CN209536884U - Prefabricated section lifts handling device - Google Patents

Prefabricated section lifts handling device Download PDF

Info

Publication number
CN209536884U
CN209536884U CN201821473969.0U CN201821473969U CN209536884U CN 209536884 U CN209536884 U CN 209536884U CN 201821473969 U CN201821473969 U CN 201821473969U CN 209536884 U CN209536884 U CN 209536884U
Authority
CN
China
Prior art keywords
lever
fixed
prefabricated section
handling device
telescopic clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821473969.0U
Other languages
Chinese (zh)
Inventor
张敏健
许庆辉
许闽峰
林世杰
林必贤
覃锦鹏
李劭明
董国泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources And Hydropower Co Ltd
Original Assignee
China Water Resources And Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources And Hydropower Co Ltd filed Critical China Water Resources And Hydropower Co Ltd
Priority to CN201821473969.0U priority Critical patent/CN209536884U/en
Application granted granted Critical
Publication of CN209536884U publication Critical patent/CN209536884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A kind of prefabricated section lifting handling device, it is characterized by: it is made of walking mechanism, lever, telescopic clamp, walking mechanism is made of the connecting shaft of two wheels of two wheels and connection, support rod is fixed in connecting shaft, lever is fixed on support rod, one end of lever is connect with telescopic clamp, the other end of lever is fixed with lever, telescopic clamp is respectively fixed with clamping piece below two sides, the tie point of lever and lever is A, lever and the tie point of telescopic clamp are B, and the vertical range of A to O is greater than the vertical range of B to O.The utility model is integrally equivalent to two wheel barrows, uses laborsaving lever structure, and lifting handling process is laborsaving, is pushed using wheel, and operating quickly, can improve labor efficiency, reduce labor intensity.

Description

Prefabricated section lifts handling device
Technical field
The utility model belongs to hanging apparatus, especially belongs to prefabricated section lifting handling device.
Background technique
In the production process of prefabricated section, one piece of more smooth place is usually looked for carry out concentration production on-site, Monolithic prefabricated section is tied up by manual handling, stacking to certain altitude, usually 5-10 block for a pile after air-drying, then by fork truck Etc. equipment the prefabricated section of entire bundle is transported on transport vehicle or at practical application, the weight of usual monolithic prefabricated section is 70.5kg, Thickness 10cm, manual handling, stacking large labor intensity, low efficiency.
Summary of the invention
The purpose of the utility model is to overcome manual handling labor intensity present in the production process of existing prefabricated section Big defect provides a kind of laborsaving, the prefabricated section lifting handling device for the labor intensity that can improve labor efficiency, reduce.
Technical solution used by the utility model is that a kind of prefabricated section lifts handling device, and be characterized by: it is by going It walks mechanism, lever, telescopic clamp to constitute, walking mechanism is made of the connecting shaft of two wheels of two wheels and connection, solid in connecting shaft Surely there is support rod, lever is fixed on support rod, and one end of lever is connect with telescopic clamp, and the other end of lever is fixed with operation Handle, is respectively fixed with clamping piece below telescopic clamp two sides, and the tie point of lever and lever is A, the company of lever and telescopic clamp Contact is B, and the vertical range of A to O is greater than the vertical range of B to O.
The utility model is laborsaving lever, is directed to carrying, the stacking of monolithic prefabricated section, in lifting, people manipulation Lever, another people help to help clamping piece to be allowed to clamp prefabricated section two sides, the telescopic clamp of staggered form, and when longitudinal stress can be converted into Lateral clamping force the more is pressed from both sides the more tight when telescopic clamp is improved by leverage under gravity, as long as transportational process one man operation, It is pushed using wheel, operating is quick.When putting down at stacking, prefabricated section is helped by another people, guarantee is in place.
There are two the connecting shaft that support rod lower end is individually fixed in wheel, upper end is fixed in lever, forms triangular support. Two wheels of certain distance ensure that the stability of the utility model transportational process, and two support rods form triangular support, Guarantee wheel uniform force.
There is a reinforcement strut, one end has middle part to connect with connecting shaft, and the other end is connect with lever, the tie point with lever There is spacing between support rod and the tie point of lever.Reinforce strut and two support rods formation triangular support planes be angled, Longitudinal triangular support is formed, the firm of lever is reinforced.
Reinforce the tie point of strut and lever than the tie point of support rod and lever closer to lever.It is close to reinforce strut Lever, stability are good.
The tie point for reinforcing strut and lever is C, and C point and O point are located at the two sides at the midpoint AB.The center of gravity of lever in this way It falls in and reinforces in strut and support rod, overall stability is good.
AO:BO=1.3-1.7:1。
The angle steel that clamping piece is 90 degree, short side are fixed with telescopic clamp.
The upper end of telescopic clamp is fixed with iron chains, and suspension hook is fixed on lever, and suspension hook connects with the midpoint of iron chains.
The utility model is integrally equivalent to two wheel barrows, uses laborsaving lever structure, and lifting handling process is laborsaving, benefit It is pushed with wheel, operating quickly, can improve labor efficiency, reduce labor intensity.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model
Fig. 2 is the top view of Fig. 1
Fig. 3 is the O-O cross-sectional view of Fig. 1
Fig. 4 is the B-B cross-sectional view of Fig. 1
Wherein: 1 walking mechanism, 11 wheel, 12 connecting shaft, 2 lever, 21 support rod 22 is reinforced 23 lever of strut, 24 suspension hook 3 and is stretched Contracting folder 31 clamping piece, 32 iron chains.
Specific embodiment
The utility model is described in detail below with reference to view
As shown in Figs 1-4, a kind of prefabricated section lifts handling device, it is made of walking mechanism 1, lever 2, telescopic clamp 3, row It walks mechanism to be made of the connecting shaft 12 of two wheels of two wheels 11 and connection, support rod 21 is fixed in connecting shaft, there are two branch Strut lower end is individually fixed in both ends of the connecting shaft close to wheel of wheel, and upper end is fixed in lever, forms triangular support.Have One reinforces strut 22, middle part (preferably midpoint) connection of one end and connecting shaft, and the other end is connect with lever, the company with lever There is spacing between contact and the tie point of support rod and lever, reinforces the bearing diagonal that strut is plane where two support rods.Add The tie point of strong strut and lever is than the tie point of support rod and lever closer to lever.One end of lever and telescopic clamp connect It connects, the other end of lever is fixed with lever 23, and the tie point of lever and lever is A, and the tie point of lever and telescopic clamp is The vertical range of B, A to O are greater than the vertical range of B to O, and AO:BO=1.3-1.7:1, best ratio is 1.5:1.Reinforce strut Tie point with lever is C, and C point and O point are located at the two sides at the midpoint AB, and optimal design is the midpoint AB and the midpoint CO weight It closes.Clamping piece 31, the angle steel that clamping piece is 90 degree are respectively fixed with below telescopic clamp two sides, short side is fixed with telescopic clamp.It stretches The upper end of contracting folder is fixed with iron chains 32, suspension hook 24 is fixed on lever, suspension hook connects with the midpoint of iron chains.
The utility model is directed to the carrying of monolithic prefabricated section, stacking, and in lifting, people's manipulation operations handle is another People helps that clamping piece is helped to be allowed to clamp prefabricated section two sides, as long as transportational process one man operation, when putting down at stacking, by another people Prefabricated section is helped, guarantee is in place.1000 blocks of prefabricated sections are originally carried, 8 people are needed, are worked 8 hours, spoilage is 1% left The right side now uses 4 present apparatus, and 6 personal works 2 hours can have been removed, substantially without damage.

Claims (7)

1. a kind of prefabricated section lifts handling device, it is characterised in that: it is made of walking mechanism, lever, telescopic clamp, walking mechanism It is made of the connecting shaft of two wheels of two wheels and connection, support rod is fixed in connecting shaft, lever is fixed on support rod, thick stick One end of bar is connect with telescopic clamp, and the other end of lever is fixed with lever, and the upper end of telescopic clamp is fixed with iron chains, on lever It is fixed with suspension hook, suspension hook connects with the midpoint of iron chains, and clamping piece is respectively fixed with below telescopic clamp two sides, and clamping piece is 90 degree Angle steel, short side fixes with telescopic clamp, and the tie point of lever and lever is A, and the tie point of lever and telescopic clamp is B, A to O Vertical range be greater than B to O vertical range.
2. a kind of prefabricated section according to claim 1 lifts handling device, it is characterised in that: there are two support rod lower ends point It is not fixed on the connecting shaft of wheel, upper end is fixed in lever, forms triangular support.
3. a kind of prefabricated section according to claim 1 lifts handling device, it is characterised in that: have a reinforcement strut, one end There is middle part to connect with connecting shaft, the other end is connect with lever, between the tie point and support rod of lever and the tie point of lever There is spacing.
4. a kind of prefabricated section according to claim 3 lifts handling device, it is characterised in that: reinforce the company of strut and lever Contact is than the tie point of support rod and lever closer to lever.
5. a kind of prefabricated section according to claim 3 lifts handling device, it is characterised in that: reinforce the company of strut and lever Contact is C, and C point and O point are located at the two sides at the midpoint AB.
6. a kind of prefabricated section according to claim 5 lifts handling device, it is characterised in that: the midpoint AB and the midpoint CO weight It closes.
7. a kind of prefabricated section according to claim 1 lifts handling device, it is characterised in that: AO:BO=1.3-1.7:1.
CN201821473969.0U 2018-09-10 2018-09-10 Prefabricated section lifts handling device Active CN209536884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821473969.0U CN209536884U (en) 2018-09-10 2018-09-10 Prefabricated section lifts handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821473969.0U CN209536884U (en) 2018-09-10 2018-09-10 Prefabricated section lifts handling device

Publications (1)

Publication Number Publication Date
CN209536884U true CN209536884U (en) 2019-10-25

Family

ID=68245035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821473969.0U Active CN209536884U (en) 2018-09-10 2018-09-10 Prefabricated section lifts handling device

Country Status (1)

Country Link
CN (1) CN209536884U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114179878A (en) * 2021-12-30 2022-03-15 中冶天工集团天津有限公司 Large-scale precast block rapid carrying device and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114179878A (en) * 2021-12-30 2022-03-15 中冶天工集团天津有限公司 Large-scale precast block rapid carrying device and using method thereof

Similar Documents

Publication Publication Date Title
CN209536884U (en) Prefabricated section lifts handling device
CN210707436U (en) Stone material transport shallow
CN109625044B (en) Transport vehicle for transporting components
CN205524327U (en) Novel fortune pole gun carriage
CN207700655U (en) A kind of precast beam stretching construction lift work platform
CN204778565U (en) Well lid handling device
CN211169652U (en) Portable small-size concrete pipe transportation and hoist device
CN204432482U (en) Precast concrete block automatic handling device
CN206664619U (en) A kind of multifunction simple gun carriage
CN112441092B (en) Manufacturing and operating method of labor-saving trolley capable of being automatically assembled, disassembled and transported
CN112455512A (en) Method for conveying large-volume prefabricated concrete flue by hoistway type construction elevator
CN206155480U (en) Handcart
CN202671138U (en) Manual hydraulic platform car
CN205589250U (en) Cart
CN207000480U (en) Evaporate and press concrete aerated block handcart convenient to loading and unloading
CN205916229U (en) Cable transportation car
CN212861474U (en) Manual portable transport vehicle
CN209683730U (en) A kind of journal box spring group handling device
CN208813227U (en) It is a kind of for carrying the cart of strip and block weight
CN218839453U (en) Transfer device convenient for pipeline transportation and processing in field area
CN216741566U (en) Simple tunnel rail transport vehicle
CN217923097U (en) Auxiliary construction device for bridge deck auxiliary structure
CN216266735U (en) Stretching and protecting integrated frame for steel strand of prefabricated box girder
CN213950406U (en) Simple heavy object hoisting and moving device
CN212222182U (en) Hydraulic guardrail precast block hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant