CN209525160U - A kind of reinforcing bar connection grout sleeve test specimen production frame - Google Patents
A kind of reinforcing bar connection grout sleeve test specimen production frame Download PDFInfo
- Publication number
- CN209525160U CN209525160U CN201822039495.5U CN201822039495U CN209525160U CN 209525160 U CN209525160 U CN 209525160U CN 201822039495 U CN201822039495 U CN 201822039495U CN 209525160 U CN209525160 U CN 209525160U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- frame
- plate
- sleeve
- grout sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model discloses a kind of reinforcing bar connection grout sleeve test specimens to make frame, including frame and tie up button, wherein a side bottom is provided with the support plate for being used to support reinforcing bar grout sleeve to the frame, the frame side upper and lower ends are provided with the first limit plate for positioning to reinforcing bar, first limit plate, which is provided with, is provided with fixed plate with matched first circumferential notch of reinforcing bar, the frame middle side part;It is described to tie up that button tightens sleeve and both ends are clamped in fixed plate.First limit plate of the upper and lower ends of the design is positioned and is limited to reinforcing bar grout sleeve, the support plate of bottom effectively supports reinforcing bar grout sleeve, sleeve is tightened on frame by intermediate button of tying up again, the clamping of reinforcing bar grout sleeve is fixed in realization, carries out grouting solidification convenient for subsequent.
Description
Technical field
The utility model relates to building trade prefabricated components fields, are tried more particularly to a kind of reinforcing bar connection with grout sleeve
Part makes frame.
Background technique
Currently, with Modern Residence industrialization continue to develop, prefabricated concrete structure use element factory it is prefabricated and
The method that assembled in situ combines has achieved the purpose that guarantee quality and shorten the construction period.Prefabricated concrete structure is built in life
It produces efficiency to be significantly improved, while energy saving and resource, embodies environmentally protective theory.Prefabricated concrete structure closes
Connection at key node is critical issue, this will have great influence to the safety of prefabricated concrete structure.State at present
Interior prefabricated concrete structure at the node used by reinforcing bar connection type mainly have reinforced bar sleeve grouting connection and reinforcing bar slurry
Two kinds of connection of anchor overlap joint.It is generally necessary to be manufactured experimently and tested, test specimen is not easy to fix reinforcement location when making.
Utility model content
The utility model is intended to solve above-mentioned technical problem at least to a certain extent.For this purpose, the utility model proposes one
Kind reinforcing bar connection makes frame with grout sleeve test specimen.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of reinforcing bar connection grout sleeve test specimen
Frame is made, including frame and ties up button, wherein a side bottom is provided with the support for being used to support reinforcing bar grout sleeve to the frame
Plate, the frame side upper and lower ends are provided with the first limit plate for positioning to reinforcing bar, and first limit plate is provided with
With matched first circumferential notch of reinforcing bar, the frame middle side part is provided with fixed plate;The button of tying up tightens sleeve and two
End is clamped in fixed plate.
It further, further include multiple clamping plates, the clamping plate is separately fixed at frame upper and lower ends and the steel by upper and lower ends
Muscle is clamped between clamping plate and frame.
Further, the frame upper end is provided with the positioning plate for the clamping plate bottom surface against upper end, the folder of lower end
Plate supports on the supporting plate.
Further, the clamping plate is fixedly connected by bolt with frame.
Further, the button of tying up includes strapping and ties up nut, and the fixed plate is provided with matched with strapping
Opening, the strapping both ends, which pass through, to be open and connect with nut is tied up, and the strapping and fixed plate tie up sleeve in centre.
Further, the fixed plate bottom is provided with the second limit plate for positioning to sleeve, second limit plate
It is provided with and matched second circumferential notch of sleeve.
The beneficial effects of the utility model are: the first upper and lower limit plate is positioned and is limited to reinforcing bar grout sleeve,
The support plate of bottom effectively supports reinforcing bar grout sleeve, then is tightened sleeve on frame by intermediate button of tying up,
The clamping of reinforcing bar grout sleeve is fixed in realization, carries out grouting solidification convenient for subsequent.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the utility model mounting structure schematic diagram;
Fig. 2 is the installation condition decomposition diagram of the utility model;
Fig. 3 is fixed plate and the attachment structure schematic diagram for tying up button;
Fig. 4 is the schematic diagram of the utility model clamping reinforcing bar grout sleeve;
Fig. 5 is enlarged view at the A of Fig. 2.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and examples.
Referring to figs. 1 to Fig. 5, a kind of reinforcing bar connection of the utility model makes frame with grout sleeve test specimen, is used for clamping steel
Muscle grout sleeve 5, the reinforcing bar grout sleeve 5 include sleeve 52 and the reinforcing bar 51 for being inserted into 52 upper and lower ends of sleeve.Reinforcing bar connection
It include that frame 1 and tying up buckles 2 with grout sleeve test specimen production frame, wherein a side bottom is provided with and is used to support steel the frame 1
The support plate 14 of muscle grout sleeve 5, the frame 1 side upper and lower ends are provided with the first limit plate for positioning to reinforcing bar 51
13, first limit plate 13 is provided with and matched first circumferential notch 131 of reinforcing bar 51, the first circumferential notch 131 opening court
Outer setting, and be semicircle.Described middle side part of frame 1 is provided with fixed plate 12;The button 2 of tying up tightens sleeve 52 and both ends
It is clamped in fixed plate 12.In order to improve clamping efficiency, not only only one the side clamping reinforcing bar grout sleeve 5 of frame 1, frame
There are two symmetrical sides to be used for clamping for frame 1, and is symmetrically arranged with the first limit plate 13, fixed plate 12 and support plate accordingly
14, another side can also be with the multiple reinforcing bar grout sleeves 5 of clamping, and as shown in Figure 1 and Figure 4, there are two a side clampings
Reinforcing bar grout sleeve 5 is also equipped with two group of first limit plate 13 accordingly and ties up button 2.Frame 1 is cuboid framework, each
Side is welded by four rod pieces.First limit plate 13 is then arranged on the rod piece that upper and lower ends are laterally arranged, fixed plate
12 both ends are connected in the middle part of the rod piece being vertically arranged.
The preferred connection structure of button 2 and fixed plate 12 is tied up as shown in figure 3, the button 2 of tying up includes strapping 21 and bundle
Prick nut 22, the fixed plate 12 be provided with strapping 21 it is matched opening 122,21 both ends of strapping pass through opening
It 122 and is connect with nut 22 is tied up, the strapping 21 ties up sleeve 52 in centre with fixed plate 12.When installation, strapping 21
One end, which is screwed with, ties up nut 22 and is caught in opening 122, and the other end passes through opening 122 and tighten around sleeve 52 ties up nut
22, so that two are tightened and tie up the abutting fixed plate 12 of nut 22 back to the side of sleeve 52, sleeve 52 is tightened.In order to make sleeve
It is mountable to position when 52 pre-installation, 12 bottom of fixed plate is provided with the second limit plate 121 for positioning to sleeve 52,
Second limit plate 121 be provided with matched second circumferential notch of sleeve 52, sleeve 52 is tied not yet to be buckled 2 and pinions
When, it first leans on into pre-determined bit is realized in the second circumferential notch, prevents mobile when button 2 is tied up in installation.
The sleeve 52 of reinforcing bar grout sleeve 5, which is tied up, buckles 2 fixations, in order to make 51 part of reinforcing bar also be able to achieve fixation, this examination
Part production frame further includes multiple clamping plates 3, and the clamping plate 3 is separately fixed at 1 upper and lower ends of frame and by the reinforcing bar of upper and lower ends 51
It is clamped between clamping plate 3 and frame 1.In order to facilitate the installation of clamping plate 3,1 upper end of frame is provided with for the folder against upper end
The clamping plate 3 of the positioning plate 11 of 3 bottom surface of plate, lower end is against in support plate 14.Preferably, the clamping plate 3 passes through bolt 4 and frame
Frame 1 is fixedly connected, and 1 upper and lower ends of frame are correspondingly arranged on bolt hole 15.Since two sides are symmetrical arranged, two symmetrical sides are provided with
Clamping plate 3, thus bolt 4 pass through height on both sides alignment clamping plate 3 and frame 1 and prominent two sides clamping plate 3,4 both ends of bolt it is outstanding
Part screws on nut and two clamping plates 3 is fixedly clamped, and the clamping plate 3 of such two sides can share bolt.
The working principle of the design is as follows:
When reinforcing bar grout sleeve 5 is packed into, the reinforcing bar 51 of upper and lower ends is caught in the first circumferential notch 131 of the first limit plate 13
Interior realization positioning, the second circumferential notch that intermediate sleeve 52 is then caught in fixed plate 12 realize positioning, realize reinforcing bar grout sleeve 5
Three positions of upper, middle and lower positioning.5 bottom of reinforcing bar grout sleeve is then against in support plate 14.By tying up 2 pairs of sleeves 52 of button
Fixation is tightened, clamping plate 3 is then clamped fixation to the reinforcing bar of upper and lower ends 51, realizes 5 upper, middle and lower of reinforcing bar grout sleeve, three positions
The fixation set.After fixation, the rear acquisition test specimen to be solidified that is in the milk can be carried out to reinforcing bar grout sleeve 5, the design can once manufacture more
A test specimen, it is high-efficient, and accurate positioning, clamping fixation.
Above embodiments are only to illustrate the technical solution of the utility model and are not intended to limit it, all without departing from this
Any modification of utility model spirit and scope or equivalent replacement should all cover the range in technical solutions of the utility model
It is interior.
Claims (6)
1. a kind of reinforcing bar connection makes frame with grout sleeve test specimen, it to be used for clamping reinforcing bar grout sleeve (5), the reinforcing bar grouting set
Cylinder (5) includes sleeve (52) and the reinforcing bar (51) for being inserted into sleeve (52) upper and lower ends, it is characterised in that: including frame (1) and bundle
Clasp (2), wherein a side bottom is provided with the support plate (14) for being used to support reinforcing bar grout sleeve (5) to the frame (1), described
Frame (1) the side upper and lower ends are provided with the first limit plate (13) for positioning to reinforcing bar (51), first limit plate
(13) it is provided with and reinforcing bar (51) matched first circumferential notch (131), described frame (1) middle side part is provided with fixed plate
(12);It is described to tie up that button (2) tightens sleeve (52) and both ends are clamped on fixed plate (12).
2. reinforcing bar connection according to claim 1 makes frame with grout sleeve test specimen, it is characterised in that: further include multiple folders
Plate (3), the clamping plate (3) are separately fixed at frame (1) upper and lower ends and the reinforcing bar of upper and lower ends (51) are clamped in clamping plate (3)
Between frame (1).
3. reinforcing bar connection according to claim 2 makes frame with grout sleeve test specimen, it is characterised in that: the frame (1)
Upper end is provided with the positioning plate (11) for clamping plate (3) bottom surface against upper end, and the clamping plate (3) of lower end is against support plate
(14) on.
4. reinforcing bar connection according to claim 2 makes frame with grout sleeve test specimen, it is characterised in that: the clamping plate (3)
It is fixedly connected by bolt (4) with frame (1).
5. reinforcing bar connection according to claim 1 makes frame with grout sleeve test specimen, it is characterised in that: described to tie up button
(2) include strapping (21) and tie up nut (22), the fixed plate (12) is provided with and strapping (21) matched opening
(122), strapping (21) both ends pass through opening and (122) and connects with nut (22) is tied up, the strapping (21) with consolidate
Fixed board (12) ties up sleeve (52) in centre.
6. reinforcing bar connection according to claim 1 makes frame with grout sleeve test specimen, it is characterised in that: the fixed plate
(12) bottom is provided with the second limit plate (121) for positioning to sleeve (52), second limit plate (121) be provided with
Matched second circumferential notch of sleeve (52).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822039495.5U CN209525160U (en) | 2018-12-05 | 2018-12-05 | A kind of reinforcing bar connection grout sleeve test specimen production frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822039495.5U CN209525160U (en) | 2018-12-05 | 2018-12-05 | A kind of reinforcing bar connection grout sleeve test specimen production frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209525160U true CN209525160U (en) | 2019-10-22 |
Family
ID=68226298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822039495.5U Expired - Fee Related CN209525160U (en) | 2018-12-05 | 2018-12-05 | A kind of reinforcing bar connection grout sleeve test specimen production frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209525160U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109490039A (en) * | 2018-12-05 | 2019-03-19 | 中建科技湖南有限公司 | A kind of reinforcing bar connection grout sleeve test specimen production frame |
-
2018
- 2018-12-05 CN CN201822039495.5U patent/CN209525160U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109490039A (en) * | 2018-12-05 | 2019-03-19 | 中建科技湖南有限公司 | A kind of reinforcing bar connection grout sleeve test specimen production frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109490039A (en) | A kind of reinforcing bar connection grout sleeve test specimen production frame | |
CN106284654B (en) | Assembled beam-column joint attachment device | |
CN105649213B (en) | A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting | |
CN209525160U (en) | A kind of reinforcing bar connection grout sleeve test specimen production frame | |
CN107059879B (en) | Adaptive connection node of steel support and steel purlin in foundation pit and construction method thereof | |
CN209907570U (en) | Assembled frame beam column node that steel sheet and reinforcement are connected | |
CN218083367U (en) | Municipal administration road bridge pretension method prestressing force is put and is opened construction equipment | |
CN206987144U (en) | A kind of dismountable steel bar truss floor support plate of bed die | |
CN213210172U (en) | Concrete construction uniformity detection device | |
CN201265214Y (en) | Steel plate anchorage block used for external pre-stress reinforcement structure | |
CN212248808U (en) | Connecting device for cast-in-place concrete structure building outer wall heat preservation system | |
CN207863310U (en) | A kind of prestressed carbon cloth stretching and anchoring device | |
CN104005410A (en) | Tensioning and anchoring device based on unbonded prestress reinforced soil technology | |
CN205012328U (en) | Novel shaped steel joint design of super dark worker's method stake | |
CN206707281U (en) | Early-dismantling formwork system reinforces fastener and reinforcement assembly | |
CN208857812U (en) | A kind of civil engineering built pile | |
CN208533863U (en) | A kind of prefabricated girder of armored concrete | |
CN201597115U (en) | Pipe pile prestressed tension device | |
CN211229189U (en) | Steel concrete composite beam convenient to butt joint | |
CN109397523A (en) | A kind of deformed bar tensioning tooling and its application method | |
CN209040172U (en) | A kind of connection structure of pullout tests concrete tubular pile | |
CN209686151U (en) | Railway bed bracing means | |
CN209703492U (en) | A kind of anti-fracture tubular pole | |
CN220729295U (en) | Sensor for monitoring reinforced cage concrete | |
CN109680840A (en) | One kind is exempted to tear the compound heat preservation die plate stupefied frame of monoblock type time and its construction method open |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191022 Termination date: 20211205 |
|
CF01 | Termination of patent right due to non-payment of annual fee |