CN209549030U - Water mist dust removing equipment for blast furnace taphole - Google Patents

Water mist dust removing equipment for blast furnace taphole Download PDF

Info

Publication number
CN209549030U
CN209549030U CN201822266730.2U CN201822266730U CN209549030U CN 209549030 U CN209549030 U CN 209549030U CN 201822266730 U CN201822266730 U CN 201822266730U CN 209549030 U CN209549030 U CN 209549030U
Authority
CN
China
Prior art keywords
water
inlet pipe
air inlet
outlet pipe
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822266730.2U
Other languages
Chinese (zh)
Inventor
周军彦
潘湘闽
谭昆
王利
王林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangchun New Iron and Steel Co Ltd
Original Assignee
Yangchun New Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangchun New Iron and Steel Co Ltd filed Critical Yangchun New Iron and Steel Co Ltd
Priority to CN201822266730.2U priority Critical patent/CN209549030U/en
Application granted granted Critical
Publication of CN209549030U publication Critical patent/CN209549030U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

本实用新型公开一种高炉出铁口用的水雾除尘设备,包括出铁口的顶吸式电除尘器、水罐、第一进气管、进水管、出水管和第二进气管,所述第一进气管的一端安装在水罐顶部,进水管的一端和出水管的一端分别与水罐相连,所述出水管上还设有第二进气管,出水管的另一端设于出铁口的顶吸式电除尘器的四周,位于出铁口的顶吸式电除尘器处的出水管上设置多个喷雾孔。本实用新型用于高炉出铁口上方的水雾除尘,能够利用水和压缩空气混合产生水雾,喷出后达到水雾降尘的效果,成本低廉,改造技术简洁,能耗低,能解决现有的高炉铁口出铁时烟尘大且外扬的问题,效果良好。

The utility model discloses a water mist dust removal device for a blast furnace taphole, which comprises a top-suction electric dust collector for the taphole, a water tank, a first air inlet pipe, a water inlet pipe, a water outlet pipe and a second air inlet pipe. One end of the first air inlet pipe is installed on the top of the water tank, one end of the water inlet pipe and one end of the water outlet pipe are respectively connected with the water tank, the second air inlet pipe is also arranged on the water outlet pipe, and the other end of the water outlet pipe is arranged at the taphole Around the top-suction electrostatic precipitator, multiple spray holes are set on the outlet pipe of the top-suction electrostatic precipitator at the taphole. The utility model is used for water mist dedusting above the blast furnace taphole, and can use water and compressed air to mix and produce water mist, which can achieve the effect of water mist dust reduction after spraying out, with low cost, simple transformation technology, low energy consumption, and can solve existing problems In some blast furnaces, there is a problem that there is a lot of smoke and dust when tapping the iron hole, and the effect is good.

Description

高炉出铁口用的水雾除尘设备Water mist dust removal equipment for blast furnace taphole

技术领域technical field

本实用新型涉及冶金行业水雾除尘技术领域,特别涉及一种高炉出铁口用的水雾除尘设备。The utility model relates to the technical field of water mist dedusting in the metallurgical industry, in particular to a water mist dedusting device for blast furnace tapholes.

背景技术Background technique

在高炉出铁的过程中,常常碰到因铁口窜煤气而引发的铁口喷溅,铁口喷溅会带来大量烟尘以及渣铁,极大的增加了除尘压力,造成环境污染,并影响高炉的正常生产。为了解决铁口喷溅带来的大量烟尘,现在的高炉铁口前上方都设计有顶吸式电除尘器,同时在铁口前方设置侧吸式电除尘器,但是顶吸式电除尘器和侧吸式电除尘器无法完全将烟尘吸走,每次造成大量烟尘往电除尘部位外扬,除尘效果不理想。In the process of blast furnace tapping, it is often encountered that the iron hole is splashed due to the gas escaping from the iron hole. The iron hole splash will bring a lot of smoke and dust and slag iron, which greatly increases the dust removal pressure, causes environmental pollution, and Affect the normal production of the blast furnace. In order to solve the large amount of smoke and dust caused by the splashing of the iron hole, the top suction electrostatic precipitator is designed on the front and upper part of the blast furnace iron hole. The side-suction electrostatic precipitator cannot completely suck away the dust, and every time a large amount of dust is released to the electrostatic precipitator, the dust removal effect is not ideal.

实用新型内容Utility model content

本实用新型的目的在于克服现有技术的不足,提供一种高炉出铁口用的水雾除尘设备,该设备可对扬尘部位进行水雾喷洒来解决扬尘的问题。The purpose of the utility model is to overcome the deficiencies of the prior art and provide a water mist dedusting device for blast furnace tapholes. The equipment can spray water mist on dusty parts to solve the problem of dusty dust.

本实用新型的技术方案为:一种高炉出铁口用的水雾除尘设备,包括出铁口的顶吸式电除尘器、水罐、第一进气管、进水管、出水管和第二进气管,所述第一进气管的一端安装在水罐顶部,进水管的一端和出水管的一端分别与水罐相连,所述出水管上还设有第二进气管,出水管的另一端设于出铁口的顶吸式电除尘器的四周,位于出铁口的顶吸式电除尘器处的出水管上设置多个喷雾孔。其中,水罐能够储存喷出水雾所需的水,第一进气管通气后,水罐中的水受到气压进入出水管,出水管的水与第二进气管通入的高压气体混合后,通过喷雾孔在高炉出铁口的顶吸式电除尘器喷出水雾,达到水雾除尘的效果。The technical scheme of the utility model is: a water mist dust removal equipment for a blast furnace taphole, including a top-suction electrostatic precipitator for the taphole, a water tank, a first inlet pipe, a water inlet pipe, a water outlet pipe and a second inlet pipe. Air pipe, one end of the first air inlet pipe is installed on the top of the water tank, one end of the water inlet pipe and one end of the water outlet pipe are connected to the water tank respectively, the second air inlet pipe is also provided on the described water outlet pipe, and the other end of the water outlet pipe is provided with Around the top-suction electrostatic precipitator of the taphole, a plurality of spray holes are arranged on the outlet pipe at the top-suction electrostatic precipitator of the taphole. Among them, the water tank can store the water required for spraying water mist. After the first air intake pipe is ventilated, the water in the water tank enters the water outlet pipe under air pressure. The top-suction electrostatic precipitator at the blast furnace taphole sprays water mist through the spray hole to achieve the effect of water mist dust removal.

所述进水管的另一端连接外接水源,第一进气管的另一端外接压缩空气管道,第二进气管的一端连接出水管,第二进气管的另一端连接供气管道。The other end of the water inlet pipe is connected to an external water source, the other end of the first air inlet pipe is connected to a compressed air pipeline, one end of the second air inlet pipe is connected to a water outlet pipe, and the other end of the second air inlet pipe is connected to an air supply pipe.

所述水罐上还设有安全阀门。The water tank is also provided with a safety valve.

所述水罐底部还设有排污管,排污管上设有排污阀。The bottom of the water tank is also provided with a blowdown pipe, and the blowdown pipe is provided with a blowdown valve.

所述出水管上,相邻喷雾孔的间距相同,间距为230~280mm。On the water outlet pipe, the distance between adjacent spray holes is the same, and the distance is 230-280mm.

所述出水管上,喷雾孔开口朝向远离出铁口的顶吸式电除尘器方向。On the water outlet pipe, the opening of the spray hole faces the direction of the top-suction electrostatic precipitator away from the taphole.

所述进水管、出水管、第一进气管和第二进气管上均设有阀门。The water inlet pipe, the water outlet pipe, the first air inlet pipe and the second air inlet pipe are all provided with valves.

所述第一进气管、进水管、出水管和第二进气管均采用无缝钢管。The first air inlet pipe, the water inlet pipe, the water outlet pipe and the second air inlet pipe are all made of seamless steel pipes.

所述出水管和第二进气管之间、不同出水管之间均采用焊接方式连接。The water outlet pipe and the second air inlet pipe and the different water outlet pipes are all connected by welding.

所述出水管上喷雾孔的孔径为3~5mm。The diameter of the spray hole on the outlet pipe is 3-5mm.

使用上述一种高炉出铁口用的水雾除尘设备,其原理是,水罐通过进水管装满水,再开启水罐顶部的第一进气管,通入压缩空气,气压使得水罐中的水进入出水管,打开第二进气管阀门通入高压气体,通过出水管阀门调节出水管的水量,水和气体混合后,从喷雾孔中喷出水雾,达到在高炉出铁口用水雾除尘的效果。The principle of using the above-mentioned water mist dust removal equipment for blast furnace tapholes is that the water tank is filled with water through the water inlet pipe, and then the first air inlet pipe on the top of the water tank is opened, and compressed air is introduced, and the air pressure makes the water in the water tank Water enters the outlet pipe, opens the valve of the second inlet pipe to feed high-pressure gas, and adjusts the water volume of the outlet pipe through the valve of the outlet pipe. After the water and gas are mixed, water mist is sprayed from the spray hole to achieve dust removal with water mist at the blast furnace taphole. Effect.

本实用新型相对于现有技术,具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

本高炉出铁口用的水雾除尘设备,用于高炉出铁口上方的水雾除尘,能够利用水和压缩空气混合产生水雾,喷出后达到水雾降尘的效果,成本低廉,改造技术简洁,能耗低,能解决现有的高炉铁口出铁时烟尘大且外扬的问题,效果良好。The water mist dust removal equipment for the blast furnace taphole is used for the water mist dust removal above the blast furnace taphole. It can use the mixture of water and compressed air to generate water mist, which can achieve the effect of water mist dust reduction after spraying. The cost is low and the transformation technology It is simple and low in energy consumption, and can solve the problem of large and outwardly rising smoke and dust in the existing blast furnace tap hole, with good effect.

本高炉出铁口用的水雾除尘设备,通过设计实用新型对扬尘部位水雾喷洒的方法,对扬尘部位进行喷水雾来杜绝扬尘的发生,技术简单,改造成本低,使用操作简单易行,相比现有的技术,非常节能,效果明显。The water mist dust removal equipment for the blast furnace taphole, through the design of a utility model for spraying water mist on the dusty part, spraying water mist on the dusty part to prevent the occurrence of dust, the technology is simple, the transformation cost is low, and the operation is simple and easy. , compared with the existing technology, it is very energy-saving and the effect is obvious.

附图说明Description of drawings

图1为本高炉出铁口用的水雾除尘设备的结构示意图。Fig. 1 is a structural schematic diagram of the water mist dedusting equipment used in the blast furnace taphole.

具体实施方式Detailed ways

下面结合实施例,对本实用新型作进一步的详细说明,但本实用新型的实施方式不限于此。The utility model will be further described in detail below in conjunction with the examples, but the implementation of the utility model is not limited thereto.

实施例Example

本实施例一种高炉出铁口用的水雾除尘设备,如图1所示,包括两个出铁口的顶吸式电除尘器6、水罐1、第一进气管3、进水管2、出水管4和第二进气管5,水罐1的容积为0.5m3,工作压力1.35Mpa,第一进气管3的一端安装在水罐1顶部,进水管2的一端和出水管4的一端分别与水罐1相连,出水管4上还设有第二进气管5,出水管4的另一端设于出铁口的顶吸式电除尘器6处的四周,位于出铁口的顶吸式电除尘器6处的出水管4上设置多个喷雾孔7。水罐1能够储存需要用到的水,第一进气管3通气后,水罐1中的水受到气压进入出水管4,出水管4的水与压缩空气混合后通过喷雾孔7在高炉出铁口的顶吸式电除尘器6喷出水雾,达到水雾除尘的效果。出铁口的顶吸式电除尘器安装在高炉出铁口前上方,出铁口(图中未示出)是高炉的一个重要部位。A kind of water mist dedusting equipment for blast furnace taphole of the present embodiment, as shown in Figure 1, comprises the top-suction type electrostatic precipitator 6 of two tapholes, water tank 1, first air inlet pipe 3, water inlet pipe 2 , the water outlet pipe 4 and the second air inlet pipe 5, the volume of the water tank 1 is 0.5m 3 , the working pressure is 1.35Mpa, one end of the first air inlet pipe 3 is installed on the top of the water tank 1, one end of the water inlet pipe 2 and the water outlet pipe 4 One end is respectively connected with the water tank 1, and the second air inlet pipe 5 is also arranged on the water outlet pipe 4, and the other end of the water outlet pipe 4 is arranged around the top suction electrostatic precipitator 6 of the taphole, and is located at the top of the taphole. A plurality of spray holes 7 are arranged on the outlet pipe 4 of the suction electrostatic precipitator 6 . The water tank 1 can store the required water. After the first air intake pipe 3 is ventilated, the water in the water tank 1 is subjected to air pressure and enters the water outlet pipe 4. The water in the water outlet pipe 4 is mixed with compressed air and passed through the spray hole 7 in the blast furnace. The top-suction electrostatic precipitator 6 at the mouth sprays water mist to achieve the effect of water mist dust removal. The top-suction electrostatic precipitator of the taphole is installed above the blast furnace taphole, and the taphole (not shown in the figure) is an important part of the blast furnace.

水罐上还设有安全阀门8,安全阀确保气罐工作压力不能超过1.75Mpa,起到安全保护的作用。水罐底部还设有排污管9,排污管上设有排污阀,目的是把水罐中长时间沉积的杂质及时排放,以免造成堵塞水管。第二进气管5的一端连接出水管4,第二进气管5的另一端连接供气管道(图中未示出),通入0.95Mpa的高压气体。进水管2的另一端连接外接水源(图中未示出)。第一进气管3的另一端外接压缩空气管道(图中未示出)。出水管4上,相邻喷雾孔7的间距相同,孔径为4mm,间距为250mm。出水管4上,喷雾孔7开口朝向远离出铁口的顶吸式电除尘器6的方向设置。进水管2、出水管4、第一进气管3和第二进气管5上均设有阀门。第一进气管3、进水管2、出水管4和第二进气管5均采用无缝钢管。出水管4和第二进气管5之间、不同出水管之间均采用焊接方式连接。The water tank is also provided with a safety valve 8, which ensures that the working pressure of the gas tank cannot exceed 1.75Mpa, and plays the role of safety protection. The bottom of the water tank is also provided with a blowdown pipe 9, and the blowdown pipe is provided with a blowdown valve for the purpose of discharging the impurities deposited for a long time in the water tank in order to avoid blocking the water pipe. One end of the second air inlet pipe 5 is connected with the water outlet pipe 4, and the other end of the second air inlet pipe 5 is connected with an air supply pipeline (not shown in the figure), and feeds the high-pressure gas of 0.95Mpa. The other end of the water inlet pipe 2 is connected to an external water source (not shown in the figure). The other end of the first air intake pipe 3 is externally connected to a compressed air pipeline (not shown in the figure). On the outlet pipe 4, the adjacent spray holes 7 have the same spacing, the aperture is 4mm, and the spacing is 250mm. On the water outlet pipe 4, the opening of the spray hole 7 is set towards the direction away from the top-suction electrostatic precipitator 6 of the taphole. The water inlet pipe 2, the water outlet pipe 4, the first air inlet pipe 3 and the second air inlet pipe 5 are all provided with valves. The first air inlet pipe 3, the water inlet pipe 2, the water outlet pipe 4 and the second air inlet pipe 5 are all made of seamless steel pipes. The water outlet pipe 4 and the second air inlet pipe 5 and between different water outlet pipes are connected by welding.

使用上述一种高炉出铁口用的水雾除尘设备,水罐通过进水管装满水,再开启水罐顶部的第一进气管,通入压缩空气,气压使得水罐中的水进入出水管,打开第二进气管阀门通入高压气体,通过出水管阀门调节出水管的水量,水和气体混合后,从喷雾孔中喷出水雾,达到在高炉出铁口用水雾除尘的效果。Using the above-mentioned water mist dedusting equipment for the blast furnace taphole, the water tank is filled with water through the water inlet pipe, and then the first air inlet pipe on the top of the water tank is opened, and compressed air is introduced, and the air pressure makes the water in the water tank enter the outlet pipe , Open the valve of the second inlet pipe to feed high-pressure gas, and adjust the water volume of the outlet pipe through the valve of the outlet pipe. After the water and gas are mixed, water mist is sprayed from the spray hole to achieve the effect of water mist dust removal at the blast furnace taphole.

如上所述,便可较好地实现本实用新型,上述实施例仅为本实用新型的较佳实施例,并非用来限定本实用新型的实施范围;即凡依本实用新型内容所作的均等变化与修饰,都为本实用新型权利要求所要求保护的范围所涵盖。As mentioned above, the utility model can be better realized, and the above-described embodiment is only a preferred embodiment of the utility model, and is not used to limit the scope of implementation of the utility model; that is, all equal changes made according to the contents of the utility model and modifications are all covered by the scope of protection required by the claims of the present utility model.

Claims (10)

1.一种高炉出铁口用的水雾除尘设备,其特征在于,包括出铁口的顶吸式电除尘器、水罐、第一进气管、进水管、出水管和第二进气管,所述第一进气管的一端安装在水罐顶部,进水管的一端和出水管的一端分别与水罐相连,所述出水管上还设有第二进气管,出水管的另一端设于出铁口的顶吸式电除尘器的四周,位于出铁口的顶吸式电除尘器处的出水管上设置多个喷雾孔。1. a kind of water mist dedusting equipment that blast furnace taphole is used, it is characterized in that, comprise the top-suction electric precipitator of taphole, water tank, the first air inlet pipe, water inlet pipe, water outlet pipe and the second air inlet pipe, One end of the first air inlet pipe is installed on the top of the water tank, one end of the water inlet pipe and one end of the water outlet pipe are respectively connected with the water tank, the second air inlet pipe is also provided on the water outlet pipe, and the other end of the water outlet pipe is located at the water outlet. Around the top-suction electrostatic precipitator of the taphole, a plurality of spray holes are arranged on the outlet pipe at the top-suction electrostatic precipitator of the taphole. 2.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述进水管的另一端连接外接水源,第一进气管的另一端外接压缩空气管道,第二进气管的一端连接出水管,第二进气管的另一端连接供气管道。2. The water mist dedusting equipment for a blast furnace taphole according to claim 1, wherein the other end of the water inlet pipe is connected to an external water source, the other end of the first air inlet pipe is externally connected to a compressed air pipeline, and the second One end of the air inlet pipe is connected with the water outlet pipe, and the other end of the second air inlet pipe is connected with the air supply pipe. 3.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述水罐上还设有安全阀门。3. A water mist dedusting device for a blast furnace taphole according to claim 1, wherein a safety valve is also provided on the water tank. 4.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述水罐底部还设有排污管,排污管上设有排污阀。4. A water mist dedusting device for a blast furnace taphole according to claim 1, characterized in that, the bottom of the water tank is further provided with a blowdown pipe, and a blowdown valve is arranged on the blowdown pipe. 5.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述出水管上,相邻喷雾孔的间距相同,间距为230~280mm。5 . The water mist dedusting equipment for blast furnace taphole according to claim 1 , characterized in that, on the outlet pipe, the distance between adjacent spray holes is the same, and the distance is 230-280 mm. 6.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述出水管上,喷雾孔开口朝向远离出铁口的顶吸式电除尘器方向。6. A water mist dedusting device for a blast furnace taphole according to claim 1, characterized in that, on the water outlet pipe, the opening of the spray hole faces the direction of the top-suction electrostatic precipitator away from the taphole. 7.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述进水管、出水管、第一进气管和第二进气管上均设有阀门。7. A water mist dedusting device for a blast furnace taphole according to claim 1, wherein valves are provided on the water inlet pipe, the water outlet pipe, the first air inlet pipe and the second air inlet pipe. 8.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述第一进气管、进水管、出水管和第二进气管均采用无缝钢管。8. A water mist dedusting device for a blast furnace taphole according to claim 1, wherein the first air inlet pipe, the water inlet pipe, the water outlet pipe and the second air inlet pipe are all made of seamless steel pipes. 9.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述出水管和第二进气管之间、不同出水管之间均采用焊接方式连接。9. A water mist dedusting device for a blast furnace taphole according to claim 1, characterized in that the water outlet pipe and the second air inlet pipe and between different water outlet pipes are connected by welding. 10.根据权利要求1所述一种高炉出铁口用的水雾除尘设备,其特征在于,所述出水管上喷雾孔的孔径为3~5mm。10. The water mist dedusting equipment for blast furnace taphole according to claim 1, characterized in that, the diameter of the spray hole on the outlet pipe is 3-5mm.
CN201822266730.2U 2018-12-28 2018-12-28 Water mist dust removing equipment for blast furnace taphole Expired - Fee Related CN209549030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822266730.2U CN209549030U (en) 2018-12-28 2018-12-28 Water mist dust removing equipment for blast furnace taphole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822266730.2U CN209549030U (en) 2018-12-28 2018-12-28 Water mist dust removing equipment for blast furnace taphole

Publications (1)

Publication Number Publication Date
CN209549030U true CN209549030U (en) 2019-10-29

Family

ID=68306630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822266730.2U Expired - Fee Related CN209549030U (en) 2018-12-28 2018-12-28 Water mist dust removing equipment for blast furnace taphole

Country Status (1)

Country Link
CN (1) CN209549030U (en)

Similar Documents

Publication Publication Date Title
CN207243917U (en) A kind of blast furnace gas diffusing dust-extraction unit
CN203711818U (en) Multi-pipeline tundish baking device
CN209549030U (en) Water mist dust removing equipment for blast furnace taphole
CN213668638U (en) Blast furnace gas auxiliary desulfurization and dewatering device
CN210964594U (en) A desulfurization device suitable for hazardous waste recycling and processing production lines
CN207596886U (en) Improve hot-metal bottle dust-arrest device
CN205443349U (en) Gas supply system suitable for blast furnace oxygen coal jetting technology
CN209735815U (en) A coal washing flotation agent spraying device
CN202380017U (en) Secondary dust removal system for converters
CN203393170U (en) Pulverized coal filter device of blast furnace coal injection system
CN208178104U (en) The upper header device of nozzle can be replaced online
CN201179392Y (en) Improved upper-gas-intake blast furnace cloth bag dust remover
CN206731351U (en) A kind of two-fluid Multi-nozzle high-efficient denitration spray gun
CN202238849U (en) Secondary dust removal system for steelmaking
CN103993125A (en) Novel gas curtain type revolving furnace secondary flue gas capture device
CN203642213U (en) Online dredging device for coal inlet of coal feeder
CN103834761B (en) A kind of tower literary composition integral type converter coal gas purification tower
CN205205166U (en) Gravity dust collector water-fetching and ash-removing device
CN205784625U (en) A kind of oxygen blowing device for oxygen inclined blown converter
CN204455163U (en) A kind of dedusting ash humidifier spraying box
CN221648519U (en) A spray cooling device
CN206318881U (en) A kind of quicklime slaking system that can effectively prevent from being vented blockage
CN211358164U (en) A pressurized cleaning water pipeline
CN202169126U (en) Blowdown pipe device of spray tower of high temperature hydrolysis furnace
CN204369951U (en) The self chlorine of online aluminium liquid getter or refining agent injection equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029