Prior art keywords
steel plate
loading arm
steel
ultralong
fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822238486.9U
Other languages
Chinese (zh)
Inventor
孙涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JIANZHONG NEW MATERIAL TECHNOLOGY Co Ltd
Original Assignee
JIANGSU JIANZHONG NEW MATERIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JIANZHONG NEW MATERIAL TECHNOLOGY Co Ltd filed Critical JIANGSU JIANZHONG NEW MATERIAL TECHNOLOGY Co Ltd
Priority to CN201822238486.9U priority Critical patent/CN209554636U/en
Application granted granted Critical
Publication of CN209554636U publication Critical patent/CN209554636U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses ultralong steel tube vanning Boom of a fork-lift trucks, it mainly include fixing seat, loading arm and suspension hook, fixing seat is equipped with the steel plate of identical two block gap setting, is symmetrically installed with two root cutting pipes between steel plate, the both ends of intubation are worn on the steel plate respectively, and there are jacks on the steel plate;Fixing seat is equipped with loading arm, and loading arm is arranged at the symmetry axis of two root cutting pipes;Multiple suspension hooks are evenly equipped on the tube wall of loading arm.The utility model transports lift truck design exclusively for ultralong steel tube, and structure is simple, safety and stability, the uniform force in ultralong steel tube transport process, will not be deformed phenomenon, and easy to operate, utilitarian design, work efficiency is high.

Description

Ultralong steel tube vanning Boom of a fork-lift truck
Technical field
The utility model relates to steel pipe transloading equipment technical field, specially a kind of ultralong steel tube, which is quickly cased, uses forklift Arm.
Background technique
With the development of the modernization of industry, in major field using steel pipe, it is often necessary to steel pipe is transported through and Storage.During steel pipe's production, since part steel pipe weight is big, length is long, therefore needs to use in process of production hydraulic Fork truck is completed to carry.But in current ultralong steel tube production field, since the length of ultralong steel tube is longer, without dedicated turn Fortune tool, long to be shipped using large-tonnage bridge crane or forklift, shipment is time-consuming and laborious, it is therefore desirable to specially make one kind and be suitable for Ultralong steel tube cases Boom of a fork-lift truck quickly to meet modernization industry demand for development.
Utility model content
The purpose of this utility model is to provide a kind of ultralong steel tube vanning Boom of a fork-lift truck, the forklift arm configuration is simple, operates Simplicity, utilitarian design, safety and stability, boxing efficiency are high, can effectively solve the problems mentioned above in the background art.
The Boom of a fork-lift truck the technical scheme adopted by the utility model to solve the technical problem is as follows: ultralong steel tube is cased, including it is solid Reservation, loading arm and suspension hook, the fixing seat are equipped with the first steel plate and the second steel plate of identical two block gap setting, and described the Two root cutting pipes are symmetrically installed between one steel plate and second steel plate, the both ends of the intubation are threaded through first steel respectively On plate and second steel plate, and there are jacks on first steel plate and second steel plate;The fixing seat is equipped with Rectangular steel tube loading arm, one end of the loading arm sequentially pass through second steel plate and first steel plate, and described There are rectangular jacks on one steel plate;The loading arm is arranged at the symmetry axis of the two root cuttings pipe;The tube wall of the loading arm On be evenly equipped with multiple suspension hooks.
Preferably, the junction of the loading arm and second steel plate is installed with 4 pieces of stiffening plates.
Preferably, the suspension hook is W-shaped, and hook portion is symmetrically arranged at the two sides of the loading arm.
Preferably, the intubation is hollow pipe steel.
Compared with prior art, the utility model has the beneficial effects that
The utility model transports vanning design exclusively for ultralong steel tube, and structure is simple, safety and stability, fills in ultralong steel tube Easy to operate during case, utilitarian design, work efficiency is high for vanning.
Detailed description of the invention
Fig. 1 is the utility model of the whole structure diagram;
1, fixing seat in the figure;11, the first steel plate;12, the second steel plate;13, it is intubated;2, loading arm;3, suspension hook;4, add Strong plate.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;In order to better illustrate this embodiment, attached Scheme certain components to have omission, zoom in or out, does not represent the size of actual product;To those skilled in the art, The omitting of some known structures and their instructions in the attached drawings are understandable.In the description of the present invention, it is understood that , in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more.It is practical at this In novel description, it is to be understood that in the description of the present invention, it should be noted that unless otherwise specific rule Fixed and restriction, term " installation ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to detachably connect It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, be also possible to pass through centre Medium is indirectly connected with, it may be said that the connection inside two elements.It for the ordinary skill in the art, can specific feelings Condition understands above-mentioned term in the concrete meaning of the utility model.
The technical solution of the utility model is described further with reference to the accompanying drawings and examples.
As shown in the picture, ultralong steel tube vanning Boom of a fork-lift truck provided by the utility model, mainly includes fixing seat 1, loading arm 2 And suspension hook 3, fixing seat 1 are equipped with the first steel plate 11 and the second steel plate 12 of identical two block gap setting, the first steel plate 11 and institute It states and is symmetrically welded with two hollow pipe steel intubations 13 between the second steel plate 12, the both ends for being intubated 13 are threaded through the first steel plate respectively 11 and second on steel plate 12, and there are jacks on the first steel plate 11 and the second steel plate 12;Rectangular steel tube is welded in fixing seat 1 Loading arm 2, one end of loading arm 2 sequentially passes through the second steel plate 12 and the first steel plate 11, and there are rectangular on the first steel plate 11 Jack;Loading arm 2 is arranged at the symmetry axis of two root cutting pipes 13;On the tube wall of loading arm 2 by screw be uniformly fixed with it is multiple Suspension hook 3, uniformly distributed suspension hook 3 can make lower section hang the ultralong steel tube uniform force set, will not be deformed, ensure that the matter of steel pipe Amount.
As a preference, the present embodiment is in order to guarantee connection of the stability in loading arm 2 and the second steel plate 12 of device Place is installed with 4 pieces of stiffening plates 4.
As a preference, the suspension hook 3 of the present embodiment is W-shaped, hook portion is symmetrically arranged at the two sides of loading arm 2.Load-bearing 2 two sides of arm, which are all uniformly provided with suspension hook, can be improved the boxing efficiency of forklift, while making this Boom of a fork-lift truck performance is more during the work time Stablize.
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention, All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it It is interior.

Claims (4)

  1. The Boom of a fork-lift truck 1. ultralong steel tube is cased, it is characterised in that: described including counterweight fixing seat (1), loading arm (2) and suspension hook (3) Fixing seat (1) is equipped with the first steel plate (11) and the second steel plate (12) of the setting of identical two block gap, first steel plate (11) Two root cutting pipes (13) are symmetrically installed between second steel plate (12), the both ends of the intubation (13) are threaded through described respectively On first steel plate (11) and second steel plate (12), and on first steel plate (11) and second steel plate (12) there are Jack;The fixing seat (1) is equipped with rectangular steel tube loading arm (2), and one end of the loading arm (2) sequentially passes through described second Steel plate (12) and first steel plate (11), and there are rectangular jacks on first steel plate (11);The loading arm (2) sets It sets at the symmetry axis of the two root cuttings pipe (13);Multiple suspension hooks (3) are evenly equipped on the tube wall of the loading arm (2).
  2. The Boom of a fork-lift truck 2. ultralong steel tube according to claim 1 is cased, it is characterised in that: the loading arm (2) and described the The junction of two steel plates (12) is installed with 4 pieces of stiffening plates (4).
  3. The Boom of a fork-lift truck 3. ultralong steel tube according to claim 1 is cased, it is characterised in that: the suspension hook (3) is W-shaped, hangs Hook portion is symmetrically arranged at the two sides of the loading arm (2).
  4. The Boom of a fork-lift truck 4. ultralong steel tube according to claim 1 is cased, it is characterised in that: the intubation (13) is hollow pipe Steel.
CN201822238486.9U 2018-12-28 2018-12-28 Ultralong steel tube vanning Boom of a fork-lift truck Expired - Fee Related CN209554636U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822238486.9U CN209554636U (en) 2018-12-28 2018-12-28 Ultralong steel tube vanning Boom of a fork-lift truck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822238486.9U CN209554636U (en) 2018-12-28 2018-12-28 Ultralong steel tube vanning Boom of a fork-lift truck

Publications (1)

Publication Number Publication Date
CN209554636U true CN209554636U (en) 2019-10-29

Family

ID=68304224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822238486.9U Expired - Fee Related CN209554636U (en) 2018-12-28 2018-12-28 Ultralong steel tube vanning Boom of a fork-lift truck

Country Status (1)

Country Link
CN (1) CN209554636U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112723131A (en) * 2020-12-30 2021-04-30 中国核工业华兴建设有限公司 Hoisting tool and hoisting method for assembled concrete member supporting track

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112723131A (en) * 2020-12-30 2021-04-30 中国核工业华兴建设有限公司 Hoisting tool and hoisting method for assembled concrete member supporting track

Similar Documents

Publication Publication Date Title
CN209554636U (en) Ultralong steel tube vanning Boom of a fork-lift truck
CN203558702U (en) Lifting appliance for steel reinforcement cages
CN108946475B (en) Overturning and hoisting system and method for horizontal equipment
CN204917618U (en) Flexible horizontal supporting beam
CN206872270U (en) A kind of device of across the railway cluster lifting of large-tonnage railway single freely-supported trough girder
CN103343639A (en) Efficiently-adjusting module sliding system
CN103058045B (en) Large-size test-run cradle for crane
CN207551699U (en) Convenient for disassembly and assembly, the repeatable steel-reinforcement cage hanger utilized
CN207030735U (en) Prefabricated balcony lifts servicing unit
CN203095397U (en) Trial run cradle of heavy-duty crane
CN209583386U (en) Prefabricated part hanging tool and Lift-on/Lift-off System
CN211110630U (en) Multifunctional lifting appliance for lifting high-speed rail concrete box girder
CN208294101U (en) Large-span girder steel installation slides and promotes combination device
CN203639016U (en) Balance beam for hoisting reinforcing steel bars by tower crane
CN207046729U (en) A kind of arm-tie bracket
CN103015323B (en) Beam body hoisting device
CN205976431U (en) Tube -shape structures hydraulic pressure slipform promotes construction platform
CN206735623U (en) Framework of steel reinforcement hanging apparatus
CN205023715U (en) A pier loading and unloading multipurpose thick stick
CN214031383U (en) Expansion type hanging frame
CN205023729U (en) Gallows frame
CN210214550U (en) Special lifting appliance for loading aluminum profiles
CN204643670U (en) Split type arm tower crane Shears structure
CN213800654U (en) Novel door-shaped support combined tool
CN203345948U (en) Box-type balance beam device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029