CN209552027U - A kind of precast beam wedge block and pre-embedded bolt installation mold - Google Patents

A kind of precast beam wedge block and pre-embedded bolt installation mold Download PDF

Info

Publication number
CN209552027U
CN209552027U CN201821740290.3U CN201821740290U CN209552027U CN 209552027 U CN209552027 U CN 209552027U CN 201821740290 U CN201821740290 U CN 201821740290U CN 209552027 U CN209552027 U CN 209552027U
Authority
CN
China
Prior art keywords
embedded bolt
wedge block
hole
mold
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821740290.3U
Other languages
Chinese (zh)
Inventor
潘伟
于德强
张海滨
刘卫东
张波
郑平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical Second Construction Co Ltd of China Construction First Group Co Ltd
Priority to CN201821740290.3U priority Critical patent/CN209552027U/en
Application granted granted Critical
Publication of CN209552027U publication Critical patent/CN209552027U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of precast beam wedge block and pre-embedded bolt installation mold, include master mold and auxiliary mould, the auxiliary mould includes rectangle frame and the composite plate with pre-buried hole completely spread, master mold includes cope plate and lower template, it is placed in the pre-buried hole of rectangle frame, the upper and lower template is rectangular slab, correspond on lower die plate face pre-embedded bolt be provided with across pre-embedded bolt adjustment hole and center be provided with handle hole;Four corners are correspondingly arranged on adjusting sleeve, the corresponding location hole for being provided with pre-embedded bolt of cope plate on bottom surface.The master mold and auxiliary mould of this mold are arranged on precast beam bottom stage seat, by the height change for adjusting bolt and realizing master mold of lift adjustment sleeve connection, to adapt to wedge block thickness;The positioning of pre-embedded bolt is realized by adjustment hole;Auxiliary mould integral preform can effectively save working hour, and master mold is adjustable and easy to operate, practical.

Description

A kind of precast beam wedge block and pre-embedded bolt installation mold
Technical field
The utility model relates to civil construction field, in particular to a kind of precast beam wedge block and pre-embedded bolt install mould Tool.
Background technique
With the development of science of bridge building, in railway, highway and urban road using increasing, and There are the structures shapes such as prefabricated case beam, T beam and hollow slab girder in the method for mostly using standard paragraphs prefabricated in science of bridge building implementation process Formula is typically provided with the fixing bolt of wedge block and support in the beam bottom of these precast beams.Normal practice is pre- on precast pedestal Wedge block position hole is stayed, reserving hole is filled using medium coarse sand, wedge block absolute altitude and the gradient are controlled according to medium coarse sand loading, Pre-buried carrier setting bolt is fixed on framework of steel reinforcement, this way precision is lower, and beam bottom appearance is poor and is unfavorable in subsequent support Installation.Accordingly, it is desirable to provide it is a kind of convenient for construction, wedge block height and the gradient can be controlled accurately, and have higher pre-buried spiral shell The position precision mold of bolt.
Utility model content
The utility model proposes a kind of precast beam wedge blocks and pre-embedded bolt installation mold to solve the above problems, specifically Scheme is as follows:
A kind of installation mold of precast beam wedge block and pre-embedded bolt includes master mold and auxiliary mould, the auxiliary mould Tool includes rectangle frame and the composite plate for being completely layered on rectangle frame upper port, is wherein provided in composite plate across the pre-buried hole of master mold Mouthful;The master mold is placed in the pre-buried hole of rectangle frame, is included cope plate and lower template, is wherein formed between cope plate and composite plate Difference in height and wedge block height be adapted.
A side of the master mold is provided with inclined plate;The inclined plate is located on the inside of prefabricated girder tensioning direction, and passes through one Group supporting rod is correspondingly connected with rectangle frame.
The angle of the inclined plate and cope plate is obtuse angle.
Gap filling between the master mold and auxiliary mould has cement mortar.
The cope plate is rectangular slab, above the corresponding location hole for being provided with pre-embedded bolt;The location hole is circular hole, diameter It is adapted with pre-embedded bolt diameter.
The lower template is rectangular slab, and pre-embedded bolt is corresponded in plate face and is provided with adjustment hole and center across pre-embedded bolt Position is provided with handle hole;Four corners are correspondingly arranged on adjusting sleeve on bottom surface.
The installation mold is placed on the pedestal at Prefabricated bar bottom, and wherein lower template is adjustable by adjusting bolt and pedestal Connection;The lower end of the pre-embedded bolt is connected by connection sleeve and the adjustment hole of lower template, and the pre-embedded bolt upper end passes through The location hole of cope plate;The wedge block passes through pre-embedded bolt and is mounted on upper mold plate top surface, and upper surface is concordant with composite plate.
Adjusting bolt upper end adjusting sleeve corresponding with lower template is threadedly coupled, lower end and the pedestal for being mounted on beam bottom On bush whorl connection;The connection sleeve is mounted in the adjustment hole of lower template.
The adjustment hole is slotted hole, and width is adapted with sleeve diameter is connect, and length is 100~200mm.
The utility model has the following beneficial effects:
The utility model passes through the fixed installation of wedge block and pre-embedded bolt, can effectively increase pre-embedded bolt position essence Degree, and then precast beam weight is improved, and master mold can height according to the Thickness adjusting die of wedge block and pre-embedded bolt position It sets, can make it is suitable for different Prefabricated bar bodies, increasing it can be used range;Auxiliary mould is that integration is prefabricated, effectively The construction time is saved, inclined board can effectively protect the corner of precast beam wedge block in stretching process, guarantees its integrated beauty The property seen;The utility model can standardize prefabricated in construction usage, and circulation is used for multiple times, and mold overall structure is simple, operation Simplicity is easy to construct.
Detailed description of the invention
Fig. 1 is installation mold internal structure schematic diagram;
Fig. 2 is installation mold overall schematic;
Fig. 3 is lower template schematic diagram;
Fig. 4 is cope plate schematic diagram.
Appended drawing reference: 1- rectangle frame;2- composite plate;3- inclined plate;4- lower template;5- cope plate;6- cement mortar;7- support Rod piece;8- adjusts bolt;9- adjusts sleeve;10- connection sleeve;11- pre-embedded bolt;12- adjustment hole;13- handle hole.
Specific embodiment
The present embodiment is illustrated by taking the wedge block of prefabricated box beam and pre-embedded bolt as an example, as depicted in figs. 1 and 2, auxiliary Rectangle frame 1 is helped in mold to be welded using the closing of 20# channel steel, length is not less than 13000mm, the not small precast beam bottom width of width, The composite plate 2 that 1 port top surface of rectangle frame is completely spread is 5+1 clad steel plate, and by being welded and fixed, the wherein reserved installation of clad steel plate is led The pre-buried hole of mold;Inclined plate 3 is made into chamfering using 50 × 50mm plate, and the supporting rod 7 with channel steel welding is 12 reinforcing bars.
As shown in Figure 3 and Figure 4, lower template 4 uses 2cm steel form in the present embodiment, having a size of 700 × 600mm, in 2cm The handle hole 13 that diameter is 300mm is opened in steel form center, while in the four Angle Position welding 40 of 2cm punching block back Sleeve 9 and installation and adjustment bolt 8 are adjusted, bolt 8 and precast beam pedestal is adjusted and passes through sleeve connection, 2cm steel form mounting height Adjusting bolt 8 is turned by handle hole 13 to be adjusted;Cope plate 5 uses 1cm steel form, the steel having a size of 700 × 500mm Plate carries out setting location hole according to determining 11 position of support pre-embedded bolt.
In the present embodiment, adjustment hole 12,12 side of setting of adjustment hole are arranged according to 10 size of connection sleeve of pre-embedded bolt 11 Method is first simultaneously to set circular hole according to the position for designing the connection sleeve 10 that prefabricated beam body support position of center line determines, and to prefabricated Girder tensioning direction extends 100mm and sets same circular hole again, two circular hole connection, forms a whole sliding slot, beam length is in 100mm When variation, connection sleeve 10 can adjusted according to prefabricated beam body difference support center line, and then adjust 11 position of pre-embedded bolt.
Specific implementation steps when construction are as follows:
Step 1: support center is determined according to prefabricated beam length, the installation auxiliary installation mould group on precast beam pedestal, In pre-buried dimension of opening correspond to 2cm steel form die size.
Step 2: according to pre-buried support position of center line, adjustment installation 2cm steel form so that 2cm steel form center line with Pre-buried support center line alignment, and the adjusting bolt 8 connected by adjusting sleeve 9, and will adjust on bolt 8 and precast beam pedestal Sleeve is connected.
Bolt 8 is adjusted Step 3: adjusting according to wedge block actual size, so that 2cm steel form is with 2 difference in height of composite plate The sum of wedge block and 1cm punching block plate thickness.
Step 4, adjusting the connection sleeve 10 in adjustment hole 12 makes it correspond to the pre-buried position of susceptor design, in connection sleeve Pre-embedded bolt 11 is connected on 10.
Step 5: installation 1cm steel form so that pre-embedded bolt 11 pass through location hole and fixation, verification plate centre line with Support center line, error are not more than 1mm.
Step 6: 2cm steel plate mold, 1cm steel form and auxiliary installation mould group gap are blocked with cement mortar 6.
Step 7: box beam wedge block and pre-embedded bolt 11 is fixedly mounted, bale handle, takes out 1cm steel form, circulation after the completion It uses.
Obviously, above-described embodiment is only intended to clearly illustrate made by the outstanding feature of the utility model and illustrates, and is not It is the restriction to the utility model embodiment;For those skilled in the art, basis is used above explained On can still make other variations or changes in different ways, if not carrying out inventive improvements to it, belong to the utility model Protection scope.

Claims (9)

1. a kind of installation mold of precast beam wedge block and pre-embedded bolt, it is characterised in that: include master mold and auxiliary mould, institute Stating auxiliary mould includes rectangle frame (1) and the composite plate (2) for being completely layered on rectangle frame (1) upper port, is wherein provided in composite plate (2) Across the pre-buried hole of master mold;The master mold is placed in rectangle frame (1) pre-buried hole, includes cope plate (5) and lower template (4), the height of the difference in height and wedge block that are wherein formed between cope plate (5) and composite plate (2) is adapted.
2. the installation mold of a kind of precast beam wedge block and pre-embedded bolt according to claim 1, it is characterised in that: described A side of master mold is provided with inclined plate (3);The inclined plate (3) is located on the inside of prefabricated girder tensioning direction, and passes through one group of support Rod piece (7) is correspondingly connected with rectangle frame (1).
3. the installation mold of a kind of precast beam wedge block and pre-embedded bolt according to claim 2, it is characterised in that: described Inclined plate (3) and the angle of cope plate (5) are obtuse angle.
4. according to claim 1 to the installation mold of precast beam wedge block and pre-embedded bolt described in 3 any one, feature exists In: the gap filling between the master mold and auxiliary mould has cement mortar (6).
5. the installation mold of a kind of precast beam wedge block and pre-embedded bolt according to claim 4, it is characterised in that: described Cope plate (5) is rectangular slab, above the corresponding location hole for being provided with pre-embedded bolt (11);The location hole is circular hole, diameter and pre- Bolt (11) diameter is buried to be adapted.
6. the installation mold of a kind of precast beam wedge block and pre-embedded bolt according to claim 5, it is characterised in that: described Lower template (4) is rectangular slab, correspond in plate face pre-embedded bolt (11) be provided with across pre-embedded bolt (11) adjustment hole (12) and in Heart position is provided with handle hole (13);Four corners, which are correspondingly arranged on, on bottom surface adjusts sleeve (9).
7. a kind of installation mold using a kind of precast beam wedge block and pre-embedded bolt described in claim 1 to 6 any one Mounting structure, it is characterised in that: the installation mold is placed on the pedestal at Prefabricated bar bottom, and wherein lower template (4) passes through Adjust bolt (8) and the adjustable connection of pedestal;The lower end of the pre-embedded bolt (11) passes through connection sleeve (10) and lower template (4) Adjustment hole (12) connection, pre-embedded bolt (11) upper end pass through the location hole of cope plate (5);The wedge block passes through pre-buried spiral shell Bolt (11) is mounted on cope plate (5) top surface, and upper surface is concordant with composite plate (2).
8. mounting structure according to claim 7, it is characterised in that: the adjusting bolt (8) upper end and lower template (4) are right The adjusting sleeve (9) answered is threadedly coupled, and lower end is connect with the bush whorl on the pedestal for being mounted on beam bottom;The connection sleeve (10) it is mounted in the adjustment hole (12) of lower template (4).
9. mounting structure according to claim 8, it is characterised in that: the adjustment hole (12) is slotted hole, width and company Female connector cylinder (10) diameter is adapted, and length is 100~200mm.
CN201821740290.3U 2018-10-26 2018-10-26 A kind of precast beam wedge block and pre-embedded bolt installation mold Active CN209552027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821740290.3U CN209552027U (en) 2018-10-26 2018-10-26 A kind of precast beam wedge block and pre-embedded bolt installation mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821740290.3U CN209552027U (en) 2018-10-26 2018-10-26 A kind of precast beam wedge block and pre-embedded bolt installation mold

Publications (1)

Publication Number Publication Date
CN209552027U true CN209552027U (en) 2019-10-29

Family

ID=68298293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821740290.3U Active CN209552027U (en) 2018-10-26 2018-10-26 A kind of precast beam wedge block and pre-embedded bolt installation mold

Country Status (1)

Country Link
CN (1) CN209552027U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109129849A (en) * 2018-10-26 2019-01-04 中建局集团第二建筑有限公司 A kind of precast beam wedge block and pre-embedded bolt installation mold and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109129849A (en) * 2018-10-26 2019-01-04 中建局集团第二建筑有限公司 A kind of precast beam wedge block and pre-embedded bolt installation mold and its construction method
CN109129849B (en) * 2018-10-26 2024-01-23 中建一局集团第二建筑有限公司 Prefabricated beam wedge block and embedded bolt mounting die and construction method thereof

Similar Documents

Publication Publication Date Title
CN103321111B (en) Streetcar track connects the construction method of paving
CN206245139U (en) precast slab ballast bed
CN102817324B (en) Construction method for quickly installing pot rubber bearing by using epoxy resin mortar
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN106245529A (en) Railway tee girder falls beam method safely and fast
CN109129849A (en) A kind of precast beam wedge block and pre-embedded bolt installation mold and its construction method
CN209552027U (en) A kind of precast beam wedge block and pre-embedded bolt installation mold
CN110172921A (en) Box beam reinforcing bar moulding bed processes structure and steel bar framework of box beam construction method
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN110005200B (en) Construction process for concrete pouring compaction of horizontal hidden beam
CN212866938U (en) Leveling structure of prefabricated wall body
CN111663794A (en) Wall body leveling mechanism for longitudinal rib superposed shear wall and construction method
CN210657852U (en) Prefabricated road deck and temporary road structure
CN212866939U (en) Wall body leveling mechanism for longitudinal rib superposed shear wall
CN216739751U (en) High-precision asphalt trunk inspection well
CN115613398A (en) Prefabricated track structure for built-in pump house section of track traffic and construction method
CN214883824U (en) Pre-leveling tower foundation
CN1464825A (en) Formwork for precast concrete panels
CN210658028U (en) Continuous rigid frame bridge 0# block support with decorative plate
CN107059913A (en) A kind of reactor built-in fitting supporting construction and method for embedding
CN208702161U (en) A kind of template support that recycling can be adjusted accurately
KR20050091252A (en) Construction method for bridge using a jig apparatus
CN215395869U (en) Novel precast concrete superimposed sheet's preparation mould
CN216865984U (en) Template assembly for building beam
CN114687467B (en) Vertical connection pouring method and correction support tool for assembled prefabricated shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant