CN209538469U - The mounting structure of complete stealthy hanging stone curtain wall - Google Patents
The mounting structure of complete stealthy hanging stone curtain wall Download PDFInfo
- Publication number
- CN209538469U CN209538469U CN201822144413.3U CN201822144413U CN209538469U CN 209538469 U CN209538469 U CN 209538469U CN 201822144413 U CN201822144413 U CN 201822144413U CN 209538469 U CN209538469 U CN 209538469U
- Authority
- CN
- China
- Prior art keywords
- hook
- mounting groove
- angle steel
- slabstone
- pendant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to a kind of mounting structures of complete hanging stone curtain wall of stealth, including slabstone and channel steel cross beam, cladding component, described slabstone one end is provided with fourth of the twelve Earthly Branches slot, the cladding component includes upper pendant, lower pendant, supporting, angle steel, mounting groove is provided in the upper pendant and the lower pendant, first hook, the side of the fourth of the twelve Earthly Branches slot is plugged in the mounting groove, the side of the mounting groove is also plugged in the fourth of the twelve Earthly Branches slot simultaneously, barb at arranged up and down two is provided on the supporting, described first is hung on the barb, the second hook is provided at the top of the supporting, second hitch arrangements are on side of the supporting far from the barb, described second is hung on one end of the angle steel.Slabstone does not have to open up blind hole in the utility model, and mounting structure is secured, will not be loosened by common climatic effect, and have the effect of three-dimensional regulation.
Description
Technical field
The utility model relates to the technical fields of outdoor architecture finishing, more particularly, to a kind of complete hanging stone curtain wall of stealth
Mounting structure.
Background technique
Stone curtain wall is usually made of stone panel and supporting structure (steel logical, cross beam and upright post), does not undertake main structure lotus
The architectural exterior-protecting construction with effect is carried, freexing tolerance with higher, compression strength add bright sparkling and crystal-clear, elegant for building
Effect.
Stone curtain wall has frame fully implicit solution, half implicitly and frame reveals three kinds of mounting means of formula entirely, and common stone curtain wall is big
Fully implicit solution is mostly used to install, existing mounting means is first to be anchored at pendant on slabstone by swollen bolt, then be hung on cladding structure
On part, anchoring type installation can cause slabstone centainly to damage, and slabstone is influenced by climatic environments such as high wind, sunlight for a long time, swollen bolt
It may relax, anchor force decline can be fallen when serious to will cause slabstone loosening, have very big safety
Hidden danger.
The prior art among the above has the following deficiencies: that the installation of 1. anchoring types needs to open up blind hole on slabstone in advance, to stone
Plate causes centainly to damage, and destroys slabstone internal stress;2. the anchor force of swollen bolt can be influenced with the long-term climate of slabstone and gradually under
Drop will cause slabstone loosening, can fall when serious.
Utility model content
The utility model provides a kind of mounting structure of complete hanging stone curtain wall of stealth, does not have to open up on slabstone in advance
Slabstone both ends are directly clamped between the cladding component of two column by blind hole.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of mounting structure of the complete hanging stone curtain wall of stealth, including slabstone and channel steel cross beam, the slabstone pass through cladding
Component is fixed on the channel steel cross beam, and described slabstone one end is provided with fourth of the twelve Earthly Branches slot, and the cladding component includes upper pendant, lower extension
Part, supporting, angle steel;
Mounting groove, the first hook, the peace in the upper pendant are provided in the upper pendant and the lower pendant
Tankage opening direction and first hooking slits direction reversed arrangement, the mounting groove opening direction in the lower pendant with
First hooking slits direction arranges that the side of the fourth of the twelve Earthly Branches slot is plugged in the mounting groove, while the mounting groove in the same direction
Side be also plugged in the fourth of the twelve Earthly Branches slot;
Barb at arranged up and down two is provided on the supporting, described first is hung on the barb, institute
It states and is provided with the second hook at the top of supporting, second hitch arrangements are in side of the supporting far from the barb
On;
The angle steel cross section arranges that described second is hung on one end of the angle steel, and passes through bolt in " L "
It is connected, side of the angle steel far from the supporting is also by being bolted on the channel steel cross beam.
By using above-mentioned technical proposal, the bottom in the lower pendant in the dry-hanging component of above-listed arrangement is contradicted at the top of slabstone
Portion is hung in the upper pendant in the dry-hanging component of following arrangement, so slabstone can be clamped between two column dry-hanging components, is not had to
Blind hole is opened up in advance, in dry-hanging component, as long as upper pendant and lower pendant are connection slabstone structures, the two passes through the first extension
Hook is hung on supporting, and supporting makes the transition member in cladding component, the other side and Bolted angle connection, then will by angle steel
Cladding component is fixed on channel steel cross beam, to make slabstone fixed peace by way of being clamped in above-listed and following dry-hanging component
On channel steel cross beam, anchoring type is substituted for clipping, slabstone internal stress does not lack, will not be by common climatic effect
And it loosens.
Further, offset plate is provided between the channel steel cross beam and the angle steel.
By using above-mentioned technical proposal, offset plate has certain elasticity, keeps cladding component three-dimensional on channel steel cross beam
It adjusts, realizes flexible connection, improve anti-seismic performance.
Further, on the angle steel right angle two at be provided with sawtooth lamina on inside, the sawtooth lamina is flat
Row is arranged in the length direction of the angle steel, and backing plate is provided on the sawtooth lamina, and the backing plate passes through on the angle steel
Bolt is fixed on the sawtooth lamina.
By using above-mentioned technical proposal, backing plate increases the contact area between nut and angle steel, strengthens bolt pair
Fastening effect between angle steel and channel steel cross beam, while backing plate has certain elasticity, has the effect of three-dimensional regulation, avoids bolt
Skew occurs, the side that backing plate is contacted with sawtooth lamina is also equipped with hackle mark, on sawtooth lamina, makes backing plate not
Easily loosen.
Further, second hook top, which is provided with, is bolted, and the screw rod being bolted passes through second hook and supports
Touching is on the angle steel.
It by using above-mentioned technical proposal, is bolted by screwing, increases the conflict power of diagonal steel, further enhance angle steel
Firmness horizontally.
Further, first hook is above interior is provided with glue-line.
By using above-mentioned technical proposal, realizes the flexible connection of the first hook and barb, adjust cladding component can multidirectional
It is whole, and keep the piece between the first hook and barb straight, neat, anti-seismic performance is provided.
Further, fire retardant, anticorrosive wood is provided in the mounting groove, the fire retardant, anticorrosive wood is arranged on the fourth of the twelve Earthly Branches slot
Between the side being arranged in the mounting groove and the mounting groove.
By using above-mentioned technical proposal, fire retardant, anticorrosive wood reduces slabstone end and receives for accepting slabstone and mounting groove
Shock loading, in order to avoid slabstone self-regulation when, slabstone end is broken because rigidity is excessive, while fire retardant, anticorrosive wood has
High flame retardant, high corrosion-resistant, long service life.
Further, marble glue-line is provided in the fourth of the twelve Earthly Branches slot.
By using above-mentioned technical proposal, after upper pendant, lower pendant are installed on the slot of the fourth of the twelve Earthly Branches, cloud stone glue is added, cloud stone glue is solid
High rigidity, high tenacity, Gao Naihuo, high anti-corrosion glue-line can be obtained after change, upper pendant and lower pendant can be fixed on the slot of the fourth of the twelve Earthly Branches, be used
For the preliminary step of slabstone installation, installation is hung convenient for slabstone.
Further, the end that the mounting groove is arranged in the side of the fourth of the twelve Earthly Branches slot is provided with hangnail.
By using above-mentioned technical proposal, the side that mounting groove can be arranged in the slot of the fourth of the twelve Earthly Branches by hangnail strengthens in being anchored at
The firmness of upper pendant and lower pendant on the slot of the fourth of the twelve Earthly Branches is conducive to the stability that slabstone is installed on cladding component.
In conclusion the advantageous effects of the utility model are as follows: 1. angle steel two sides are fixed on undertaking by other point of bolt
On part and channel steel cross beam, keep cladding element structure solid and reliable, slabstone is hung on cladding component by the way of clamping, slabstone
Upper not have to open up blind hole, slabstone internal stress does not lack, and slabstone is clamped between above-listed pendant and following upper pendant, peace
Assembling structure is secured, will not be loosened by common climatic effect;It, can self-regulated 2. pendant component has certain three-dimensional regulation
Arthrolith plate swings brought load, realizes flexible connection, improves anti-seismic performance.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the exploded view of upper pendant in the utility model, lower pendant, supporting connection structure.
In figure, 1, slabstone;11, fourth of the twelve Earthly Branches slot;111, marble glue-line;2, channel steel cross beam;3, cladding component;31, upper pendant;311,
Mounting groove;3111, fire retardant, anticorrosive wood;3112, hangnail;312, the first hook;3121, glue-line;32, lower pendant;33, supporting;
331, barb;332, the second hook;3311, it is bolted;34, angle steel;4, offset plate;5, sawtooth lamina;51, backing plate.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to Figures 1 and 2, a kind of mounting structure of complete hanging stone curtain wall of stealth, including stone are provided for the utility model
Plate 1, channel steel cross beam 2 do not identify in cladding component 3(figure, and cladding component 3 includes upper pendant 31, lower pendant 32, supporting 33, angle
Steel 34), slabstone 1 is fixed on channel steel cross beam 2 by cladding component 3, and channel steel cross beam 2 is welded on column, and 1 one end of slabstone opens up
There is fourth of the twelve Earthly Branches slot 11, after upper pendant 31, lower pendant 32 are installed on fourth of the twelve Earthly Branches slot 11, add cloud stone glue, can be obtained after marble adhesive curing high hard
Upper pendant 31 and lower pendant 32, can be fixed on fourth of the twelve Earthly Branches slot 11, use by degree, high tenacity, Gao Naihuo, high anti-corrosion marble glue-line 111
For the preliminary step that slabstone 1 is installed, installation is hung convenient for slabstone 1.
It include that mounting groove 311, first is linked up in 312(figure in mark upper pendant 31 in upper pendant 31 and lower pendant 32
The hook of mounting groove 311, first 312), it is anti-that 311 opening direction of mounting groove in upper pendant 31 with first links up with 312 opening directions
To arrangement, 311 opening direction of mounting groove in lower pendant 32 is arranged in the same direction with the first 312 opening directions of hook, the one of fourth of the twelve Earthly Branches slot 11
Side is plugged in mounting groove 311, while the side of mounting groove 311 is also plugged in fourth of the twelve Earthly Branches slot 11, interior on the first hook 312 to be lined with glue
Layer 3121 realizes the flexible connection of the first hook 312 and barb 331, adjust cladding component 3 can multidirectional, and make the first hook
Piece between 312 and barb 331 is straight, neat, provides anti-seismic performance.
Fire retardant, anticorrosive wood 3111 is provided in mounting groove 311, fire retardant, anticorrosive wood 3111, which is arranged on fourth of the twelve Earthly Branches slot 11, is arranged in peace
Between side in tankage 311 and mounting groove 311, fire retardant, anticorrosive wood 3111 reduces stone for accepting slabstone 1 and mounting groove 311
The shock loading that 1 end of plate receives, in order to avoid slabstone 1 is in self-regulation, 1 end of slabstone is broken because rigidity is excessive, simultaneously
Fire retardant, anticorrosive wood 3111 has high flame retardant, high corrosion-resistant, long service life, and mounting groove 311 is arranged in the side of fourth of the twelve Earthly Branches slot 11
Integrally formed with hangnail 3112, the side that mounting groove 311 is arranged in fourth of the twelve Earthly Branches slot 11 can be anchored at interior, reinforcement by hangnail 3112 for end
The firmness of upper pendant 31 and lower pendant 32 on fourth of the twelve Earthly Branches slot 11, is conducive to the stabilization that slabstone 1 is installed on cladding component 3
Property.
On supporting 33 integrally formed with barb 331(at arranged up and down two in scheming on the basis of up and down direction), first
Hook 312 is hung on barb 331, and integrally formed with the second hook 332, the second hook 332 is arranged at the top of supporting 33
On side of the supporting 33 far from barb 331,332 top of the second hook is provided with and is bolted 3311, and 3311 screw rod is bolted and passes through
Second hook 332 contradicts on angle steel 34, is bolted 3311 by screwing, increases the conflict power of diagonal steel 34, further enhance
The firmness of angle steel 34 horizontally.
34 cross section of angle steel arranges that the second hook 332 is hung on one end of angle steel 34, and is connected by bolt in " L ",
Side of the angle steel 34 far from supporting 33 is lined between channel steel cross beam 2 and angle steel 34 also by being bolted on channel steel cross beam 2
Offset plate 4, offset plate 4 have certain elasticity, mention cladding component 3 can on channel steel cross beam 2 three-dimensional regulation, realization flexible connection
High shock resistance energy is carved with sawtooth lamina 5 on inside at the two of right angle on angle steel 34, and sawtooth lamina 5 is each parallel to angle steel 34
Length direction is arranged, is engaged with backing plate 51 on sawtooth lamina 5, backing plate 51 is fixed on sawtooth lamina 5 by the bolt on angle steel 34
On.
Backing plate 51 increases the contact area between nut and angle steel 34, strengthens bolt diagonal steel 34 and channel steel cross beam 2
Between fastening effect, while backing plate 51 has certain elasticity, has the effect of three-dimensional regulation, avoids bolt from occurring crooked.
It is contradicted in the lower pendant 32 in the dry-hanging component of above-listed arrangement at the top of slabstone 1, bottom is hung on following arrangement
In upper pendant 31 in dry-hanging component, so slabstone 1 can be clamped between two column dry-hanging components, without opening up blind hole in advance,
In dry-hanging component, as long as upper pendant 31 and lower pendant 32 are to connect the structure of slabstone 1, the two passes through the first hook 312 and hangs
On supporting 33, supporting 33 makes the transition member in cladding component 3, and the other side is connect with angle steel 34, then passes through angle steel
34 are fixed on cladding component 3 on channel steel cross beam 2, to make slabstone 1 by being clamped in the side of above-listed and following dry-hanging component
Formula is fixedly mounted on channel steel cross beam 2, anchoring type is substituted for clipping, and 1 internal stress of slabstone does not lack, will not be by common
Climatic effect and loosen.
The implementation principle of the utility model are as follows: lower pendant 32 and upper pendant 31 are first installed respectively in 1 upper and lower ends of slabstone, and
Cloud stone glue is filled in fourth of the twelve Earthly Branches slot 11, then assembles the part-structure of above-listed and following cladding component 3, is pacified angle steel 34 by bolt
It is fixed on the other side of angle steel 34 on channel steel cross beam 2, then by supporting 33 also by bolt, finally being fixed on slabstone
The first hook 312 in lower pendant 32 and upper pendant 31 on 1 is hung on falling for the next arrangement of the supporting 33 in above-listed respectively
Hook 331 and it is following in the upper arrangement of supporting 33 barb 331 on.
The embodiment of present embodiment is the preferred embodiment of the utility model, and non-sequential limitation is originally practical new
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all cover practical with this
Within novel protection scope.
Claims (8)
1. a kind of mounting structure of the complete hanging stone curtain wall of stealth, including slabstone (1) and channel steel cross beam (2), it is characterised in that: institute
It states slabstone (1) to be fixed on the channel steel cross beam (2) by cladding component (3), described slabstone (1) one end is provided with fourth of the twelve Earthly Branches slot
(11), the cladding component (3) includes upper pendant (31), lower pendant (32), supporting (33), angle steel (34);
Be provided on the upper pendant (31) and the lower pendant (32) mounting groove (311), first hook (312), it is described on
The mounting groove (311) opening direction and described first hook (312) opening direction reversed arrangement on pendant (31), under described
The mounting groove (311) opening direction on pendant (32) is linked up with (312) opening direction with described first and is arranged in the same direction, the fourth of the twelve Earthly Branches
The side of slot (11) is plugged in the mounting groove (311), while the side of the mounting groove (311) is also plugged on the fourth of the twelve Earthly Branches slot
(11) in;
Barb (331) at arranged up and down two are provided on the supporting (33), first hook (312) is hung on described
It on barb (331), is provided with the second hook (332) at the top of the supporting (33), second hook (332) is arranged in institute
Supporting (33) are stated far from the side of the barb (331);
Angle steel (34) cross section arranges that second hook (332) is hung on one end of the angle steel (34) in " L ",
And be connected by bolt, side of the angle steel (34) far from the supporting (33) is horizontal also by the channel steel is bolted to
On beam (2).
2. the mounting structure of the complete hanging stone curtain wall of stealth according to claim 1, it is characterised in that: the channel steel cross beam
(2) it is provided between the angle steel (34) offset plate (4).
3. the mounting structure of the complete hanging stone curtain wall of stealth according to claim 1, it is characterised in that: the angle steel (34)
It is provided with sawtooth lamina (5) on inside at the two of upper right angle, length of the sawtooth lamina (5) each parallel to the angle steel (34)
Direction arrangement is spent, is provided with backing plate (51) on the sawtooth lamina (5), the backing plate (51) passes through the spiral shell on the angle steel (34)
Bolt is fixed on the sawtooth lamina (5).
4. the mounting structure of the complete hanging stone curtain wall of stealth according to claim 1, it is characterised in that: second hook
(332) top, which is provided with, is bolted (3311), and the screw rod that (3311) are bolted passes through second hook (332) and contradicts described
On angle steel (34).
5. the mounting structure of the complete hanging stone curtain wall of stealth according to claim 1, it is characterised in that: first hook
(312) glue-line (3121) are provided on.
6. the mounting structure of the complete hanging stone curtain wall of stealth according to claim 1, it is characterised in that: the mounting groove
(311) it is wooden (3111) that fire retardant, anticorrosive is provided in, the fire retardant, anticorrosive wooden (3111), which is arranged on the fourth of the twelve Earthly Branches slot (11), to be arranged in
Between side and the mounting groove (311) in the mounting groove (311).
7. the mounting structure of the complete hanging stone curtain wall of stealth according to claim 1, it is characterised in that: the fourth of the twelve Earthly Branches slot (11)
Inside it is provided with marble glue-line (111).
8. the mounting structure of the complete hanging stone curtain wall of stealth according to claim 1, it is characterised in that: the mounting groove
(311) end for being arranged in the side of the fourth of the twelve Earthly Branches slot (11) is provided with hangnail (3112).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822144413.3U CN209538469U (en) | 2018-12-20 | 2018-12-20 | The mounting structure of complete stealthy hanging stone curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822144413.3U CN209538469U (en) | 2018-12-20 | 2018-12-20 | The mounting structure of complete stealthy hanging stone curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209538469U true CN209538469U (en) | 2019-10-25 |
Family
ID=68265215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822144413.3U Active CN209538469U (en) | 2018-12-20 | 2018-12-20 | The mounting structure of complete stealthy hanging stone curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209538469U (en) |
-
2018
- 2018-12-20 CN CN201822144413.3U patent/CN209538469U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203308046U (en) | Thermal insulation decorative plate hanging buckle assembly | |
CN211499206U (en) | Assembled house | |
CN113530071B (en) | Assembled simple suspended ceiling mounting structure | |
CN209129220U (en) | A kind of mounting structure for installation unit formula curtain wall | |
CN209538469U (en) | The mounting structure of complete stealthy hanging stone curtain wall | |
CN214329323U (en) | Multi-story high-rise assembled steel structure mounting base | |
CN207354122U (en) | Color steel roofing photovoltaic aluminium alloy post system | |
CN110469150A (en) | Movable plank house | |
CN211447458U (en) | Anti-cracking device for gypsum board suspended ceiling | |
CN202809934U (en) | Back-buckling locking type stone material curtain wall dry hanging structure installed in close seam | |
CN216305083U (en) | Full buckle assembled furred ceiling | |
CN210342532U (en) | Indoor stone dry-hanging mounting structure | |
CN213038690U (en) | Alloy resin tile with high-strength structure | |
CN210798707U (en) | Wooden door with reinforced structure | |
CN114232850A (en) | Completely-assembled stone, glass and metal curtain wall | |
CN208455981U (en) | A kind of drag-line decoration device for guaranteeing sunshade grid and being in horizontality | |
CN112832477A (en) | Concrete hanging plate for exterior wall | |
CN215484937U (en) | Block terminal protection canopy convenient to assemble | |
CN201635228U (en) | Novel flash rack ceiling system | |
CN218057971U (en) | Temporary electric wire storage rack for construction site | |
CN206279666U (en) | A kind of aluminium alloy curtain wall connector | |
CN218028378U (en) | Sunshine room combined with curtain wall | |
CN221321731U (en) | Firm type furred ceiling fossil fragments clamping device for building decoration | |
CN219528087U (en) | Building curtain wall mounting fastener | |
CN209732249U (en) | pet house for household life |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 518000 Zhusheng Garden, 78 Zizhu Six Road, Xiangmihu Street, Futian District, Shenzhen City, Guangdong Province, 16301 Patentee after: Shenzhen Pengcheng Jianke Group Co., Ltd Address before: 518000 Zhusheng Garden, 78 Zizhu Six Road, Xiangmihu Street, Futian District, Shenzhen City, Guangdong Province, 16301 Patentee before: Shenzhen Pengcheng Jianke Decoration Design Engineering Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |