CN103252150A - Integral washing tower - Google Patents

Integral washing tower Download PDF

Info

Publication number
CN103252150A
CN103252150A CN2013101996528A CN201310199652A CN103252150A CN 103252150 A CN103252150 A CN 103252150A CN 2013101996528 A CN2013101996528 A CN 2013101996528A CN 201310199652 A CN201310199652 A CN 201310199652A CN 103252150 A CN103252150 A CN 103252150A
Authority
CN
China
Prior art keywords
cooling tower
saturated cooling
tower
saturated
nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101996528A
Other languages
Chinese (zh)
Inventor
杨海俊
张辉煌
强勇
李亚飞
管校飞
顾孟奇
马如龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd
Original Assignee
WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd filed Critical WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd
Priority to CN2013101996528A priority Critical patent/CN103252150A/en
Publication of CN103252150A publication Critical patent/CN103252150A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The invention discloses an integral washing tower which comprises a saturated cooling tower (1), wherein an overflow system, a spraying system and a purification system are sequentially arranged inside the saturated cooling tower (1) from top to bottom; and the purification system comprises a circular seam long neck venturi (12). The various dehydraters and riser equipment in the original system are replaced, a vortex region and an explosion-proof valve are avoided, and the integral washing tower has the outstanding advantages of small resistance, low water consumption, high purification efficiency, particularly small maintenance amount and the like.

Description

A kind of one scrubbing tower
Technical field
The invention belongs to the environmental protection equipment field, relate in particular to a kind of one scrubbing tower.
Background technology
Adopt equipment such as an overflow Venturi tube (or washing cooling tower), gravity dehydration device, 180 degree bend pipes, RD Venturi tube, elbow separator, baffle plate dehydrator, silk screen dehydrating tower in converter current gas cleaning and coal-gas recovering " OG " system, be provided with various dehydrators and tedge equipment, also be provided with vortex, explosion-proof valve, complex structure, repair and maintenance inconvenience, purification efficiency are not high.
Summary of the invention
Technical problem to be solved by this invention provides the one scrubbing tower that a kind of resistance is little, water consumption is low, purification efficiency is high, repair and maintenance is few especially.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of one scrubbing tower, comprise saturated cooling tower, described saturated cooling tower inside is provided with overflow system, water injection system and cleaning system from top to bottom successively, and described cleaning system comprises circumferential weld long-neck Venturi tube.
Described circumferential weld long-neck Venturi tube afterbody is provided with straight tube, and described straight tube stretches out saturated cooling tower.
Described overflow system is positioned at the upper end of saturated cooling tower, comprises the overflow water seal around described saturated cooling tower, and the height that described overflow water is sealed up end face is higher than the height of saturated cooling tower upper surface, and described saturated cooling tower upper surface is zigzag; Described overflow water seal below is provided with overflow water seal water inlet manifold, and is provided with overflow water seal water inlet pipe and is communicated with described overflow water seal and overflow water seal water inlet manifold; The air-flow ingress pipe stretches into saturated cooling tower from saturated cooling tower upper end, is provided with nozzle near position, saturated cooling tower upper surface on the air-flow ingress pipe, and described nozzle stretches in the air-flow ingress pipe.
Described water injection system comprises the series of spray nozzles that is arranged on the saturated cooling tower, described nozzle stretches into saturated cooling tower inside, described nozzle comprises two types of a hole nozzle and two hole nozzles, and the nozzle on the saturated cooling tower is that a hole nozzle and two hole nozzles are alternately arranged.
Described saturated cooling tower is provided with circumferential weld long-neck Venturi tube installing hole, described circumferential weld long-neck Venturi tube is installed in the circumferential weld long-neck Venturi tube installing hole, corresponding circumferential weld long-neck Venturi tube position is provided with saturated cooling tower top drainpipe on the saturated cooling tower, and is provided with saturated cooling tower top shrouding and reinforcement.
Described saturated cooling tower bottom is provided with saturated cooling tower bearing, and saturated cooling tower bearing below is provided with the bottom drainpipe, and is provided with bottom shrouding and reinforcement, and is provided with H shaped steel reinforcement.
Drainpipe top, described bottom is provided with the high water-level alarm point.
Described saturated cooling tower is provided with discharge pipe, and described discharge pipe is provided with the stainless steel compensator.
Described saturated cooling tower is provided with inspection platform and inspection opening.
Described saturated cooling tower is provided with saturated cooling tower bearing near the middle part.
The invention has the advantages that, the mode that scrubbing tower supplies water and adopts overflow and water spray to combine in order to prevent the spillwag chute injustice, is set up a nozzle at the gasification cooling flue end, in scrubbing tower, adopt single, doublely to the water spray mode that combines, make the flue gas in the scrubbing tower reach thorough turbulent flow.It is conical hollow that the spray area of nozzle is selected spray configuration for use, farthest reduces choking phenomenon, and source quality is not had special requirement, also can play the effect of energy efficiency.Utilize elementary errors to press the aperture of regulating circumferential weld long-neck Venturi tube, just control the size of Venturi tube circumferential weld area, thereby guarantee when exhaust gas volumn changes, the circumferential weld area also and then changes, the flue gas flow rate of control Venturi tube fluctuates in prescribed limit, resistance is decreased also just control in prescribed limit, thereby guarantee the clean-up effect of Venturi tube and the least energy consumption of blower fan, circumferential weld long-neck Venturi tube vapour, liquor ratio are big, the back does not have bend pipe, do not need water flushing and artificial periodic cleaning, save cost of labor and time, increased output indirectly; Circumferential weld long-neck Venturi tube liquid vapour flow-disturbing is strong especially in the one tower, and clean-up effect is well more a lot of than conventional " OG " system, can reach 20mg/Nm3, controls at ordinary times about 50mg/Nm3, obviously is better than existing " OG " system.
Description of drawings
Fig. 1 is the structural representation of a kind of one scrubbing tower of the present invention;
Mark among the above-mentioned figure is: 1, saturated cooling tower, 2, overflow water seal water inlet pipe, 3, overflow water seal water inlet manifold, 4, overflow water seal drainage for overhaul pipe, 5, discharge pipe, 6, the stainless steel compensator, 7, saturated cooling tower top drainpipe, 8, saturated cooling tower top shrouding, 9, the bottom shrouding, 10, bottom drainpipe, 11, nozzle, 12, circumferential weld long-neck Venturi tube, 13, saturated cooling tower bearing, 14, overflow water seal, 15, the air-flow ingress pipe.
The specific embodiment
Fig. 1 comprises saturated cooling tower 1 for the structural representation of a kind of one scrubbing tower of the present invention, and saturated cooling tower 1 inside is provided with overflow system, water injection system and cleaning system from top to bottom successively, and cleaning system comprises circumferential weld long-neck Venturi tube 12.
Circumferential weld long-neck Venturi tube 12 afterbodys are provided with straight tube, and straight tube stretches out saturated cooling tower 1.
Overflow system is positioned at the upper end of saturated cooling tower 1, comprises the overflow water seal 14 around saturated cooling tower 1, and the height of overflow water seal 14 upper surfaces is higher than the height of saturated cooling tower 1 upper surface, and saturated cooling tower 1 upper surface is zigzag; Overflow water seal 14 belows are provided with overflow water seal water inlet manifold 3, and are provided with overflow water seal water inlet pipe 2 connection overflow water seal 14 and overflow water seal water inlet manifolds 3, also are provided with overflow water seal drainage for overhaul pipe 4 on the overflow water seal water inlet manifold 3; Air-flow ingress pipe 15 stretches into saturated cooling tower 1 from saturated cooling tower 1 upper end, is provided with nozzle 11 near position, saturated cooling tower 1 upper surface on the air-flow ingress pipe 15, and nozzle 11 stretches in the air-flow ingress pipe 15.
Water injection system comprises the series of spray nozzles 11 that is arranged on the saturated cooling tower 1, nozzle 11 stretches into saturated cooling tower 1 inside, nozzle 11 comprises two types of a hole nozzle and two hole nozzles, and the nozzle 11 on the saturated cooling tower 1 is that a hole nozzle and two hole nozzles are alternately arranged.
Saturated cooling tower 1 is provided with circumferential weld long-neck Venturi tube installing hole, circumferential weld long-neck Venturi tube 12 is installed in the circumferential weld long-neck Venturi tube installing hole, corresponding circumferential weld long-neck Venturi tube 12 positions are provided with saturated cooling tower top drainpipe 7 on the saturated cooling tower 1, and are provided with saturated cooling tower top shrouding 8 and reinforcement.Saturated cooling tower 1 bottom is provided with saturated cooling tower bearing 13, and saturated cooling tower bearing 13 belows are provided with bottom drainpipe 10, and are provided with bottom shrouding 9 and reinforcement, and is provided with H shaped steel reinforcement.Drainpipe 10 tops in bottom are provided with the high water-level alarm point.Saturated cooling tower 1 is provided with discharge pipe 5, and discharge pipe 5 is provided with stainless steel compensator 6.Saturated cooling tower 1 is provided with inspection platform and inspection opening.Being provided with saturated cooling tower guiding near saturated cooling tower 1 middle part supports.
The course of work: 1400~1600 ° of C of high-temperature flue gas cool off through gasification cooling flue, and flue-gas temperature is reduced to 1000~800 ° of C, then by scrubbing tower carry out saturatedly cooling, dedusting, temperature is down to about 72 ° of C.Cooled smoke enters circumferential weld long-neck Venturi tube 12 and carries out smart dedusting, and flue gas is with at a high speed and spray into water droplet collision in the circumferential weld long-neck Venturi tube 12, grit in the flue gas since diffusion, effect of inertia be combined with the globule cohesion and by except under.
After adopting such structure, the mode that scrubbing tower supplies water and adopts overflow and water spray to combine in order to prevent the spillwag chute injustice, is set up a nozzle 11 at the gasification cooling flue end, in scrubbing tower, adopt single, doublely to the water spray mode that combines, make the flue gas in the scrubbing tower reach thorough turbulent flow.It is conical hollow that the spray area of nozzle 11 is selected spray configuration for use, farthest reduces choking phenomenon, and source quality is not had special requirement, also can play the effect of energy efficiency.Utilize elementary errors to press the aperture of adjusting circumferential weld long-neck Venturi tube 12, just control the size of Venturi tube circumferential weld area, thereby guarantee when exhaust gas volumn changes, the circumferential weld area also and then changes, the flue gas flow rate of control Venturi tube fluctuates in prescribed limit, resistance is decreased also just control in prescribed limit, thereby guarantee the clean-up effect of Venturi tube and the least energy consumption of blower fan, circumferential weld long-neck Venturi tube 12 vapour, liquor ratio are big, the back does not have bend pipe, do not need water flushing and artificial periodic cleaning, save cost of labor and time, increased output indirectly; Circumferential weld long-neck Venturi tube 12 liquid vapour flow-disturbings are strong especially in the one tower, and clean-up effect is well more a lot of than conventional " OG " system, can reach 20mg/Nm3, controls at ordinary times about 50mg/Nm3, obviously is better than existing " OG " system.
By reference to the accompanying drawings the present invention has been carried out exemplary description above; obviously specific implementation of the present invention is not subjected to the restriction of aforesaid way; as long as adopted the improvement of the various unsubstantialities that method of the present invention design and technical scheme carry out; or without improving design of the present invention and technical scheme are directly applied to other occasion, all within protection scope of the present invention.

Claims (10)

1. an one scrubbing tower is characterized in that, comprises saturated cooling tower (1), and described saturated cooling tower (1) inside is provided with overflow system, water injection system and cleaning system from top to bottom successively, and described cleaning system comprises circumferential weld long-neck Venturi tube (12).
2. one scrubbing tower as claimed in claim 1 is characterized in that, described circumferential weld long-neck Venturi tube (12) afterbody is provided with straight tube, and described straight tube stretches out saturated cooling tower (1).
3. one scrubbing tower as claimed in claim 1 or 2, it is characterized in that, described overflow system is positioned at the upper end of saturated cooling tower (1), comprise the overflow water seal (14) around described saturated cooling tower (1), the height of described overflow water seal (14) upper surface is higher than the height of saturated cooling tower (1) upper surface, and described saturated cooling tower (1) upper surface is zigzag; Described overflow water seal (14) below is provided with overflow water seal water inlet manifold (3), and is provided with overflow water seal water inlet pipe (2) connection described overflow water seal (14) and overflow water seal water inlet manifold (3); Air-flow ingress pipe (15) stretches into saturated cooling tower (1) from saturated cooling tower (1) upper end, and air-flow ingress pipe (15) is gone up and is provided with nozzle (11) near saturated cooling tower (1) position, upper surface, and described nozzle (11) stretches in the air-flow ingress pipe (15).
4. one scrubbing tower as claimed in claim 3, it is characterized in that, described water injection system comprises the series of spray nozzles (11) that is arranged on the saturated cooling tower (1), described nozzle (11) stretches into saturated cooling tower (1) inside, described nozzle (11) comprises two types of a hole nozzle and two hole nozzles, and the nozzle (11) on the saturated cooling tower (1) is that a hole nozzle and two hole nozzles are alternately arranged.
5. one scrubbing tower as claimed in claim 4, it is characterized in that, described saturated cooling tower (1) is provided with circumferential weld long-neck Venturi tube installing hole, described circumferential weld long-neck Venturi tube (12) is installed in the circumferential weld long-neck Venturi tube installing hole, saturated cooling tower (1) is gone up corresponding circumferential weld long-neck Venturi tube (12) position and is provided with saturated cooling tower top drainpipe (7), and is provided with saturated cooling tower top shrouding (8) and reinforcement.
6. one scrubbing tower as claimed in claim 5, it is characterized in that, described saturated cooling tower (1) bottom is provided with saturated cooling tower bearing (13), saturated cooling tower bearing (13) below is provided with bottom drainpipe (10), and be provided with bottom shrouding (9) and reinforcement, and be provided with H shaped steel reinforcement.
7. one scrubbing tower as claimed in claim 6 is characterized in that, described bottom drainpipe (10) top is provided with the high water-level alarm point.
8. one scrubbing tower as claimed in claim 7 is characterized in that, described saturated cooling tower (1) is provided with discharge pipe (5), and described discharge pipe (5) is provided with stainless steel compensator (6).
9. one scrubbing tower as claimed in claim 8 is characterized in that, described saturated cooling tower (1) is provided with inspection platform and inspection opening.
10. one scrubbing tower as claimed in claim 9 is characterized in that, is provided with saturated cooling tower guiding near described saturated cooling tower (1) middle part and supports.
CN2013101996528A 2013-05-27 2013-05-27 Integral washing tower Pending CN103252150A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101996528A CN103252150A (en) 2013-05-27 2013-05-27 Integral washing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101996528A CN103252150A (en) 2013-05-27 2013-05-27 Integral washing tower

Publications (1)

Publication Number Publication Date
CN103252150A true CN103252150A (en) 2013-08-21

Family

ID=48956561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101996528A Pending CN103252150A (en) 2013-05-27 2013-05-27 Integral washing tower

Country Status (1)

Country Link
CN (1) CN103252150A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103834761A (en) * 2014-01-14 2014-06-04 中冶南方工程技术有限公司 Tower and venturi integrated converter gas purification tower
CN105797515A (en) * 2016-05-30 2016-07-27 上海华力微电子有限公司 Water-sprinkling waste gas treatment scrubber
CN107174933A (en) * 2017-06-01 2017-09-19 山东三融环保工程有限公司 A kind of smoke eliminator with turbulent flow gas-liquid switching layer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201151713Y (en) * 2007-07-12 2008-11-19 鞍钢集团设计研究院 Gas purification washing tower of converter
CN102580437A (en) * 2012-02-21 2012-07-18 中冶华天工程技术有限公司 Converter primary flue gas dual-tower purification method and converter primary flue gas purification tower
CN203303792U (en) * 2013-05-27 2013-11-27 芜湖华洁环保设备有限公司 Integrated washing tower

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201151713Y (en) * 2007-07-12 2008-11-19 鞍钢集团设计研究院 Gas purification washing tower of converter
CN102580437A (en) * 2012-02-21 2012-07-18 中冶华天工程技术有限公司 Converter primary flue gas dual-tower purification method and converter primary flue gas purification tower
CN203303792U (en) * 2013-05-27 2013-11-27 芜湖华洁环保设备有限公司 Integrated washing tower

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103834761A (en) * 2014-01-14 2014-06-04 中冶南方工程技术有限公司 Tower and venturi integrated converter gas purification tower
CN103834761B (en) * 2014-01-14 2015-09-02 中冶南方工程技术有限公司 A kind of tower literary composition integral type converter coal gas purification tower
CN105797515A (en) * 2016-05-30 2016-07-27 上海华力微电子有限公司 Water-sprinkling waste gas treatment scrubber
CN107174933A (en) * 2017-06-01 2017-09-19 山东三融环保工程有限公司 A kind of smoke eliminator with turbulent flow gas-liquid switching layer

Similar Documents

Publication Publication Date Title
CN102580437A (en) Converter primary flue gas dual-tower purification method and converter primary flue gas purification tower
CN202654927U (en) Rotational flow rectification gas-liquid absorbing tower
CN107029523B (en) Foam washer
CN201488631U (en) Horizontal tubular primary cooler scale removal device
CN103252150A (en) Integral washing tower
CN201445885U (en) Desulfuration and dedusting device
CN102586523B (en) Blast furnace gas purification plant
CN204522719U (en) Flue gas processing equipment of boiler
CN102269527A (en) Low-temperature flue gas exhaust heat utilization method and system including desulfurizing process
CN110384981B (en) Gas-water separator for enhancing water recovery
CN202590581U (en) Defogger adapted to changes in gas flow
CN105289182B (en) A kind of air-cooled ellipse tube type demister of low-resistance and its defogging method
CN203303792U (en) Integrated washing tower
CN201551961U (en) Ammonia flue gas desulfurization tower
CN203187700U (en) Cooling, dehydrating and water sealing device for high-temperature flue gas
CN207871891U (en) A kind of efficient desulfurizing tower
CN202543241U (en) One-step flue gas purification tower for converter
CN108579316A (en) A kind of flue gas for wet desulfuration tower disappears white plumage governing system
CN202516471U (en) Desulfurizing device for industrial kiln flue gas
CN105289181B (en) A kind of air-cooled drop type tubular demister of low-resistance and its defogging method
CN210752016U (en) Combined wet flue gas desulfurization system device
CN209049219U (en) Double tower desulfurating dust-removing equipment
CN108889098B (en) Energy-saving ammonia process modified by gypsum-process desulfurization device
CN203346420U (en) Efficient two-tower system
CN206660858U (en) A kind of producing gas blower chimney cyclon dust collector device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130821