CN209537466U - A kind of pin-connected panel organic waste, sewage biogas generator - Google Patents
A kind of pin-connected panel organic waste, sewage biogas generator Download PDFInfo
- Publication number
- CN209537466U CN209537466U CN201821981687.1U CN201821981687U CN209537466U CN 209537466 U CN209537466 U CN 209537466U CN 201821981687 U CN201821981687 U CN 201821981687U CN 209537466 U CN209537466 U CN 209537466U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pipe
- gas
- guide tube
- sediment well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
The utility model relates to a kind of pin-connected panel organic waste, sewage biogas generator, it is by pipeline, communicating pipe, plug, gas-guide tube, hatching spine integrated apparatus;Pipeline, hatching spine, sediment are simultaneously, gas-guide tube, remove the gred pipe integrated device;Pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe integrated apparatus;Pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve integrated apparatus biogas generator made of assembling combination together with supervisor's material that preparation extends connection, the generator architecture is compact, assembling is convenient, air-tightness is strong, factor of created gase is high, at low cost, the construction period is short, do not account for aboveground space, arbitrarily expands processing capacity, manages simple, long service life.
Description
Technical field
The present invention relates to organic wastes, technical field of sewage, and in particular to a kind of pin-connected panel organic waste, sewage
Biogas generator.
Background technique
Large and medium-sized biogas project investment traditional at present is big, and complex procedures, the construction period is long, and the area that occupies cultivated land is big, has
Machine garbage leachate treating capacity is limited, and not exclusively, factor of created gase bottom is easily crusted for fermentation, and large and medium-sized tank type biogas design is increasingly complex,
Mechanical-electric maintenance trouble, high failure rate, especially some cement tank bodies phenomenon entire pond body needs that once leak air are reprocessed,
Scrappage is high, there is a jargon " no sand does not leak " in building.Cement tank body is particular about " building seven for three points to be in charge of " management trouble, often
" 1 year good, gas leakage in 3 years of pooring for 2 years scrap "!Its result causes China especially to spend huge sums what long-term investment was built in rural area
Methane-generating pit is in the state of scrapping mostly, and " wasting man power and money " makes us pained.It invents one kind and does not take up an area (or land occupation is less) with low investment, construction
The biogas of " permanent secured " board that the period is short, easy to operate, assembly is convenient, sealing performance is strong, processing capacity is big, the service life is long occurs
Device is ready to appear.
Summary of the invention
Existing biogas project there are aiming at the problem that, the purpose of the present invention is to provide a kind of pin-connected panel organic wastes, dirt
Water biogas generator, with low investment, process operations are simple, the construction period is short, and management is simple, assembled convenient, does not account for aboveground space, can
Unlimited to expand garbage leachate processing capacity, completely, air-tightness is strong, factor of created gase is high, long-lived biogas generator for fermentation.
The technical scheme of the present invention is realized as follows:
A kind of pin-connected panel organic waste, sewage biogas generator, the generator integrated apparatus different by four kinds of structures
It is formed with the main body tubing seamless assembled of preparation splicing, selects good air-tightness, watertightness, resistance to resistance to compression, corrosion resistance good
Tubing be primary structural material, can according to garbage leachate produce the amount of having install additional splicing unequal length main body tubing with expand processing
Capacity forms the powerful anaerobic fermentation space of closed performance.
As further scheme of the invention, pipeline, communicating pipe, plug, gas-guide tube, hatching spine integrated apparatus, device
Middle communicating pipe communicates with rubbish, sewage source of generation, and convenient for receiving dirt into biogas generator, it is true that plug seals main pipeline one end
Protect air tight water, only communicated by communicating pipe with biogas generator, communicating pipe oblique cutting or straight cutting to lower end of duct about 1/3 at, pipe
Mesh-shape hatching spine is inlayed in road, the biogas slurry upper layer of crust can be made to be constantly in broken shell state, the biogas of generation can be along hollow
Shell on be convenient for connecting with collecting methane using system in, pipeline upper end installation gas-guide tube.Communicating pipe, air guide pipe outer wall and pipe
Road seamless sticky connection, it is ensured that air water sealing.The supervisor's material and next device seamless interfacing that the device other end can be connected with preparation.
As further scheme of the invention, pipeline, hatching spine, sediment well, gas-guide tube, the pipe integrated device of slagging-off;Institute
Pipeline, hatching spine, sediment well, gas-guide tube, the slagging-off pipe stated form a whole, and the left and right ends of pipeline can be connected with preparation
Main body tubing penetrate through seamless connection, the length of supervisor's material of preparation connection is set according to sewage rubbish processing capacity, in pipeline
Mesh-shape hatching spine is inlayed, the biogas slurry upper layer of crust can be made to be constantly in broken shell state, the biogas of generation can be along hollow shell
It is sediment well in the middle part of, pipeline on body, sediment well is upper-lower seal, left and right perforation " well " shape object, fails to degenerate for deposit
Bits, slagging-off pipe straight cutting enter sediment well close to the position of bottom end, and the installation for the pipe that removes the gred may block pipeline convenient for drawing (absorption) clearly
Deposit biogas residue, it is ensured that pipeline is unimpeded, slagging-off pipe upper port be slightly above sediment well upper end, air guide is set in pipeline or sediment well upper end
Pipe is connect with collecting methane using system.Gas-guide tube, slagging-off pipe outer wall and sediment well seamless sticky join, it is ensured that air-tightness.This one
Makeup, which is set, is mostly installed at a large amount of processing organic wastes, the interlude of sewage work and corner, convenient for the deposition and work of biogas residue
The dredging of Cheng Guandao.
As further scheme of the invention, pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, be connected to it is pipe integrated
Device;Pipeline, sediment well, gas-guide tube, slagging-off pipe, forms a whole communicating pipe at hatching spine, and pipe ends can be connected with preparation
Main body tubing penetrate through and be seamlessly connected, be " well " shape sediment well among pipeline, penetrated through on the left of sediment well with pipeline, right side wall
It is blocked with right end pipeline, be in closed state above and below sediment well only by being connected to right end pipeline communicating pipe, communicating pipe oblique cutting enter
Sediment well right side wall, across left and right section, at away from lower end of duct horizontal line about 1/3, right section connects left section connection infratubal port
Siphunculus upper port is away from pipeline upper end spacing about 15cm or so.Slagging-off pipe straight cutting enters sediment well close to the position of bottom end, removes the gred on pipe
Port is slightly above sediment well upper end, and pipeline or sediment well upper end are set gas-guide tube and connect with collecting methane using system.Gas-guide tube, company
Siphunculus, the outer wall for the pipe that removes the gred and pipeline or sediment well seamless sticky join, it is ensured that air-tightness.This integrated apparatus is mostly installed at biogas
The intermediate position of engineering.
As further scheme of the invention, pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve
Integrated apparatus.Its pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve form a whole, pipeline
Left end can penetrate through seamless connection with the main body tubing of preparation connection, mesh-shape hatching spine is inlayed in pipeline, close to pipeline
Sediment well is up and down and right end is closed, and only by being connected to the right external world communicating pipe, slagging-off pipe straight cutting enters sediment well close to the position of bottom end
It sets, slagging-off pipe upper port is slightly above sediment well upper end, and gas-guide tube is set in pipeline or sediment well upper end, and communicating pipe, oblique cutting was in the sediment well right side
End wall, across inside and outside section, interior section communicating pipe lower port at away from lower end of duct horizontal line about 1/2, communicating pipe upper end highest point
Spacing about 15cm or so is kept with pipeline upper end horizontal line.Gas-guide tube, slagging-off pipe and connection pipe outer wall and pipeline or sediment well without
The viscous connection of seam, it is ensured that air-tightness closes valve in the middle section installation air water stretched out communicating pipe outside sediment well.The integrated apparatus is general
It is mounted on the tail portion of biogas project, setting biogas slurry is stored pond and matched.
As the main body tubing that further scheme of the invention, the integrated apparatus preparation with different structure are mutually spliced, add
It is convenient that dress extends, and material caliber wants almost the same, material matching, can ensure that good seal performance after docking, crushing resistance, corrosion resistance
Can be strong, it is durable.
As further scheme of the invention, the heat supply of biogas project can be by ground heating type heating system, in tube body
Placement collection hot coil comes to biogas generator heat supply, it is ensured that the fermentation temperature of middle low temperature.
As further scheme of the invention, the heat supply of biogas project can occur biogas by solar thermal collector
Device heat supply.
As further scheme of the invention, the heat supply of biogas project can be by sunlight plastics, glass arched shed come to natural pond
Gas generator heat supply.
Beneficial effects of the present invention: a kind of pin-connected panel organic waste disclosed by the invention, sewage biogas generator, this biogas
Generator architecture is simple and compact, install convenient, at low cost, and short time limit arbitrarily expands processing capacity, can be embedded to underground and not take up an area
Space, sealing performance is strong, facilitates management and maintenance, factor of created gase is high, long service life.
Detailed description of the invention
Fig. 1 is pipeline of the invention, communicating pipe, plug, gas-guide tube, hatching spine integrated apparatus structural schematic diagram;
Fig. 2 is pipeline of the invention, hatching spine, sediment well, gas-guide tube, the pipe integrated apparatus structure schematic diagram of slagging-off;
Fig. 3 is pipeline of the invention, hatching spine, sediment well, gas-guide tube, slagging-off is managed, communicating pipe integrated apparatus structure is shown
It is intended to;
Fig. 4 is pipeline of the invention, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve integrated apparatus
Structural schematic diagram;
Fig. 5 is the main body tubing schematic diagram that preparation of the invention is mutually spliced;
Fig. 6 is a kind of pin-connected panel organic waste of the invention, sewage biogas generator structural schematic diagram;
In figure: 1- pipeline, 2- plug, 3- communicating pipe, 4- gas-guide tube, 5- hatching spine, 6- pipeline, 7- hatching spine, 8- sediment
Well, 9- gas-guide tube, 10- slagging-off pipe, 11- pipeline, 12- hatching spine, 13- gas-guide tube, 14- sediment well, 15- slagging-off pipe, 16- connection
Pipe, 17- pipeline, 18- hatching spine, 19- gas-guide tube, 20- sediment well, 21- slagging-off pipe, 22- communicating pipe, 23- air water valve
Specific embodiment
It shows that example illustrates certain embodiments of the present invention, and should not be construed as limiting model of the invention
It encloses, present disclosure can be improved from material, method and reaction condition simultaneously, all these improvement should all
It falls within spirit and scope of the invention.
Embodiment: a kind of pin-connected panel organic waste, sewage biogas generator
It selects that air-tightness is good, crushing resistance is strong, the tubing of the corrosion resistant shapes such as not, is with common PE tubing here
Example is illustrated, and PE material air-tightness, corrosion resistance are preferable, there is certain crushing resistance, convenient for welding, after welding is assembled, leakproofness
It can well form the anaerobic fermentation space of a favorable sealing property, be embedded to underground general service life at 50 years or so,
Primary investment lifelong benefit.
Pipeline, communicating pipe, plug, gas-guide tube, hatching spine integrated apparatus as shown in Figure 1:
Pipeline, communicating pipe, plug, gas-guide tube, hatching spine integrated apparatus, communicating pipe 3 and rubbish, sewage generate in device
Source communicates, and convenient for receiving dirt into biogas generator, plug 2 seals 1 beginning of main pipeline, it is ensured that air tight water, pipeline 1 only lead to
Cross and communicated with biogas generator communicating pipe 3, communicating pipe 3 oblique cutting or straight cutting to 1 lower end of pipeline about 1/3 at, communicating pipe 3 is across inside and outside
Mesh-shape hatching spine 5 is inlayed at both ends in pipeline 1, and hatching spine 5 is generally taper or cylindricality, intermediate hollow, and periphery is in mesh-shape,
The biogas slurry upper layer of crust can be made to be constantly in broken shell state, the biogas of generation can along on hollow shell in 1 upper end of pipeline peace
Dress gas-guide tube 4 is convenient for connecting with collecting methane using system.Communicating pipe 3,4 outer wall of gas-guide tube and 1 seamless sticky of pipeline join, it is ensured that gas
Water-stop.The supervisor's material 24 (Fig. 5) and next device seamless interfacing that the device other end can be connected with preparation.
As shown in Figure 2;Pipeline, hatching spine, sediment well, gas-guide tube, the pipe integrated device of slagging-off
The pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe form a whole, and the left and right ends of pipeline 6 are equal
It can penetrate through and be seamlessly connected with the main body tubing 24 (see Fig. 5) of preparation connection, supervisor's material 24 of preparation connection produces the amount of having according to rubbish
Pipeline length is set, conducive to the capacity for expanding processing rubbish, sewage, inlays mesh-shape hatching spine 7 in pipeline 6, hatching spine is general
For taper or cylindricality, intermediate hollow, periphery is in mesh-shape, and the biogas slurry upper layer of crust can be made to be constantly in broken shell state, generation
Biogas can along on hollow shell in.It is sediment well 8 in the middle part of pipeline 6, sediment well is upper-lower seal, left and right perforation " well " shape
Object, sediment well 8 enter sediment well 8 close to the position of bottom end, remove for depositing the bits that could not degenerate to fall completely, slagging-off 10 straight cutting of pipe
10 upper port of slag pipe is slightly above 8 upper end of sediment well, and the installation of slagging-off pipe 10 may block the deposition of pipeline convenient for drawing (absorption) clearly
Object biogas residue, it is ensured that pipeline is unimpeded, and 8 upper end of sediment well is set gas-guide tube 9 and connect with collecting methane using system.Gas-guide tube 9, slagging-off pipe
10 outer walls and 8 seamless sticky of sediment well join, it is ensured that air-tightness.This integrated apparatus is mostly installed at a large amount of processing organic wastes, dirt
The interlude of Hydraulic Projects or corner, convenient for the deposition of biogas residue and the dredging of engineering pipeline.
It is as shown in Figure 3: pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe integrated apparatus
Pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, form a whole communicating pipe, 11 both ends of pipeline can with it is pre-
The main body tubing 24 (Fig. 5) of standby connection is penetrated through and is seamlessly connected, and supervisor's material of preparation connection produces the amount of having according to rubbish and sets pipeline
Length inlays mesh-shape hatching spine 12 in pipeline 11, hatching spine is generally taper conducive to the processing capacity for expanding rubbish, sewage
Or cylindricality, intermediate hollow, periphery are in mesh-shape, the biogas slurry upper layer of crust can be made to be constantly in broken shell state, the biogas of generation can
Along on hollow shell, in, 11 upper end of pipeline, installation gas-guide tube 13 is convenient for connecting with collecting methane using system, in pipeline 11
Between be " well " shape sediment well 14, penetrated through on the left of sediment well with pipeline 11, right sidewall and right end pipeline 11 are blocked, only pass through
Communicating pipe 16 is connected to right end pipeline 11, and about 14 sediment well is in closed state, and communicating pipe, 16 oblique cutting entered 14 right side wall of sediment well,
Across left and right section, left 16 lower port of section communicating pipe is at away from 11 lower end horizontal line about 1/3 of pipeline, and communicating pipe, 16 upper port was away from pipe
Road upper end spacing about 15cm or so, convenient for reserving gas storage space and controlling the capacitance balance in next fermentation section.Remove the gred pipe 15
Straight cutting enters sediment well 14 close to the position of bottom end, and 15 upper port of pipe that removes the gred is slightly above 14 upper end of sediment well, and the installation for the pipe that removes the gred is just
The deposit biogas residue of pipeline 11 may be blocked in drawing (absorption) clearly, it is ensured that pipeline is unimpeded.Gas-guide tube 13, communicating pipe 16, slagging-off pipe
15 outer wall joins with pipeline 11,14 seamless sticky of sediment well, it is ensured that air-tightness.This integrated apparatus is mostly installed at biogas project
Section of fermenting up and down is accepted at intermediate position.
It is as shown in Figure 4: pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve integrated apparatus
The pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve form a whole, pipeline
17 left end can penetrate through seamless connection with the main body tubing 24 (Fig. 5) of preparation connection, and supervisor's material 24 of preparation connection, is basis
Rubbish produces the amount of having and sets pipeline length, conducive to the processing capacity for expanding rubbish, sewage, inlays mesh-shape hatching spine in pipeline 17
18, hatching spine is generally taper or cylindricality, intermediate hollow, and periphery is in mesh-shape, and the biogas slurry upper layer of crust can be made to be constantly in brokenly
Shelly-shaped state, the biogas of generation can along on hollow shell in.About 20 sediment well and right end close to pipeline 17 are closed, and are only leaned on
Communicating pipe 22 is connected to the right external world, and slagging-off 21 straight cutting of pipe removes the position into sediment well 20 close to bottom end, and slagging-off pipe upper port is omited
Higher than sediment well upper end, gas-guide tube 19 is set in sediment well upper end, communicating pipe 22 oblique cutting in 20 right end wall of sediment well, across inner and outer ends,
Inner end communicating pipe, 22 lower port was at away from 17 lower end horizontal line about 1/2 of pipeline, communicating pipe 22 upper end highest point and 17 upper end of pipeline
Horizontal line keeps spacing about 15cm or so, convenient for reserving gas storage space and controlling leaking for aqueous vapor, stretches out sediment in communicating pipe 22
Middle section outside well 20 is installed by air water valve 23.Before air water gate valve main function is that sewage rubbish capacity also not up to sets limitation
It prevents biogas and biogas slurry from leaking, can be opened a sluice gate after liquid level floods 22 lower port of communicating pipe.The integrated apparatus is in biogas project
In be mounted on the tail portion of entire biogas generator, matched with end biogas slurry storage pond.
It is as shown in Figure 5: the PE main body tubing of preparation splicing
The main body tubing pipeline is the main body tubing 24 that the integrated apparatus preparation with different structure is mutually spliced, tubes of material
Diameter wants almost the same, material matching, convenient for docking, can ensure that good seal performance after docking, and crushing resistance, corrosion resistance are strong, warp
Long durable, tubing dosage length, cuts according to garbage treatment quantity and splices.
It is as shown in Figure 6: a kind of pin-connected panel organic waste, sewage biogas generator
By Fig. 1, Fig. 2, Fig. 3, Fig. 4, the integrated apparatus of four seed types and PE main body tubing Fig. 5 of preparation connection are through seamless
A favorable sealing property, the stronger biogas generator of crushing resistance (Fig. 6) are formd after assembling combination is good.Including 1- pipeline, 2-
Plug, 3- communicating pipe 4- gas-guide tube, 5- hatching spine, 6- pipeline, 7- hatching spine, 8- sediment well, 9- gas-guide tube, 10- slagging-off pipe,
11- pipeline, 12- hatching spine 13- gas-guide tube, 14- sediment well, 15- slagging-off pipe, 16- communicating pipe, 17- pipeline, 18- hatching spine,
19- gas-guide tube, 20- sediment well, 21- slagging-off pipe, 22- communicating pipe, 23- air water valve, 24- are responsible for material.
The application method and working principle of biogas generator: in a kind of pin-connected panel organic waste, sewage biogas generator group
After dress, close all nozzles, inflate pressure testing, it is air tight, reach setting pressure situation under, can use.Use preceding pass
It closes end air water valve, injects water or sewage floods connection infratubal port and forms anaerobic fermentation section, while after preventing fermentation, generating
Gas it is outer in being then gradually added into the organic waste for being pre-adjusted pH value and fragmentation, sewage mixture, grasped in reality
Biogas generator is generally embedded to underground in work, connect by downward gravitional force with garbage leachate source.Due in pipeline
In a resistant-walled anaerobic fermentation space, the biogas that organic matter fermentation generates can only input collecting methane benefit by gas-guide tube
Use system.As sewage gradually increases, air water was opened again after sewage floods the connection infratubal port position for being mounted on tail portion
Valve, the biogas slurry of fermentation maturity automatically flow into biogas slurry storage pond and do organic fertilizer use.By removing the gred, pipe periodic cleaning cannot degenerate
Biogas residue, it is ensured that pipeline is unimpeded.Its working principle: 1, rubbish, sewage pass through first enters by pipeline, communicating pipe, blocks up communicating pipe
Head, gas-guide tube, hatching spine integrated apparatus;Pipeline, hatching spine, sediment well, gas-guide tube, the pipe integrated device of slagging-off;Pipeline is broken
The primary fermentation section that shell device, sediment well, gas-guide tube, slagging-off pipe, communicating pipe integrated apparatus and main body tubing are assemblied to form jointly,
The species precipitates such as the biggish organic waste solids of specific gravity and harmful worm's ovum are got off, and are started preliminary fermentation and are decomposed, premenstrual section
The Organic waste sewage of processing, points three layers: the waste precipitate of rubbish leather shell, more clear rubbish solution and solid-like,
Under the action of hatching spine, the rubbish leather shell of surface layer paste is in broken shell state always, and the biogas of generation becomes silted up along hatching spine to natural pond
Gas collection system.2, the garbage leachate flow ipe through preliminary exposition, hatching spine, sediment well, gas-guide tube, the pipe integrated dress of slagging-off
It sets;Pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve integrated apparatus and main body tubing collectively constitute
Post-fermentation section, and swim in rubbish leather shell above and be deposited on following biogas residue and then stay in primary fermentation section after supervention
Ferment.3, in post-fermentation section, garbage leachate continues fermentation and decomposes, and harmful bacteria and worm's ovum continue to sink, and pathogen is gradually dead,
Rubbish is further innoxious, and the rubbish biogas residue thickness of generation is substantially reduced than first interval.4, the biogas slurry in post-fermentation section is flowed out
Decomposed, germ therein and parasitic ovum are killed substantially, and post-fermentation section downstream generally has biogas slurry to store the mating storage in pond
It deposits biogas slurry and does organic fertilizer use.
A kind of pin-connected panel organic waste disclosed by the invention, sewage biogas generator, this biogas generator structure are simply tight
It gathers, install convenient is at low cost, short time limit, arbitrarily expands processing capacity, does not account for aboveground space, and sealing performance is strong, and management is facilitated to tie up
It repairs, factor of created gase is high, long service life.The generator is the mode of resilience formula processing garbage leachate, is obtained while handling rubbish
Biogas energy, organic solid fertilizer and liquid fertilizer are obtained, all organic wastes, sewage first is that the generation of processing living community is acted on, avoids
House refuse sewage expands in living environment, greatly reduces pollution of area source;Second is that occurring in pin-connected panel Organic waste sewage biogas
In the working environment of device anaerobism corruption, harmful bacteria and worm's ovum are killed;Third is that being carried out in sewage treatment project to sanitary sewage
After Anaerobic Treatment, mitigate the engineering pressure of subsequent processing.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (5)
1. a kind of pin-connected panel organic waste, sewage biogas generator, it is characterised in that: by pipeline, communicating pipe, plug, gas-guide tube,
Hatching spine integrated apparatus;Pipeline, hatching spine, sediment well, gas-guide tube, the pipe integrated device of slagging-off;Pipeline, hatching spine, sediment
Well, gas-guide tube, slagging-off pipe, communicating pipe integrated apparatus;Pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, gas
Water valve integrated apparatus biogas generator made of assembling combination together with supervisor's material that preparation extends connection.
2. a kind of pin-connected panel organic waste according to claim 1, sewage biogas generator, it is characterised in that: by pipeline,
Communicating pipe, plug, gas-guide tube, hatching spine integrated apparatus;The pipeline, communicating pipe, plug, gas-guide tube, hatching spine composition one
One end of a entirety, pipeline is sealed with plug, communicating pipe oblique cutting or straight cutting to lower end of duct about 1/3 at, communicating pipe outer tube wall with
Be responsible for connection, gas-guide tube air guide is installed in pipeline upper end, inlay mesh-shape hatching spine in pipeline, the other end of pipeline can with it is pre-
The main body tubing of standby connection is penetrated through and is seamlessly connected.
3. a kind of pin-connected panel organic waste according to claim 1, sewage biogas generator, it is characterised in that: pipeline is broken
Shell device, sediment well, gas-guide tube, the pipe integrated device of slagging-off;The pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe group
At an entirety, the left and right ends of pipeline can penetrate through with the main body tubing of preparation connection and connect, and it is broken that mesh-shape is inlayed in pipeline
Shell device, pipeline middle part are sediment well, and sediment well is upper-lower seal, left and right perforation " well " shape object, and the pipe straight cutting that removes the gred enters sediment well and leans on
The position of nearly bottom end, slagging-off pipe upper port are slightly above sediment well upper end, and gas-guide tube is set in sediment well upper end, and gas-guide tube, slagging-off pipe are outer
Tube wall and supervisor, sediment well connection.
4. a kind of pin-connected panel organic waste according to claim 1, sewage biogas generator, it is characterised in that: pipeline is broken
Shell device, sediment well, gas-guide tube, slagging-off pipe, communicating pipe integrated apparatus;Pipeline, hatching spine, sediment well, gas-guide tube, slagging-off pipe,
Communicating pipe forms a whole, and pipe ends can be penetrated through and be seamlessly connected with the main body tubing of preparation connection, and net is inlayed in pipeline
Eye shape hatching spine, pipeline centre are " well " shape sediment well, are penetrated through on the left of sediment well with pipeline, right side wall is separated by with right end pipeline
It is disconnected, only by be connected to right end pipeline communicating pipe, the closing up and down of sediment well, communicating pipe oblique cutting enter sediment well right side wall, across or so
Section is connected to infratubal port at away from lower end of duct horizontal line about 1/3, and communicating pipe, upper port was away from the left side pipeline upper end spacing about 15cm
The right side, slagging-off pipe straight cutting enter sediment well close to the position of bottom end, and the pipe upper port that removes the gred is slightly above sediment well upper end, pipeline upper end or heavy
Set gas-guide tube, gas-guide tube, communicating pipe, slagging-off pipe outer tube wall and supervisor, sediment well connection in slag well upper end.
5. a kind of pin-connected panel organic waste according to claim 1, sewage biogas generator, it is characterised in that: pipeline is broken
Shell device, sediment well, gas-guide tube, slagging-off pipe, communicating pipe, air water valve integrated apparatus, the pipeline, sediment well, are led at hatching spine
Tracheae, slagging-off pipe, communicating pipe, air water valve form a whole, and the left end of pipeline can penetrate through nothing with the main body tubing of preparation connection
Seam connection, inlays mesh-shape hatching spine in pipeline, close to the sediment well of pipeline above and below and right end closing, outside communicating pipe and right end
Boundary's connection, slagging-off pipe straight cutting enter sediment well close to the position of bottom end, and the pipe upper port that removes the gred is slightly above sediment well upper end, sediment well or
Gas-guide tube is set in pipeline upper end, communicating pipe oblique cutting in sediment Jing Youduanbi be connected to infratubal port away from lower end of duct across inside and outside section
At horizontal line about 1/2, communicating pipe upper end highest point and pipeline upper end horizontal line keep spacing about 15cm or so, stretched out in communicating pipe
Middle section outside sediment well is installed by air water valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821981687.1U CN209537466U (en) | 2018-11-18 | 2018-11-18 | A kind of pin-connected panel organic waste, sewage biogas generator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821981687.1U CN209537466U (en) | 2018-11-18 | 2018-11-18 | A kind of pin-connected panel organic waste, sewage biogas generator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209537466U true CN209537466U (en) | 2019-10-25 |
Family
ID=68262581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821981687.1U Active CN209537466U (en) | 2018-11-18 | 2018-11-18 | A kind of pin-connected panel organic waste, sewage biogas generator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209537466U (en) |
-
2018
- 2018-11-18 CN CN201821981687.1U patent/CN209537466U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201334723Y (en) | Garbage landfill leachate draining and landfill gas collection system | |
CN104649530B (en) | A kind of aquaculture processes the method that excrement is dirty | |
CN203048931U (en) | Dry-fermentation methane gas preparing device by utilizing shed, film and slot combining technology | |
CN207849802U (en) | A kind of geothermal tail water backflow device based on geothermal well association atmospheric pressure | |
CN104322378A (en) | Septic tank for pig farms | |
CN209537466U (en) | A kind of pin-connected panel organic waste, sewage biogas generator | |
CN103923822A (en) | Invisible multistage methane tank capable of producing methane evenly | |
CN203683539U (en) | Precipitation type FRP (Fiber Reinforced Plastic) purification biogas digester | |
CN204335506U (en) | Pig farm bubble manure pit | |
CN208633131U (en) | Building foundation pit precipitation recycling device | |
CN201250233Y (en) | Tunnel biogas pool with water return on the top | |
CN206681921U (en) | Twin-well connects electricity generation system | |
CN205874393U (en) | Large -scale methane system based on solar energy collection carries out anaerobic digestion | |
CN201296753Y (en) | Horizontal-flow biogas tank | |
CN106047671A (en) | Integrated biogas production device with circulating heating function | |
CN107434344A (en) | A kind of stool detection and recycling equipment and method | |
CN102861747B (en) | Four-way horizontal landfill gas collecting well | |
CN206408222U (en) | A kind of good airproof performance and the methane-generating pit for facilitating folding | |
CN208200944U (en) | A kind of refuse landfill gas gathering system | |
CN205974502U (en) | Tectorial membrane methane -generating pit | |
CN201915014U (en) | Methane generator | |
CN206902141U (en) | The waste material waste heat temperature-raising marsh pool system discharged using methane-generating pit | |
CN206408221U (en) | The long small shallow horizontal cylinder shape domestic methane tank of one kind | |
CN205530420U (en) | Energy -conserving formula hydraulic engineering is with arranging silt equipment | |
CN206408220U (en) | One kind grows small shallow pair of bar arcuately domestic methane tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |