CN209549168U CN201822247458.3U CN201822247458U CN209549168U CN 209549168 U CN209549168 U CN 209549168U CN 201822247458 U CN201822247458 U CN 201822247458U CN 209549168 U CN209549168 U CN 209549168U
Authority
CN
China
Prior art keywords
partition
purified treatment
treatment case
spray tower
water spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822247458.3U
Other languages
Chinese (zh)
Inventor
赖华生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Weiqi New Materials Technology Co ltd
Original Assignee
Zhuhai Winner Anticorrosion Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Winner Anticorrosion Technology Co ltd filed Critical Zhuhai Winner Anticorrosion Technology Co ltd
Priority to CN201822247458.3U priority Critical patent/CN209549168U/en
Application granted granted Critical
Publication of CN209549168U publication Critical patent/CN209549168U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Catalysts (AREA)
  • Physical Water Treatments (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model discloses a kind of paint shop's air cleaning systems, including centrifugal blower, water spray tower, cyclic water tank, feeding spraying pump and purified treatment case, centrifugal blower is connected to by gas pipeline with the lower part of water spray tower, centrifugal blower is for exhaust gas to be delivered in water spray tower, water spray tower, cyclic water tank and feeding spraying pump are interconnected by spray tube, the top of purified treatment case is connected to setting by gas pipeline with the top of water spray tower, first partition and second partition are vertically arranged in purified treatment case, the inner cavity of purified treatment case is separated into the first process chamber by first partition and second partition, second processing room and third process chamber, filter screen is provided in first process chamber, the first active carbon layer and the second active carbon layer are provided in second processing room, ultraviolet lamp tube and photocatalyst layer are provided in third process chamber;Paint shop's air cleaning system exhaust-gas treatment effect is good, and processing cost is low.

Description

一种油漆车间空气净化系统An air purification system for a paint shop

技术领域technical field

本实用新型涉及一种油漆车间空气净化系统。The utility model relates to an air purification system for a paint workshop.

背景技术Background technique

金属工件长时间暴露在空气中,表面极易与空气的水蒸气、氧气作用产生锈迹,这不仅会影响金属工件的美观性,还会影响金属工件的使用性能,长时间的锈蚀会导致金属工件的硬度和强度不符合要求,为了避免金属工件表面产生锈迹,通常会在金属工件投入使用前进行漆料的涂覆,在金属表面形成保护层。The metal workpiece is exposed to the air for a long time, and the surface is easily rusted by the water vapor and oxygen in the air. This will not only affect the aesthetics of the metal workpiece, but also affect the performance of the metal workpiece. Long-term corrosion will cause metal The hardness and strength of the workpiece do not meet the requirements. In order to avoid rust on the surface of the metal workpiece, paint is usually applied before the metal workpiece is put into use to form a protective layer on the metal surface.

油漆车间的油漆废气一般含有较多的有毒物质、粉尘以及存在刺鼻性气味。目前,一些油漆车间通过抽风机将废弃直接排放到室外,这种方式虽然缓解了油漆车间内的空气环境,但是污染了大自然空气,危害了公众健康,也有一些油漆车间采用空气净化装置,但是其处理成本高,净化效果不佳。Paint exhaust gas from paint workshops generally contains more toxic substances, dust and pungent odors. At present, some paint workshops discharge waste directly to the outside through exhaust fans. Although this method alleviates the air environment in the paint workshop, it pollutes the natural air and endangers public health. Some paint workshops also use air purification devices, but Its processing cost is high, and the purification effect is not good.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中的缺陷,提供一种废气处理效果好,处理成本低的油漆车间空气净化系统,来解决现有技术中存在的问题。The purpose of the utility model is to solve the defects in the prior art, provide a paint shop air purification system with good waste gas treatment effect and low treatment cost, so as to solve the existing problems in the prior art.

为实现上述目的,本实用新型的技术方案如下:In order to achieve the above object, the technical scheme of the utility model is as follows:

一种油漆车间空气净化系统,包括离心风机、水喷淋塔、循环水箱、喷淋水泵和净化处理箱,所述离心风机通过气体管道与水喷淋塔的下部连通,所述水喷淋塔、循环水箱和喷淋水泵通过喷淋管相互连通,所述净化处理箱的上部与水喷淋塔的顶部通过气体管道连通设置,所述净化处理箱内纵向设置有第一隔板和第二隔板,所述第一隔板的上端与净化处理箱的内顶面固定连接,所述第一隔板的下端与净化处理箱的内底面存在间隙,所述第二隔板的下端与净化处理箱的内底面固定连接,所述第二隔板的上端与净化处理箱的内顶面存在间隙,所述第一隔板和第二隔板将净化处理箱的内腔分隔成第一处理室、第二处理室和第三处理室,所述第一处理室内设置有过滤网,所述第二处理室内设置有第一活性炭层和第二活性炭层,所述第三处理室内设置有紫外灯管和光触媒层。An air purification system for a paint shop, comprising a centrifugal fan, a water spray tower, a circulating water tank, a spray water pump and a purification treatment box, the centrifugal fan communicates with the lower part of the water spray tower through a gas pipeline, and the water spray tower , the circulating water tank and the spray water pump communicate with each other through the spray pipe, the upper part of the purification treatment box is connected with the top of the water spray tower through the gas pipeline, and the first partition and the second partition are arranged longitudinally in the purification treatment box. A partition, the upper end of the first partition is fixedly connected to the inner top surface of the purification treatment box, there is a gap between the lower end of the first partition and the inner bottom surface of the purification treatment box, and the lower end of the second partition is connected to the purification treatment box. The inner bottom surface of the treatment box is fixedly connected, and there is a gap between the upper end of the second partition and the inner top surface of the purification treatment box, and the first partition and the second partition divide the inner cavity of the purification treatment box into the first treatment chamber, a second treatment chamber and a third treatment chamber, the first treatment chamber is provided with a filter screen, the second treatment chamber is provided with a first activated carbon layer and a second activated carbon layer, and the third treatment chamber is provided with an ultraviolet Light tube and photocatalyst layer.

为了进一步实现本实用新型,所述水喷淋塔的底部与循环水箱的顶部连通设置,所述循环水箱的下部与喷淋水泵的输入端连通设置,所述喷淋水泵的输出端与水喷淋塔的上部连通设置。In order to further realize the utility model, the bottom of the water spray tower is communicated with the top of the circulating water tank, the lower part of the circulating water tank is communicated with the input end of the spray water pump, and the output end of the spray water pump is connected with the water spray tank. The upper part of the shower tower is connected.

为了进一步实现本实用新型,所述循环水箱的顶部和底部分别设置有进水管和排水管。In order to further realize the utility model, the top and the bottom of the circulating water tank are respectively provided with water inlet pipes and drain pipes.

为了进一步实现本实用新型,所述过滤网的两端分别固定设置在净化处理箱的内壁和第一隔板的侧面上,所述第一活性炭层和第二活性炭层的两端分别固定设置在第一隔板的侧面和第二隔板的侧面上,所述紫外灯管和光触媒层的两端分别设置在第二隔板的侧面和净化处理箱的内壁上。In order to further realize the utility model, the two ends of the filter screen are respectively fixedly arranged on the inner wall of the purification treatment box and the side of the first partition, and the two ends of the first activated carbon layer and the second activated carbon layer are respectively fixedly arranged on the On the side of the first partition and the side of the second partition, the two ends of the ultraviolet lamp tube and the photocatalyst layer are respectively arranged on the side of the second partition and the inner wall of the purification treatment box.

有益效果Beneficial effect

本实用新型通过离心风机将有机油漆车间的废气通入至水喷淋塔内,水喷淋塔对废气中的粉尘颗粒物及部分有机物进行吸收,防止颗粒物堵塞后续的净化处理箱以及降低净化处理箱的处理负荷;通过净化处理箱内设置有第一隔板和第二隔板,增长废气的流动路径和减缓气体流动速度,提高净化效果;通过设置有过滤网、活性炭层和光触媒层,废气经过过滤网过滤、活性炭的吸收和光触媒层的催化降解废气中有毒有害气体,从而达标排放;该油漆车间空气净化系统废气处理效果好,处理成本低。The utility model passes the waste gas from the organic paint workshop into the water spray tower through the centrifugal fan, and the water spray tower absorbs the dust particles and some organic matter in the waste gas, preventing the particles from blocking the subsequent purification treatment box and reducing the purification treatment box The processing load; through the first partition and the second partition in the purification treatment box, the flow path of the waste gas is increased and the gas flow velocity is slowed down to improve the purification effect; through the filter, the activated carbon layer and the photocatalyst layer, the waste gas passes through Filtering, activated carbon absorption and photocatalyst layer catalytically degrade toxic and harmful gases in the waste gas, so as to meet the emission standards; the air purification system of the paint workshop has good waste gas treatment effect and low treatment cost.

附图说明Description of drawings

图1为本实用新型油漆车间空气净化系统的结构示意图;Fig. 1 is the structural representation of the air purification system of the utility model paint shop;

附图标记说明:Explanation of reference signs:

1、离心风机;2、水喷淋塔;3、循环水箱;31、进水管;32、排水管;4、喷淋水泵;5、净化处理箱;51、第一隔板;52、第二隔板;53、过滤网;54、第一活性炭层;55、第二活性炭层;56、紫外灯管;57、光触媒层;6、气体管道;7、喷淋管。1. Centrifugal fan; 2. Water spray tower; 3. Circulating water tank; 31. Water inlet pipe; 32. Drainage pipe; 4. Spray water pump; 5. Purification treatment box; 51. First clapboard; 52. Second Partition plate; 53, filter screen; 54, first activated carbon layer; 55, second activated carbon layer; 56, ultraviolet lamp tube; 57, photocatalyst layer; 6, gas pipeline; 7, spray pipe.

具体实施方式Detailed ways

下面结合附图对本实用新型作进一步地详细的说明,这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,本具体实施的方向以图1方向为标准。Below in conjunction with accompanying drawing, the utility model is described in further detail. These accompanying drawings are simplified schematic diagrams, only illustrating the basic structure of the utility model in a schematic way, and the direction of this specific implementation is based on the direction of Fig. 1.

实施例一Embodiment one

如图1所示,本实用新型的油漆车间空气净化系统包括离心风机1、水喷淋塔2、循环水箱3、喷淋水泵4和净化处理箱5,其中:As shown in Figure 1, the air purification system of the paint shop of the present invention includes a centrifugal fan 1, a water spray tower 2, a circulating water tank 3, a spray water pump 4 and a purification treatment box 5, wherein:

离心风机1通过气体管道6与水喷淋塔2的下部连通,离心风机1用于将废气输送至水喷淋塔2内,水喷淋塔2、循环水箱3和喷淋水泵4通过喷淋管7相互连通,水喷淋塔2的底部与循环水箱3的顶部连通设置,循环水箱3的下部与喷淋水泵4的输入端连通设置,喷淋水泵4的输出端与水喷淋塔2的上部连通设置,循环水箱3的顶部和底部分别设置有进水管31和排水管32。The centrifugal fan 1 communicates with the lower part of the water spray tower 2 through the gas pipeline 6. The centrifugal fan 1 is used to transport the waste gas to the water spray tower 2. The water spray tower 2, the circulating water tank 3 and the spray water pump 4 pass through the spray The pipes 7 are connected to each other, the bottom of the water spray tower 2 is connected to the top of the circulating water tank 3, the bottom of the circulating water tank 3 is connected to the input end of the spray water pump 4, and the output end of the spray water pump 4 is connected to the water spray tower 2 The top and bottom of the circulating water tank 3 are respectively provided with a water inlet pipe 31 and a drain pipe 32.

净化处理箱5的上部与水喷淋塔2的顶部通过气体管道6连通设置,净化处理箱5内纵向设置有第一隔板51和第二隔板52,第一隔板51的上端与净化处理箱5的内顶面固定连接,第一隔板51的下端与净化处理箱5的内底面存在间隙,第二隔板52的下端与净化处理箱5的内底面固定连接,第二隔板52的上端与净化处理箱5的内顶面存在间隙,第一隔板51和第二隔板52将净化处理箱5的内腔分隔成第一处理室、第二处理室和第三处理室,第一处理室内设置有过滤网53,过滤网53的两端分别固定设置在净化处理箱5的内壁和第一隔板51的侧面上,第二处理室内设置有第一活性炭层54和第二活性炭层55,第一活性炭层54和第二活性炭层55的两端分别固定设置在第一隔板51的侧面和第二隔板52的侧面上,第三处理室内设置有紫外灯管56和光触媒层57,紫外灯管56和光触媒层57的两端分别设置在第二隔板52的侧面和净化处理箱5的内壁上。The top of the purification treatment box 5 is communicated with the top of the water spray tower 2 through the gas pipeline 6, and the first partition plate 51 and the second partition plate 52 are longitudinally arranged in the purification treatment box 5. The upper end of the first partition plate 51 is connected to the purification process. The inner top surface of processing box 5 is fixedly connected, and there is a gap between the lower end of the first dividing plate 51 and the inner bottom surface of purification treatment box 5, and the lower end of the second dividing plate 52 is fixedly connected with the inner bottom surface of purification treatment box 5, and the second dividing plate There is a gap between the upper end of 52 and the inner top surface of the purification treatment box 5, and the inner cavity of the purification treatment box 5 is divided into the first treatment chamber, the second treatment chamber and the third treatment chamber by the first dividing plate 51 and the second dividing plate 52 , the first processing chamber is provided with a filter screen 53, and the two ends of the filter screen 53 are respectively fixedly arranged on the inner wall of the purification treatment box 5 and the side surface of the first partition plate 51, and the first activated carbon layer 54 and the first activated carbon layer 54 are arranged in the second processing chamber. Two activated carbon layers 55, the two ends of the first activated carbon layer 54 and the second activated carbon layer 55 are respectively fixedly arranged on the side of the first partition 51 and the side of the second partition 52, and the third treatment chamber is provided with an ultraviolet lamp 56 And the photocatalyst layer 57, the two ends of the ultraviolet lamp tube 56 and the photocatalyst layer 57 are respectively arranged on the side of the second partition 52 and the inner wall of the purification treatment box 5.

本实用新型通过离心风机将有机油漆车间的废气通入至水喷淋塔内,水喷淋塔对废气中的粉尘颗粒物及部分有机物进行吸收,防止颗粒物堵塞后续的净化处理箱以及降低净化处理箱的处理负荷;通过净化处理箱内设置有第一隔板和第二隔板,增长废气的流动路径和减缓气体流动速度,提高净化效果;通过设置有过滤网、活性炭层和光触媒层,废气经过过滤网过滤、活性炭的吸收和光触媒层的催化降解废气中有毒有害气体,从而达标排放;该油漆车间空气净化系统废气处理效果好,处理成本低。The utility model passes the waste gas from the organic paint workshop into the water spray tower through the centrifugal fan, and the water spray tower absorbs the dust particles and some organic matter in the waste gas, preventing the particles from blocking the subsequent purification treatment box and reducing the purification treatment box The processing load; through the first partition and the second partition in the purification treatment box, the flow path of the waste gas is increased and the gas flow velocity is slowed down to improve the purification effect; through the filter, the activated carbon layer and the photocatalyst layer, the waste gas passes through Filtering, activated carbon absorption and photocatalyst layer catalytically degrade toxic and harmful gases in the waste gas, so as to meet the emission standards; the air purification system of the paint workshop has good waste gas treatment effect and low treatment cost.

以上所述仅为本实用新型的较佳实施方式,本实用新型并不局限于上述实施方式,在实施过程中可能存在局部微小的结构改动,如果对本实用新型的各种改动或变型不脱离本实用新型的精神和范围,且属于本实用新型的权利要求和等同技术范围之内,则本实用新型也意图包含这些改动和变型。The above is only the preferred implementation of the utility model, the utility model is not limited to the above implementation, there may be local minor structural changes in the implementation process, if the various changes or modifications of the utility model do not depart from the present invention If the spirit and scope of the utility model belong to the claims of the utility model and the equivalent technical scope, the utility model also intends to include these changes and modifications.

Claims (4)

1. a kind of paint shop's air cleaning system, which is characterized in that including centrifugal blower, water spray tower, cyclic water tank, spray Water pump and purified treatment case, the centrifugal blower are connected to by gas pipeline with the lower part of water spray tower, and the water spray tower follows Ring water tank and feeding spraying pump are interconnected by spray tube, pass through gas at the top of the top of the purified treatment case and water spray tower The connection setting of body pipeline, is vertically arranged with first partition and second partition in the purified treatment case, the first partition it is upper End is fixedly connected with the inner top surface of purified treatment case, between the lower end of the first partition and the inner bottom surface presence of purified treatment case The lower end of gap, the second partition is fixedly connected with the inner bottom surface of purified treatment case, at the upper end of the second partition and purification The inner top surface of case is managed there are gap, the inner cavity of purified treatment case is separated into the first processing by the first partition and second partition Room, second processing room and third process chamber are provided with filter screen in first process chamber, are provided in the second processing room First active carbon layer and the second active carbon layer are provided with ultraviolet lamp tube and photocatalyst layer in the third process chamber.
2. paint shop's air cleaning system according to claim 1, which is characterized in that the bottom of the water spray tower with The top of cyclic water tank is connected to setting, and the lower part of the cyclic water tank is connected to setting, the spray with the input terminal of feeding spraying pump The output end of water pump is connected to setting with the top of water spray tower.
3. paint shop's air cleaning system according to claim 1, which is characterized in that the top of the cyclic water tank and Bottom is respectively arranged with water inlet pipe and drainpipe.
4. paint shop's air cleaning system according to claim 1, which is characterized in that distinguish at the both ends of the filter screen It is fixed on the inner wall of purified treatment case and the side of first partition, first active carbon layer and the second active carbon layer Both ends are respectively fixedly disposed on the side of first partition and the side of second partition, and the two of the ultraviolet lamp tube and photocatalyst layer End is separately positioned on the side of second partition and the inner wall of purified treatment case.
CN201822247458.3U 2018-12-29 2018-12-29 A kind of paint shop's air cleaning system Active CN209549168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822247458.3U CN209549168U (en) 2018-12-29 2018-12-29 A kind of paint shop's air cleaning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822247458.3U CN209549168U (en) 2018-12-29 2018-12-29 A kind of paint shop's air cleaning system

Publications (1)

Publication Number Publication Date
CN209549168U true CN209549168U (en) 2019-10-29

Family

ID=68304578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822247458.3U Active CN209549168U (en) 2018-12-29 2018-12-29 A kind of paint shop's air cleaning system

Country Status (1)

Country Link
CN (1) CN209549168U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111013293A (en) * 2019-12-31 2020-04-17 惠州市三龙涂料有限公司 Local air purification device for paint production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111013293A (en) * 2019-12-31 2020-04-17 惠州市三龙涂料有限公司 Local air purification device for paint production

Similar Documents

Publication Publication Date Title
CN204563868U (en) A kind of dicalcium powder process gas treating apparatus
CN202893168U (en) High-concentration organic waste gas treatment device
CN207153446U (en) A kind of enamelling machine waste gas spray purification device
CN208097814U (en) A kind of Sewage Disposal waste gas treatment equipment
WO2018068246A1 (en) Exhaust gas purification processing device
CN204996280U (en) Dust purification device is used to diet food manufacturing shop
CN106943838A (en) Alternative waste gas cleaning system
CN204502704U (en) Gas cleaning plant
CN205361040U (en) Combination formula exhaust gas purification system is washed to two spray rinsings
CN105413408A (en) System and method of waste gas concentrated recycling treatment for reducing air pollution
CN205516966U (en) Exhaust gas purifying apparatus is washed to combined type spectrum fog
CN104841234A (en) Washing type waste gas treatment device
CN209679797U (en) A kind of novel exhaust-gas treatment integrated cabinet
CN207401308U (en) A kind of purifying processing device of industrial waste high temperature incineration flue gas
CN207042994U (en) A kind of chemical industry tail gas purifies absorption plant
CN109990608A (en) A heat treatment oil fume treatment system
CN205995249U (en) A low-temperature plasma waste gas processor
CN205435346U (en) Industrial waste gas retrieves purifier
CN205216476U (en) Waste gas processing system
CN210729051U (en) A diesel engine casting production waste gas treatment system
CN211133382U (en) Workshop waste gas dust collector
CN203469732U (en) Air purification system of sanding room
CN101584955B (en) Triphen waste gas treatment method
CN207533007U (en) A kind of fragrance processing emission-control equipment
CN205598860U (en) Purification tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.16, Damen Road, Sanzao Town, Jinwan District, Zhuhai City, Guangdong Province

Patentee after: Guangdong Weiqi New Materials Technology Co.,Ltd.

Country or region after: China

Address before: No.16, Damen Road, Sanzao Town, Jinwan District, Zhuhai City, Guangdong Province

Patentee before: ZHUHAI WINNER ANTICORROSION TECHNOLOGY Co.,Ltd.

Country or region before: China

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A paint workshop air purification system

Granted publication date: 20191029

Pledgee: Hengqin Financial Investment International Finance Leasing Co.,Ltd.

Pledgor: Guangdong Weiqi New Materials Technology Co.,Ltd.

Registration number: Y2024980036509

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20191029

Pledgee: Hengqin Financial Investment International Finance Leasing Co.,Ltd.