CN209555275U - A kind of combined type goes with each other all the time efficient blast furnace cooling air port - Google Patents

A kind of combined type goes with each other all the time efficient blast furnace cooling air port Download PDF

Info

Publication number
CN209555275U
CN209555275U CN201822093387.6U CN201822093387U CN209555275U CN 209555275 U CN209555275 U CN 209555275U CN 201822093387 U CN201822093387 U CN 201822093387U CN 209555275 U CN209555275 U CN 209555275U
Authority
CN
China
Prior art keywords
cap
partition
back cavity
inlet opening
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822093387.6U
Other languages
Chinese (zh)
Inventor
吴纯辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU CHANGHONG MOULD FOR CCM Co Ltd
Original Assignee
CHANGZHOU CHANGHONG MOULD FOR CCM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU CHANGHONG MOULD FOR CCM Co Ltd filed Critical CHANGZHOU CHANGHONG MOULD FOR CCM Co Ltd
Priority to CN201822093387.6U priority Critical patent/CN209555275U/en
Application granted granted Critical
Publication of CN209555275U publication Critical patent/CN209555275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Blast Furnaces (AREA)

Abstract

A kind of combined type goes with each other all the time efficient blast furnace cooling air port, including preceding cap, middle cap, rear cap, and the preceding cap, middle cap and rear cap enclose a cavity structure;It is equipped with partition between preceding cap and middle cap, the cavity structure is divided into ante-chamber and back cavity;Cooling water inlet pipe and cooling water outlet pipe are equipped in back cavity, partition is equipped with partition inlet opening and partition apopore, and the cooling water inlet pipe and cooling water outlet pipe are connected to partition inlet opening and partition apopore respectively;Ante-chamber partition is equipped in ante-chamber, the ante-chamber partition is between partition inlet opening and partition apopore.It can be improved the cooling capacity of tuyere small sleeve, and leakage hidden trouble caused by conventional cast structure can be eliminated, to extend air port service life, improve and use quality, improve combustion rate.

Description

A kind of combined type goes with each other all the time efficient blast furnace cooling air port
Technical field
It goes with each other all the time efficient blast furnace cooling air port the utility model relates to a kind of combined type.
Background technique
Blast-furnace tuyere is blast furnace for blow and the important process component of coal powder injection, by covering greatly, three middle set, small set portions Divide and be socketed to form, is installed in the furnace wall between bosh and cupola well.Wherein, tuyere small sleeve is usually copper, the logical cooling in the inside Water is cooling, and setting is in furnace wall most the inside and protrudes into furnace and directly washes away furnace wall to avoid hot wind and coal dust.
Tuyere small sleeve is responsible for being sent into hot wind in blast furnace for task, its front end is nearly 2000 DEG C of hot environment, slag 1400 DEG C of iron solution temperature or more, the hot blast temperature passed through from tuyere small sleeve is also at 1000 DEG C or more, the building ring of tuyere small sleeve Border is extremely severe, not only to bear high temperature, still suffers from the high-speed rotating char particle of Tuyere Raceway and coal dust and melting furnace charge Erosion, when making tuyere small sleeve Fast Wearing, especially blast wandering or slag crust come off, tuyere small sleeve damage it is more frequent.Wind Once a mouthful small set leak enters in furnace, the hidden danger of consumption and the safety in production of coke is not only increased.Replacement damage Tuyere small sleeve, blast furnace need damping down to stop production, and reduce the operating rate of blast furnace, and fuel consumption increases.
Patent document CN203411557U discloses a kind of blast furnace tuyere small sleeve, including tapered sleeve, and the inner cavity of tapered sleeve is air inlet Hole is equipped with water cavity in the cavity wall of tapered sleeve, the partition close to the setting of tapered sleeve taper end is equipped in water cavity, and water cavity is separated into position by partition Rear water cavity between partition and tapered sleeve taper end and the preceding water cavity between partition and tapered sleeve butt end;Be equipped in preceding water cavity every Set, spacer one end is connect with partition, the other end is connected by end cap with preceding water cavity outer wall, outside spacer, partition, end cap and preceding water cavity Wall surrounds water chamber;The end wall of preceding water cavity is equipped with two gussets connecting with end cap, two gussets, end cap, preceding water cavity end wall and Preceding water cavity outer wall surrounds collecting chamber;Tapered sleeve butt end is equipped with the inlet opening being connected to preceding water cavity, and tapered sleeve butt end is equipped with and catchments The apopore of room connection, preceding water cavity, rear water cavity and water chamber are sequentially communicated, and water chamber is connected to collecting chamber.The tuyere small sleeve, structure letter It is single, good cooling results.
Above-mentioned technical proposal represents the traditional mentality of designing of tuyere small sleeve, is provided with inside tuyere small sleeve more complicated Chamber structure, promote cooling water to flow through in tuyere small sleeve various pieces to recycle ratio more thoroughly.But this structure makes to cool down The water speed of water is greatly lowered, and hydraulic pressure also will receive influence, and the reduction of water speed reduces the capacity of heat transmission of tuyere small sleeve, increases wind The abrasion of mouth;The probability of scale formation, the biography between scale meeting severe exacerbation air port wall surface and cooling water are also will increase simultaneously Heat.
On the other hand, traditional this complicated inner cavity structure can only be formed by casting and welding, and there are casting cracks, folder Slag, weld are easy the problems such as damaged, welding difficulty is big, weld seam is easily stained with slag, are easy leak in use.
Utility model content
In view of above situation, in order to solve the problems, such as that above-mentioned technology exists, the utility model proposes a kind of combined type it is double into Double efficient blast furnace cooling air ports out, can be improved the cooling capacity of tuyere small sleeve, and can eliminate caused by conventional cast structure Leakage hidden trouble improves to extend air port service life and uses quality, improves combustion rate.
A kind of combined type according to the present utility model goes with each other all the time efficient blast furnace cooling air port, including preceding cap, middle cap, after Cap, the preceding cap, middle cap and rear cap enclose a cavity structure;Partition is equipped between preceding cap and middle cap, by the cavity knot Structure is divided into ante-chamber and back cavity;Cooling water inlet pipe and cooling water outlet pipe are equipped in back cavity, partition is equipped with partition inlet opening and partition Apopore, the cooling water inlet pipe and cooling water outlet pipe are connected to partition inlet opening and partition apopore respectively;It is equipped in ante-chamber Ante-chamber partition, the ante-chamber partition is between partition inlet opening and partition apopore.
The cavity structure is for cooling down tuyere small sleeve;The inner hole of preceding cap is used to for hot wind being sent into blast furnace, blows Oxygen and aiding combustion.
By redistributing and designing to each functional part, passes through forging respectively convenient for preceding cap, middle cap and rear cap or squeeze Molded, the preceding cap, middle cap and rear cap, which pass through to be welded to connect after being separately formed, encloses a cavity structure, avoids tradition Leakage hidden trouble caused by cast structure.It is equipped with partition between preceding cap and middle cap, the cavity structure is divided into ante-chamber and back cavity, So as to which the inside of tuyere small sleeve is divided into two parts, is cooled down respectively, the preceding cavity segment protruded into furnace is directed to Property cooling, improve cooling effect.
By cooling inlet and outlet pipes, cooling water is introduced directly into preceding cavity segment, the preceding cap of preceding cavity segment is carried out directly cold But, it avoids cooling water from first passing through back cavity and is entered back into ante-chamber after the heating of rear cavity wall, improve cooling effect.
In ante-chamber be equipped with ante-chamber partition, the ante-chamber partition between partition inlet opening and partition apopore, promote from The high-pressure cooling water that cooling water inlet pipe is passed through is exported from cooling water outlet pipe again after ante-chamber that is, preceding cap inner wall one circle, it is ensured that preceding The cooling effect of cap.
Preferably, the rear cap is equipped with rear cap inlet opening and rear cap apopore, is connected to respectively with inside the back cavity.With Back cavity is targetedly cooled down in being passed through cooling water, simultaneously as carrying out cooling cooling water inlet pipe and cooling to ante-chamber Outlet pipe is located in the cooling water in back cavity, the front end of cap before being entered back into after the heating of rear cavity wall compared to traditional cooling water, by In back cavity also in lasting cooling, the temperature of the cooling water in back cavity is lower than the temperature of back cavity wall surface, the front end of application scheme Cooling water heats up less in the road for being delivered to front end.
Preferably, the first back cavity partition and the second back cavity partition are equipped in the back cavity, the first back cavity partition and the Two back cavity partitions are arranged in parallel along back cavity length direction, and the rear cap inlet opening is located at the first back cavity partition and the second back cavity Between partition.It is mainly used for guiding water (flow) direction, it is ensured that the cooling water for being passed through back cavity forms flowing in back cavity, without only existing Cap inlet opening and rear cap apopore are nearby cooled down afterwards, it is ensured that are cooled down to entire back cavity.
Preferably, one in the first back cavity partition or the second back cavity partition be located at it is described after cap inlet opening and rear cap Between apopore.For cap inlet opening and rear cap apopore after separating, cap after avoiding cooling water from directly flowing into from rear cap inlet opening Apopore.
Preferably, one in the first back cavity partition or the second back cavity partition be located at it is described after cap inlet opening and rear cap Between apopore, also, after the first back cavity partition or second between the rear cap inlet opening and rear cap apopore The length of chamber partition is greater than the length of the second back cavity partition or the first back cavity partition positioned at the rear cap inlet opening other side.For dividing Every rear cap inlet opening and rear cap apopore, cap apopore after avoiding cooling water from directly flowing into from rear cap inlet opening, and due to two The length of a back cavity partition is different, and water flow flows the resistance difference being subject to after entering back cavity around, promotes water flow to after deviating from The direction of cap apopore is flowed, cap apopore after flowing to again after the circle that circles round in back cavity, to be promoted to entire back cavity Cooling effect.
Preferably, the preceding cap includes the preceding cap inner wall of composition tuyere small sleeve inner wall and inner wall top is inwardly overturn in front The preceding cap outer wall of cavity outer wall before constituting, it is described after cap include for cap base portion to be arranged after the annular of each paddle hole and from institute The annular outer edge for stating rear cap base portion overturns interconnecting piece and the outer interconnecting piece of rear cap in the rear cap to be formed, interconnecting piece in the rear cap It is connect with preceding cap inner wall, the rear outer interconnecting piece of cap is connect with middle cap, and the other end of middle cap is connect with preceding cap outer wall.By to each Functional part being redistributed and designing, and passes through forging or extrusion forming respectively convenient for preceding cap, middle cap and rear cap, the preceding cap, Middle cap and rear cap, which pass through to be welded to connect after being separately formed, encloses a cavity structure, avoids caused by conventional cast structure Leakage hidden trouble.
Preferably, the partition is welded to connect in the opening of the preceding cap outer wall, and the ante-chamber partition welding is set to In the preceding cap outer wall.
Preferably, the first back cavity partition and the second back cavity partition, which are respectively welded, is connected to the rear cap base portion inner wall And/or the outer wall of the preceding cap inner wall.
Preferably, a kind of combined type goes with each other all the time the processing method of efficient blast furnace cooling air port, includes the following steps:
Preceding cap, middle cap and the forging of rear capped pipe base or extrusion moduling are circle;
The pipe is tempered, pipe is stretched as shell;
Secondary extrusion modification, tempering are carried out to the shell;
The shell is subjected to extrusion forming again;
The shell cold-drawn is squeezed as finished product;
Preceding cap, middle cap and rear cap and remaining part are finished, to meet the requirement of the fitted position between each component;
It will be machined again after the assembling of each component, welding.
Preferably, the process conditions when shell cold-drawn is squeezed as finished product are pressure 15-30pa, elongation 20-200mm。
Preferably, it is described will each component assembling, welding after machine again after, to weld seam entirety pressure testing power 2.0Mpa, pressure maintaining It must not leak within 30 minutes.
Take the utility model proposes technology after, gone with each other all the time efficiently according to the combined type of the utility model embodiment Blast furnace cooling air port, has the advantages that
1) by the improvement in structure, forging or integrated extrusion forming technology be can use, to each building block in air port into Row extruding/punch forming, changes the manufacture of traditional tuyere small sleeve, and welding after traditional casting is improved to forge or be squeezed Welding, improves the hardness and strength of tuyere small sleeve, high mechanical strength is unlikely to deform after molded;Section components do not have to welding, The risks such as breakage, crackle are reduced, service life is improved.
2) it is rationally designed, the section of regulating tuyere wall thickness and each cooling water channel, is realized comparatively ideal cold by inner flow passage But water flow and flow velocity, reinforcing heat exchange capability.Meanwhile optimization cooling water channel structure can reduce damage resistance.Can ensure ante-chamber and Water flow is unobstructed in back cavity, and the resistance being subject to is smaller, and the water speed and hydraulic pressure of cooling water are able to maintain higher, improves leading for tuyere small sleeve Thermal energy power, and can be reduced the generation of scale and abrasion.
Detailed description of the invention
Fig. 1 is that the combined type of the application goes with each other all the time the cooling tuyere structure figure of efficient blast furnace;
Fig. 2 be the application combined type go with each other all the time the preceding cap of efficient blast furnace cooling air port, middle cap and rear cap assembly decompose Schematic diagram;
Fig. 3 is that the combined type of the application goes with each other all the time efficient blast furnace cooling air port assembling assumption diagram, internal structure dotted line It indicates;
Fig. 4 is the face the A-A cutting three-dimensional structure diagram of Fig. 3;
Fig. 5 is the face the B-B cutting three-dimensional structure diagram of Fig. 3;
Fig. 6 is that the combined type of the application goes with each other all the time the local cutting three-dimensional structure diagram of efficient blast furnace cooling air port, mainly Express the positional relationship of back cavity partition;
Fig. 7 is that the combined type of the application goes with each other all the time the assembling of efficient blast furnace cooling air port and welding structure schematic diagram.Attached drawing Label declaration:
Preceding cap 1
Preceding cap inner wall 11
Preceding cap outer wall 12
Middle cap 2
Cap 3 afterwards
Cap base portion 30 after annular
Cap inlet opening 31 afterwards
Cap apopore 32 afterwards
Interconnecting piece 35 in cap afterwards
The outer interconnecting piece 36 of cap afterwards
Partition 4
Partition inlet opening 41
Partition apopore 42
Ante-chamber 8
Ante-chamber partition 81
Back cavity 9
Cooling water inlet pipe 91
Cooling water outlet pipe 92
First back cavity partition 95
Second back cavity partition 96
Specific embodiment
The utility model is described in further detail below in conjunction with the embodiment that attached drawing provides.Described implementation Example includes the various details for helping to understand, but they can only be counted as illustratively, be a part of the utility model Embodiment, instead of all the embodiments.Unless otherwise defined, the technical term or scientific term used herein should be this The ordinary meaning that personage in utility model fields with general technical ability is understood.Meanwhile in order to keep specification more clear Chu is succinct, by omission pair it is well known that the detailed description of function and construction.
As shown in Figure 1 to Figure 3, a kind of combined type goes with each other all the time efficient blast furnace cooling air port, including preceding cap 1, middle cap 2, after Cap 3, the preceding cap 1, middle cap 2 and rear cap 3 enclose a cavity structure;Cavity structure is for cooling down tuyere small sleeve; The inner hole of preceding cap 1 is used to for hot wind being sent into blast furnace, and oxygen blast is combustion-supporting.
Below incorporated by reference to shown in Fig. 4 and Fig. 5, partition 4 is equipped between preceding cap 1 and middle cap 2, before the cavity structure is divided into Chamber 8 and back cavity 9.It so as to the inside of tuyere small sleeve is divided into two parts, is cooled down respectively, to protruding into the preceding cavity portion in furnace Divide and targetedly cooled down, improves cooling effect.
Cooling water inlet pipe 91 and cooling water outlet pipe 92 are equipped in back cavity 9, partition 4 is equipped with partition inlet opening 41 and partition goes out Water hole 42, the cooling water inlet pipe 91 and cooling water outlet pipe 92 are connected to partition inlet opening 41 and partition apopore 42 respectively;It is logical Cooling water is introduced directly into preceding cavity segment by supercooling inlet and outlet pipes, directly cool down to the preceding cap of preceding cavity segment, is avoided cooling down Water first passes through back cavity and is entered back into ante-chamber after the heating of rear cavity wall, improves cooling effect.
Be equipped with ante-chamber partition 81 in ante-chamber 8, the ante-chamber partition 81 be located at partition inlet opening 41 and partition apopore 42 it Between, promote from the high-pressure cooling water that cooling water inlet pipe 91 is passed through after ante-chamber 8 that is, 1 inner wall one of preceding cap circle again from cooling water outlet pipe 92 export, it is ensured that the cooling effect of preceding cap 1.
Cap 3 is equipped with rear cap inlet opening 31 and rear cap apopore 32 after described, is connected to respectively with inside the back cavity 9.With Back cavity is targetedly cooled down in being passed through cooling water, simultaneously as carrying out cooling cooling water inlet pipe 91 and cold to ante-chamber 8 But outlet pipe 92 is located in the cooling water in back cavity 9, before being entered back into after the heating of 9 wall of back cavity compared to traditional cooling water before cap End, since back cavity 9 is also in lasting cooling, the temperature of the cooling water in back cavity 9 is lower than the temperature of 9 wall surface of back cavity, the application side The front end cooling water of case heats up less in the road for being delivered to front end.
Below please further as shown in connection with fig. 6, the first back cavity partition 95 and the second back cavity partition are equipped in the back cavity 9 96, the first back cavity partition 95 and the second back cavity partition 96 are arranged in parallel along 9 length direction of back cavity, the rear cap inlet opening 31 Between the first back cavity partition 95 and the second back cavity partition 96.It is mainly used for guiding water (flow) direction, it is ensured that be passed through back cavity 9 Cooling water flowing is formed in back cavity 9, without only being cooled down near rear cap inlet opening 31 and rear cap apopore 32, really Guarantor cools down entire back cavity 9.
One in the first back cavity partition 95 or the second back cavity partition 96 is located at the rear cap inlet opening 31 and rear cap Between apopore 32.For cap inlet opening 31 and rear cap apopore 32 after separating, avoid cooling water directly from rear cap inlet opening 31 Cap apopore 32 after inflow.
One in the first back cavity partition 95 or the second back cavity partition 96 is located at the rear cap inlet opening 31 and rear cap Between apopore 32, also, the first back cavity partition 95 between the rear cap inlet opening 31 and rear cap apopore 32 Second back cavity partition 96 length be greater than positioned at rear 31 other side of cap inlet opening the second back cavity partition 96 or the first back cavity every The length of plate 95.For cap inlet opening 31 and rear cap apopore 32 after separating, cooling water is avoided directly to flow from rear cap inlet opening 31 Enter rear cap apopore 32, and since the length of two back cavity partitions is different, water flow enters after back cavity 9 what flowing around was subject to Resistance is different, and water flow is promoted to flow to the direction away from rear cap apopore 32, cap after flowing to again after the circle that circles round in back cavity 9 Apopore 32, to promote the cooling effect to entire back cavity 9.
Further, the preceding cap 1 includes the preceding cap inner wall 11 for constituting tuyere small sleeve inner wall and 11 top of inner wall in front Inwardly overturning constitutes the preceding cap outer wall 12 of 8 outer wall of ante-chamber, it is described after cap 3 include for cap after the annular of each paddle hole to be arranged The base portion 30 and annular outer edge of cap base portion 30 overturns in the rear cap to be formed and connects outside interconnecting piece 35 and rear cap after described Portion 36, it is described after in cap interconnecting piece 35 connect with preceding cap inner wall 11, interconnecting piece 36 is connect the cap afterwards with middle cap 2 outside, middle cap 2 The other end is connect with preceding cap outer wall 12.By redistributing and designing to each functional part, it is convenient for preceding cap 1, middle cap 2 and rear cap 3 respectively by forging or extrusion forming, and the preceding cap 1, middle cap 2 and rear cap 3, which pass through to be welded to connect after being separately formed, encloses one A cavity structure avoids leakage hidden trouble caused by conventional cast structure.
Below please further as shown in connection with fig. 7, the partition 4 is welded to connect in the opening of the preceding cap outer wall 12, institute The welding of ante-chamber partition 81 is stated to be set in the preceding cap outer wall 12.
The first back cavity partition 95 and the second back cavity partition 96 be respectively welded be connected to it is described after 30 inner wall of cap base portion and/ Or the outer wall of the preceding cap inner wall 11.
Said combination formula goes with each other all the time the processing method of efficient blast furnace cooling air port, includes the following steps:
Preceding cap 1, middle cap 2 and the forging of 3 pipe of rear cap or extrusion moduling are circle;
The pipe is tempered, pipe is stretched as shell;
Secondary extrusion modification, tempering are carried out to the shell;
The shell is subjected to extrusion forming again;
The shell cold-drawn is squeezed as finished product;
Preceding cap 1, middle cap 2 and rear cap 3 and remaining part are finished, wanted with meeting the fitted position between each component It asks;
It will be machined again after the assembling of each component, welding.
Further, the process conditions when shell cold-drawn is squeezed as finished product are pressure 15-30pa, are extended Measure 20-200mm.
Further, it is described will machine again after the assembling of each component, welding after, to weld seam entirety pressure testing power 2.0Mpa, protect Pressure must not leak for 30 minutes.
Pass through the above procedure of processing, it is ensured that the contour structures of preceding cap 1, middle cap 2 and rear cap 3 meet the component cooperation of the application It is required that forming reasonable runner;And wall surface is bright and clean, passes through conducive to cooling water high speed.Its mechanical strength can be improved simultaneously, makes it not It is easily-deformable, the risks such as breakage, crackle are reduced, service life is improved.
It is gone with each other all the time efficient blast furnace cooling air port technical solution according to the combined type of the application, it is cooling compared to traditional blast furnace Tuyere small sleeve used in air port mainly has following beneficial effect.
By the improvement in structure, it can use forging or integrated extrusion forming technology, each building block in air port carried out Extruding/punch forming changes the manufacture of traditional tuyere small sleeve, and welding after traditional casting is improved to forge or be squeezed It is welded after molding, improves the hardness and strength of tuyere small sleeve, high mechanical strength is unlikely to deform;Section components do not have to welding, subtract The risks such as less breakage, crackle, improve service life.
It is rationally designed by inner flow passage, comparatively ideal cooling is realized in the section of regulating tuyere wall thickness and each cooling water channel Water flow and flow velocity, reinforcing heat exchange capability.Meanwhile optimization cooling water channel structure can reduce damage resistance.It can ensure ante-chamber with after Intracavitary water flow is unobstructed, and the resistance being subject to is smaller, and the water speed and hydraulic pressure of cooling water are able to maintain higher, improves the thermally conductive of tuyere small sleeve Ability, and can be reduced the generation of scale and abrasion.
"upper" described herein, "lower" or " top ", " lower section " are the phases for the placement status with normal use To upper and lower relation, that is, the upper and lower relation that illustrations are substantially shown.When placement status changes, such as overturn When, corresponding positional relationship should be also converted therewith to understand or implement the technical solution of the application.

Claims (7)

  1. The efficient blast furnace cooling air port 1. a kind of combined type goes with each other all the time, which is characterized in that including preceding cap (1), middle cap (2), rear cap (3), the preceding cap (1), middle cap (2) and rear cap (3) enclose a cavity structure;Between preceding cap (1) and middle cap (2) be equipped with every The cavity structure is divided into ante-chamber (8) and back cavity (9) by plate (4);It is equipped with cooling water inlet pipe (91) in back cavity (9) and cooling goes out Water pipe (92), partition (4) are equipped with partition inlet opening (41) and partition apopore (42), the cooling water inlet pipe (91) and cooling Outlet pipe (92) is connected to partition inlet opening (41) and partition apopore (42) respectively;Ante-chamber partition (81) are equipped in ante-chamber (8), The ante-chamber partition (81) is located between partition inlet opening (41) and partition apopore (42).
  2. The efficient blast furnace cooling air port 2. a kind of combined type according to claim 1 goes with each other all the time, which is characterized in that after described Cap (3) is equipped with rear cap inlet opening (31) and rear cap apopore (32), is connected to respectively with the back cavity (9) inside.
  3. The efficient blast furnace cooling air port 3. a kind of combined type according to claim 2 goes with each other all the time, which is characterized in that after described The first back cavity partition (95) and the second back cavity partition (96), the first back cavity partition (95) and the second back cavity are equipped in chamber (9) Partition (96) is arranged in parallel along back cavity (9) length direction, and the rear cap inlet opening (31) is located at the first back cavity partition (95) And second between back cavity partition (96).
  4. The efficient blast furnace cooling air port 4. a kind of combined type according to claim 3 goes with each other all the time, which is characterized in that described One in one back cavity partition (95) or the second back cavity partition (96) is located at the rear cap inlet opening (31) and rear cap apopore (32) between.
  5. The efficient blast furnace cooling air port 5. a kind of combined type according to claim 3 goes with each other all the time, which is characterized in that described One in one back cavity partition (95) or the second back cavity partition (96) is located at the rear cap inlet opening (31) and rear cap apopore (32) between, also, the first back cavity partition between the rear cap inlet opening (31) and rear cap apopore (32) (95) or the length of the second back cavity partition (96) be greater than positioned at rear cap inlet opening (31) other side the second back cavity partition (96) or The length of first back cavity partition (95).
  6. The efficient blast furnace cooling air port 6. a kind of combined type according to any one of claim 1 to 5 goes with each other all the time, feature It is, the preceding cap (1) includes constituting preceding cap inner wall (11) He Qian cap inner wall (11) top of tuyere small sleeve inner wall to varus Turn to constitute the preceding cap outer wall (12) of ante-chamber (8) outer wall, it is described after cap (3) include for cap after the annular of each paddle hole to be arranged Base portion (30) and the annular outer edge of cap base portion (30) overturns interconnecting piece (35) and rear cap in the rear cap to be formed after described Outer interconnecting piece (36), it is described after in cap interconnecting piece (35) connect with preceding cap inner wall (11), it is described after outside cap interconnecting piece (36) and in Cap (2) connection, the other end of middle cap (2) are connect with preceding cap outer wall (12).
  7. The efficient blast furnace cooling air port 7. a kind of combined type according to claim 6 goes with each other all the time, which is characterized in that it is described every Plate (4) is welded to connect in the opening of the preceding cap outer wall (12), and ante-chamber partition (81) welding is set to outside the preceding cap In wall (12).
CN201822093387.6U 2018-12-13 2018-12-13 A kind of combined type goes with each other all the time efficient blast furnace cooling air port Active CN209555275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822093387.6U CN209555275U (en) 2018-12-13 2018-12-13 A kind of combined type goes with each other all the time efficient blast furnace cooling air port

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822093387.6U CN209555275U (en) 2018-12-13 2018-12-13 A kind of combined type goes with each other all the time efficient blast furnace cooling air port

Publications (1)

Publication Number Publication Date
CN209555275U true CN209555275U (en) 2019-10-29

Family

ID=68301924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822093387.6U Active CN209555275U (en) 2018-12-13 2018-12-13 A kind of combined type goes with each other all the time efficient blast furnace cooling air port

Country Status (1)

Country Link
CN (1) CN209555275U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109439826A (en) * 2018-12-13 2019-03-08 常州市武进长虹结晶器有限公司 Blast furnace cooling air port

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109439826A (en) * 2018-12-13 2019-03-08 常州市武进长虹结晶器有限公司 Blast furnace cooling air port

Similar Documents

Publication Publication Date Title
CN109439826A (en) Blast furnace cooling air port
CN103451510B (en) The manufacture method of vermicular cast iron piston ring
CN201811564U (en) Multi-section high-temperature reducing rotary kiln
CN209555275U (en) A kind of combined type goes with each other all the time efficient blast furnace cooling air port
CN105537533B (en) A kind of casting technique of rocker arm of coal mining machine
CN107034329A (en) One kind can be blown pluralities of fuel blast furnace copper coin tuyere case
CN207002773U (en) One kind can be blown pluralities of fuel blast furnace copper coin tuyere case
CN201495245U (en) Stream guidance type blast furnace tuyere small sleeve
CN103008617A (en) Method for preparing high-speed steel composite roll for hot rolling
CN201751783U (en) Inner structure of high-efficiency and energy-saving aluminum and aluminum alloy isothermal smelting furnace
CN207267883U (en) A kind of clean energy-saving type steelmaking furnace
CN2844127Y (en) Composite air port of blast-furnace
CN201058876Y (en) Modified blast furnace tuyere cover
CN208776758U (en) A kind of band convex copper cooling wall
CN206556409U (en) Water Cooled Tuyere for Cupola
CN206410513U (en) A kind of metallurgy industry solid material injection device
KR101434308B1 (en) Tuyere for blast furnace
CN210528964U (en) Special oxygen burning gun for horizontal charging electric furnace
CN201145472Y (en) Split type welding compound casting gear roller
CN203159645U (en) Device for preventing through-flow type air opening of blast furnace from moving outside
CN220393786U (en) Cyclone blast furnace tuyere small sleeve
CN210974741U (en) Tuyere sleeve of blast furnace
CN108754055A (en) A kind of band convex copper cooling wall and its manufacturing method
CN203286879U (en) Water cooling tuyere for cupola furnace
CN201722398U (en) Blast-furnace tuyere for copper steel profiles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant