CN203303792U - Integrated washing tower - Google Patents

Integrated washing tower Download PDF

Info

Publication number
CN203303792U
CN203303792U CN2013202936021U CN201320293602U CN203303792U CN 203303792 U CN203303792 U CN 203303792U CN 2013202936021 U CN2013202936021 U CN 2013202936021U CN 201320293602 U CN201320293602 U CN 201320293602U CN 203303792 U CN203303792 U CN 203303792U
Authority
CN
China
Prior art keywords
cooling tower
saturated cooling
tower
saturated
venturi tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202936021U
Other languages
Chinese (zh)
Inventor
杨海俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd
Original Assignee
WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd filed Critical WUHU HUAJIE ENVIRONMENTAL PROTECTION EQUIPMENT CO Ltd
Priority to CN2013202936021U priority Critical patent/CN203303792U/en
Application granted granted Critical
Publication of CN203303792U publication Critical patent/CN203303792U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an integrated washing tower. The integrated washing tower comprises a saturated cooling tower (1), wherein an overflowing system, a water spraying system and a purification system are arranged inside the saturated cooling tower (1) in sequence from top to bottom; the purification system comprises a circular seam long-neck venturi tube (12) which replaces various dehydration devices and ascension pipe equipment in a previous system; the integrated washing tower is not provided with a vortex region and an explosion-proof valve, and the integrated washing tower has the prominent advantages of small resistance, small water consumption amount, high purification efficiency, very small overhauling and maintenance amount, and the like.

Description

The one scrubbing tower
Technical field
The utility model belongs to the environmental protection equipment field, relates in particular to a kind of one scrubbing tower.
Background technology
In converter current gas cleaning and coal-gas recovering " OG " system, adopt the equipment such as an overflow Venturi tube (or wash cooling tower), gravity dewatering apparatus, 180 degree bend pipes, RD Venturi tube, elbow separator, baffle plate dehydrator, silk screen dehydrating tower, be provided with various dehydrators and tedge equipment, also be provided with vortex, explosion-proof valve, complex structure, repair and maintenance inconvenience, purification efficiency are not high.
The utility model content
Technical problem to be solved in the utility model is to provide the one scrubbing tower that a kind of resistance is little, water consumption is low, purification efficiency is high, repair and maintenance is few especially.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of one scrubbing tower, comprise saturated cooling tower, described saturated cooling tower inside is provided with overflow system, water injection system and cleaning system from top to bottom successively, and described cleaning system comprises circumferential weld long-neck Venturi tube.
Described circumferential weld long-neck Venturi tube afterbody is provided with straight tube, and described straight tube stretches out saturated cooling tower.
Described overflow system is positioned at the upper end of saturated cooling tower, comprises the overflow water seal around described saturated cooling tower, and described overflow water is sealed up the height of the height of end face higher than saturated cooling tower upper surface, and described saturated cooling tower upper surface is zigzag; Described overflow water seal below is provided with overflow water seal water inlet manifold, and is provided with the described overflow water seal of connection of overflow water seal water inlet pipe and overflow water seal water inlet manifold; The air-flow ingress pipe stretches into saturated cooling tower from saturated cooling tower upper end, near position, saturated cooling tower upper surface, is provided with nozzle on the air-flow ingress pipe, and described nozzle stretches in the air-flow ingress pipe.
Described water injection system comprises the series of spray nozzles be arranged on saturated cooling tower, described nozzle stretches into saturated cooling tower inside, described nozzle comprises two types of a hole nozzle and two hole nozzles, and the nozzle on saturated cooling tower is that a hole nozzle and two hole nozzles are alternately arranged.
Described saturated cooling tower is provided with circumferential weld long-neck Venturi tube installing hole, described circumferential weld long-neck Venturi tube is arranged in circumferential weld long-neck Venturi tube installing hole, on saturated cooling tower, corresponding circumferential weld long-neck Venturi tube position is provided with saturated cooling tower top drainpipe, and is provided with saturated cooling tower top shrouding and reinforcement.
Described saturated cooling tower bottom is provided with saturated cooling tower bearing, and saturated cooling tower bearing below is provided with the bottom drainpipe, and is provided with bottom shrouding and reinforcement, and is provided with H shaped steel reinforcement.
Drainpipe top, described bottom is provided with the high water-level alarm point.
Described saturated cooling tower is provided with discharge pipe, and described discharge pipe is provided with the stainless steel compensator.
Described saturated cooling tower is provided with inspection platform and inspection opening.
Described saturated cooling tower near middle is provided with saturated cooling tower bearing.
The utility model has the advantage of, the mode that scrubbing tower supplies water and adopts overflow and water spray to combine, in order to prevent the spillwag chute injustice, set up a nozzle at the gasification cooling flue end, in scrubbing tower, adopt single, doublely to the water spray mode that combines, make the flue gas in scrubbing tower reach thorough turbulent flow.It is conical hollow that the spray area of nozzle is selected spray configuration, farthest reduces choking phenomenon, and source quality is not had to special requirement, also can play the effect of energy efficiency.Utilize differential pressure to regulate the aperture of circumferential weld long-neck Venturi tube, namely control the size of Venturi tube circumferential weld area, thereby guarantee when exhaust gas volumn changes, the circumferential weld area also and then changes, the flue gas flow rate of controlling Venturi tube fluctuates in prescribed limit, resistance is damaged and also just is controlled at prescribed limit, thereby guarantee the clean-up effect of Venturi tube and the least energy consumption of blower fan, circumferential weld long-neck Venturi tube vapour, liquor ratio are large, back does not have bend pipe, do not need water to rinse and artificial periodic cleaning, save cost of labor and time, indirectly increased output; In integrated tower, circumferential weld long-neck Venturi tube liquid vapour flow-disturbing is strong especially, and clean-up effect is well more a lot of than conventional " OG " system, can reach 20mg/Nm3, is controlled at ordinary times the 50mg/Nm3 left and right, obviously is better than existing " OG " system.
The accompanying drawing explanation
Fig. 1 is the structural representation of a kind of one scrubbing tower of the utility model;
Mark in above-mentioned figure is: 1, saturated cooling tower, 2, overflow water seal water inlet pipe, 3, overflow water seal water inlet manifold, 4, overflow water seal drainage for overhaul pipe, 5, discharge pipe, 6, the stainless steel compensator, 7, saturated cooling tower top drainpipe, 8, saturated cooling tower top shrouding, 9, the bottom shrouding, 10, bottom drainpipe, 11, nozzle, 12, circumferential weld long-neck Venturi tube, 13, saturated cooling tower bearing, 14, overflow water seal, 15, the air-flow ingress pipe.
The specific embodiment
Fig. 1 is the structural representation of a kind of one scrubbing tower of the utility model, comprises saturated cooling tower 1, and saturated cooling tower 1 inside is provided with overflow system, water injection system and cleaning system from top to bottom successively, and cleaning system comprises circumferential weld long-neck Venturi tube 12.
Circumferential weld long-neck Venturi tube 12 afterbodys are provided with straight tube, and straight tube stretches out saturated cooling tower 1.
Overflow system is positioned at the upper end of saturated cooling tower 1, comprises the overflow water seal 14 around saturated cooling tower 1, and the height of overflow water seal 14 upper surfaces is higher than the height of saturated cooling tower 1 upper surface, and saturated cooling tower 1 upper surface is zigzag; Overflow water seal 14 belows are provided with overflow water seal water inlet manifold 3, and are provided with overflow water seal water inlet pipe 2 connection overflow water seal 14 and overflow water seal water inlet manifolds 3, on overflow water seal water inlet manifold 3, also are provided with overflow water seal drainage for overhaul pipe 4; Air-flow ingress pipe 15 stretches into saturated cooling tower 1 from saturated cooling tower 1 upper end, near saturated cooling tower 1 position, upper surface, is provided with nozzle 11 on air-flow ingress pipe 15, and nozzle 11 stretches in air-flow ingress pipe 15.
Water injection system comprises the series of spray nozzles 11 be arranged on saturated cooling tower 1, nozzle 11 stretches into saturated cooling tower 1 inside, nozzle 11 comprises two types of a hole nozzle and two hole nozzles, and the nozzle 11 on saturated cooling tower 1 is that a hole nozzle and two hole nozzles are alternately arranged.
Saturated cooling tower 1 is provided with circumferential weld long-neck Venturi tube installing hole, circumferential weld long-neck Venturi tube 12 is arranged in circumferential weld long-neck Venturi tube installing hole, on saturated cooling tower 1, corresponding circumferential weld long-neck Venturi tube 12 positions are provided with saturated cooling tower top drainpipe 7, and are provided with saturated cooling tower top shrouding 8 and reinforcement.Saturated cooling tower 1 bottom is provided with saturated cooling tower bearing 13, and saturated cooling tower bearing 13 belows are provided with bottom drainpipe 10, and are provided with bottom shrouding 9 and reinforcement, and is provided with H shaped steel reinforcement.Drainpipe 10 tops in bottom are provided with the high water-level alarm point.Saturated cooling tower 1 is provided with discharge pipe 5, and discharge pipe 5 is provided with stainless steel compensator 6.Saturated cooling tower 1 is provided with inspection platform and inspection opening.Saturated cooling tower 1 near middle is provided with saturated cooling tower guide support.
The course of work: 1400~1600 ° of C are cooling through gasification cooling flue for high-temperature flue gas, and flue-gas temperature is reduced to 1000~800 ° of C, then by scrubbing tower carry out saturatedly cooling, dedusting, temperature is down to 72 ° of C left and right.Cooled flue gas enters circumferential weld long-neck Venturi tube 12 and carries out smart dedusting, and flue gas is with at a high speed and spray into the water droplet collision in circumferential weld long-neck Venturi tube 12, and in flue gas, grit is combined cohesion and quilt and is removed down due to diffusion, effect of inertia with the globule.
After adopting such structure, the mode that scrubbing tower supplies water and adopts overflow and water spray to combine, in order to prevent the spillwag chute injustice, set up a nozzle 11 at the gasification cooling flue end, in scrubbing tower, adopt single, doublely to the water spray mode that combines, make the flue gas in scrubbing tower reach thorough turbulent flow.It is conical hollow that the spray area of nozzle 11 is selected spray configuration, farthest reduces choking phenomenon, and source quality is not had to special requirement, also can play the effect of energy efficiency.Utilize differential pressure to regulate the aperture of circumferential weld long-neck Venturi tube 12, namely control the size of Venturi tube circumferential weld area, thereby guarantee when exhaust gas volumn changes, the circumferential weld area also and then changes, the flue gas flow rate of controlling Venturi tube fluctuates in prescribed limit, resistance is damaged and also just is controlled at prescribed limit, thereby guarantee the clean-up effect of Venturi tube and the least energy consumption of blower fan, circumferential weld long-neck Venturi tube 12 vapour, liquor ratio are large, back does not have bend pipe, do not need water to rinse and artificial periodic cleaning, save cost of labor and time, indirectly increased output; In integrated tower, circumferential weld long-neck Venturi tube 12 liquid vapour flow-disturbings are strong especially, and clean-up effect is well more a lot of than conventional " OG " system, can reach 20mg/Nm3, are controlled at ordinary times the 50mg/Nm3 left and right, obviously are better than existing " OG " system.
The above is exemplarily described the utility model by reference to the accompanying drawings; obviously the utility model specific implementation is not subject to the restrictions described above; the improvement of the various unsubstantialities that method of the present utility model design and technical scheme carry out as long as adopted; or without improving, design of the present utility model and technical scheme are directly applied to other occasion, all within protection domain of the present utility model.

Claims (10)

1. an one scrubbing tower, is characterized in that, comprises saturated cooling tower (1), and described saturated cooling tower (1) inside is provided with overflow system, water injection system and cleaning system from top to bottom successively, and described cleaning system comprises circumferential weld long-neck Venturi tube (12).
2. one scrubbing tower as claimed in claim 1, is characterized in that, described circumferential weld long-neck Venturi tube (12) afterbody is provided with straight tube, and described straight tube stretches out saturated cooling tower (1).
3. one scrubbing tower as claimed in claim 1 or 2, it is characterized in that, described overflow system is positioned at the upper end of saturated cooling tower (1), comprise the overflow water seal (14) around described saturated cooling tower (1), the height of described overflow water seal (14) upper surface is higher than the height of saturated cooling tower (1) upper surface, and described saturated cooling tower (1) upper surface is zigzag; Described overflow water seal (14) below is provided with overflow water seal water inlet manifold (3), and is provided with overflow water seal water inlet pipe (2) connection described overflow water seal (14) and overflow water seal water inlet manifold (3); Air-flow ingress pipe (15) stretches into saturated cooling tower (1) from saturated cooling tower (1) upper end, and air-flow ingress pipe (15) is upper is provided with nozzle (11) near saturated cooling tower (1) position, upper surface, and described nozzle (11) stretches in air-flow ingress pipe (15).
4. one scrubbing tower as claimed in claim 3, it is characterized in that, described water injection system comprises the series of spray nozzles (11) be arranged on saturated cooling tower (1), described nozzle (11) stretches into saturated cooling tower (1) inside, described nozzle (11) comprises two types of a hole nozzle and two hole nozzles, and the nozzle (11) on saturated cooling tower (1) is that a hole nozzle and two hole nozzles are alternately arranged.
5. one scrubbing tower as claimed in claim 4, it is characterized in that, described saturated cooling tower (1) is provided with circumferential weld long-neck Venturi tube installing hole, described circumferential weld long-neck Venturi tube (12) is arranged in circumferential weld long-neck Venturi tube installing hole, the upper corresponding circumferential weld long-neck Venturi tube (12) of saturated cooling tower (1) position is provided with saturated cooling tower top drainpipe (7), and is provided with saturated cooling tower top shrouding (8) and reinforcement.
6. one scrubbing tower as claimed in claim 5, it is characterized in that, described saturated cooling tower (1) bottom is provided with saturated cooling tower bearing (13), saturated cooling tower bearing (13) below is provided with bottom drainpipe (10), and be provided with bottom shrouding (9) and reinforcement, and be provided with H shaped steel reinforcement.
7. one scrubbing tower as claimed in claim 6, is characterized in that, described bottom drainpipe (10) top is provided with the high water-level alarm point.
8. one scrubbing tower as claimed in claim 7, is characterized in that, described saturated cooling tower (1) is provided with discharge pipe (5), and described discharge pipe (5) is provided with stainless steel compensator (6).
9. one scrubbing tower as claimed in claim 8, is characterized in that, described saturated cooling tower (1) is provided with inspection platform and inspection opening.
10. one scrubbing tower as claimed in claim 9, is characterized in that, described saturated cooling tower (1) near middle is provided with saturated cooling tower guide support.
CN2013202936021U 2013-05-27 2013-05-27 Integrated washing tower Expired - Fee Related CN203303792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202936021U CN203303792U (en) 2013-05-27 2013-05-27 Integrated washing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202936021U CN203303792U (en) 2013-05-27 2013-05-27 Integrated washing tower

Publications (1)

Publication Number Publication Date
CN203303792U true CN203303792U (en) 2013-11-27

Family

ID=49610030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202936021U Expired - Fee Related CN203303792U (en) 2013-05-27 2013-05-27 Integrated washing tower

Country Status (1)

Country Link
CN (1) CN203303792U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103252150A (en) * 2013-05-27 2013-08-21 芜湖华洁环保设备有限公司 Integral washing tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103252150A (en) * 2013-05-27 2013-08-21 芜湖华洁环保设备有限公司 Integral washing tower

Similar Documents

Publication Publication Date Title
CN202654927U (en) Rotational flow rectification gas-liquid absorbing tower
CN102580437A (en) Converter primary flue gas dual-tower purification method and converter primary flue gas purification tower
CN207694563U (en) A kind of desulfurization slurry collection device
CN107029523B (en) Foam washer
CN103252150A (en) Integral washing tower
CN204522719U (en) Flue gas processing equipment of boiler
CN203303792U (en) Integrated washing tower
CN201949811U (en) Flue gas spraying, cooling and washing system
CN201551961U (en) Ammonia flue gas desulfurization tower
CN203187700U (en) Cooling, dehydrating and water sealing device for high-temperature flue gas
CN202543241U (en) One-step flue gas purification tower for converter
CN203469796U (en) Boiler flue gas desulfurization tower
CN206857411U (en) A kind of multifunction storage water pot
CN206688457U (en) A kind of chemical emission processing unit
CN202516471U (en) Desulfurizing device for industrial kiln flue gas
CN203346420U (en) Efficient two-tower system
CN201901653U (en) Pipeline washing device of a dry-process acetylene generator
CN207980811U (en) Mist eliminator flushing water recovery device in a kind of desulfuration absorbing tower
CN209049219U (en) Double tower desulfurating dust-removing equipment
CN202366606U (en) Absorber cooler for sulfurous acid preparation
CN103276140B (en) A kind of High-efficiency twin-tower system
CN207951102U (en) A kind of wet desulphurization absorption tower oxidation air apparatus for eliminating sludge
CN207850108U (en) One kind is laterally into vapour condenser
CN205323520U (en) Flue gas desulphurization device of thermal power plant
CN201921626U (en) Crystallization prevention device for ammonia method desulphurization tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131127

Termination date: 20140527