CN209526060U - High-voltage electricity PT fuse withdrawing device - Google Patents
High-voltage electricity PT fuse withdrawing device Download PDFInfo
- Publication number
- CN209526060U CN209526060U CN201920294152.5U CN201920294152U CN209526060U CN 209526060 U CN209526060 U CN 209526060U CN 201920294152 U CN201920294152 U CN 201920294152U CN 209526060 U CN209526060 U CN 209526060U
- Authority
- CN
- China
- Prior art keywords
- fuse
- fixing bolt
- cabinet shell
- contraband shape
- stress support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Fuses (AREA)
Abstract
The utility model discloses a kind of high-voltage electricity PT fuse withdrawing devices, it applies in rail traffic application field, its key points of the technical solution are that: including the PT fuse in cabinet shell, extend extension block in the outer peripheral edge of the end of the one end of the PT fuse on the outside of cabinet shell, the extension block extends to the outside of cabinet shell and is connected on the outer wall of cabinet shell by the first fixing bolt, and the outside of the cabinet shell is equipped with the second fixing bolt for taking out PT fuse out of cabinet shell;Having the technical effect that for having reduces the difficulty that operator takes out PT fuse out of cabinet shell, time saving and energy saving, while decreasing the possibility that operator's misoperation during taking out PT fuse causes new failure to equipment.
Description
Technical field
The utility model relates to field of track traffic, in particular to a kind of high-voltage electricity PT fuse withdrawing device.
Background technique
Line of Nanjing Subway rail traffic mostly uses greatly the 35KV high-tension switch cabinet of Shenyang high pressure.In every set 35KV system mesohigh
Vacuum circuit breaker PT(hereinafter referred to as PT), it is that the control protection in voltage rating 35KV, 50HZ AC three-phase high voltage distribution network is set
It is standby.It is mainly used for breaking, closes load current, overload current and short circuit current in power circuit.Suitable for transformer substation system
Make protection and control is used, also can be used as the block switch of power grid, installs additional after controller, it can be achieved that distribution automation.
But equipment, through operation in a few years, PT is often easy to happen failure due to itself.However take out failure
PT fuse it is extremely difficult, be easy and the cavity in cabinet shell in moving process due to being enclosed with the PT fuse of rubber structure
Between form vacuum pressure, so it is bigger to want the difficulty of directly pulling out PT fuse outward.Maintenance personnel by PT fuse from
Frequent Fructus Forsythiae band pulls when taking out in cabinet shell, on the one hand be easy to cause new failure;On the one hand a large amount of manpower and material resources are expended.
Utility model content
The purpose of the utility model is to provide a kind of high-voltage electricity PT fuse withdrawing devices, its advantage is that: reduce maintenance people
Member takes out the difficulty of the fuse of failure PT out of cabinet shell, time saving and energy saving;It also reduces and equipment is made simultaneously in cargo handling process
The possibility of the failure of Cheng Xin.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of high-voltage electricity PT fuse
Withdrawing device, including the PT fuse in cabinet shell, the end of the one end of the PT fuse on the outside of cabinet shell
Outer peripheral edge extend extension block, the extension block extends to the outside of cabinet shell and is connected to machine by the first fixing bolt
On the outer wall of cabinet shell, the outside of the cabinet shell is equipped with the second fixed spiral shell for taking out PT fuse out of cabinet shell
Bolt.
Through the above technical solutions, when equipment needs to take out PT fuse out of cabinet shell because PT fuse breaks down
When, operator first backs out the first fixing bolt from extension block, the second fixing bolt is then rotated and pull, so that PT fuse
It is quickly taken out out of cabinet shell under the affecting of the second fixing bolt.Made in the way of the second fixing bolt of rotation
Second fixing bolt is slowly moving until PT fuse is out of cabinet shell in the cavity of the vacuum of cabinet shell by PT fuse
It completely disengages, reduces the operation difficulty taken out out of cabinet shell from PT fuse, decrease operator directly for PT fuse
Firmly pull the possibility that new failure is be easy to cause when extracting.
The utility model is further arranged to: the outside of the cabinet shell is equipped with the stress support of Contraband shape, the Contraband shape
Stress support open end end and cabinet shell outer wall it is inconsistent, second fixing bolt is fed through stress support,
And the bolt head of second fixing bolt is connected with the end of PT fuse towards stress support side.
Through the above technical solutions, the second fixing bolt is directed away from the process of the direction movement of cabinet shell by operator
In, operator is pinned stress support with a hand so that stress support contradicts the then operator on the outer wall of cabinet shell
The second fixing bolt is rotated, so that the second fixing bolt pulls out PT fuse out of cabinet shell.The setting of stress support,
On the one hand guiding role is played to the moving direction of the second fixing bolt, on the other hand plays and is fixedly supported on cabinet shell
Outer wall on consequently facilitating operator by the second fixing bolt slowly be directed away from cabinet bracket direction movement so that PT melts
The effect that silk is pulled out.
The utility model is further arranged to: second fixing bolt be fed through the stress support of Contraband shape along length side
To side center.
Through the above technical solutions, stress support is contradicted the outer wall in cabinet shell and is consolidated by rotation second by operator
When determining bolt PT fuse being made to be affected out out of cabinet shell, at this time on the second fixing bolt the moving direction of institute's stress with
The moving direction of institute's stress is opposite on stress support.The center of stress support is arranged in second fixing bolt, is convenient for second
Active force on fixing bolt and stress support acts on same straight line, consequently facilitating operator is firmly fixed by second
Bolt be directed away from cabinet shell direction it is mobile during, can by stress support in the opposite direction it is stable by
In cabinet shell.
The utility model is further arranged to: the PT fuse is equipped with Contraband shape ironware towards the side of stress support, described
The side of PT fuse towards stress support is threaded with third fixing bolt, second fixing bolt and third fixing bolt
It is fed through Contraband shape ironware respectively in the two side walls of open end, and the bolt of second fixing bolt and third fixing bolt
Head is located at the inside of Contraband shape ironware, and the Contraband shape ironware is inconsistent by third fixing bolt and PT fuse.
The second fixing bolt is made to be directed away from cabinet shell through the above technical solutions, operator rotates rotary turnplate
When direction is mobile, the direction that Contraband shape ironware is directed away from cabinet shell under the affecting of the second fixing bolt is mobile, and is inconjunction with
Third fixing bolt and PT fuse move together.At this point, PT fuse and third fixing bolt, Contraband shape ironware, the second standing screw
Between form a lever, the setting of Contraband shape ironware and third fixing bolt so that the arm of force for affecting PT fuse mobile increases, from
And power required when affecting PT fuse mobile is reduced, be conducive to save manpower.
The utility model is further arranged to: the through-hole worn for third fixing screws is offered on the Contraband shape ironware,
The inner peripheral of the through-hole is connected with rubber ring.
Through the above technical solutions, the setting of rubber ring, increase through-hole on third fixing bolt and Contraband shape ironware it
Between frictional force reduce Contraband shape ironware so that Contraband shape ironware closely links together with third fixing bolt and affecting
Sliding friction occurs between third fixing bolt during three fixing bolts, so that third fixing bolt turns on PT fuse
It moves and third fixing bolt is made to loosen the possibility fallen from PT fuse.
The utility model is further arranged to: second fixing bolt and third fixing bolt are fed through Contraband shape ironware edge
The center of the two side walls of open end.
Through the above technical solutions, the second fixing bolt is directed away from cabinet shell by rotation rotary turnplate by operator
Direction it is mobile when, the second fixing bolt, Contraband shape ironware and third fixing bolt remain on same straight line, favorably
It is applied on the second fixing bolt in operator for the influence that PT fuse takes out out of cabinet shell to be concentrated on same
On straight line, consequently facilitating operator quickly takes out PT fuse out of cabinet shell, manpower is saved.
The utility model is further arranged to: the third fixing bolt is fixedly connected on PT fuse towards stress support
The center of one side end.
Through the above technical solutions, in this way, leading third fixing bolt by from the second fixing bolt
When affecting of gravitation, due to stress balance on PT fuse, PT fuse under the affecting of third fixing bolt between cabinet shell
Generate tractive force keeping parallelism suffered on frictional resistance and PT fuse, put down in cabinet shell consequently facilitating PT fuse is whole
Being removed for weighing apparatus, saves manpower.
The utility model is further arranged to: second fixing bolt is fixedly connected with rotation far from one end of stress support
Change hands wheel.
Through the above technical solutions, the setting of rotation hand wheel, makes second to consolidate convenient for operator by rotating rotation hand wheel
Determine the direction movement that bolt is directed away from cabinet shell during rotation, is directly fixed by pulling second to reduce
The difficulty that bolt takes out PT fuse out of cabinet shell.
In conclusion the utility model has the following beneficial effects:
1. reducing the operation difficulty that PT fuse takes out PT fuse out of cabinet shell, improve work efficiency;
2. reducing possibility during dismantling out of cabinet shell to PT fuse, damaged to equipment.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the present embodiment is used to embody stress support and Contraband shape ironware.
Fig. 2 is the structure of the rubber ring in through-hole and through-hole in the present embodiment on PT fuse and Contraband shape ironware
Schematic diagram.
Fig. 3 is the enlarged drawing of part A in Fig. 2.
Appended drawing reference: 1, cabinet shell;2, PT fuse;3, extension block;4, the first fixing bolt;5, the second fixing bolt;
6, stress support;7, Contraband shape ironware;8, third fixing bolt;9, through-hole;10, rubber ring;11, rotation hand wheel.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment: a kind of high-voltage electricity PT fuse withdrawing device, with reference to Fig. 1, including the PT fuse in cabinet shell 1
2(Fig. 2).PT fuse 2 extends extension block 3 close to the outer peripheral edge of the end of the one end in 1 outside of cabinet shell, and extension block 3 extends
To cabinet shell 1 outside and be threaded on the outer wall of cabinet shell 1 by the first fixing bolt 4 so that PT is molten
The one end for the cabinet shell 1 that silk 2 extends is fixed on the lateral wall of cabinet shell 1.
With reference to Fig. 1, the outside of cabinet shell 1 is equipped with the stress support 6 of Contraband shape, the end of 6 open end of stress support of Contraband shape
Portion and the outer wall of cabinet shell 1 are inconsistent, and the outside of cabinet shell 1 is equipped with second fixing bolt 5, the second fixing bolt 5
It is fed through the center of the side of stress support 6 along its length, the second fixing bolt 5 is welded far from one end of stress support 6
It is connected to rotation hand wheel 11, the bolt head and PT fuse 2 of the second fixing bolt 5 towards one end of PT fuse 2(Fig. 2) extend cabinet
The end of the side of shell 1 is connected.When the PT fuse 2 in cabinet shell 1 breaks down by long-term use, operator is first
First fixing bolt 4 is removed from extension block 3, then operator uses a hand rotation rotation hand wheel 11 again, and uses another
The stress support 6 of Contraband shape is pinned conflict on the lateral wall of cabinet shell 1 by hand, so that the second fixing bolt 5 is directed away from machine
The direction of cabinet shell 1 is mobile, and PT fuse 2 quickly is affected out out of cabinet shell 1, and then operator is to PT fuse 2
It carries out overhauling or replacing with into cabinet shell 1 new PT fuse 2.
With reference to Fig. 1, in this process, operator rotates the second fixing bolt 5 by rotation rotation hand wheel 11, so that
Second fixing bolt 5 helically formula be directed away from cabinet shell 1 direction it is mobile to by PT fuse 2(Fig. 2) from cabinet shell 1
Interior taking-up.The moving direction of the air pressure resistance generated between PT fuse 2 and cabinet shell 1 in such a way that rotation is advanced offsets
It is anti-, so that the movement routine generated when the second fixing bolt 5 of rotation increases, to form laborsaving lever, it is convenient for operator by PT
Fuse 2 takes out out of cabinet shell 1, saves manpower.
Referring to figs. 2 and 3, PT fuse 2 towards the side of stress support 6 be equipped with Contraband shape ironware 7, Contraband shape ironware 7 far from by
Power bracket 6, the side of PT fuse 2 towards stress support 6 are threaded with third fixing bolt 8, and Contraband shape ironware 7 is along open end
The center of side wall offers through-hole 9, and the through-hole 9 that third fixing bolt 8 is fed through on Contraband shape ironware 7 simultaneously makes Contraband shape ironware
7 is inconsistent with PT fuse 2.Second fixing bolt 5 is fed through Contraband shape ironware 7 along open end far from third fixing bolt 8 respectively
On side wall, and the position that the second fixing bolt 5 is worn is located at Contraband shape ironware 7 along the center of the side wall of open end.It sets in this way
It is equipped with and is conducive to stress balance on Contraband shape ironware 7, and the bolt head of the second fixing bolt 5 and third fixing bolt 8 is located at
The inside of Contraband shape ironware 7.
Referring to figs. 2 and 3, when the second fixing bolt 5 is directed away from the side of cabinet shell 1 under the drive of rotation hand wheel 11
To when movement, Contraband shape ironware 7 affects the direction for being directed away from PT fuse 2 mobile with the second fixing bolt 5 at this time, while Contraband
Shape ironware 7 drives third fixing bolt 8 to be inconjunction with the direction movement that PT fuse 2 is directed away from cabinet shell 1, until PT fuse 2
It is detached from out of cabinet shell 1 completely.Inner peripheral due to Contraband shape ironware 7 along the through-hole 9 of the side wall of open end is bonded with rubber ring
10, the rubber ring 10 of the outer wall and 9 inner peripheral of through-hole of third fixing bolt 8 is inconsistent.The setting of rubber ring 10, increases third
Frictional force between fixing bolt 8 and Contraband shape ironware 7 reduces Contraband during affecting third fixing bolt 8 of Contraband shape ironware 7
Sliding occurs between shape ironware 7 and third fixing bolt 8 so that third fixing bolt 8 rotates on PT fuse 2 makes
Obtain the possibility that third fixing bolt 8 loosens disengaging from PT fuse 2.
Operating procedure: it when equipment is broken down due to PT fuse 2 itself and needs PT fuse 2 from cabinet shell
When taking out in 1, operator first backs out the first fixing bolt 4 from extension block 3, and then operator rotates rotation hand wheel 11,
So that the direction that rotation hand wheel 11 drives the second fixing bolt 5 to be directed away from cabinet shell 1 is mobile, Contraband shape ironware 7 is the at this time
It is mobile towards the direction of stress support 6 under the affecting of two fixing bolts 5, then Contraband shape ironware 7 affect again third fixing bolt 8 with
And PT fuse 2 is directed away from the direction movement of cabinet shell 1, until PT fuse 2 is detached out of cabinet shell 1.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (8)
1. a kind of high-voltage electricity PT fuse withdrawing device, it is characterised in that: including the PT fuse (2) in cabinet shell (1),
Extend extension block (3), the extension in the outer peripheral edge of the end of the one end of the PT fuse (2) on the outside of cabinet shell (1)
Block (3) extends to the outside of cabinet shell (1) and is connected on the outer wall of cabinet shell (1) by the first fixing bolt (4), institute
The outside for stating cabinet shell (1) is equipped with for the second fixing bolt (5) by PT fuse (2) from the interior taking-up of cabinet shell (1).
2. high-voltage electricity PT fuse withdrawing device according to claim 1, it is characterised in that: outside the cabinet shell (1)
Side is equipped with the stress support (6) of Contraband shape, the end of stress support (6) open end of the Contraband shape and the outer wall of cabinet shell (1)
Inconsistent, second fixing bolt (5) is fed through stress support (6), and the bolt head and PT of second fixing bolt (5)
The end of fuse (2) towards stress support (6) side is connected.
3. high-voltage electricity PT fuse withdrawing device according to claim 2, it is characterised in that: second fixing bolt (5)
It is fed through the center of the side along its length of the stress support (6) of Contraband shape.
4. high-voltage electricity PT fuse withdrawing device according to claim 3, it is characterised in that: the PT fuse (2) towards by
The side of power bracket (6) is equipped with Contraband shape ironware (7), and the side of PT fuse (2) towards the stress support (6) is threaded with the
Three fixing bolts (8), second fixing bolt (5) and third fixing bolt (8) are fed through Contraband shape ironware (7) along opening respectively
In the two side walls at end, and the bolt head of second fixing bolt (5) and third fixing bolt (8) is located at Contraband shape ironware
(7) inside, the Contraband shape ironware (7) are inconsistent by third fixing bolt (8) and PT fuse (2).
5. high-voltage electricity PT fuse withdrawing device according to claim 4, it is characterised in that: opened on the Contraband shape ironware (7)
Equipped with the through-hole (9) worn for third fixing bolt (8), the inner peripheral of the through-hole (9) is connected with rubber ring (10).
6. high-voltage electricity PT fuse withdrawing device according to claim 5, it is characterised in that: second fixing bolt (5)
Contraband shape ironware (7) is fed through along the center of the two side walls of open end with third fixing bolt (8).
7. high-voltage electricity PT fuse withdrawing device according to claim 6, it is characterised in that: the third fixing bolt (8)
It is fixedly connected on center of the PT fuse (2) towards a side end of stress support (6).
8. high-voltage electricity PT fuse withdrawing device according to claim 7, it is characterised in that: second fixing bolt (5)
One end far from stress support (6) is fixedly connected with rotation hand wheel (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920294152.5U CN209526060U (en) | 2019-03-07 | 2019-03-07 | High-voltage electricity PT fuse withdrawing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920294152.5U CN209526060U (en) | 2019-03-07 | 2019-03-07 | High-voltage electricity PT fuse withdrawing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209526060U true CN209526060U (en) | 2019-10-22 |
Family
ID=68232425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920294152.5U Active CN209526060U (en) | 2019-03-07 | 2019-03-07 | High-voltage electricity PT fuse withdrawing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209526060U (en) |
-
2019
- 2019-03-07 CN CN201920294152.5U patent/CN209526060U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205901145U (en) | In put cabinet switch and transport dolly | |
CN103594946B (en) | Power high voltage switch cubicle high-voltage handcart electrically operated device | |
CN110011259A (en) | A kind of automatic de-icing device beats mechanism of ice | |
CN205960668U (en) | Photovoltaic power plant is with energy -conserving protection switch device | |
CN209526060U (en) | High-voltage electricity PT fuse withdrawing device | |
CN210985195U (en) | Rural power grids switch board convenient to maintain | |
CN208078490U (en) | A kind of power transformation equipment overhauling stand | |
CN209692313U (en) | A kind of automatic de-icing device | |
CN209692314U (en) | A kind of automatic de-icing device beats mechanism of ice | |
CN108593985A (en) | A kind of electric power box can move freely lifting | |
CN110011260A (en) | A kind of automatic de-icing device | |
CN212626758U (en) | Supporting device of switch cabinet electrical automation equipment | |
CN203607316U (en) | Locking device of disconnector used for high voltage switch cabinet | |
CN203596506U (en) | High voltage frequency conversion bypass cabinet | |
CN208570450U (en) | A kind of high-pressure vacuum breaker being easily installed | |
CN203589552U (en) | High-voltage handcart electric operation device of electric power high-voltage switchgear | |
CN207938521U (en) | Solid-sealing vacuum load switch-fuse combined electric apparatus dropout transmission device | |
CN202189723U (en) | Outdoor alternating current high voltage vacuum automatic sectionalizer without external power supply | |
CN205583479U (en) | KYN61 type cubical switchboard handcart operating means | |
CN219067648U (en) | Load switch on secondary fused sleeve column | |
CN211556496U (en) | Theftproof electric power cabinet convenient to remove | |
CN109950098A (en) | A kind of breaker | |
CN209496774U (en) | Detachable disconnecting switch | |
CN219627209U (en) | Shifting device of circuit breaker | |
CN209461369U (en) | A kind of vacuum circuit breaker convenient for adjusting current transformer ratio |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |