CN206064044U - A kind of infant industry Multi-stage waste gas purifying installation - Google Patents

A kind of infant industry Multi-stage waste gas purifying installation Download PDF

Info

Publication number
CN206064044U
CN206064044U CN201621055510.XU CN201621055510U CN206064044U CN 206064044 U CN206064044 U CN 206064044U CN 201621055510 U CN201621055510 U CN 201621055510U CN 206064044 U CN206064044 U CN 206064044U
Authority
CN
China
Prior art keywords
air inlet
waste gas
internally provided
electromagnetic valve
filter layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621055510.XU
Other languages
Chinese (zh)
Inventor
蒋彦龙
李京军
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Xinyi Chuangda Electronic Technology Co Ltd
Original Assignee
Qingdao Xinyi Chuangda Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Xinyi Chuangda Electronic Technology Co Ltd filed Critical Qingdao Xinyi Chuangda Electronic Technology Co Ltd
Priority to CN201621055510.XU priority Critical patent/CN206064044U/en
Application granted granted Critical
Publication of CN206064044U publication Critical patent/CN206064044U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a kind of infant industry Multi-stage waste gas purifying installation, including air inlet, drain pipe, first filter layer, air detection instrument, gas outlet and secondary intake pipes, the air inlet is internally provided with the first blower fan, spray head is installed with above the smoke abatement and dust control chamber interior, the drain pipe is connected with smoke abatement and dust control room bottom, first filter chamber is internally provided with air inlet deflector, air inlet deflector is installed with the left of first filter layer, second filter chamber is internally provided with the second filter layer, the air detection instrument is electrically connected with the first electromagnetic valve and the second electromagnetic valve, first electromagnetic valve is installed on the gas outlet, the secondary intake pipes are internally provided with the second blower fan.The infant industry Multi-stage waste gas purifying installation can be such that waste gas uniformly contacts with filter layer by air inlet deflector, effectively improve the utilization rate of filter layer, reduce the replacement frequency of filter screen, reduce waste gas purification cost.

Description

A kind of infant industry Multi-stage waste gas purifying installation
Technical field
This utility model is related to environment protection equipment technical field, specially a kind of infant industry Multi-grade exhaust gas purification dress Put.
Background technology
It is various containing contaminant gases that industrial waste gas is produced in referring to plant area of enterprise fuel combustion and production process General name.Industrial waste gas process refers to:For the waste gas that industrial site such as factory, workshop produce, pre- place is carried out before externally discharging Reason, to reach the standard that national waste gas is externally discharged.
With increasing of the people to environmental conservation dynamics, to life with the process of industrial waste gas increasingly by social weight, mesh Before, the catalytic converter for industrial waste gas purifying process is mainly passive type depurator, and which mainly adopts filter screen or activated carbon Used as purification medium, and this kind of catalytic converter inlet end is less, causes waste gas and uniformly can not contact with filter screen, so as to Block filter screen centre serious, filter screen utilization rate is low, also accelerates the replacement frequency of filter screen, increase waste gas purification into This, while only being processed to waste gas by a metafiltration net, waste gas purification means are single, and clean-up effect is bad.
Utility model content
The purpose of this utility model is to provide a kind of infant industry Multi-stage waste gas purifying installation, to solve above-mentioned background skill Propose in art that the filter screen utilization rate of common waste gas purification apparatus is low, purification means are single, the bad problem of clean-up effect.
For achieving the above object, this utility model provides following technical scheme:A kind of infant industry Multi-grade exhaust gas purification dress Put, including air inlet, drain pipe, the first filter layer, air detection instrument, gas outlet and secondary intake pipes, inside the air inlet The first blower fan is provided with, and on the right side of air inlet, is connected with main body, the body interior is provided with smoke abatement and dust control room, the smoke elimination is removed Spray head is installed with above dirt chamber interior, and smoke abatement and dust control room is connected with the first filter chamber by the first connecting pipe, The drain pipe is connected with smoke abatement and dust control room bottom, and first filter chamber is internally provided with air inlet deflector, and the first mistake Filter chamber is connected with the second filter chamber by the second connecting pipe, is installed with air inlet water conservancy diversion on the left of first filter layer Plate, second filter chamber are internally provided with the second filter layer, the air detection instrument and the first electromagnetic valve and the second electromagnetic valve It is electrically connected with, the first electromagnetic valve is installed on the gas outlet, the secondary intake pipes is internally provided with the second blower fan, and secondary Second electromagnetic valve is installed in air inlet pipe.
Preferably, defecator is installed with the drain pipe.
Preferably, the angle between first connecting pipe and horizontal plane is between 15-45 °.
Preferably, the air inlet deflector number is five pieces, and symmetrical with regard to main body cross central line.
Preferably, the left end of the secondary intake pipes is connected with the first connecting pipe, and the right-hand member of secondary intake pipes with It is connected on the right side of main body.
Compared with prior art, the beneficial effects of the utility model are:The infant industry Multi-stage waste gas purifying installation passes through Air inlet deflector can be such that waste gas uniformly contacts with filter layer, effectively improve the utilization rate of filter layer, reduce the replacing of filter screen Frequency, reduces waste gas purification cost, and being provided with smoke abatement and dust control room, the first filter chamber and the second filter chamber can be carried out to waste gas There is certain angle with horizontal plane in multistage purification, good purification, the first connecting pipe, can prevent water from entering into the first mistake In filter chamber, contaminant filter in sewage can be fallen by the defecator on drain pipe, prevent secondary pollution.
Description of the drawings
Fig. 1 is this utility model structural representation.
In figure:1st, air inlet, the 2, first blower fan, 3, main body, 4, smoke abatement and dust control room, 5, spray head, 6, drain pipe, 7, first Connecting pipe, the 8, first filter chamber, 9, air inlet deflector, the 10, first filter layer, the 11, second connecting pipe, 12, second filters Room, the 13, second filter layer, 14, air detection instrument, the 15, first electromagnetic valve, 16, gas outlet, the 17, second electromagnetic valve, 18, second Blower fan, 19, secondary intake pipes, 20, defecator.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Fig. 1 is referred to, this utility model provides a kind of technical scheme:A kind of infant industry Multi-stage waste gas purifying installation, bag Air inlet 1, drain pipe 6, the first filter layer 10, air detection instrument 14, gas outlet 16 and secondary intake pipes 19 are included, in air inlet 1 Portion is provided with the first blower fan 2, and main body 3 is connected with the right side of air inlet 1, and main body 3 is internally provided with smoke abatement and dust control room 4, and smoke elimination is removed 4 inner upper of dirt room is installed with spray head 5, and smoke abatement and dust control room 4 passes through the first connecting pipe 7 and 8 phase of the first filter chamber Connection, between 15-45 °, drain pipe 6 is connected the angle between the first connecting pipe 7 and horizontal plane with 4 bottom of smoke abatement and dust control room It is logical, defecator 20 is installed with drain pipe 6, the first filter chamber 8 is internally provided with air inlet deflector 9, air inlet deflector 9 Number is five pieces, and symmetrical with regard to 3 cross central line of main body, and uniformly waste gas can be shunted, and the first filter chamber 8 passes through the Two connecting pipes 11 are connected with the second filter chamber 12, and air inlet deflector 9, the second mistake are installed with the left of the first filter layer 10 Filter chamber 12 is internally provided with the second filter layer 13, and air detection instrument 14 is electrically connected with the first electromagnetic valve 15 and the second electromagnetic valve 17 Connect, the first electromagnetic valve 15 is installed on gas outlet 16, secondary intake pipes 19 are internally provided with the second blower fan 18, and secondary intake pipes Second electromagnetic valve 17 is installed on 19, the left end of secondary intake pipes 19 is connected with the first connecting pipe 7, and secondary intake pipes 19 Right-hand member be connected with the right side of main body 3 such that it is able to form a circulation canal, waste gas can be made to carry out secondary filter.
Operation principle:When using the infant industry Multi-stage waste gas purifying installation, waste gas is passed through air inlet by the first blower fan 2 1 is sucked in main body 3, and enters in the middle of smoke abatement and dust control room 4, and spray head 5 can carry out sprinkling water smoke to waste gas, gives up in waste gas Slag is adsorbed by water smoke, and drops into 4 bottom of smoke abatement and dust control room, and is discharged from drain pipe 6, useless after mist purification Gas is sequentially entered into the first filter chamber 8 and the second filter chamber 12 by the first connecting pipe 7, in the first filter layer 10 and second 13 left effect of filter layer, the harmful gass in waste gas are adsorbed, and out the waste gas after filtration enters into the right side of main body 3, When air detection instrument 14 detect filter after waste gas in the middle of also there are toxic gas when, close the first electromagnetic valve 15, open Waste gas is drawn into secondary intake pipes 19 by the second electromagnetic valve 17, the second blower fan 18, and is entered in the middle of the first filter chamber 8 again simultaneously Carry out secondary filter.
Although being described in detail to this utility model with reference to the foregoing embodiments, for those skilled in the art comes Say, which still can be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc. all should It is included within protection domain of the present utility model.

Claims (5)

1. a kind of infant industry Multi-stage waste gas purifying installation, including air inlet(1), drain pipe(6), the first filter layer(10), it is empty Gas detector(14), gas outlet(16)And secondary intake pipes(19), it is characterised in that:The air inlet(1)It is internally provided with One blower fan(2), and air inlet(1)Right side is connected with main body(3), the main body(3)It is internally provided with smoke abatement and dust control room(4), institute State smoke abatement and dust control room(4)Inner upper is installed with spray head(5), and smoke abatement and dust control room(4)By the first connecting pipe(7) With the first filter chamber(8)It is connected, the drain pipe(6)With smoke abatement and dust control room(4)Bottom is connected, first filter chamber (8)It is internally provided with air inlet deflector(9), and the first filter chamber(8)By the second connecting pipe(11)With the second filter chamber (12)It is connected, first filter layer(10)Left side is installed with air inlet deflector(9), second filter chamber(12)It is interior Portion is provided with the second filter layer(13), the air detection instrument(14)With the first electromagnetic valve(15)With the second electromagnetic valve(17)Electrically Connection, the gas outlet(16)On the first electromagnetic valve is installed(15), the secondary intake pipes(19)It is internally provided with the second wind Machine(18), and secondary intake pipes(19)On the second electromagnetic valve is installed(17).
2. a kind of infant industry Multi-stage waste gas purifying installation according to claim 1, it is characterised in that:The drain pipe (6)On be installed with defecator(20).
3. a kind of infant industry Multi-stage waste gas purifying installation according to claim 1, it is characterised in that:First connection Pipeline(7)Angle between horizontal plane is between 15-45 °.
4. a kind of infant industry Multi-stage waste gas purifying installation according to claim 1, it is characterised in that:The air inlet water conservancy diversion Plate(9)Number is five pieces, and with regard to main body(3)Cross central line is symmetrical.
5. a kind of infant industry Multi-stage waste gas purifying installation according to claim 1, it is characterised in that:The secondary air inlet Pipe(19)Left end and the first connecting pipe(7)It is connected, and secondary intake pipes(19)Right-hand member and main body(3)Right side be connected Connect.
CN201621055510.XU 2016-09-14 2016-09-14 A kind of infant industry Multi-stage waste gas purifying installation Active CN206064044U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621055510.XU CN206064044U (en) 2016-09-14 2016-09-14 A kind of infant industry Multi-stage waste gas purifying installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621055510.XU CN206064044U (en) 2016-09-14 2016-09-14 A kind of infant industry Multi-stage waste gas purifying installation

Publications (1)

Publication Number Publication Date
CN206064044U true CN206064044U (en) 2017-04-05

Family

ID=58437982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621055510.XU Active CN206064044U (en) 2016-09-14 2016-09-14 A kind of infant industry Multi-stage waste gas purifying installation

Country Status (1)

Country Link
CN (1) CN206064044U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107051089A (en) * 2017-05-26 2017-08-18 金川集团股份有限公司 A kind of mineral processing air purifier
CN107321126A (en) * 2017-07-01 2017-11-07 苏州诚亭自动化设备有限公司 Industrial waste-gas purifier
CN108744745A (en) * 2018-06-19 2018-11-06 张家港市益成机械有限公司 The tail gas environment-friendly processing unit of vacuum paint-dipping machine drying equipment
CN113398702A (en) * 2021-06-25 2021-09-17 内蒙古瑞濠新材料科技有限公司 Alloy preparation electric stove flue gas purification processing system
CN114099997A (en) * 2020-08-31 2022-03-01 研能科技股份有限公司 Filtration and purification treatment method
US11898554B2 (en) 2020-08-31 2024-02-13 Microjet Technology Co., Ltd. Filtration and purification processing method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107051089A (en) * 2017-05-26 2017-08-18 金川集团股份有限公司 A kind of mineral processing air purifier
CN107321126A (en) * 2017-07-01 2017-11-07 苏州诚亭自动化设备有限公司 Industrial waste-gas purifier
CN108744745A (en) * 2018-06-19 2018-11-06 张家港市益成机械有限公司 The tail gas environment-friendly processing unit of vacuum paint-dipping machine drying equipment
CN114099997A (en) * 2020-08-31 2022-03-01 研能科技股份有限公司 Filtration and purification treatment method
US11898554B2 (en) 2020-08-31 2024-02-13 Microjet Technology Co., Ltd. Filtration and purification processing method
CN113398702A (en) * 2021-06-25 2021-09-17 内蒙古瑞濠新材料科技有限公司 Alloy preparation electric stove flue gas purification processing system

Similar Documents

Publication Publication Date Title
CN206064044U (en) A kind of infant industry Multi-stage waste gas purifying installation
CN204563868U (en) A kind of dicalcium powder process gas treating apparatus
CN205164405U (en) Waste gas processing system
CN207153446U (en) A kind of enamelling machine waste gas spray purification device
CN204535440U (en) A kind of kiln gas secondary utilization device
CN205164441U (en) Waste gas processing system
CN104785057A (en) Environment-friendly type pump-free paint mist dust treatment equipment
CN205435208U (en) Active carbon absorption device
CN206897118U (en) Organic waste gas treatment system
CN202962190U (en) Welding dedusting and purifying device
CN201658914U (en) Coal-smoke purification flue and coal-smoke purifier
CN207203771U (en) Pulse bag formula precipitron
CN205164442U (en) Waste gas processing system
CN205796826U (en) A kind of vortex cleaning device of exhaust-gas efficient
CN204412014U (en) A kind of industrial organic waste-gas purification device
CN205392132U (en) A carbon fiber absorber for acid mist purification tower
CN207271770U (en) A kind of chemical emission centralized recovery processing unit
CN207307497U (en) A kind of industrial waste gas dedusting purifier with dust-like
CN208493655U (en) A kind of efficient exhaust gas processing device
CN207599712U (en) A kind of incinerator that may filter that burning waste gas
CN205627558U (en) Plasma photocatalyst exhaust gas purification device
CN205340429U (en) Separated haze belt cleaning device
CN215352745U (en) Chemical waste gas treatment device capable of effectively reducing dust particles in waste gas
CN205127614U (en) Waste gas purifier
CN205164409U (en) Waste gas processing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant