Construction coherent-wall scaffolding cantilever arrangement Download PDFInfo
- Publication number
- CN209509457U CN209509457U CN201822037978.1U CN201822037978U CN209509457U CN 209509457 U CN209509457 U CN 209509457U CN 201822037978 U CN201822037978 U CN 201822037978U CN 209509457 U CN209509457 U CN 209509457U
- Authority
- CN
- China
- Prior art keywords
- support column
- fixed
- pedestal
- fixed plate
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses construction coherent-wall scaffolding cantilever arrangements, including pedestal, two lateral roofs of the pedestal are fixedly connected to the first support column, fixed link is slidably connected on first support column, the same fixed plate is fixedly connected at the top of two fixed links, first support column is connect by supporting mechanism with fixed plate, and the top of first support column is connected with the second support column by bindiny mechanism.In the utility model, pass through hydraulic cylinder, the mating reaction of cylinder rod, the first sliding block, fixed link, fixed plate, support rod and the second sliding block, achieve the effect that hydraulic cylinder effect drives cylinder rod to rise, has realized hydraulic cylinder for fixed plate work and drive fixed plate elevating function;By the mating reaction of the first support column, the second support column, fixinig plate and the first fixed screw, achieve the effect that the first support column is connected together by fixed plate and the first fixed screw with the second support column, has realized and increase track length function.
Description
Technical field
The utility model relates to construction technical field of tools more particularly to construction coherent-wall scaffolding cantilever to fill
It sets.
Background technique
Scaffold be construction site be worker operation and solving vertically and horizontally transport and the various brackets set up, architecture field
Generic term, refer on construction site be used in exterior wall, interior decoration or the higher place that can not directly construct of layer height, mainly for
Construction personnel up and down go along with sb. to guard him and high-altitude installation component etc. by operation or perimeter security net, is a kind of common tool in construction.
Coherent-wall scaffolding used at present is typically all to be fixed on the wall, and the process of lifting is relatively difficult, lifting
It is easy to shake in the process, leads to the generation of safety accident.
For this purpose, it is proposed that construction coherent-wall scaffolding cantilever arrangement solves the above problems.
Utility model content
Purpose of the utility model is to solve the mistakes that the coherent-wall scaffolding lifting used now exists in the prior art
The problem of journey is relatively difficult, and shaking is easy during lifting, and the construction coherent-wall scaffolding cantilever arrangement proposed.
To achieve the goals above, the utility model adopts the technical scheme that
Construction coherent-wall scaffolding cantilever arrangement, including pedestal, two lateral roofs of the pedestal are fixedly connected to
One support column slidably connects fixed link on first support column, is fixedly connected at the top of two fixed links same
A fixed plate, first support column are connect by supporting mechanism with fixed link, pass through connection at the top of first support column
Mechanism is connected with the second support column, and the pedestal is connected by elevating mechanism and connect with fixed plate, the lateral wall of the pedestal, the
The lateral wall of the lateral wall of one support column and the second support column is fixedly connected to fixed mechanism, and the top of the fixed plate is solid
Surely it is connected with fence.
Preferably, one end of the fixed link is connect by the first sliding block with the first support column, on first support column
Equipped with sliding slot corresponding with the first sliding block.
Preferably, the supporting mechanism includes the support rod for being fixed on bottom of fixed and being inclined to set, the support rod
One end far from fixed link is connect by the second sliding block with the first support column, and second sliding block is identical as the first sliding block, described
The lateral wall of second sliding block and the inner sidewall of sliding slot are slidably connected.
Preferably, the bindiny mechanism includes fixinig plate, the fixinig plate by the first fixed screw respectively with first
Dagger and the connection of the second support column.
Preferably, the elevating mechanism includes the hydraulic cylinder for being fixedly connected on base top, and the hydraulic cylinder passes through cylinder rod
It is connect with fixed plate.
Preferably, the fixed mechanism includes being fixedly connected on base outside wall, the first support column lateral wall and second
The fixed block of dagger lateral wall is threaded with the second fixed screw on the fixed block.
Preferably, the bottom of the pedestal is fixedly connected with multiple universal wheels, and multiple universal wheels are arranged in *.
The technical solution that the embodiments of the present invention provide can include the following benefits:
1, by hydraulic cylinder, the mating reaction of cylinder rod, the first sliding block, fixed link, fixed plate, support rod and the second sliding block,
Achieve the effect that hydraulic cylinder effect drives cylinder rod to rise, has realized hydraulic cylinder for fixed plate work and drive fixed plate lifting function
Energy;
2, by the mating reaction of the first support column, the second support column, fixinig plate and the first fixed screw, reached first
The effect that support column is connected together by fixed plate and the first fixed screw with the second support column, realizes increase track length
Function, the height risen convenient for fixed plate are higher.
Detailed description of the invention
Fig. 1 be the utility model proposes construction coherent-wall scaffolding cantilever arrangement structural schematic diagram;
Fig. 2 be the utility model proposes construction coherent-wall scaffolding cantilever arrangement in the second sliding block, sliding slot and first
The attachment structure schematic diagram of support column.
In figure: 1 pedestal, 2 first fixed screws, 3 fixed blocks, 4 hydraulic cylinders, 5 first sliding blocks, 6 second sliding blocks, 7 support rods,
8 fixed links, 9 fixed plates, 10 fences, 11 first support columns, 12 second fixed screws, 13 fixinig plates, 14 second support columns, 150,000
To wheel, 16 sliding slots, 17 cylinder rods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-2, construction coherent-wall scaffolding cantilever arrangement, including pedestal 1, two lateral roofs of pedestal 1 are fixed
It is connected with the first support column 11, fixed link 8 is slidably connected on the first support column 11, the top of two fixed links 8 is fixedly connected
There is the same fixed plate 9, one end of fixed link 8 is connect with the first support column 11 by the first sliding block 5, set on the first support column 11
The case where having sliding slot 16 corresponding with the first sliding block 5, preventing fixed plate 9 from shaking during raw, the first support column
11 and second support column 14 it is duplicate, convenient for increasing the height that can rise of fixed plate 9, while the sliding of the first sliding block 5 exists
In sliding slot 16 on first support column 11, increase the stability that fixed plate 9 rises.
Wherein, the first support column 11 is connect by supporting mechanism with fixed link 8, and supporting mechanism includes being fixed on fixed link 8
The support rod 7 that bottom is inclined to set, the one end of support rod 7 far from fixed link 8 are connected by the second sliding block 6 and the first support column 11
It connects, the second sliding block 6 is identical as the first sliding block 5, and the inner sidewall of the lateral wall and sliding slot 16 of the second sliding block 6 is slidably connected, fixed link
8, a triangle is formed between support rod 7 and the first support column 11, is fixed on convenient for increase fixed link steady on the first sliding block 5
It is qualitative, to increase the stability of fixed plate 9.
Wherein, the top of the first support column 11 is connected with the second support column 14 by bindiny mechanism, and bindiny mechanism includes solid
Stator 13, fixinig plate 13 are connect with the first support column 11 and the second support column 14 respectively by the first fixed screw 2, the first support
Column 11 is connect by fixinig plate 13 and the first fixed screw 2 with the second support column 14, convenient for increasing the length of sliding slot 16, is increased solid
The space that fixed board 9 can rise, can be according to situation second support column 14 of increase appropriate at scene, the second support column 14 one the
One support column 11 is identical.
Wherein, pedestal 1 is connected by elevating mechanism and is connect with fixed plate 9, and the top of fixed plate 9 is fixedly connected with fence
10, elevating mechanism includes the hydraulic cylinder 4 for being fixedly connected on 1 top of pedestal, and hydraulic cylinder 4 is connect by cylinder rod 17 with fixed plate 9, is led to
Cross the rising of 4 Work Promote cylinder rod 17 of hydraulic cylinder, it should be noted that the use technology of hydraulic cylinder 4 and hydraulic cylinder 4 is existing skill
Art does not do excessive narration herein, and cylinder rod 17, which rises, drives fixed plate 9 to go up, and the top of fixed plate 9 is fixedly connected with fence 10,
Realize the function that fixed plate 9 is gone up and down, it is the peace in order to guarantee worker that the fixed white silk grade in the top of fixed plate 9, which plays the role of fence 10,
Entirely, it prevents from worker careless slightly falling from fixed plate 9 leading to injury.
Wherein, the lateral wall of the lateral wall of pedestal 1, the lateral wall of the first support column 11 and the second support column 14 is fixed
It is connected with fixed mechanism, fixed mechanism includes being fixedly connected on 1 lateral wall of pedestal, 11 lateral wall of the first support column and the second support
The fixed block 3 of 14 lateral wall of column is threaded with the second fixed screw 12 on fixed block 3, and the bottom of pedestal 1 is fixedly connected with more
A universal wheel 15, multiple universal wheels 15 are arranged in 2*2, are supported pedestal 1, first by fixed block 3 and the second fixed screw 12
Column 11 and the second support column 14 are fixed on the wall, and the bottom of pedestal 1 is fixedly connected with the universal wheel 15 of 2*2 setting, convenient for being somebody's turn to do
The movement of device, it should be noted that universal wheel 15 is the prior art, does not do excessive narration herein.
In the utility model, when needing to carry out using coherent-wall scaffolding to painting on wall, pedestal 1 is pushed to drive pedestal
The universal wheel 15 of 1 bottom rotates, and pedestal 1 is pushed into beside wall, then uses the second fixed screw 12 by pedestal 1 and first
Dagger 11 is fixed on the wall, and starting hydraulic cylinder 4 pushes cylinder rod 17 to rise, and cylinder rod 17, which rises, drives fixed plate 9 to rise, according to need
It wants appropriate and increases by the second support column 14 toward the top of the first support column 11 using fixinig plate 13 and the first fixed screw 2, the
The top of one support column 11 is noted that sliding slot 16 and second on the first support column 11 when increasing by the second support column 14
Sliding slot 16 on dagger 14 is aligned, and avoids influencing the sliding of the first sliding block 5 and the second sliding block 6 inside sliding slot 16, which can
Easy to use with the height of height adjustment fixed plate 9 as needed, fence 10 is installed at the top of fixed plate 9, ensure that worker
Safety.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (7)
1. construction coherent-wall scaffolding cantilever arrangement, including pedestal (1), which is characterized in that two lateral roofs of the pedestal (1)
It is fixedly connected to the first support column (11), slidably connects fixed link (8) on first support column (11), two described solid
It is fixedly connected at the top of fixed pole (8) the same fixed plate (9), first support column (11) passes through supporting mechanism and fixed link
(8) it connects, the top of first support column (11) is connected with the second support column (14) by bindiny mechanism, the pedestal (1)
Connected by elevating mechanism and connect with fixed plate (9), the lateral wall of the pedestal (1), the first support column (11) lateral wall with
The lateral wall of second support column (14) is fixedly connected to fixed mechanism, is fixedly connected with and encloses at the top of the fixed plate (9)
Column (10).
2. construction coherent-wall scaffolding cantilever arrangement according to claim 1, which is characterized in that the fixed link (8)
One end connect with the first support column (11) by the first sliding block (5), first support column (11) equipped with and the first sliding block
(5) corresponding sliding slot (16).
3. construction coherent-wall scaffolding cantilever arrangement according to claim 2, which is characterized in that the supporting mechanism packet
It includes and is fixed on the support rod (7) that fixed link (8) bottom is inclined to set, the one end of the support rod (7) far from fixed link (8) is logical
It crosses the second sliding block (6) to connect with the first support column (11), second sliding block (6) is identical as the first sliding block (5), and described second is sliding
The lateral wall of block (6) and the inner sidewall of sliding slot (16) are slidably connected.
4. construction coherent-wall scaffolding cantilever arrangement according to claim 1, which is characterized in that bindiny mechanism's packet
It includes fixinig plate (13), the fixinig plate (13) is supported with the first support column (11) and second respectively by the first fixed screw (2)
Column (14) connection.
5. construction coherent-wall scaffolding cantilever arrangement according to claim 1, which is characterized in that the elevating mechanism packet
The hydraulic cylinder (4) being fixedly connected at the top of pedestal (1) is included, the hydraulic cylinder (4) is connect by cylinder rod (17) with fixed plate (9).
6. construction coherent-wall scaffolding cantilever arrangement according to claim 1, which is characterized in that the fixed mechanism packet
Include the fixed block for being fixedly connected on pedestal (1) lateral wall, the first support column (11) lateral wall and the second support column (14) lateral wall
(3), the second fixed screw (12) are threaded on the fixed block (3).
7. construction coherent-wall scaffolding cantilever arrangement according to claim 1, which is characterized in that the pedestal (1)
Bottom is fixedly connected with multiple universal wheels (15), and multiple universal wheels (15) are arranged in 2*2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822037978.1U CN209509457U (en) | 2018-12-06 | 2018-12-06 | Construction coherent-wall scaffolding cantilever arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822037978.1U CN209509457U (en) | 2018-12-06 | 2018-12-06 | Construction coherent-wall scaffolding cantilever arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209509457U true CN209509457U (en) | 2019-10-18 |
Family
ID=68194302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822037978.1U Expired - Fee Related CN209509457U (en) | 2018-12-06 | 2018-12-06 | Construction coherent-wall scaffolding cantilever arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209509457U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114575575A (en) * | 2021-12-06 | 2022-06-03 | 上海建工集团股份有限公司 | Construction method of multi-dimensional mobile automatic outer enclosure construction platform |
-
2018
- 2018-12-06 CN CN201822037978.1U patent/CN209509457U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114575575A (en) * | 2021-12-06 | 2022-06-03 | 上海建工集团股份有限公司 | Construction method of multi-dimensional mobile automatic outer enclosure construction platform |
CN114575575B (en) * | 2021-12-06 | 2023-09-26 | 上海建工集团股份有限公司 | Construction method of multi-dimensional mobile automatic peripheral protection structure construction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106006496A (en) | Power transformation device overhaul platform | |
CN204727547U (en) | A kind of electromechanics installs special jacking equipment | |
CN207277895U (en) | A kind of construction support device | |
CN209509457U (en) | Construction coherent-wall scaffolding cantilever arrangement | |
CN205527614U (en) | Walking work platform | |
CN215926636U (en) | Building engineering construction scaffold protective structure | |
CN104806002A (en) | High-rise construction lifting safe protective screen | |
CN208329558U (en) | A kind of building engineering construction scaffold that stability is good | |
CN210140985U (en) | Electric hanging basket counterweight mechanism | |
CN207375711U (en) | A kind of power construction vehicle | |
CN215858940U (en) | Novel detachable combined type steel structure aerial work moving operation platform | |
CN202508723U (en) | Novel construction lifter | |
CN205601683U (en) | High safe power maintenance car | |
CN207230378U (en) | A kind of height-adjustable rotating LED street lamp | |
CN110792290B (en) | Portable removes stage | |
CN207774562U (en) | A kind of elevator car roof repair safety device | |
CN107963591B (en) | Suspended ceiling type maintenance platform for landing ball for theatre performance | |
CN207193654U (en) | A kind of rope knitting machine frame | |
CN219058242U (en) | Portable construction well lifting device | |
CN204531320U (en) | One facilitates furred ceiling ascending/decending gypsum plank fitting machine | |
CN205153629U (en) | Simple and easy rear cantilever type lift garage | |
CN220414780U (en) | Construction platform with height adjusting function | |
CN220432276U (en) | Lifting device for construction platform | |
CN209538728U (en) | A kind of architectural electricity construction safety protection device | |
CN219061733U (en) | Hydraulic support top beam installation auxiliary device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191018 Termination date: 20211206 |