CN209562011U - Vertical arrangement of 10kV overhead lines with load to replace switchgear on pole - Google Patents
Vertical arrangement of 10kV overhead lines with load to replace switchgear on pole Download PDFInfo
- Publication number
- CN209562011U CN209562011U CN201920063018.4U CN201920063018U CN209562011U CN 209562011 U CN209562011 U CN 209562011U CN 201920063018 U CN201920063018 U CN 201920063018U CN 209562011 U CN209562011 U CN 209562011U
- Authority
- CN
- China
- Prior art keywords
- line
- cross
- shunt
- arm
- shunt line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009413 insulation Methods 0.000 claims description 15
- 230000005540 biological transmission Effects 0.000 claims 8
- 239000012212 insulator Substances 0.000 claims 2
- 230000002146 bilateral effect Effects 0.000 claims 1
- 230000037237 body shape Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 14
- 238000009826 distribution Methods 0.000 abstract description 12
- 230000000712 assembly Effects 0.000 abstract 1
- 238000000429 assembly Methods 0.000 abstract 1
- 238000007789 sealing Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000016507 interphase Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型涉及配电网带电作业技术领域,尤其涉及垂直排列10kV架空线路带负荷更换柱上开关装置。包括分流线横担固定架、分流线组件以及绝缘操作杆;多组所述分流线组件固定在分流线横担固定架上,分流线组件包括分流线主管与软高压线,分流线主管两端各连接一根软高压线,软高压线一端与分流线主管相连,另一端与高压线相连;所述分流线横担固定架固定在横担上,分流线横担固定架与绝缘操作杆适配,分流线横担固定架通过绝缘操作杆固定在横担上。本用新型实现绝缘杆作业法完成分流,减少遮蔽作业量,大幅度减少作业时间和劳动强度,减少停电范围和时间。
The utility model relates to the technical field of live work in a power distribution network, in particular to a vertically arranged 10kV overhead line load replacement switch device on a pole. It includes a diversion line cross-arm fixing frame, a diversion line assembly and an insulating operating rod; multiple sets of the diversion line assemblies are fixed on the diversion line cross-arm fixing frame, and the diversion line assembly includes a diversion line main pipe and a soft high-voltage line, Both ends of the main pipe of the shunt line are respectively connected with a soft high-voltage wire, one end of the soft high-voltage wire is connected with the main pipe of the shunt line, and the other end is connected with the high-voltage wire; The bracket is adapted to the insulating operating rod, and the shunt line cross-arm fixing frame is fixed on the cross-arm through the insulating operating rod. The utility model realizes the shunting of the insulating rod operation method, reduces the amount of shielding work, greatly reduces the operation time and labor intensity, and reduces the scope and time of power outages.
Description
技术领域technical field
本实用新型涉及配电网带电作业技术领域,尤其涉及垂直排列10kV架空线路带负荷更换柱上开关装置。The utility model relates to the technical field of live work in a power distribution network, in particular to a vertically arranged 10kV overhead line load replacement switch device on a pole.
背景技术Background technique
随着人们物质文化生活水平的不断提高,对稳定电力的供应越来越有依赖,对于停电时间的长度容忍程度越来越低。10千伏配电作业中,在线路改造中的更换柱上开关在各种作业中耗费时间较长,属于关健线路上的关健工序,缩短这个工序的作业时间有着显著的经济效益和社会效益。在现有的作业中,对于垂直排列线路的带负荷更换柱上开关作业,没有有效的办法固定分流的绝缘引流线,导致引流线无法与临相的导线保持有效的安全距离。With the continuous improvement of people's material and cultural living standards, they are more and more dependent on the stable power supply, and their tolerance for the length of power outages is getting lower and lower. In the 10 kV power distribution operation, the replacement of the column switch in the line reconstruction takes a long time in various operations, which belongs to the key process on the key line. Shortening the operation time of this process has significant economic benefits and social benefits. benefit. In the existing operation, there is no effective way to fix the shunted insulated drain wire for the load-loaded switch switch operation of vertically arranged lines, resulting in the inability of the drain wire to maintain an effective safe distance from the adjacent phase conductors.
国内申请号为2016108081862的实用新型专利公开了“一种10KV线路绝缘杆间接旁路带电更换柱上开关作业方法”,包括以下步骤:S1、搭设临时作业平台;S2、位于临时作业平台的顶部安装跌落式刀闸横担,且固定旁路电缆横担;S3、测量每相跌落式刀闸的桩头与其对应的导线之间的距离,并根据距离制作三根支线引线;S4、将绝缘遮蔽罩放置于两边相导线上,以避免在搭接中相引线时,两边相导线与中相引线相接触;S5、将三相引线安装于对应的跌落式刀闸的桩头;S6、搭接中相引线,并拆除绝缘遮蔽罩;S7、搭接两边相引线,并设置跌落绝缘遮蔽挡板。采用如上步骤,能够有效实现负荷侧临时平台作业点的作业过程,并且可以规范负荷侧的作业过程,降低生产事故,提高检修效率。该专利中虽然公开了若干步骤,但未给出相关绝缘引流线的具体结构,而绝缘引流线的结构对提高带负荷更换柱上开关作业效率和减少劳动强度具有更实际的意义,属于核心技术。The utility model patent with the domestic application number of 2016108081862 discloses "a 10KV line insulation rod indirect bypass live replacement operation method for the switch on the pole", including the following steps: S1, erecting a temporary working platform; S2, installing on the top of the temporary working platform Drop-out knife switch cross-arm, and fix bypass cable cross-arm; S3, measure the distance between the pile head of each phase drop-type knife switch and the corresponding wire, and make three branch lead wires according to the distance; S4, put the insulation shield Place it on the phase wires on both sides to avoid contact between the phase wires on both sides and the middle phase lead wire when lapping the middle phase lead wire; S5. Install the three-phase lead wire on the pile head of the corresponding drop-type knife switch; S6. Phase leads, and remove the insulation shielding cover; S7. Lap the phase leads on both sides, and set the drop insulation shielding baffle. By adopting the above steps, the operation process of the temporary platform operation point on the load side can be effectively realized, and the operation process on the load side can be standardized, production accidents can be reduced, and maintenance efficiency can be improved. Although the patent discloses several steps, it does not give the specific structure of the relevant insulated drain wires, and the structure of the insulated drain wires has more practical significance for improving the efficiency of the switch on the pole replacement with load and reducing labor intensity, which belongs to the core technology .
实用新型内容Utility model content
为了克服上述现有技术的不足,本实用新型提供一种垂直排列10kV架空线路带负荷更换柱上开关装置,实现绝缘杆作业法完成分流,减少遮蔽作业量,大幅度减少作业时间和劳动强度,减少停电范围和时间。In order to overcome the deficiencies of the above-mentioned prior art, the utility model provides a vertically arranged 10kV overhead line load replacement switchgear on the pole, which realizes the shunting of the insulating pole operation method, reduces the amount of shielding work, and greatly reduces the operation time and labor intensity. Reduce the scope and duration of outages.
为了达到上述目的,本实用新型采用以下技术方案实现:In order to achieve the above object, the utility model adopts the following technical solutions to realize:
垂直排列10kV架空线路带负荷更换柱上开关装置,包括分流线横担固定架、分流线组件以及绝缘操作杆;多组所述分流线组件固定在分流线横担固定架上,分流线组件包括分流线主管与软高压线,分流线主管两端各连接一根软高压线,软高压线一端与分流线主管相连,另一端与高压线相连;所述分流线横担固定架固定在横担上,分流线横担固定架与绝缘操作杆适配,分流线横担固定架通过绝缘操作杆固定在横担上。Vertically arrange the 10kV overhead line with load to replace the switchgear on the pole, including the cross-arm fixing frame of the shunt line, the shunt line assembly and the insulating operating rod; multiple sets of the shunt line assembly are fixed on the cross-arm fixing frame of the shunt line, The shunt line assembly includes a shunt line supervisor and a soft high-voltage line. Both ends of the shunt line supervisor are connected to a soft high-voltage line. One end of the soft high-voltage line is connected to the shunt line supervisor, and the other end is connected to the high-voltage line; The frame is fixed on the cross arm, the shunt line cross arm fixing frame is adapted to the insulating operating rod, and the shunting line cross arm fixing frame is fixed on the cross arm through the insulating operating rod.
所述分流线横担固定架包括分流线支撑管、分流线座、绝缘封门卡、卡位箍、横担绝缘勾、横担联板卡件、螺丝顶杆以及顶块;分流线座、卡位箍以及横担绝缘勾依次固定在分流线支撑管上。The cross-arm fixing frame of the distribution line includes a support pipe for the distribution line, a seat for the distribution line, an insulating door sealing card, a clamping hoop, an insulating hook for the cross-arm, a clamp for connecting the cross-arm, a screw ejector rod and a top block; The wire seat, the clip hoop and the cross-arm insulation hook are sequentially fixed on the shunt wire support pipe.
所述横担绝缘勾下部左右对称各设有一个钩体,钩体形状与横担适配。The lower part of the insulating hook of the cross arm is symmetrically provided with a hook body, and the shape of the hook body is adapted to the cross arm.
所述绝缘封门卡安装在分流线座上;所述横担联板卡件固定在卡位箍上,螺丝顶杆安装在横担联板卡件上,顶块固定在螺丝顶杆上。The insulating door sealing card is installed on the shunt wire seat; the cross-arm joint plate clamp is fixed on the clip hoop, the screw jack is installed on the cross-arm joint plate clamp, and the top block is fixed on the screw jack.
所述分流线组件还包括定位环、管套、分流线伸缩管、分流线夹挂环以及分流线夹;所述分流线伸缩管通过管套与分流线主管相连,分流线伸缩管与分流线主管之间为承插伸缩结构。The shunt line assembly also includes a positioning ring, a pipe sleeve, a shunt line telescopic tube, a shunt line clip hanging ring and a shunt line clip; There is a socket telescopic structure between the streamline telescopic pipe and the diversion line main pipe.
所述分流线夹包括C形线夹头、V形顶块和顶杆螺栓,V形顶块置于顶杆螺栓端部,顶杆螺栓与C形线夹头相连接,V形顶块与C形线夹头之间形成容纳高压线的夹持空间。The shunt clamp includes a C-shaped line clamp, a V-shaped jacking block and a jack bolt, the V-shaped jacking block is placed at the end of the jacking pin bolt, the jacking bolt is connected with the C-shaped line chuck, and the V-shaped jacking block A clamping space for high-voltage wires is formed between the C-shaped wire clamps.
所述软高压线一端与分流线伸缩管相连,另一端与分流线夹相连,分流线夹挂环与分流线夹相连。One end of the flexible high-voltage line is connected to the telescopic tube of the diversion line, the other end is connected to the diversion line clip, and the hanging ring of the diversion line clip is connected to the diversion line clip.
所述分流线夹挂环为U型,分流线夹挂环挂在分流线主管或分流线伸缩管上。The shunt wire clamp hanging ring is U-shaped, and the shunt wire clip hanging ring is hung on the shunt line main pipe or the shunt line telescopic tube.
一种垂直排列10kV架空线路带负荷更换柱上开关的方法,具体包括如下步骤:A method for vertically arranging 10kV overhead lines with load to replace switches on poles, specifically comprising the following steps:
1)将分流线横担固定架安装于垂直排列线路的中间层横担上,使其通过横担联板卡件与横担相连接,分流线横担固定架上的横担绝缘勾与横担卡紧定位,横担绝缘勾的勾持力相对横担联板卡件做为支点与分流线横担固定架上另一侧的三组分流线组件的重力相平衡;1) Install the cross-arm fixing frame of the distribution line on the cross-arm of the middle layer of the vertically arranged line, so that it is connected with the cross-arm through the cross-arm connecting plate clamp, and the cross-arm insulation hook on the cross-arm fixing frame of the shunt line Clamped and positioned with the cross-arm, the hooking force of the cross-arm insulation hook is used as a fulcrum to balance the gravity of the three-component streamline assembly on the other side of the cross-arm fixture on the cross-arm;
2)将三组分流线组件分别装入到分流线横担固定架上的三个分流线座中,分流线主管由绝缘封门卡封住;2) Install the three-component flow line assembly into the three distribution line seats on the cross-arm fixing frame of the distribution line respectively, and the main pipe of the distribution line is sealed by an insulating sealing door;
3)分别从三组分流线组件两端向三相高压线中的上线、中线、下线引出三对软高压线,软高压线的端部由分流线夹与对应高压线相连接。3) Lead three pairs of soft high-voltage lines from both ends of the three-component streamline assembly to the upper line, middle line, and lower line of the three-phase high-voltage line. The ends of the soft high-voltage lines are connected to the corresponding high-voltage lines by shunt clamps.
步骤三中分别从三组分流线组件两端向三相高压线中的上线、中线、下线引出三对软高压线,分流线横担固定架上最靠近电杆的分流线组件对应连接上线高压线,分流线横担固定架上最远离电杆的分流线组件对应连接下线高压线,分流线横担固定架上位置居中的分流线组件对应连接中线高压线。In step 3, lead three pairs of soft high-voltage wires from both ends of the three-component flow line assembly to the upper line, middle line, and lower line of the three-phase high-voltage line. For the upper-line high-voltage line, the shunt line assembly farthest from the pole on the cross-arm fixing frame of the shunt line is correspondingly connected to the high-voltage line of the lower line, and the shunt line assembly in the middle of the cross-arm fixing frame of the shunt line is correspondingly connected to the high-voltage line of the middle line.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
1)分流线横担固定架能够用绝缘杆作业法安装与拆卸,分流线组件的载流能力满足作业要求,并具有足够的机械强度,可使用射枪操作杆勾住操作环的方式旋拧操作机构,结构简单,操作方便;1) The cross-arm fixing frame of the shunt line can be installed and disassembled by the insulating rod operation method. The current carrying capacity of the shunt line assembly meets the operation requirements and has sufficient mechanical strength. The method of hooking the operating ring with the gun operating rod can be used Screw operating mechanism, simple structure, easy to operate;
2)可节省作业时间30%,提高了工作效率,保证了作业的安全性,劳动强度低;2) It can save 30% of operation time, improve work efficiency, ensure the safety of operation, and reduce labor intensity;
3)可针对各种作业现场进行拆卸组合,通用性及适用性强,小负荷线路可不使用旁路负荷开关进行旁路系统的接入与断开,充分保证旁路系统三相引流线的相间距离,旁路引流线便于携带等目标。3) It can be disassembled and assembled for various job sites, with strong versatility and applicability. The bypass load switch can be used for the connection and disconnection of the bypass system for small load lines, fully ensuring the interphase of the three-phase drainage lines of the bypass system distance, the bypass drain line is easy to carry and other goals.
附图说明Description of drawings
图1是本实用新型结构示意及工作状态主视图;Fig. 1 is a schematic view of the structure of the utility model and a front view of the working state;
图2是本实用新型结构示意及工作状态侧视图;Fig. 2 is a schematic view of the structure of the utility model and a side view of the working state;
图3是本实用新型结构示意及工作状态俯视图;Fig. 3 is a schematic view of the structure of the utility model and a top view of the working state;
图4是本实用新型分流线横担固定架结构示意图;Fig. 4 is a structural schematic diagram of the cross-arm fixing frame of the diversion line of the present invention;
图5是本实用新型分流线组件结构示意图;Fig. 5 is a structural schematic diagram of the shunt assembly of the utility model;
图6是本实用新型分流线夹结构示意图;Fig. 6 is a structural schematic diagram of the utility model shunt wire clip;
图7是本实用新型绝缘操作杆结构示意图;Fig. 7 is a schematic diagram of the structure of the insulating operating rod of the present invention;
图8是本实用新型横担绝缘勾结构示意图。Fig. 8 is a structural schematic diagram of the cross-arm insulation hook of the utility model.
图中:1-电杆,2-高压线,3-柱上开关,4-分流线横担固定架,5-分流线组件,6-横担,7-紧固杆管,8-摇臂,9-内六角头,10-铰接螺钉,11-把手,41-分流线支撑管,42-分流线座,43-绝缘封门卡,44-卡位箍,45-横担绝缘勾,46-横担联板卡件,47-螺丝顶杆,48-顶块,51-分流线主管,52-定位环,53-管套,54-分流线伸缩管,55-分流线夹挂环,56-软高压线,57-分流线夹,571-C形线夹头,572-V形顶块,573-顶杆螺栓,451-钩体。In the figure: 1-electric pole, 2-high voltage line, 3-column switch, 4-shunting line cross-arm fixing frame, 5-shunting line assembly, 6-cross arm, 7-fastening rod tube, 8-shake Arm, 9-Inner hexagon head, 10-Hinge screw, 11-Handle, 41-Shunt line support tube, 42-Shunt line seat, 43-Insulation sealing card, 44-Clamp hoop, 45-Crossarm insulation hook , 46-Cross-arm connecting plate clip, 47-Screw ejector rod, 48-Top block, 51-Shunt line supervisor, 52-Location ring, 53-Sleeve, 54-Shunt line expansion tube, 55-Shunt Wire clip hanging ring, 56-soft high-voltage wire, 57-shunt wire clip, 571-C-shaped wire chuck, 572-V-shaped top block, 573-ejector bolt, 451-hook body.
具体实施方式Detailed ways
下面结合附图对本实用新型的具体实施方式作进一步说明:The specific embodiment of the utility model will be further described below in conjunction with accompanying drawing:
如图1至图4所示,垂直排列10kV架空线路带负荷更换柱上开关装置,包括分流线横担固定架4、分流线组件5以及绝缘操作杆。As shown in Figures 1 to 4, the pole-mounted switchgear is replaced with load on a vertically arranged 10kV overhead line, including a shunt line cross-arm fixing frame 4, a shunt line assembly 5, and an insulating operating rod.
分流线组件5共有三组,分流线组件5包括分流线主管51和软高压线56,分流线主管51的两端各连接有一根软高压线56,软高压线的一端连接分流线主管51,软高压线的另一端通过分流线夹57连接相应高压线2。There are three sets of shunt line assembly 5, shunt line assembly 5 includes shunt line supervisor 51 and soft high-voltage wire 56, two ends of shunt line supervisor 51 are respectively connected with a soft high-voltage wire 56, and one end of soft high-tension line is connected with shunt line supervisor 51. The other end of the soft high-voltage wire is connected to the corresponding high-voltage wire 2 through a shunt clip 57.
分流线组件5上与分流线横担固定架4相连接处设有工字形的定位环52;定位环52与分流线横担固定架上的分流线座42匹配,分流线座42上设有绝缘封门卡43,以防止分流线脱落。An I-shaped locating ring 52 is provided at the junction of the shunt wire assembly 5 and the shunt wire cross-arm fixing frame 4; The seat 42 is provided with an insulating sealing card 43 to prevent the shunt line from falling off.
分流线横担固定架4与横担6通过横担联板卡件46相连接,横担联板卡件46上连接螺丝顶杆47,顶块48设于螺丝顶杆47的一端,螺丝顶杆47与绝缘操作杆端部的内六角套筒相配套,用于调节顶块48的位置,横担联板卡件46与顶块48之间形成能卡住横担6的卡接形状,实现分流线横担固定架4与横担6夹紧或松开。The cross-arm fixing frame 4 of the shunt line is connected with the cross-arm 6 through the cross-arm connecting board clip 46, the cross-arm connecting board clip 46 is connected with the screw ejector rod 47, and the top block 48 is arranged at one end of the screw ejector rod 47, and the screw The push rod 47 is matched with the inner hexagonal sleeve at the end of the insulating operating rod, and is used to adjust the position of the top block 48, and a clamping shape capable of clamping the cross arm 6 is formed between the cross-arm connecting plate clip 46 and the top block 48 , to realize the clamping or loosening of the cross-arm fixing frame 4 and the cross-arm 6 of the shunt line.
分流线主管51的端部设有U形的分流线夹挂环55,数量为2个,左右各1个,用于非工作状态时,分流线夹57的固定之用。本实用新型用于垂直排列10kV架空线路带负荷更换柱上开关时使用,当需要带负荷更换柱上开关3时,用分流线形成旁路,能充分保证旁路系统三相引流线的相间距离,减少绝缘遮蔽量。The end of the shunt line main pipe 51 is provided with a U-shaped shunt wire clip hanging ring 55, the quantity is 2, each one on the left and right, and is used for fixing the shunt wire clip 57 during the non-working state. The utility model is used for vertically arranging 10kV overhead lines with load to replace the switch on the column. When it is necessary to replace the switch 3 on the column with load, the shunt line is used to form a bypass, which can fully ensure the phase interval of the three-phase drainage line of the bypass system. distance, reducing the amount of insulation shielding.
见图5,分流线主管51两侧还可以设有分流线伸缩管54,分流线伸缩管54与分流线主管51之间通过管套53相连接,分流线伸缩管54与分流线主管51之间为承插伸缩结构。这是一种长度可扩展的形式,在分流线伸缩管54的端部设有U形的分流线夹挂环55,用于非工作状态时,分流线夹57的固定之用。See Fig. 5, diversion line main pipe 51 both sides can also be provided with diversion line telescopic pipe 54, the diversion line telescopic pipe 54 is connected with the diversion line main pipe 51 by pipe sleeve 53, the diversion line telescopic pipe 54 and Between the branch line main pipes 51 is a socket telescopic structure. This is a form with an expandable length. A U-shaped shunt clip hanging ring 55 is provided at the end of the shunt wire telescopic tube 54 for fixing the shunt wire clip 57 in a non-working state.
见图6,分流线夹57包括C形线夹头571、V形顶块572和顶杆螺栓573,V形顶块572设于顶杆螺栓573的端部,顶杆螺栓573与C形线夹头571相连接,V形顶块572与C形线夹头571之间形成容纳高压线2的夹持空间,该结构夹持力可调,保证带负荷接触良好。As shown in Fig. 6, the shunt clamp 57 includes a C-shaped clamp head 571, a V-shaped top block 572 and a jack bolt 573. The wire clamps 571 are connected, and a clamping space for accommodating the high-voltage wire 2 is formed between the V-shaped top block 572 and the C-shaped clamp 571. The clamping force of this structure is adjustable to ensure good contact with load.
见图7,绝缘操作杆由紧固杆管7以及其一端的内六角头9和另一端的摇臂8组成,摇臂8与把手11通过铰接螺钉10相连接。其内六角头9与横担联板卡件46上的螺丝顶杆47配套使用,可针对各种作业现场进行拆卸组合,通用性及适用性强。See FIG. 7 , the insulating operating rod is made up of a fastening rod tube 7 , an inner hexagon head 9 at one end and a rocker 8 at the other end, and the rocker 8 is connected with the handle 11 through a hinge screw 10 . Its inner hexagon head 9 is used in conjunction with the screw ejector rod 47 on the cross-arm connecting board clip 46, which can be disassembled and assembled for various job sites, and has strong versatility and applicability.
见图8,分流线横担固定架4与横担6之间设有横担绝缘勾45,横担绝缘勾下部左右对称各设有一个钩体451,钩体形状与横担6钢材下缘形状匹配。As shown in Fig. 8, a cross-arm insulating hook 45 is provided between the shunt line cross-arm fixing frame 4 and the cross-arm 6, and a hook body 451 is respectively arranged symmetrically on the lower part of the cross-arm insulating hook. Edge shape matches.
本实用新型的工作过程如下:The working process of the present utility model is as follows:
1)将分流线横担固定架4安装于垂直排列线路的中间层横担6上,使其通过横担联板卡件46与横担钢材相连接,分流线横担固定架4上的横担绝缘勾45与横担6钢材卡紧定位,横担绝缘勾45的勾持力相对横担联板卡件46做为支点与分流线横担固定架4上另一侧的三组分流线组件5的重力保持力的平衡。1) Install the cross-arm fixing frame 4 of the distribution line on the cross-arm 6 of the middle layer of the vertically arranged line, so that it is connected with the steel material of the cross-arm through the cross-arm connecting plate clamp 46, and the cross-arm fixing frame 4 of the distribution line The cross-arm insulating hook 45 and the cross-arm 6 steel materials are clamped and positioned, and the hooking force of the cross-arm insulating hook 45 is used as a fulcrum relative to the cross-arm connecting plate clip 46 and the three parts on the other side of the cross-arm fixing frame 4 of the shunt line. The gravity of the component flow line assembly 5 maintains the balance of forces.
2)将三组分流线组件5分别装入到分流线横担固定架4上的三个分流线座42中,分流线组件5由绝缘封卡门43封住,分流线座42能保证三根分流线的间距满足绝缘要求;2) Put the three-component flow line assembly 5 into the three shunt wire holders 42 on the shunt wire cross-arm fixing frame 4 respectively, the shunt wire assembly 5 is sealed by the insulating sealing door 43, and the shunt wire holder 42 can ensure that the spacing of the three shunt lines meets the insulation requirements;
3)分别从三组分流线组件5两端向三相高压线2中的上线、中线、下线引出三对软高压线56,软高压线的端部由分流线夹57与对应高压线2相连接,分流线横担固定架4上最靠近电杆1的分流线组件5对应连接上线高压线,分流线横担固定架4上最远离电杆1的分流线组件5对应连接下线高压线,分流线横担固定架上位置居中的分流线组件5对应连接中线高压线。该配置实现了绝缘杆作业法完成带负荷更换柱上开关时的分流目的,减少了遮蔽作业量,显著减少了停电范围和时间。3) Lead three pairs of soft high-voltage lines 56 from both ends of the three-component streamline assembly 5 to the upper line, middle line, and lower line of the three-phase high-voltage line 2, and the ends of the soft high-voltage lines are connected to the corresponding high-voltage lines 2 by shunt clamps 57 , the shunt line assembly 5 closest to the electric pole 1 on the shunt line cross-arm fixing frame 4 is correspondingly connected to the upper line high-voltage line, and the shunt line assembly 5 on the shunt line cross-arm fixing frame 4 farthest from the electric pole 1 is correspondingly connected to the down line The high-voltage line and the shunt line are connected to the high-voltage line of the middle line correspondingly to the shunt line assembly 5 located in the center on the cross-arm fixing frame. This configuration realizes the purpose of shunting when the switch on the pole is replaced with load by the insulating pole operation method, reduces the amount of shielding work, and significantly reduces the scope and time of power outages.
本实用新型分流线横担固定架4能够用绝缘杆作业法安装与拆卸,分流线组件5的载流能力满足作业要求,并具有足够的机械强度,可使用射枪操作杆勾住操作环的方式旋拧操作机构,结构简单,操作方便。可节省作业时间30%,提高了工作效率,保证了作业的安全性,劳动强度低;可针对各种作业现场进行拆卸组合,通用性及适用性强,小负荷线路可不使用旁路负荷开关进行旁路系统的接入与断开,充分保证旁路系统三相引流线的相间距离,旁路引流线便于携带等目标。The diversion line cross-arm fixing frame 4 of the utility model can be installed and disassembled by the insulating rod operation method, the current carrying capacity of the diversion line assembly 5 meets the operation requirements, and has sufficient mechanical strength, and can be hooked and operated by the gun operating lever. The operating mechanism is screwed in the form of a ring, which is simple in structure and easy to operate. It can save operation time by 30%, improve work efficiency, ensure the safety of operation, and have low labor intensity; it can be disassembled and combined for various operation sites, with strong versatility and applicability, and the small load line can be operated without the bypass load switch The connection and disconnection of the bypass system fully guarantee the phase-to-phase distance of the three-phase drainage lines of the bypass system, and the bypass drainage lines are easy to carry.
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920063018.4U CN209562011U (en) | 2019-01-15 | 2019-01-15 | Vertical arrangement of 10kV overhead lines with load to replace switchgear on pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920063018.4U CN209562011U (en) | 2019-01-15 | 2019-01-15 | Vertical arrangement of 10kV overhead lines with load to replace switchgear on pole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209562011U true CN209562011U (en) | 2019-10-29 |
Family
ID=68306262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920063018.4U Active CN209562011U (en) | 2019-01-15 | 2019-01-15 | Vertical arrangement of 10kV overhead lines with load to replace switchgear on pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209562011U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109994961A (en) * | 2019-01-15 | 2019-07-09 | 国网辽宁省电力有限公司鞍山供电公司 | Vertically arranged 10kV overhead line with load replacement column switch device and method |
-
2019
- 2019-01-15 CN CN201920063018.4U patent/CN209562011U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109994961A (en) * | 2019-01-15 | 2019-07-09 | 国网辽宁省电力有限公司鞍山供电公司 | Vertically arranged 10kV overhead line with load replacement column switch device and method |
CN109994961B (en) * | 2019-01-15 | 2023-10-20 | 国网辽宁省电力有限公司鞍山供电公司 | Device and method for replacing pole-mounted switch of vertically arranged 10kV overhead line with load |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104505766B (en) | The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings | |
CN105932599A (en) | Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set | |
CN104701770A (en) | Insulating support for fixing drainage wire | |
CN208078525U (en) | Three-phase conducting wire for distribution network live line work upright bar struts insulating frame | |
CN105207123A (en) | Equipotential operation method of tubular bus | |
CN102185267B (en) | 66KV ground potential hot-line make-and-break bypassing method | |
CN106450835A (en) | Shoe manufacturer high voltage wire landing device | |
CN209562011U (en) | Vertical arrangement of 10kV overhead lines with load to replace switchgear on pole | |
CN203260950U (en) | 10kV power distribution rack live-replacement drop-out type fuse device | |
CN102623927B (en) | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method | |
CN101841144B (en) | Anti-thunder insulator strain clamp string | |
CN207559108U (en) | A kind of electrical verification formula vertical wires earthing clamp device | |
CN210866095U (en) | A special shunt device for replacing drop fuse with load | |
CN109994961B (en) | Device and method for replacing pole-mounted switch of vertically arranged 10kV overhead line with load | |
CN201234081Y (en) | 220kV bus support column porcelain bottle inspection rack | |
CN205051016U (en) | General earth bar with adjustable | |
CN204741228U (en) | Insulating couple of three -phase short circuit grounding | |
CN203895633U (en) | Short circuit grounding wire suitable for box transformer substation and electricity distribution room | |
CN218867785U (en) | A take load switch action bars for breaking and meet no-load cable | |
CN202797756U (en) | Operating head for 10 kV distribution live-line clamp | |
CN205985993U (en) | Change short circuit fixture that 220kV pipe generating line line stretcher pressed from both sides with electricity | |
CN217882584U (en) | Bypass drainage operation device | |
CN211701243U (en) | Electrified defect eliminating device for jumper spacer | |
CN202550391U (en) | High-voltage power maintenance implement | |
CN210838659U (en) | 10kV does not have a power failure and changes column switch combination tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |