hole, 2-3, the second connecting tube, 2-4, limit hole, 3-1, connector, 3-2, casing, 3-3, limit hole.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here in attached drawing description and The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.Therefore, below to attached The detailed description of the embodiments of the present invention provided in figure is not intended to limit the range of claimed invention, But it is merely representative of the selected embodiment of the utility model.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without creative efforts, belongs to the model of the utility model protection It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, or The utility model product using when the orientation or positional relationship usually put, be merely for convenience of description the utility model and letter Change description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation construct and Operation, therefore should not be understood as limiting the present invention.In addition, term " first ", " second ", " third " etc. are only used for area Divide description, is not understood to indicate or imply relative importance.
The earth anchor of assembling type steel structure elevator described in the present embodiment, including component and several extending parts are drilled through, it is adjacent Connection structure is provided between component, refer between adjacent component drill through between component and extending part and extending part and lengthen Between component, as shown in Figure 1, the described component that drills through includes drilling through pipe 1 and being arranged in drill through spiral plate 1-2 on pipe 1, it is described 1 lower end of pipe that drills through be provided with nose cone 1-3, the spiral plate 1-2 is provided with multiple groups, is preferentially set as two groups, and one group sets It sets on the top for drilling through pipe 1, another group is arranged in the lower part for drilling through pipe 1, and earth anchor is allowed to guarantee enough tractive force in decline.Such as Shown in Fig. 2, the extending part includes the first connecting tube and the second connecting tube, and the first connecting tube 2-1 is partially protruded into Weld together to the second connecting tube 2-3, and between the first connecting tube 2-1 and the second connecting tube 2-3, the first connecting tube 2-1 Outer diameter match with the outer diameter for drilling through pipe 1, the internal diameter of the second connecting tube 2-3 matches with the outer diameter for drilling through pipe 1.The brill It takes and is provided with limit hole 1-1 on pipe 1, corresponding limit hole 2-2 is provided on the end of the first connecting tube 2-1, the Corresponding limit hole 2-4 is provided on the end of two connecting tube 2-3, to guarantee good bonding strength, all connecting holes Number is respectively provided with three, and the connection structure includes limit pin shaft, when drilling through pipe 1 and being connect with extending part, described Two connecting tube 2-3, which are socketed in, to be drilled through on pipe 1, the limit hole 2-4 and bore that the limit pin shaft is plugged on the second connecting tube 2-3 It takes between the limit hole 1-1 on pipe 1;When the connection of adjacent extending part, the second of the extending part positioned at upside connects Adapter tube 2-3 is socketed on the first connecting tube 2-1 of the extending part positioned at downside, and the limit pin shaft is plugged on second company Between adapter tube 2-3 and adjacent first connecting tube 2-1.
For the ease of being driven using torsion head, as shown in figure 3, the present embodiment further includes being drivingly connected component 3, it is described Drive connection component 3 include for connecting the casing 3-2 for drilling through component and extending part 2 and the connection for connecting torsion head It head 3-1, the casing 3-2 and drills through by bindiny mechanism's connection between component or extending part, on the casing 3-2 It is provided with corresponding limit hole 3-3, for connecting the first connecting tube 2-1 for drilling through pipe 1 and extending part 2, the outer diameter of casing 3-2 Match with the internal diameter for drilling through pipe 1, when being attached, casing 3-2 extend into the first connection for drilling through pipe 1 or extending part 2 In pipe 2-1.
Working principle: before carrying out the melt pit construction of assembling type steel structure elevator, first by four earth anchor deep drillings to stratum In, when drilling through, it will first drill through pipe 1 and stand on ground, torsion head is connected to the upper end for drilling through pipe 1 by drive connection component 3, The drive of starting torque head drills through the rotation of pipe 1, drills through pipe 1 and is drilled into stratum by the effect of spiral plate 1-2, is drilled through when getting by drilling 1 upper end of pipe remains with certain length, disassembles and is drivingly connected component 3, one end extending part 2 is taken, by the second of extending part 2 Connecting tube 2-3 is socketed in the upper end for drilling through pipe 1, and the limit hole of the two is allowed to be aligned, and is inserted into limit pin shaft, then will be drivingly connected portion Part 3 is connected on the first connecting tube 2-1 of extending part 2, and starting torque head carries out operation, and is repeated the above steps until boring The predetermined depth taken.
Above-mentioned specific embodiment is only the specific case of the utility model, and the scope of patent protection of the utility model includes But it is not limited to the product form and style of above-mentioned specific embodiment, it is any to meet the utility model claims book and any institute Belong to the appropriate changes or modifications that the those of ordinary skill of technical field does it, should all fall into the patent protection of the utility model Range.

Claims (8)

1. a kind of earth anchor of assembling type steel structure elevator, it is characterised in that: including drilling through component and several extending parts, adjacent portions Connection structure is provided between part, the component that drills through includes drilling through pipe and the spiral plate drilled through on pipe being arranged in.
2. the earth anchor of assembling type steel structure elevator according to claim 1, it is characterised in that: the extending part includes First connecting tube and the second connecting tube, are fixedly connected between the first connecting tube and the second connecting tube, the outer diameter of the first connecting tube with The outer diameter for drilling through pipe matches, and the internal diameter of the second connecting tube matches with the outer diameter for drilling through pipe.
3. the earth anchor of assembling type steel structure elevator according to claim 2, it is characterised in that: first connecting section Divide and stretch in the second connecting tube, and welds together between the first connecting tube and the second connecting tube.
4. the earth anchor of assembling type steel structure elevator according to claim 1, it is characterised in that: the pipe lower end that drills through is set It is equipped with nose cone, the spiral plate is provided with multiple groups.
5. the earth anchor of assembling type steel structure elevator according to claim 4, it is characterised in that: the spiral plate is provided with Two groups.
6. the earth anchor of assembling type steel structure elevator according to claim 2, it is characterised in that: described drilling through is arranged on pipe There is a limit hole, in the first connecting tube and end of the second connecting tube is provided with corresponding limit hole, the company Binding structure includes limit pin shaft, and when drilling through pipe and connecting with extending part, second connecting tube, which is socketed in, to be drilled through on pipe, institute It limit hole that the limit pin shaft stated is plugged in the second connecting tube and drills through between limit hole on pipe;When adjacent extending part connects When connecing, the socket of the second connecting tube of the extending part positioned at upside in place in downside extending part the first connecting tube On, the limit pin shaft is plugged between second connecting tube and adjacent first connecting tube.
7. the earth anchor of assembling type steel structure elevator according to claim 6, it is characterised in that: the limit hole is provided with Three.
8. the earth anchor of assembling type steel structure elevator according to claim 1, it is characterised in that: further include drive connection portion Part, the drive connection component includes for connecting the casing for drilling through component and extending part and the company for connecting torsion head Connector, the casing and drill through between component or extending part by bindiny mechanism connect.
CN201920129916.5U 2019-01-25 2019-01-25 A kind of earth anchor of assembling type steel structure elevator Active CN209568434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920129916.5U CN209568434U (en) 2019-01-25 2019-01-25 A kind of earth anchor of assembling type steel structure elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920129916.5U CN209568434U (en) 2019-01-25 2019-01-25 A kind of earth anchor of assembling type steel structure elevator

Publications (1)

Publication Number Publication Date
CN209568434U true CN209568434U (en) 2019-11-01

Family

ID=68332871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920129916.5U Active CN209568434U (en) 2019-01-25 2019-01-25 A kind of earth anchor of assembling type steel structure elevator

Country Status (1)

Country Link
CN (1) CN209568434U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081103A (en) * 2020-09-21 2020-12-15 蒋露瑶 Anchor rod for slope construction of constructional engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081103A (en) * 2020-09-21 2020-12-15 蒋露瑶 Anchor rod for slope construction of constructional engineering
CN112081103B (en) * 2020-09-21 2022-07-26 浙江坤宁岩土科技有限公司 Anchor rod for slope construction of constructional engineering

Similar Documents

Publication Publication Date Title
CN104234651B (en) A kind of high temperature resistant vibratory tool for horizontal well
CN101294480A (en) Device for drilling miniature borehole on ultra-short radius of coiled tubing
CN209568434U (en) A kind of earth anchor of assembling type steel structure elevator
CN207568553U (en) Bridge plug
CN206530288U (en) The high build angle rate drilling well transmission device of small bend angle
CN106761467B (en) A kind of integration connector and the deep water cementing method using integration connector implementation
CN203022669U (en) Drilling system for coring while drilling
CN207776838U (en) Full-sleeve full-rotation drill counter-force fork device
CN215716058U (en) Cavity node structure of assembled wall and building frame
CN201083085Y (en) Drilling rod without welding down-the-hole drill
CN2685529Y (en) Hydraulic pulse drill bit vibrating short section
CN205577106U (en) Well roof beam is directly shelved in capital formula beam column articulation node
CN201057188Y (en) Non-thread type transmission shaft connecting structure
CN204532329U (en) Borehole accuracy precise control device
CN106150387A (en) The hinged driving-shaft assembly of helicoid hydraulic motor
CN206468295U (en) A kind of hollow cylinder rock sample prepares drill bit and rig
CN209083229U (en) A kind of novel mechanical boring casing
CN201747260U (en) Double-drill pipe well drill rig
CN2649765Y (en) Ground controllable underground adjustable elbow connection
CN201810213U (en) Hydraulic mechanical cave forming tool
CN201521272U (en) Branching hanger
CN2934357Y (en) Butt-jointing device for anchor cable and borer
CN213062362U (en) Assembly type building bottom connecting mechanism
CN2856386Y (en) High strength coring tool
CN2672164Y (en) Centrifugal steel pipe concrete pipe pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. z-1-379, 8th floor, No. 1 incubator main building, Jinan innovation Valley, high tech Zone, Jinan City, Shandong Province

Patentee after: Shandong quanshunda assembled Intelligent Elevator Technology Co.,Ltd.

Address before: No. z-1-379, 8th floor, No. 1 incubator main building, Jinan innovation Valley, high tech Zone, Jinan City, Shandong Province

Patentee before: SHANDONG QUANSHUNDA ASSEMBLY BUILDING Co.,Ltd.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ground anchor for a prefabricated steel structure elevator

Effective date of registration: 20230410

Granted publication date: 20191101

Pledgee: Bank of China Limited Jinan Licheng sub branch

Pledgor: Shandong quanshunda assembled Intelligent Elevator Technology Co.,Ltd.

Registration number: Y2023370000066

PE01 Entry into force of the registration of the contract for pledge of patent right