CN209568296U - Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber - Google Patents

Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber Download PDF

Info

Publication number
CN209568296U
CN209568296U CN201822073319.3U CN201822073319U CN209568296U CN 209568296 U CN209568296 U CN 209568296U CN 201822073319 U CN201822073319 U CN 201822073319U CN 209568296 U CN209568296 U CN 209568296U
Authority
CN
China
Prior art keywords
vaporization chamber
ironing equipment
steam control
automatic steam
flatiron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822073319.3U
Other languages
Chinese (zh)
Inventor
多米尼克·格吕斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEB SA
Original Assignee
SEB SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEB SA filed Critical SEB SA
Application granted granted Critical
Publication of CN209568296U publication Critical patent/CN209568296U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F75/00Hand irons
    • D06F75/08Hand irons internally heated by electricity
    • D06F75/10Hand irons internally heated by electricity with means for supplying steam to the article being ironed
    • D06F75/12Hand irons internally heated by electricity with means for supplying steam to the article being ironed the steam being produced from water supplied to the iron from an external source
    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F75/00Hand irons
    • D06F75/08Hand irons internally heated by electricity
    • D06F75/24Arrangements of the heating means within the iron; Arrangements for distributing, conducting or storing the heat
    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F75/00Hand irons
    • D06F75/08Hand irons internally heated by electricity
    • D06F75/10Hand irons internally heated by electricity with means for supplying steam to the article being ironed
    • D06F75/14Hand irons internally heated by electricity with means for supplying steam to the article being ironed the steam being produced from water in a reservoir carried by the iron
    • D06F75/18Hand irons internally heated by electricity with means for supplying steam to the article being ironed the steam being produced from water in a reservoir carried by the iron the water being fed slowly, e.g. drop by drop, from the reservoir to a steam generator

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Irons (AREA)

Abstract

A kind of ironing equipment, the ironing equipment includes flatiron (3), the flatiron (3) includes Heating body (14), the Heating body (14) includes main vaporization chamber (18) and the second vaporization chamber (19), the main vaporization chamber (18) is used for daily ironing, and second vaporization chamber (19) obtains additional steam by punctually supply liquid, the main vaporization chamber (18) is supplied to liquid when user's starting is by automatic steam control component (27) that the flatiron (3) carry, to obtain continuous steam stream.Second vaporization chamber (19) is supplied to the water of predetermined amount when starting automatic steam control component (27) every time.

Description

Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber
Technical field
The utility model relates to the flatirons with two sseparated vaporization chambers.
Background technique
Document US4091551 discloses a kind of flatiron comprising Heating body, the Heating body include main vaporization chamber and Second vaporization chamber, the main vaporization chamber are used for daily ironing, and second vaporization chamber is for obtaining additional steam.The master Vaporization chamber is supplied to liquid when starting specifically in user by automatic steam control component that the flatiron carries, and described second Vaporization chamber is supplied to liquid when user's starting is by the extra steam control unit that flatiron carries.
When automatic steam control component is enabled for generating steam in main vaporization chamber, this ironing equipment has very big (meaning is to start automatic steam control component in user and export between steam at steam outlet ports to have for the delay of steam output Have the process of one section of duration, the steam outlet ports are arranged on the ironing bottom plate of flatiron), which is likely to be breached several seconds Clock, this may be inconvenient source for the user.
Utility model content
The purpose of this utility model is that entirely or partly overcoming these defects.
Therefore, the technical issues of the utility model is based on is to provide a kind of ironing equipment, the knot of the ironing equipment Structure is simple and economical, and allows to reduce the delay of steam output simultaneously significantly.
For this purpose, the ironing equipment includes flatiron the utility model relates to a kind of ironing equipment, the flatiron includes heating Main body, the Heating body include main vaporization chamber and the second vaporization chamber, and the main vaporization chamber is used for daily ironing, and described second Vaporization chamber is obtained additional steam by punctually supply liquid, and the main vaporization chamber starts in user to be held by the flatiron It is supplied to liquid when the automatic steam control component of load, to obtain continuous steam stream, which is characterized in that second vaporization chamber exists The water of predetermined amount is supplied to when starting the automatic steam control component every time.
Therefore, ironing equipment according to the present utility model allows when user starts automatic steam control component every time, by liquid Body is injected into generate continuous steam stream in main vaporization chamber, and also allows for the liquid of predetermined amount being injected into the second steaming So that additional steam is automatically generated in hair room.
Therefore this configuration of the ironing equipment strongly limits the steam when starting each steam generation cycle The delay of output.
In addition, the amount for the water being injected into the second vaporization chamber in starting automatic steam control component every time is advantageously less (e.g., about 0.3 between 1.5g) on the one hand to avoid any risk for making the second vaporization chamber hold-up, another party Face ensures the quick generation of steam.
In addition the ironing equipment can have following one or more features, these features can be deposited individually or jointly In.
Embodiment according to the present utility model, the ironing equipment include liquid container and with the liquid container fluid The supply circuit of connection, the supply circuit are configured for when the automatic steam control component is activated as the main vaporization chamber Supply liquid.
Embodiment according to the present utility model, the supply circuit include blockage element, and the blockage element can hinder It is moved between plug position and supply position, in the closed position, the blockage element interrupts the liquid of the main vaporization chamber Supply, and in the supply position, the liquid from liquid container can be flowed towards the main vaporization chamber, the steam Control unit includes control section, and the control section connect with the blockage element and is configured for when the steam control The blockage element is moved in supply position when component processed is started by user.
Embodiment according to the present utility model, when user decontrols automatic steam control component, the blockage element is automatic Ground is brought into closed position.
Embodiment according to the present utility model, the translatable movement of blockage element.
Embodiment according to the present utility model, the supply circuit include the plunger carried by the flatiron, the column Plug includes blockage element.
Embodiment according to the present utility model, the plunger are dripping type plunger (boisseau goutte à goutte)。
Embodiment according to the present utility model, the supply circuit include electric pump, and the electric pump is configured for as institute Main vaporization chamber supply liquid is stated, the starting that the ironing equipment is configured to the automatic steam control component controls the electric pump Work.
Embodiment according to the present utility model, the ironing equipment include switch, such as microswitch (microrupteur), the switch is configured for controlling the power supply of the electric pump, and the automatic steam control component includes control Part, the control section are configured for when automatic steam control component is activated with switch cooperation to control the electricity The power supply of pump.
Embodiment according to the present utility model, the ironing equipment include supply pump, and the supply pump is configured for Liquid is supplied when the automatic steam control component is activated for second vaporization chamber.
Embodiment according to the present utility model, the supply pump are carried by the flatiron.
Embodiment according to the present utility model, the supply pump are manually supply pumps, such as piston pump (pompe à Piston), the automatic steam control component includes actuating section, and the actuating section is configured for when the automatic steam control component Starting belongs to the pump control unit of the supply pump when being activated.
Embodiment according to the present utility model, the flatiron include interface channel, and the interface channel is by the supply The liquid delivery outlet of pump is fluidly connected with second vaporization chamber.
Embodiment according to the present utility model, the flatiron include connecting component, and the connecting component is at least partly The interface channel is defined, the supply pump includes liquid reflux part, and the liquid reflux part is equipped with the delivery outlet And it is connected with the connecting component.
Embodiment according to the present utility model, the flatiron include shunting slot, and the shunting slot includes first end Portion part and the second end part, the first end part are led in the interface channel, and the second end part is led to In the main vaporization chamber, so that a part of the liquid flowed in the interface channel is divided to the main vaporization chamber.This A little settings especially allow to inject liquid at two different points of main vaporization chamber, and therefore allow to avoid the liquid of main vaporization chamber Body is saturated and ensures the better distribution of the steam of generation.In addition, by being arranged the outlet of the shunting slot described The near exit of main vaporization chamber can be further reduced the delay of steam output.
Embodiment according to the present utility model, the flatiron includes internal container, and the supply pump includes and institute State the liquid inlet handhole that internal container fluidly connects.
Embodiment according to the present utility model, the supply circuit include the internal container and fluid delivery catheter, The fluid delivery catheter fluidly connects the liquid container and the internal container.According to this embodiment, the liquid Body container can be therefore in the outside of flatiron.
Embodiment according to the present utility model, the internal container are fluidly connected with the main vaporization chamber.
Another embodiment according to the present utility model, the supply circuit include fluid delivery catheter, the fluid Delivery conduit includes the first end part fluidly connected with liquid container and the second end portion fluidly connected with main vaporization chamber Point.This embodiment according to the present utility model, the internal container and main vaporization chamber fluid isolation.
Implementation variation example according to the present utility model, the liquid container is in the outside of the flatiron, and the supply The liquid inlet handhole of pump is fluidly connected with the liquid container.
Embodiment according to the present utility model, the flatiron includes pressurized water container, and the ironing equipment is matched It sets for the water of the predetermined amount from the pressurized water container to be supplied the second vaporization chamber in starting automatic steam control component every time. The flatiron may include feed path and shut-off block, and the feed path is configured for connection pressurized water container and second and steams Room is sent out, the shut-off block (such as closing valve) can be movable between a closed position and a open position, in the closed position In, the shut-off block closes feed path, and in the open position, it is logical that the shut-off block at least partly discharges supply Road, the automatic steam control component are configured for moving closing element when the automatic steam control component is activated to open position Or control closing element is moved in open position.
Embodiment according to the present utility model, the supply pump is electric supply pump, and the ironing equipment is configured So as to the work of the starting control supply pump of the automatic steam control component.It is supplied to the amount for the water that pump is injected into the second vaporization chamber It can for example be adjusted according to the temperature of the second vaporization chamber.
Embodiment according to the present utility model, the flatiron include grip portions, and the automatic steam control component is mounted on On the grip portions.
Embodiment according to the present utility model, the automatic steam control component be automatic steam control pin key or automatic steam control by Button.
Embodiment according to the present utility model, the automatic steam control component can rest position and automatic steam control position it Between move, the automatic steam control component is configured for being moved to when it is started by user in automatic steam control position.
Embodiment according to the present utility model, the ironing equipment are configured to the automatic steam control component from idle The movement for being positioned against automatic steam control position leads to the starting of supply pump.Advantageously, ironing equipment is configured to automatic steam control Component leads to movement of the blockage element from closed position towards supply position from rest position towards the movement of automatic steam control position Or the starting of electric pump.
Embodiment according to the present utility model, the automatic steam control component are pivoted on rest position and automatic steam control Between position.
Embodiment according to the present utility model, the automatic steam control component include actuating section, control section and surround The installation section that pivot axis is pivotally mounted, the pivot axis are carried by the flatiron, and for example by the grip portions Carrying.
Embodiment according to the present utility model, the installation section are arranged between actuating section and control section.
Embodiment according to the present utility model, the automatic steam control component includes operation part, and the operation part is convex For the grip portions, and for example positioned at the lower section of the grip portions.
Embodiment according to the present utility model, the flatiron include stress element (organe de Sollicitation), the stress element is configured for the automatic steam control component towards rest position load.
Embodiment according to the present utility model, the ironing equipment further include base portion, during the stage is left unused in ironing, institute State flatiron setting on the base portion.
Embodiment according to the present utility model, the liquid container are integrated in the base portion.Advantageously, electric pump It is integrated in the base portion.
Embodiment according to the present utility model, flatiron include ironing bottom plate, the ironing bottom plate include ironing surface and At least one steam outlet ports, at least one described steam outlet ports lead in the ironing surface and with the main vaporization chamber It is fluidly connected with second vaporization chamber.
Embodiment according to the present utility model, the Heating body include heating element, and the heating element is configured For heating main vaporization chamber and the second vaporization chamber.Advantageously, heating element is also configured for heating ironing surface.
Embodiment according to the present utility model, the Heating body include casting, and the casting at least partly defines Main vaporization chamber and the second vaporization chamber.Advantageously, the heating element is integrated in the casting.
Embodiment according to the present utility model, the Heating body include the closing plate being shelved on the casting, institute Main vaporization chamber and the second vaporization chamber is stated to be defined by the casting and the closing plate.
Embodiment according to the present utility model, the Heating body include at least one laterally attached conduit, it is described extremely A few laterally attached conduit includes first end part and the second end part, and the first end part leads to described second In vaporization chamber, the second end part is led in the rear part of the main vaporization chamber.Advantageously, it is described at least one laterally connect Access slot road is laterally staggered relative to main vaporization chamber.
Embodiment according to the present utility model, the Heating body include two laterally attached conduits, described two sides Extend to connecting channel in the two sides of the main vaporization chamber, each connecting channel includes first end part and the second end portion Point, the first end part is led in second vaporization chamber, after the main vaporization chamber is led in the second end part In part.
Embodiment according to the present utility model, the flatiron include steam distribution circuit, and the steam distribution circuit will The main vaporization chamber and the second vaporization chamber are fluidly connected at least one described steam outlet ports, and by the main vaporization chamber and The steam stream that second vaporization chamber generates is intended to flow in the steam distribution circuit.Advantageously, the steam distribution circuit includes Two lateral distribution channels and the through hole being arranged on the casting, described two lateral distribution channels are in the main vaporization chamber Two sides extend and converge in the preceding part of the casting, on the one hand each through hole leads at least one lateral distributing trough In road, on the other hand lead on the lower surface of the casting.Advantageously, whole through holes are located at front end and the institute of the casting It states between the middle section of casting.
Embodiment according to the present utility model, second vaporization chamber have the volume less than main vaporization chamber.These set Set the steam output delay for further limiting ironing equipment.Advantageously, second vaporization chamber, which has, is less than 10mm3Body Product.
Embodiment according to the present utility model, second vaporization chamber are located at the front of the main vaporization chamber.
Embodiment according to the present utility model, the main vaporization chamber include main base wall, and second vaporization chamber Including the second base wall, second base wall is increased relative to the main base wall.
Embodiment according to the present utility model, the Heating body include the liquid fluidly connected with the supply circuit Injection opening, the liquid injection opening are led in the preceding part of the main vaporization chamber.These settings allow to inject liquid into Therefore allow to further decrease steaming at heating element, and on the point of the heat due to injecting liquid into ironing bottom plate The delay of vapour output.
Embodiment according to the present utility model, the flatiron include pedestal (talon), and flatiron can leave unused the stage in ironing Period shelves on the base.
Embodiment according to the present utility model, the ironing equipment include extra steam control unit, such as additional to steam Vapour control button, the extra steam control unit are carried by flatiron and are intended to be started by user, the ironing equipment quilt Configuration leads to the starting of supply pump so as to the starting of extra steam control unit, and for example leads to the starting for pumping control unit.
Embodiment according to the present utility model, the extra steam control unit are located on the grip portions of the flatiron Or near the grip portions of the flatiron.
Detailed description of the invention
Pass through the multiple specific of the ironing equipment referring to attached drawing given below shown by way of non-limiting examples The utility model will be best understood in the description of embodiment, in the accompanying drawings:
- Fig. 1 is the side view of the ironing equipment of first embodiment according to the present utility model;
- Fig. 2 is the perspective view of the flatiron of the ironing equipment of Fig. 1, and some of shells are removed;
- Fig. 3 is the exploded perspective view of the Heating body of the flatiron of Fig. 2.
- Fig. 4 is the top view of the casting of the Heating body of Fig. 3.
- Fig. 5 is the cross-sectional view of the flatiron of Fig. 2.
- Fig. 6 is the partial sectional view of the flatiron of second embodiment according to the present utility model.
- Fig. 7 is the partial sectional view of the flatiron of third embodiment according to the present utility model.
Specific embodiment
Fig. 1 to Fig. 5 shows the ironing equipment 2 of first embodiment according to the present utility model, and the ironing equipment 2 includes Flatiron 3 and base portion 4, the flatiron 3 can be shelved on the base 4 during the stage is left unused in ironing.The base portion 4 especially includes liquid Container 5, such as water container.
As shown in Figure 1 and Figure 5, the flatiron 3 include shell 7, the shell 7 especially include grip portions 8 and pedestal 9, The pedestal 9 is located in the rear part of shell 7, and the flatiron 3 can substantially vertically be shelved during the stage is left unused in ironing On the pedestal 9.
The flatiron 3 further includes ironing bottom plate 11, ironing surface 12 He of the ironing bottom plate 11 equipped with general planar Multiple steam outlet ports 13, the multiple steam outlet ports 13 are led in the ironing surface 12.
If Fig. 3 to Fig. 5 is shown more particularly, the flatiron 3 further includes the heating being integrated in the lower part of the shell 7 Main body 14, and the Heating body 14 and the ironing bottom plate 11 are thermally connected and are mechanically connected.The Heating body 14 includes Casting 15 and heating resistance element 16, the casting 15 are, for example, aluminum casting, and the heating resistance element 16 is manipulated into U-shaped simultaneously And it is integrated in the casting 15.
Heating body 14 further includes closing plate 17, main vaporization chamber 18 and the second vaporization chamber 19, the closing plate 17 to be shelved on On the casting 15, the main vaporization chamber 18 be flash evaporation type and be used for daily ironing and be intended to be supplied to liquid with Just continuous steam stream is obtained, second vaporization chamber 19 is also flash evaporation type and and is intended to punctually be supplied liquid To obtain additional steam stream.The main vaporization chamber 18 and the second vaporization chamber 19 are defined by the casting 15 and closing plate 17, And it is respectively configured for generating steam stream.The casting 15 especially includes partition 21, and the partition 21 rises until described Plate 17 is closed, the partition 21 laterally defines main vaporization chamber 18 and partly defines the second vaporization chamber 19.
According to the first embodiment of ironing equipment 2, second vaporization chamber 19 is located at the front of the main vaporization chamber 18 (and the top for being advantageously located at heating resistance element), and the second base wall 19.1 of second vaporization chamber 19 is relative to institute The main base wall 18.1 for stating main vaporization chamber 18 increases.Advantageously, the main base wall 18.1 and second base wall 19.1 are each From with multiple contacts (plots), the contact is, for example, pyramid, allows to increase the heat exchange of the main vaporization chamber 18 The heat exchange area of area and second vaporization chamber 19.
According to the first embodiment of ironing equipment 2, the Heating body 14 further includes the two of the main vaporization chamber 18 Two laterally attached conduits 22 that side extends.Each laterally attached conduit 22, which advantageously comprises, to lead in second vaporization chamber 19 First end part and lead to the second end part in the rear part of the main vaporization chamber 18.
The flatiron 3 further includes steam distribution circuit 23, and the steam distribution circuit 23 is by the casting 15 and the pass Closing plate 17 limits, and the main vaporization chamber 18 and the second vaporization chamber 19 are fluidly connected with steam outlet ports 13, so as in master The steam stream generated in vaporization chamber 18 and the second vaporization chamber 19 can flow to steam outlet ports 13.Advantageously, the steam point It include two lateral distribution channels 24 with circuit 23, described two lateral distribution channels 24 are prolonged in the two sides of the main vaporization chamber 18 It stretches, such as extends in the two sides of the laterally attached conduit 22, and converge in the front end of the Heating body 14.Each side It is advantageously led to distribution channel 24 in the rear part of main vaporization chamber 18, and for example leads to respective laterally attached conduit 22 Near the second end part.
The steam distribution circuit 23 further includes the through hole 25 being arranged on casting 15, each 25 1 side of through hole Face is led at least one lateral conduit 24, is on the other hand led on the lower surface of the casting 15, in the steam distribution cavity At 26, the steam distribution cavity 26 is found in Fig. 5, fluidly connects with the steam outlet ports 13 of the ironing bottom plate 11.Favorably Ground, whole through holes are all located between the front end of the casting 15 and the middle section of the casting 15.
According to Fig. 1 to first embodiment shown in fig. 5, the steam distribution circuit 23 includes that a through hole 25 is located at In at the preceding a quarter of the casting 15 and for example at the join domain of two lateral distribution channels 24, and also wrap Two through holes 25 are included to be each located in the center portion of corresponding lateral distribution channel 24.
The ironing equipment 2 further includes automatic steam control component 27, and the automatic steam control component 27 is carried simultaneously by the flatiron 3 And it is intended to manually be started by user.According to the first embodiment of ironing equipment 2, the automatic steam control component 27, which has, to be steamed The form of vapour control key.
Automatic steam control component 27 is more specifically mounted on the grip portions 8 of the flatiron 3.Advantageously, the steam control Component 27 processed includes operation part 27.1, and the operation part 27.1 protrudes from the grip portions 8, and for example positioned at described The lower section of grip portions 8.
According to the first embodiment of ironing equipment 2, the automatic steam control component 27 includes installation section 27.2, the peace Dress part 27.2 by the pivot axis 28 that the shell 7 carries around being pivotally mounted, so that the automatic steam control component 27 can be It is moved between rest position and automatic steam control position.The automatic steam control component 27 is more specifically configured for being used when it Person is moved in automatic steam control position when starting.
The ironing equipment 2 is advantageously configured to pivot of the automatic steam control component 27 towards automatic steam control position On the one hand the main vaporization chamber 18 is caused to be supplied to the liquid from liquid container 5 to generate continuous steam stream, another party Face causes second vaporization chamber 19 to be supplied to the water of predetermined amount.
The ironing equipment 2 further includes supply circuit, and the supply circuit fluidly connects and is configured with liquid container 5 For supplying liquid when the automatic steam control component 27 is started by user for the main vaporization chamber 18.
According to the first embodiment of ironing equipment 2, the supply circuit includes electric pump 29, the electric pump 29 and the liquid Body container 5 is fluidly connected and is configured for when the automatic steam control component 27 is started by user as the main vaporization chamber 18 supply liquid.The electric pump 29 is advantageously integrated in base portion 4, but may alternatively be integrated in flatiron 3.
Advantageously, the ironing equipment 2 include switch 31, such as microswitch, the switch 31 carried by flatiron 3 and It is configured for the power supply of the position control electric pump 29 according to automatic steam control component 27.Advantageously, the automatic steam control component 27 Including control section 27.3, the control section 27.3 is configured for when the automatic steam control component 27 is activated and switch 31 cooperations, to control the power supply of the electric pump 29.Therefore, the ironing equipment 2 is configured to automatic steam control component 27 Starting controls the work of the electric pump 29.
The supply circuit further includes fluid delivery catheter 32, the fluid delivery catheter 32 include first end part and The second end part, the first end part are fluidly connected with the liquid container 5 and the electric pump 29, the second end Part is fluidly connected with the main vaporization chamber 18 by liquid injection opening 33, and the liquid injection opening 33 is arranged in the pass On closing plate 17 and lead in the preceding part of the main vaporization chamber 18.
According to the first embodiment of ironing equipment 2, the ironing equipment 2 further includes the supply carried by the flatiron 3 Pump 34, the supply pump 34 are configured for when the automatic steam control component 27 is started by user as second vaporization chamber 19 supply liquid.
Advantageously, the supply pump 34 is manually such as piston pump, and the automatic steam control component 27 includes starting Part 27.4, the actuating section 27.4 are matched against the pump control unit 35 for belonging to supply pump 34, such as pump control head It sets for starting the pump control unit 35 when the automatic steam control component 27 is moved in automatic steam control position.Favorably Ground, the installation section 27.2 are arranged between the actuating section 27.4 and the control section 27.3.
It is described pump control unit 35 specifically in correspond to automatic steam control component 27 rest position first position and It is translatable movement between the second position corresponding to the automatic steam control position of automatic steam control component 27.Advantageously, described to press Bucket 3 includes stress element 36, such as stress spring, on the one hand the stress element 36 is configured for the pump control unit 35 towards first position load, on the other hand for by the automatic steam control component 27 towards the rest position load.
According to the first embodiment of ironing equipment 2, the flatiron 3 includes internal container 37 (being found in Fig. 5), and institute Stating 34 one side of supply pump includes the liquid inlet handhole (Fig. 1 is not shown into Fig. 5) fluidly connected with internal container 37, another party Face includes liquid reflux part 39, and the liquid reflux part 39 is equipped with liquid delivery outlet (Fig. 1 is not shown into Fig. 5), institute It states liquid delivery outlet and on the one hand passes through interface channel 41 and on the other hand by liquid injection hole 42 and second vaporization chamber 19 fluidly connect, and the interface channel 41 is for example, at least partly disposed in the connecting conduit closed on plate 17 and limits, described Liquid injection hole 42 is arranged on the closing plate 17 and leads in second vaporization chamber 19.
Therefore, the ironing equipment 2 is more specifically configured to the automatic steam control component 27 from rest position direction The mobile one side of automatic steam control position causes the supply pump 34 to be started by the actuating section 27.4, therefore leads to the second steaming The liquid supply of room 19 is sent out, and on the other hand the switch 31 is caused to be started by the control section 27.3, therefore cause to control The work of electric pump 29 processed, and the liquid of the main vaporization chamber 18 is therefore caused to supply.
Advantageously, the ironing equipment 2 further includes extra steam control unit 50 (as shown in Figure 1), such as extra steam Control button, the extra steam control unit 50 are carried by flatiron 3 and are intended to be started by user.Ironing equipment 2 has more The starting for being configured to body the extra steam control unit 50 leads to the starting of supply pump 34, and for example causes to pump control Movement of the component 35 from its first position towards its second position.The extra steam control unit 50 can be for example positioned at flatiron On the upper part of grip portions 8 or it is located near the grip portions 8.
Therefore the presence of this extra steam control unit 50 allows to ensure the supply of the second vaporization chamber 19 and not necessarily supplies To the main vaporization chamber 18.
Fig. 6 shows the ironing equipment 2 of second embodiment according to the present utility model, the difference with first embodiment It essentially consists in, the flatiron 3 includes shunting slot 43, and the shunting slot 43 includes first end part and the second end portion Point, the first end part is led in the interface channel 41, and the second end part is led in the main vaporization chamber 18, So as to being flowed in the interface channel 41 and be divided to the master by a part of liquid that the supply pump 34 flows back Vaporization chamber 18.
According to second of embodiment of ironing equipment 2, the fluid delivery conduit 32 leads to the internal container 37 In, and the main vaporization chamber 18 is fluidly connected with the internal container 37 by liquid injection opening 33.
The liquid inlet handhole 38 and the liquid delivery outlet 40 for belonging to supply pump 34 more specifically can on Fig. 6 See.
Fig. 7 shows the ironing equipment 2 of third embodiment according to the present utility model, the difference with first embodiment It essentially consists in, liquid container 5 is integrated in the shell of flatiron 3 and also forms internal container, and the supply circuit includes Instead of the plunger 44 of electric pump 29, the plunger 44 is carried by the shell 7 of flatiron 3, and for example, dripping type plunger.
The plunger 44 more specifically includes blockage element 45, such as obstruction bar, and the blockage element 45 can be in obstruction The translation activity between supply position is set, in the closed position, the blockage element 45 interrupts the main vaporization chamber 18 Liquid supply, in the supply position, the liquid from the liquid container 5 can be flowed towards the main vaporization chamber 18.Institute The control section 27.3 for stating automatic steam control component 27 is advantageously connect with blockage element 45, such as by way of articulated shaft 46, And it is configured for that the blockage element 45 is moved to supply position when the automatic steam control component 27 is started by user In setting.
According to the embodiments of the present invention not shown in the figure, flatiron 3 may include pressurized water container, feed path with And shut-off block, the feed path is configured for connection pressurized water container and the second vaporization chamber 19, the shut-off block are all Valve is for example closed, movable between a closed position and a open position, in the closed position, the shut-off block is closed Feed path, and in the open position, the shut-off block at least partly discharges feed path, the automatic steam control component 27 Then it is configured for moving closing element into open position when the automatic steam control component 27 is started by user or control Closing element processed is moved in open position.
According to the embodiments of the present invention not shown in the figure, the supply pump 34 can be electric supply pump, and institute Stating ironing equipment 2 may be configured so that the starting of automatic steam control component 27 controls the work of the supply pump 34.
According to the embodiments of the present invention not shown in the figure, the automatic steam control component can have to be held by flatiron 3 The form of the automatic steam control button of load.
Certainly, the utility model be only limitted to absolutely not it is given only in an example shown in and described embodiment. Can be still modified without departing from the protection scope of the utility model, especially in terms of the composition of different elements or Pass through technology equivalencing.

Claims (16)

1. ironing equipment (2), the ironing equipment (2) includes flatiron (3), and the flatiron (3) includes Heating body (14), described Heating body (14) includes main vaporization chamber (18) and the second vaporization chamber (19), and the main vaporization chamber (18) is used for daily ironing, And second vaporization chamber (19) is supplied liquid punctually to obtain additional steam, and the main vaporization chamber (18) makes It is supplied to liquid when user's starting is by automatic steam control component (27) that the flatiron (3) carry, to obtain continuous steam stream, It is characterized in that, second vaporization chamber (19) is supplied to predetermined amount when starting automatic steam control component (27) every time Water.
2. ironing equipment (2) according to claim 1, which is characterized in that the ironing equipment (2) includes liquid container (5) and with the liquid container (5) supply circuit fluidly connected, the supply circuit are configured for when the automatic steam control Liquid is supplied when component (27) is activated for the main vaporization chamber (18).
3. ironing equipment (2) according to claim 2, which is characterized in that the supply circuit includes blockage element (45), The blockage element (45) can move between closed position and supply position, in the closed position, the blockage element (45) the liquid supply for interrupting the main vaporization chamber (18) comes from the liquid of the liquid container (5) in the supply position It can be flowed towards the main vaporization chamber (18), the automatic steam control component (27) includes control section (27.3), the control unit Divide (27.3) to connect with the blockage element (45) and is configured for being opened when the automatic steam control component (27) by user The blockage element (45) is moved in supply position when dynamic.
4. ironing equipment (2) according to claim 3, which is characterized in that the supply circuit includes by the flatiron (3) The plunger (44) of carrying, the plunger (44) include blockage element (45).
5. ironing equipment (2) according to claim 2, which is characterized in that the supply circuit includes electric pump (29), described Electric pump (29) is configured for supplying liquid for the main vaporization chamber (18), and the ironing equipment (2) is configured to the steaming The starting of vapour control unit (27) controls the work of the electric pump (29).
6. ironing equipment (2) according to any one of claim 1 to 5, which is characterized in that ironing equipment (2) packet It includes supply pump (34), the supply pump (34) is configured for being described second when the automatic steam control component (27) is activated Vaporization chamber (19) supplies liquid.
7. ironing equipment (2) according to claim 6, which is characterized in that the supply pump (34) is held by the flatiron (3) It carries.
8. ironing equipment (2) according to claim 7, which is characterized in that the supply pump (34) is manually supply pump, The automatic steam control component (27) includes actuating section (27.4), and the actuating section (27.4) is configured for when the steam Starting belongs to the pump control unit (35) of the supply pump (34) when control unit (27) is activated.
9. ironing equipment (2) according to claim 6, which is characterized in that the flatiron (3) includes interface channel (41), The interface channel (41) fluidly connects the liquid delivery outlet (40) of the supply pump (34) and second vaporization chamber (19).
10. ironing equipment (2) according to claim 9, which is characterized in that the flatiron (3) includes shunting slot (43), The shunting slot (43) includes first end part and the second end part, and it is logical that the connection is led in the first end part In road (41), and the second end part is led in the main vaporization chamber (18), so as in the interface channel (41) A part of the liquid of flowing is divided to the main vaporization chamber (18).
11. ironing equipment (2) according to claim 6, which is characterized in that the flatiron (3) includes internal container (37), And the supply pump (34) includes the liquid inlet handhole (38) fluidly connected with the internal container (37).
12. ironing equipment (2) according to any one of claim 1 to 5, which is characterized in that the flatiron (3) includes holding Part (8) is held, the automatic steam control component (27) is mounted on the grip portions (8).
13. ironing equipment (2) according to any one of claim 1 to 5, which is characterized in that the automatic steam control component It (27) is automatic steam control pin key or automatic steam control button.
14. ironing equipment (2) according to any one of claim 1 to 5, which is characterized in that the automatic steam control component (27) it can be moved between rest position and automatic steam control position, the automatic steam control component (27) is configured for being made when it User is moved in automatic steam control position when starting.
15. ironing equipment (2) according to claim 14, which is characterized in that the automatic steam control component (27) pivots peace Between rest position and automatic steam control position.
16. ironing equipment (2) according to any one of claim 1 to 5, which is characterized in that the ironing equipment (2) is also Including base portion (4), during the stage is left unused in ironing, the flatiron (3) is arranged on the base portion (4).
CN201822073319.3U 2017-12-11 2018-12-11 Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber Active CN209568296U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1761953 2017-12-11
FR1761953A FR3074816B1 (en) 2017-12-11 2017-12-11 IRONING APPARATUS WITH MAIN AND SECONDARY VAPORIZATION CHAMBERS

Publications (1)

Publication Number Publication Date
CN209568296U true CN209568296U (en) 2019-11-01

Family

ID=61258417

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201822073319.3U Active CN209568296U (en) 2017-12-11 2018-12-11 Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber
CN201811510636.5A Active CN109972374B (en) 2017-12-11 2018-12-11 Ironing appliance equipped with a primary evaporation chamber and a secondary evaporation chamber

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201811510636.5A Active CN109972374B (en) 2017-12-11 2018-12-11 Ironing appliance equipped with a primary evaporation chamber and a secondary evaporation chamber

Country Status (4)

Country Link
EP (1) EP3724393B1 (en)
CN (2) CN209568296U (en)
FR (1) FR3074816B1 (en)
WO (1) WO2019115895A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972374A (en) * 2017-12-11 2019-07-05 Seb公司 Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber
CN110685140A (en) * 2019-11-22 2020-01-14 沙洲职业工学院 Self-heating steam iron

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4091551A (en) 1976-10-28 1978-05-30 General Electric Company Extra capacity steam iron
FR2740787B1 (en) * 1995-11-03 1999-06-11 Moulinex Sa STEAM IRON
DE19614511C1 (en) * 1996-04-12 1997-01-23 Rowenta Werke Gmbh Steam iron station
DE20013529U1 (en) * 2000-08-05 2000-10-19 Eugster/Frismag Ag, Romanshorn Steam ironing system with a stationary steam generator
WO2005080664A1 (en) * 2004-01-29 2005-09-01 Euro-Pro Operating, Llc Steam iron fitted with an extra steam chamber
ES2350143B1 (en) * 2008-07-30 2011-11-16 Bsh Krainel, S.A STEAM IRONING FLOOR DEVICE AND STEAM IRONING DEVICE
CN201473800U (en) * 2009-05-26 2010-05-19 漳州灿坤实业有限公司 Electric steam iron
US9200403B2 (en) * 2014-03-13 2015-12-01 Hamilton Beach Brands, Inc. Gravity-fed combined iron and steamer
FR3074816B1 (en) * 2017-12-11 2019-11-01 Seb S.A. IRONING APPARATUS WITH MAIN AND SECONDARY VAPORIZATION CHAMBERS

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972374A (en) * 2017-12-11 2019-07-05 Seb公司 Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber
CN109972374B (en) * 2017-12-11 2022-11-01 Seb公司 Ironing appliance equipped with a primary evaporation chamber and a secondary evaporation chamber
CN110685140A (en) * 2019-11-22 2020-01-14 沙洲职业工学院 Self-heating steam iron

Also Published As

Publication number Publication date
FR3074816A1 (en) 2019-06-14
WO2019115895A1 (en) 2019-06-20
CN109972374A (en) 2019-07-05
FR3074816B1 (en) 2019-11-01
CN109972374B (en) 2022-11-01
EP3724393A1 (en) 2020-10-21
EP3724393B1 (en) 2021-10-27

Similar Documents

Publication Publication Date Title
CN209568296U (en) Equipped with the ironing equipment of main vaporization chamber and the second vaporization chamber
US3599357A (en) Electric pressing iron
RU2346094C2 (en) Iron
JP2010512905A (en) Equipment for supplying superheated water
US9624620B2 (en) Gravity-fed combined iron and steamer
US7603800B2 (en) Iron with a vertical crease-smoothing function
US9273426B2 (en) Ironing system with iron provided with supplementary water tank
TW201703678A (en) Steaming hairdressing comb
US1843568A (en) Electric steam iron
CN206245102U (en) A kind of hand-held Garment Steamer Machine
JP4667188B2 (en) Steam iron
US20230313443A1 (en) Hybrid steamer iron assembly
JP5035758B2 (en) Steam iron
CN202925351U (en) Steam and dry iron with hairbrush
US4149328A (en) Steam iron
CN201339136Y (en) Integrative secondary-vaporization electric steam iron
JP7236661B2 (en) steam jets and steam irons
KR20100120349A (en) Electric steam iron
JP2011030717A (en) Steam iron
JPS6323800B2 (en)
US10053814B2 (en) Iron with steam channels and textured soleplate
JP3820671B2 (en) Spray iron
KR101420372B1 (en) Steam iron injection device
SU149386A1 (en) Upper pillow for ironing press
JPS5875600A (en) Steam iron

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant