CN209507406U - A kind of muti-piece cooling wall dislocation hanging device - Google Patents

A kind of muti-piece cooling wall dislocation hanging device Download PDF

Info

Publication number
CN209507406U
CN209507406U CN201821300075.1U CN201821300075U CN209507406U CN 209507406 U CN209507406 U CN 209507406U CN 201821300075 U CN201821300075 U CN 201821300075U CN 209507406 U CN209507406 U CN 209507406U
Authority
CN
China
Prior art keywords
lifting rope
cooling wall
muti
work
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821300075.1U
Other languages
Chinese (zh)
Inventor
王雪
王桂川
王军
陈维坤
王亚敏
常喜
史大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201821300075.1U priority Critical patent/CN209507406U/en
Application granted granted Critical
Publication of CN209507406U publication Critical patent/CN209507406U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of muti-piece cooling wall dislocation hanging device, including boom hoisting, boom hoisting includes suspension hook, and suspension hook is equipped with lifting rope, and lifting rope is a plurality of, it is connected between lifting rope and lifting rope by separator, separator includes demarcation plate, and demarcation plate is equipped with open-work, and open-work is multiple, open-work equidistant arrangement, lifting rope are placed in open-work.The beneficial effects of the utility model are: structure is simple, it is easy to operate, adjacent lifting rope is separated by separator, so that cooling wall is in hoisting process steadily without impact, lifting rope is avoided mutually to wind, it avoids cooling wall caused by winding because of lifting rope from mutually colliding, while improving Hoisting Security performance, ensure that the intact of cooling wall, lifting is steady quick, primary lifting can sling muti-piece cooling wall, save the lifting time, improve work efficiency.

Description

A kind of muti-piece cooling wall dislocation hanging device
Technical field
The utility model belongs to technical field of building construction, more particularly, to a kind of muti-piece cooling wall dislocation hanging device.
Background technique
China is a big steel country, and domestic steel plant's blast-furnace body mainly uses cooling wall to carry out Water-cooling circulating, is realized To material resistance in furnace body, to the purpose of furnace shell cooling.The pipeline sections such as water-cooled inlet/outlet pipe, temperature tube, cooling wall are equipped on cooling wall mostly Outer wall inlay refractory brick mostly, cause the monomer of cooling wall than heavier.
Existing hanging device and traditional form of construction work mostly use greatly tower crane or other heavy-duty hoisting mechanical equipments to hang Dress, gradually block-by-block lifts mostly, i.e., lifts 1 piece of cooling equipment every time.Although operational procedure cannot be filled without too big problem Divide and utilize lifting machine optimal load ability, causes mechanical drop effect use, cause construction speed slowly to carry out, while also increasing Construction cost.
Utility model content
Problem to be solved in the utility model is to provide a kind of hanging device;It is especially adapted for use in the muti-piece of blast furnace cooling stave Lifting operates, and structure is simple, safety, a kind of muti-piece cooling wall dislocation hanging device quickly, economic.
In order to solve the above technical problems, the technical solution adopted in the utility model is: a kind of muti-piece cooling wall dislocation lifting Equipment, including boom hoisting, the boom hoisting include suspension hook, and the suspension hook is equipped with lifting rope, and described lifting rope one end connects institute State suspension hook, the lifting rope other end connects cooling wall, the lifting rope be it is a plurality of, pass through separation between the lifting rope and the lifting rope Device connection, the separator includes demarcation plate, the demarcation plate be equipped with open-work, the open-work be it is multiple, the open-work is equidistant Arrangement, the lifting rope are placed in the open-work.
Further, protective case is equipped in the open-work, the protective case is placed on outside the lifting rope.
Further, the lifting rope includes the first lifting rope, the second lifting rope, third lifting rope and the 4th lifting rope, and the described 4th hangs Rope is than the third lifting rope length H, and the third lifting rope is than the second lifting rope length H, described in the second lifting rope ratio First lifting rope length H.
Further, the length H is made of the length and length L of the cooling wall.
Further, the length L is 1m-3m.
Further, the length L is 2m.
Further, the demarcation plate upper and lower surface 50mm is respectively exposed at the protective case both ends.
Further, the open-work quantity is two.
Further, the separation board ends are arc-shaped.
Further, the lifting rope is wirerope.
The utility model has the advantages and positive effects of:
1, the utility model structure is simple, easy to operate, is separated adjacent lifting rope by separator, so that cooling wall exists It steadily avoids lifting rope from mutually winding without impact in hoisting process, avoids cooling wall caused by winding because of lifting rope from mutually colliding, improve While Hoisting Security performance, the intact of cooling wall ensure that, lifting is steady quick, and it is cold that primary lifting can sling muti-piece But wall saves the lifting time, improves work efficiency.
2, the separator structure of the utility model is simple, easy to make, can be made into using simple material, and materials are easy, Quickly, at low cost, capital investment is few, the high financial profit of generation for assembling.
3, the utility model can reasonably select the quantity of lifting rope according to the suspension hook size of boom hoisting, and mating selection separates The quantity of device makes full use of the optimal load ability of boom hoisting, realizes the lifting of cooling wall, using flexible, work efficiency is high.
Detailed description of the invention
Fig. 1 is the overall structure and operation principle schematic diagram of the utility model embodiment
Fig. 2 is the separator structure schematic diagram of the utility model embodiment
In figure:
1, boom hoisting 2, suspension hook 3, the first lifting rope
4, the second lifting rope 5, third lifting rope 6, the 4th lifting rope
7, separator 8, cooling wall 9, demarcation plate
10, open-work 11, lifting rope 12, protective case
Specific embodiment
The utility model embodiment is described further with reference to the accompanying drawing:
The hanging device as shown in Figure 1, a kind of muti-piece cooling wall misplaces, including boom hoisting 1, boom hoisting 1 include suspension hook 2, suspension hook 2 is equipped with lifting rope 11.11 one end connecting shackle 2 of lifting rope, 11 other end of lifting rope connect cooling wall 8, and lifting rope 11 is more Item is connected between lifting rope 11 and lifting rope 11 by separator 7.In the present embodiment, lifting rope 11 includes the first lifting rope 3, the second lifting rope 4, third lifting rope 5 and the 4th lifting rope 6, the 4th lifting rope 6 is than 5 length H of third lifting rope, the long length of 5 to the second lifting rope of third lifting rope 4 H, 4 to the first lifting rope of the second lifting rope, 3 length H.Length H is made of the length and length L of cooling wall 8, and length L is 1m-3m.This Preferred 11 material of lifting rope of embodiment is the wirerope of 7 times of safety coefficients.
As shown in Fig. 2, separator 7 includes demarcation plate 9, demarcation plate 9 is equipped with open-work 10, and open-work 10 is multiple, open-work 10 Equidistant arrangement, lifting rope 11 are placed in open-work 10.Protective case 12 is equipped in open-work 10, protective case 12 is placed on outside lifting rope 11.Separate 9 both ends of plate are arc-shaped.Respectively expose 9 upper and lower surface 50mm of demarcation plate in 12 both ends of protective case.Preferred 10 quantity of open-work of the present embodiment It is two, a separator 7 is penetrated between two lifting ropes 11, is i.e. the first lifting rope 3 and the second lifting rope 4 is connected with the same separator 7 It connects, the second lifting rope 4 and third lifting rope 5 are connected with the same separator 7, third lifting rope 5 and the same separation of the 4th lifting rope 6 Device 7 connects, and successively arranges, the cooling wall 8 of misplace fixed corresponding lifting rope 11 and lifting.
The specific manufacturing process of the utility model embodiment is as follows:
S1: four wirerope that there are 7 times of safety coefficients, that length successively shortens are selected, wirerope one end, which is hung on, hangs On hook 2, the wirerope other end is separately connected cooling wall 8.In wirerope and 8 contact position of cooling wall, it is equipped with protective device, to protect Card wirerope will not be worn fracture of wire, and protective device can be the binding safeguard measures such as rubber pad or corner protector.Lifting rope 11 includes the One lifting rope 3, the second lifting rope 4, third lifting rope 5 and the 4th lifting rope 6, the 4th lifting rope 6 is than 5 length H of third lifting rope, third lifting rope 5 Than 4 length H of the second lifting rope, the long length H of 4 to the first lifting rope of the second lifting rope 3.Length H by cooling wall 8 length and length L group At length L is 1m-3m.Wirerope rope length difference is between the bottom of upper one piece of cooling wall 8 and the top of next piece of cooling wall 8 Distance about 1m-3m or so.That is the 4th lifting rope 6 adds 1m-3m, third lifting rope 5 than the length of 5 long one pieces of cooling walls 8 of third lifting rope Length than the long one piece of cooling wall 8 of the second lifting rope 4 adds 1m-3m, the length of 4 to the first 3 one pieces of cooling walls 8 of lifting rope of the second lifting rope In addition 1m-3m, is detailed in Fig. 1.
S2: production separator 7.It selects and makes demarcation plate 9, the shape ruler of demarcation plate 9 with a thickness of the steel plate of 12mm-20mm Very little be length is 400mm, width 200mm.9 both ends of demarcation plate are arc-shaped, set that there are two open-works 10 on demarcation plate 9, will be protected Sheath 12 is inserted into open-work 10.Protective case 12 is round tube, and demarcation plate each 50mm of 9 upper and lower surface is respectively exposed at 12 both ends of protective case, circle Pipe outside diameter is equal to 10 internal diameter of open-work, and round tube is welded on steel plate, can preferably protect wirerope in this way, avoids abrasion steel wire Rope, is detailed in Fig. 2.
S3: before lifting cooling wall 8, by multiple separators 7 successively through on wirerope, one is penetrated between two wirerope A separator 7, i.e. the first lifting rope 3 and the second lifting rope 4 are ined succession with the same separator 7, and the second lifting rope 4 and third lifting rope 5 are with together One separator 7 is ined succession, and third lifting rope 5 and the 4th lifting rope 6 are ined succession with the same separator 7, is successively arranged, misplace fixed phase The wirerope answered and the cooling wall of lifting 8.
S4: while the lifting of boom hoisting 1 is promoted, cooling wall 8 is successively sling, cooling wall 8 is transported in blast furnace accordingly Position.
The utility model has the advantages and positive effects of:
1, the utility model structure is simple, easy to operate, is separated adjacent lifting rope by separator, so that cooling wall exists It steadily avoids lifting rope from mutually winding without impact in hoisting process, avoids cooling wall caused by winding because of lifting rope from mutually colliding, improve While Hoisting Security performance, the intact of cooling wall ensure that, lifting is steady quick, and it is cold that primary lifting can sling muti-piece But wall saves the lifting time, improves work efficiency.
2, the separator structure of the utility model is simple, easy to make, can be made into using simple material, and materials are easy, Quickly, at low cost, capital investment is few, the high financial profit of generation for assembling.
3, the utility model can reasonably select the quantity of lifting rope according to the suspension hook size of boom hoisting, and mating selection separates The quantity of device makes full use of the optimal load ability of boom hoisting, realizes the lifting of cooling wall, using flexible, work efficiency is high.
One embodiment of the utility model is described in detail above, but the content is only the utility model Preferred embodiment should not be considered as limiting the scope of the present invention.It is all to be made according to application scope of the utility model All the changes and improvements etc., should still belong within the patent covering scope of the utility model.

Claims (10)

  1. The hanging device 1. a kind of muti-piece cooling wall misplaces, including boom hoisting, it is characterised in that: the boom hoisting includes hanging Hook, the suspension hook are equipped with lifting rope, and described lifting rope one end connects the suspension hook, and the lifting rope other end connects cooling wall, described Lifting rope be it is a plurality of, between the lifting rope and the lifting rope by separator connection, the separator includes demarcation plate, the separation Plate be equipped with open-work, the open-work be it is multiple, the open-work equidistant arrangement, the lifting rope is placed in the open-work.
  2. The hanging device 2. a kind of muti-piece cooling wall according to claim 1 misplaces, it is characterised in that: be equipped in the open-work Protective case, the protective case are placed on outside the lifting rope.
  3. The hanging device 3. a kind of muti-piece cooling wall according to claim 1 or 2 misplaces, it is characterised in that: the lifting rope packet The first lifting rope, the second lifting rope, third lifting rope and the 4th lifting rope are included, the 4th lifting rope is described than the third lifting rope length H Third lifting rope is than the second lifting rope length H, and second lifting rope is than the first lifting rope length H.
  4. The hanging device 4. a kind of muti-piece cooling wall according to claim 3 misplaces, it is characterised in that: the length H is by institute State the length and length L composition of cooling wall.
  5. The hanging device 5. a kind of muti-piece cooling wall according to claim 4 misplaces, it is characterised in that: the length L is 1m- 3m。
  6. The hanging device 6. a kind of muti-piece cooling wall according to claim 5 misplaces, it is characterised in that: the length L is 2m.
  7. The hanging device 7. a kind of muti-piece cooling wall according to claim 2 misplaces, it is characterised in that: the protective case both ends Respectively expose the demarcation plate upper and lower surface 50mm.
  8. The hanging device 8. a kind of muti-piece cooling wall according to claim 1 or 2 misplaces, it is characterised in that: the open-work number Amount is two.
  9. The hanging device 9. a kind of muti-piece cooling wall according to claim 1 or 2 misplaces, it is characterised in that: the demarcation plate Both ends are arc-shaped.
  10. The hanging device 10. a kind of muti-piece cooling wall according to claim 3 misplaces, it is characterised in that: the lifting rope is steel Cord.
CN201821300075.1U 2018-08-13 2018-08-13 A kind of muti-piece cooling wall dislocation hanging device Active CN209507406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821300075.1U CN209507406U (en) 2018-08-13 2018-08-13 A kind of muti-piece cooling wall dislocation hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821300075.1U CN209507406U (en) 2018-08-13 2018-08-13 A kind of muti-piece cooling wall dislocation hanging device

Publications (1)

Publication Number Publication Date
CN209507406U true CN209507406U (en) 2019-10-18

Family

ID=68187093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821300075.1U Active CN209507406U (en) 2018-08-13 2018-08-13 A kind of muti-piece cooling wall dislocation hanging device

Country Status (1)

Country Link
CN (1) CN209507406U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108862007A (en) * 2018-08-13 2018-11-23 中冶天工集团天津有限公司 A kind of muti-piece cooling wall dislocation hanging device and hanging method
CN112209271A (en) * 2020-10-14 2021-01-12 保定元辰变压器制造有限公司 Transformer hoisting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108862007A (en) * 2018-08-13 2018-11-23 中冶天工集团天津有限公司 A kind of muti-piece cooling wall dislocation hanging device and hanging method
CN112209271A (en) * 2020-10-14 2021-01-12 保定元辰变压器制造有限公司 Transformer hoisting device

Similar Documents

Publication Publication Date Title
CN201864459U (en) Buckle type hoisting and fastening device for hoisting electrode of large diameter
CN209507406U (en) A kind of muti-piece cooling wall dislocation hanging device
CN205045698U (en) Reinforcement cage hoisting utensil
CN101994318A (en) Lifting frame, hoisting system and hoisting method for vertically and rotatably hoisting steel reinforcement cage
CN2915812Y (en) High capacity distribution and main transformer coil sling
CN108946475B (en) Overturning and hoisting system and method for horizontal equipment
CN108862007A (en) A kind of muti-piece cooling wall dislocation hanging device and hanging method
CN104401865B (en) Steel billet handling appliance
CN205603044U (en) RH vacuum impregnation pipe ring brick hoist
CN208869199U (en) A kind of overturning Lift-on/Lift-off System for horizontal equipment
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN203402809U (en) Three-group vertical connection pulley block series connection type hanging row
CN201962679U (en) Lifting bracket used for vertically and aswirl lifting steel reinforcement cage and lifting system
CN205555857U (en) Portable hoisting structure
CN105162292B (en) Stator core hoisting fixture
CN206665921U (en) A kind of New type mine hoist
CN201605579U (en) Tubular pile industrial steel cage suspending device
CN106335841A (en) Portable heavy hoisting rope winding method
CN103010925B (en) Bundling and hoisting method of loop reactor
CN201495022U (en) Steel tube lifting appliance
CN202321961U (en) Novel connecting shackle
CN202321955U (en) Multifunctional lifting basket
CN101774504A (en) Steel cage lifting device for tubular pile industry
CN206035369U (en) Load formula rope ladder
CN204873480U (en) Grab bucket of driving machinery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant