CN209559384U - A kind of gob side entry retaining goaf lateral stress monitoring device - Google Patents

A kind of gob side entry retaining goaf lateral stress monitoring device Download PDF

Info

Publication number
CN209559384U
CN209559384U CN201920533121.0U CN201920533121U CN209559384U CN 209559384 U CN209559384 U CN 209559384U CN 201920533121 U CN201920533121 U CN 201920533121U CN 209559384 U CN209559384 U CN 209559384U
Authority
CN
China
Prior art keywords
entry retaining
stress
shaped steel
fixedly connected
lateral stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920533121.0U
Other languages
Chinese (zh)
Inventor
仇小祥
刘雯
刘威
牛金兴
付辉
许矿伟
苗良磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongcheng Coal and Electricity Holding Group Co Ltd
Original Assignee
Yongcheng Coal and Electricity Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongcheng Coal and Electricity Holding Group Co Ltd filed Critical Yongcheng Coal and Electricity Holding Group Co Ltd
Priority to CN201920533121.0U priority Critical patent/CN209559384U/en
Application granted granted Critical
Publication of CN209559384U publication Critical patent/CN209559384U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to stress monitoring technical fields, and disclose a kind of gob side entry retaining goaf lateral stress monitoring device, include U-shaped steel, the right side of the U-shaped steel is fixedly connected with metal baffle, the right side of the metal baffle is connected with stress meter by bolt, the upper and lower surfaces of the stress meter are fixedly connected to hanging ring, and the front of the stress meter, which is connected, is connected to high-pressure rubber pipe.The gob side entry retaining goaf lateral stress monitoring device, by the variation for monitoring lateral stress, it optimizes deep medium-thickness seam and cuts top release gear cash support technology, gob side entry retaining is carried out by binodal U-shaped steel substitution I-steel and keeps off cash supporting, continue to monitor goaf top plate spoil be caving, it is broken it is swollen during to the lateral stress of U-shaped steel, it explores the strata-pressure behavior of the side Liu Xiang lane side and then is to keep off the type selecting of cash supporting equipment or the opportunity of reprocessing in lane is stayed to lay the foundation, solve the problems, such as that the lane gob side entry retaining Nei Liu side lane side lateral stress changing rule is difficult to grasp.

Description

A kind of gob side entry retaining goaf lateral stress monitoring device
Technical field
The utility model relates to stress monitoring technical field, specially a kind of gob side entry retaining goaf lateral stress monitoring dress It sets.
Background technique
Top release gob side entry retaining is cut without coal pillar mining technology, it is quick-fried along back production side lane side cut top before working face extraction It is broken, shorten the length of goaf top plate cantilever beam, reduce gob side entry retaining is influenced by goaf dynamic pressure, after working face extraction, Goaf top plate is caving along presplitting position and forms lane side under the action of keeping off cash supporting, continues to use for next working face.
It cuts top release gob side entry retaining and gear cash supporting is carried out using double-level-metal net cooperation I-steel or binodal U-shaped steel.Back production Period successively hangs rhombus net and big eye net at tail first, above and below big eye net outer side stand binodal U-shaped steel, U-shaped steel It is interlocked using limiting card cable, front and back is interlocked using connection clamp cable, forms gear cash wall whole together with double-level-metal net.
After gob side entry retaining is formed, goaf inner top panel spoil is persistently caving, broken swollen persistently forms side to gear cash supporting wall To pressure.When monitoring the changing rule system voltage-controlled to the side Liu Xiang lane side mine of goaf lateral stress, keeping off cash supporting optimum and reprocess Key issues of machine determines is of great significance.
But existing device can not be measured between gob side entry retaining gear cash supporting equipment and goaf spoil on the market Lateral stress causes the lane gob side entry retaining Nei Liu side lane side lateral stress changing rule and is difficult to the problem of grasping.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of gob side entry retaining goaf lateral stress monitoring dress It sets, has the lateral stress advantage measured between gob side entry retaining gear cash supporting equipment and goaf spoil, solve gob side entry retaining The lane Nei Liu side lane side lateral stress changing rule is difficult to the problem of grasping.
To realize that above-mentioned gob side entry retaining out keeps off the purpose of the lateral stress between cash supporting equipment and goaf spoil, this reality It is provided the following technical solutions with novel: a kind of gob side entry retaining goaf lateral stress monitoring device, including U-shaped steel, the U-shaped steel Right side be fixedly connected with metal baffle, the right side of the metal baffle is connected with stress meter by bolt, described to answer The upper and lower surfaces of power meter are fixedly connected to hanging ring, and the front of the stress meter, which is connected, is connected to high-pressure rubber pipe, the height Moulding pipe is fixedly connected with pressure gauge far from one end of the stress meter, and the stress meter is fixed far from the side of the U-shaped steel It is connected with metal mesh.
Preferably, the side far from the stress meter of the metal mesh is fixedly connected with one group of telescopic rod, described flexible The outer surface for being evenly distributed on the metal mesh of bar, the quantity of the telescopic rod is as many as four, the appearance of the telescopic rod Surface cover is equipped with spring.
Preferably, the side far from the metal mesh of the telescopic rod is fixedly connected with mounting plate, the mounting plate Lower surface is fixedly connected with hydraulic stem, and the bottom end of the hydraulic stem is fixedly connected with tripod.
Preferably, the outer surface of the metal baffle is opened up there are four drilling, and four drillings are evenly distributed on described The outer surface of metal baffle.
Preferably, the metal baffle, the U-shaped steel and the stress meter are chain by bifilar iron wire.
Beneficial effect
Compared with prior art, the utility model provides a kind of gob side entry retaining goaf lateral stress monitoring device, tool It is standby following the utility model has the advantages that
(1) the gob side entry retaining goaf lateral stress monitoring device optimizes deep by monitoring the variation of lateral stress Medium-thickness seam cuts top release gear cash support technology, i.e., carries out gob side entry retaining by binodal U-shaped steel substitution I-steel and keep off cash supporting, continue Monitoring goaf top plate spoil be caving, it is broken it is swollen during to the lateral stress of U-shaped steel, the mine pressure for exploring the side Liu Xiang lane side is aobvious Existing rule is to keep off the type selecting of cash supporting equipment or the opportunity of reprocessing in lane is stayed to lay the foundation in turn, solves the lane gob side entry retaining Nei Liu side Lane side lateral stress changing rule is difficult to the problem of grasping.
(2) gob side entry retaining goaf lateral stress monitoring device, by playing and improving device and inspection by setting spring The stability of survey portion connection, improves the accuracy for collecting data, plays the high effect of device by the way that hydraulic stem is arranged, passes through setting Tripod plays the effect for improving device stability, to achieve the purpose that convenient to use.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the main view of the utility model
Fig. 3 is the top view of the utility model.
In figure: 1 metal baffle, 2U fashioned iron, 3 high-pressure rubber pipes, 4 pressure gauges, 5 metal meshes, 6 stress meters, 7 hanging rings, 8 are stretched Bar, 9 springs, 10 mounting plates, 11 hydraulic stems, 12 tripods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, a kind of gob side entry retaining goaf lateral stress monitoring device, including U-shaped steel 2, the right side of U-shaped steel 2 Side is fixedly connected with metal baffle 1, and the outer surface of metal baffle 1 is opened up there are four drilling, and four drillings are evenly distributed on gold Belong to the outer surface of baffle 1, the right side of metal baffle 1 is connected with stress meter 6 by bolt, metal baffle 1, U-shaped steel 2 and answers Power meter 6 is chain by bifilar iron wire, after gob side entry retaining just stays, the space not being caving sufficiently also using goaf spoil, in time Lateral stress monitoring device is installed, since notch is arranged metal at 2 notch of U-shaped steel and keeps off towards goaf when U-shaped steel 2 is stood Plate 1 makes an entirety, increases the area that stress meter 6 is in contact with it, avoids stress from concentrating, reach the mesh continued to monitor , continue to monitor the purpose for the lateral stress that goaf spoil acts in U-shaped steel 2.
The upper and lower surfaces of stress meter 6 are fixedly connected to hanging ring 7, and the front of stress meter 6, which is connected, is connected to high-pressure glue Pipe 3, high-pressure rubber pipe 3 are fixedly connected with pressure gauge 4 far from one end of stress meter 6, and side of the stress meter 6 far from U-shaped steel 2 is fixed to be connected It is connected to metal mesh 5, the side of the separate stress meter 6 of metal mesh 5 is fixedly connected with one group of telescopic rod 8, and telescopic rod 8 is uniformly distributed In the outer surface of metal mesh 5, for the quantity of telescopic rod 8 as many as four, the outer surface of telescopic rod 8 is arranged with spring 9, telescopic rod 8 The side of separate metal mesh 5 be fixedly connected with mounting plate 10, the lower surface of mounting plate 10 is fixedly connected with hydraulic stem 11, hydraulic The bottom end of bar 11 is fixedly connected with tripod 12, by the way that spring 9 is arranged, plays and improves the stability that device is connect with test section, The accuracy for collecting data is improved, the high effect of device is played by the way that hydraulic stem 11 is arranged, by the way that tripod 12 is arranged, plays and mention The effect of high device stability, to achieve the purpose that convenient to use.
Working principle: the gob side entry retaining goaf lateral stress monitoring device, goaf spoil is caving, it is broken it is swollen during produce Raw stress can objectively respond out by the reading of pressure gauge 4 on stress meter 6, according to actual requirement of engineering, differently Monitoring station is arranged in matter condition section, and metal baffle 1 and stress meter 6 are installed between U-shaped steel 2 and gear cash metal mesh 5, daily to do Good lateral stress observation, draws out different geological conditions section goaf lateral stress data variation curve graph, further instructs edge The engineering construction in the lane Kong Liu.
In conclusion the gob side entry retaining goaf lateral stress monitoring device, by monitoring the variation of lateral stress, optimization Deep medium-thickness seam cuts top release gear cash support technology, i.e., substitutes I-steel by binodal U-shaped steel 2 and carry out gob side entry retaining and keep off cash branch Shield, continue to monitor goaf top plate spoil be caving, it is broken it is swollen during to the lateral stress of U-shaped steel 2, explore the side Liu Xiang lane side Strata-pressure behavior, and then for gear cash supporting equipment type selecting or stay the opportunity of reprocessing in lane to lay the foundation, solve gob side entry retaining The lane Nei Liu side lane side lateral stress changing rule is difficult to the problem of grasping.
The gob side entry retaining goaf lateral stress monitoring device plays by the way that spring 9 is arranged and improves device and test section company The stability connect improves the accuracy for collecting data, the high effect of device is played by the way that hydraulic stem 11 is arranged, by the way that three feet are arranged Frame 12 plays the effect for improving device stability, to achieve the purpose that convenient to use.
It should be noted that the terms "include", "comprise" or its any other variant are intended to the packet of nonexcludability Contain, so that the process, method, article or equipment for including a series of elements not only includes those elements, but also including Other elements that are not explicitly listed, or further include for elements inherent to such a process, method, article, or device. In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including the element Process, method, article or equipment in there is also other identical elements.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of gob side entry retaining goaf lateral stress monitoring device, including U-shaped steel (2), it is characterised in that: the U-shaped steel (2) Right side be fixedly connected with metal baffle (1), the right side of the metal baffle (1) is connected with stress meter by bolt (6), the upper and lower surfaces of the stress meter (6) are fixedly connected to hanging ring (7), and the front of the stress meter (6) is connected It is connected to high-pressure rubber pipe (3), the high-pressure rubber pipe (3) is fixedly connected with pressure gauge (4), institute far from the one end of the stress meter (6) It states stress meter (6) and is fixedly connected with metal mesh (5) far from the side of the U-shaped steel (2).
2. a kind of gob side entry retaining goaf lateral stress monitoring device according to claim 1, it is characterised in that: the gold The side far from the stress meter (6) for belonging to net (5) is fixedly connected with one group of telescopic rod (8), and the telescopic rod (8) is uniformly divided Cloth is in the outer surface of the metal mesh (5), and the quantity of the telescopic rod (8) is as many as four, the outer surface of the telescopic rod (8) It is arranged with spring (9).
3. a kind of gob side entry retaining goaf lateral stress monitoring device according to claim 2, it is characterised in that: described to stretch The side far from the metal mesh (5) of contracting bar (8) is fixedly connected with mounting plate (10), and the lower surface of the mounting plate (10) is solid Surely it is connected with hydraulic stem (11), the bottom end of the hydraulic stem (11) is fixedly connected with tripod (12).
4. a kind of gob side entry retaining goaf lateral stress monitoring device according to claim 1, it is characterised in that: the gold The outer surface for belonging to baffle (1) is opened up there are four drilling, and four described drill are evenly distributed on the appearance of the metal baffle (1) Face.
5. a kind of gob side entry retaining goaf lateral stress monitoring device according to claim 1, it is characterised in that: the gold It is chain by bifilar iron wire to belong to baffle (1), the U-shaped steel (2) and the stress meter (6).
CN201920533121.0U 2019-04-19 2019-04-19 A kind of gob side entry retaining goaf lateral stress monitoring device Expired - Fee Related CN209559384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920533121.0U CN209559384U (en) 2019-04-19 2019-04-19 A kind of gob side entry retaining goaf lateral stress monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920533121.0U CN209559384U (en) 2019-04-19 2019-04-19 A kind of gob side entry retaining goaf lateral stress monitoring device

Publications (1)

Publication Number Publication Date
CN209559384U true CN209559384U (en) 2019-10-29

Family

ID=68313115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920533121.0U Expired - Fee Related CN209559384U (en) 2019-04-19 2019-04-19 A kind of gob side entry retaining goaf lateral stress monitoring device

Country Status (1)

Country Link
CN (1) CN209559384U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112213181A (en) * 2020-09-16 2021-01-12 安徽理工大学 Method for monitoring and simulating lateral stress of filling entry retaining roadside body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112213181A (en) * 2020-09-16 2021-01-12 安徽理工大学 Method for monitoring and simulating lateral stress of filling entry retaining roadside body

Similar Documents

Publication Publication Date Title
CN104198207B (en) Large-size roadway support laboratory simulation system and method
CN209559384U (en) A kind of gob side entry retaining goaf lateral stress monitoring device
CN103267601A (en) Goaf overlying stratum movement stability monitoring system and stability monitoring distinguishing method
CN208187756U (en) A kind of unmanned plane acquisition device used for geological prospecting
CN109505654A (en) The anti-risk topmast maintaining method in tunnel under the influence of a kind of repeated mining
CN102654062A (en) Top plate dynamical monitoring method for comprehensive mechanical filling and mining gob
CN209725635U (en) A kind of damping base of mining machinery multilevel hierarchy time damping
CN208578576U (en) A kind of underground ballistic support device
CN202347511U (en) Standard penetration test equipment
CN209533191U (en) Clamping device is used in a kind of part maintenance of opencast coal engineering mechanical device
CN208313615U (en) A kind of Mining Land matter exploration drawing out soil equipment
CN109631830B (en) Roadway head-on limit empty-roof distance measuring device and method
CN206593892U (en) A kind of soil layer sampling apparatus with pilot sleeve
CN206246053U (en) A kind of detection means of ground foundation engineering construction sediment thickness
CN102175110B (en) Method for detecting mortar joints of coke oven
CN205477366U (en) A complete set of pipe vice clamping device of wedge for full -rotating drill
CN205968113U (en) Vertical bearing roller bearing, oil blanket detaching device
CN205642690U (en) Similar material analogue test in mine is with propping up a posture stress collection system from moving
CN208907859U (en) A kind of portable coal field geology exploration geology sampler
CN103306255A (en) Box-type power penetrometer without feeler lever and probing method thereof
CN211401163U (en) Highway subgrade settlement observation device
CN217541737U (en) Hydraulic ring geological crack measuring device
CN214403487U (en) Device for monitoring and collecting pulverized coal by mining drilling cutting method
CN107916692A (en) A kind of geosyncline excavator
CN204691707U (en) Radial well construction liquid level dynamic monitoring system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029

Termination date: 20200419

CF01 Termination of patent right due to non-payment of annual fee