CN209497168U - Easily construction transformer room - Google Patents

Easily construction transformer room Download PDF

Info

Publication number
CN209497168U
CN209497168U CN201920479487.4U CN201920479487U CN209497168U CN 209497168 U CN209497168 U CN 209497168U CN 201920479487 U CN201920479487 U CN 201920479487U CN 209497168 U CN209497168 U CN 209497168U
Authority
CN
China
Prior art keywords
cable
secondary cable
switchboard cabinet
transformer room
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920479487.4U
Other languages
Chinese (zh)
Inventor
李光应
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Xinjiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Xinjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Xinjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201920479487.4U priority Critical patent/CN209497168U/en
Application granted granted Critical
Publication of CN209497168U publication Critical patent/CN209497168U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model relates to distribution engineering technical fields, it is a kind of easily construction transformer room, it includes the first switchboard cabinet that transformer room's inner front side is arranged in, second switchboard cabinet of transformer room's inner back side is set, secondary cable ditch is formed between first switchboard cabinet and the second switchboard cabinet, being provided on secondary cable ditch can be by secondary cable trench cover that secondary cable ditch seals, once cable duct is all provided on the outside of first switchboard cabinet and the second switchboard cabinet, the upper setting of cable duct once cable channel cover plate, the first switchboard cabinet in secondary cable ditch and a cable duct and cable aperture is equipped on the side of the second switchboard cabinet.The utility model forms secondary cable ditch using the first switchboard cabinet and the second switchboard cabinet, and is sealed by secondary cable trench cover to secondary cable ditch;Without secondary cable pipe laying pre-buried between power distribution cabinet and secondary cable ditch, work progress is simplified, is improved work efficiency.

Description

Easily construction transformer room
Technical field
The utility model relates to distribution engineering technical fields, are a kind of easily construction transformer rooms.
Background technique
At present when installing 110kV modular transformer substation, 10kV switchboard cabinet and 35kV switchboard cabinet need to be arranged in together In one room, need to set one 800 × 800 secondary cable ditch between 10kV switchboard cabinet and 35kV switchboard cabinet, but due to The secondary cable hole of switchboard cabinet has with a distance from 0.9m or so from secondary cable ditch, therefore need to be in every each switchboard cabinet and secondary cable Pre-buried secondary cable pipe laying between ditch, and after the completion of secondary cable pipe laying is pre-buried, it is whole again by the earthen backfill of secondary cable ditch two sides A work progress is complicated, and process is more, low efficiency.
Summary of the invention
The utility model provides a kind of easily construction transformer room, overcomes the defects of the prior art, can effectively solve Certainly existing switchboard cabinet needs pre-buried secondary cable pipe laying when secondary cable ditch passes in and out cable by secondary cable hole, existing time-consuming Arduously, the lower problem of construction efficiency.
The technical solution of the utility model is realized by following measures: a kind of easily construction transformer room, including power transformation Room, the first switchboard cabinet that transformer room's inner front side is set, the second switchboard cabinet that transformer room's inner back side is set, first Secondary cable ditch is formed between switchboard cabinet and the second switchboard cabinet, is provided with and secondary cable ditch can be sealed on secondary cable ditch Secondary cable trench cover, be all provided with once cable duct, a cable duct on the outside of the first switchboard cabinet and the second switchboard cabinet On be provided with can by a cable duct seal a cable channel cover plate, in secondary cable ditch and a cable duct first Cable aperture is equipped on the side of switchboard cabinet and the second switchboard cabinet.
Here is the further optimization and/or improvements to above-mentioned utility model technical solution:
It is equipped on the above-mentioned side of the first switchboard cabinet and the side of the second switchboard cabinet positioned in secondary cable ditch The both ends of concave station, secondary cable trench cover are mounted on concave station.
The above-mentioned inner back side in transformer room can be equipped with front and back penetrate through and the secondary cable that is connected with secondary cable ditch into The right side and left side of line passage out, secondary cable disengaging line passage are distributed with the first switchboard cabinet and a cable duct, secondary Cable incoming-outgoing line passage is not connected to a cable duct of the left and right sides.
The above-mentioned inner front side in transformer room can be equipped with the first cable incoming-outgoing line passages and the 2nd 1 of front and back perforation A cable duct phase on the left of secondary cable incoming-outgoing line passage, the first cable incoming-outgoing line passages and secondary cable disengaging line passage Connection, the second one times cable incoming-outgoing line passage is connected with the cable duct that secondary cable passes in and out on the right side of line passage.
Above-mentioned secondary cable trench cover and a cable channel cover plate can be reinforced concrete cover plate.
The utility model reasonable and compact in structure, it is easy to use, it is formed using the first switchboard cabinet and the second switchboard cabinet Secondary cable ditch, and the cable aperture of the first switchboard cabinet and the second switchboard cabinet is located in secondary cable ditch, and by secondary Cable channel cover plate is sealed secondary cable ditch;Farther out from secondary cable ditch without the cable aperture due to power distribution cabinet, exist Pre-buried secondary cable pipe laying between power distribution cabinet and secondary cable ditch, and after the completion of secondary cable pipe laying is pre-buried, again by secondary cable The earthen backfill of ditch two sides, effectively simplifies work progress, improves work efficiency.
Detailed description of the invention
Attached drawing 1 is the floor map of the best embodiment of the utility model.
Attached drawing 2 is the broken section structural schematic diagram in attached drawing 1 at A-A.
Coding in attached drawing is respectively as follows: 1 for the first switchboard cabinet, and 2 be the second switchboard cabinet, and 3 be secondary cable ditch, and 4 are Secondary cable trench cover, 5 be a cable duct, and 6 be a cable channel cover plate, and 7 be cable aperture, and 8 be concave station, and 9 be secondary cable Pass in and out line passage, 10 be the first cable incoming-outgoing line passages, and 11 be the second cable incoming-outgoing line passages, and 12 be transformer room.
Specific embodiment
The utility model is not limited by following embodiments, can technical solution according to the present utility model and actual conditions Determine specific embodiment.
In the present invention, for ease of description, the description of the relative positional relationship of each component is according to specification The Butut mode of attached drawing 1 is described, such as: front, rear, top, and bottom, left and right positional relationship be according to Figure of description Butut direction determine.
The utility model is further described below with reference to examples and drawings:
As shown in attached drawing 1,2, which includes transformer room, the first distribution that transformer room's inner front side is arranged in Screen cabinet 1, the second switchboard cabinet 2 that transformer room's inner back side is set, shape between the first switchboard cabinet 1 and the second switchboard cabinet 2 At secondary cable ditch 3, the secondary cable trench cover 4 that secondary cable ditch 3 can be sealed is provided on secondary cable ditch 3, first matches The outside of electric screen cabinet 1 and the second switchboard cabinet 2 is all provided with once cable duct 5, and being provided on a cable duct 5 can be by a cable The cable channel cover plate 6 that ditch 5 seals, the first switchboard cabinet 1 and second in secondary cable ditch 3 and a cable duct 5 Cable aperture 7 is equipped on the side of switchboard cabinet 2.
Above-mentioned first switchboard cabinet 1 can be 10KV switchboard cabinet, and the second switchboard cabinet 2 can be 35KV switchboard cabinet.
It, can be first when the above-mentioned outside in the first switchboard cabinet 1 and the second switchboard cabinet 2 is respectively provided with a cable duct 5 Partition is established in the outside of switchboard cabinet 1 and the second switchboard cabinet 2, to make to be formed between the first switchboard cabinet 1 and partition primary Cable duct 5 forms a cable duct 5 between second switchboard cabinet 2 and partition.Cable duct 5 does not connect with secondary cable ditch 3 It is logical.
In the utility model, secondary cable ditch 3 is formed using the first switchboard cabinet 1 and the second switchboard cabinet 2, and first matches The cable aperture 7 of electric screen cabinet 1 and the second switchboard cabinet 2 is located in secondary cable ditch 3, and by secondary cable trench cover 4 to two Secondary cable duct 3 is sealed;Farther out from secondary cable ditch 3 without the cable aperture 7 due to power distribution cabinet, power distribution cabinet with it is secondary Pre-buried secondary cable pipe laying between cable duct 3, and after the completion of secondary cable pipe laying is pre-buried, again by the soil of 3 two sides of secondary cable ditch Backfill, effectively simplifies work progress, improves work efficiency.
Above-mentioned easy construction transformer room can be made further optimization and/or improvements according to actual needs:
As shown in attached drawing 1,2, the side of the first switchboard cabinet 1 in secondary cable ditch 3 and the second switchboard Concave station 8 is equipped on the side of cabinet 2, the both ends of secondary cable trench cover 4 are mounted on concave station 8.Here it is being located at secondary cable It is respectively provided with concave station 8 on the side of the first switchboard cabinet 1 in ditch 3 and the side of the second switchboard cabinet 2, is convenient for secondary cable operculum colpi The installation of plate 4.
As shown in attached drawing 1,2, the inner back side in the transformer room is equipped with front and back and penetrates through and be connected with secondary cable ditch 3 Secondary cable pass in and out line passage 9, secondary cable disengaging line passage 9 right side and left side be distributed with 1 He of the first switchboard cabinet Cable duct 5, secondary cable disengaging line passage 9 are not connected to a cable duct 5 of the left and right sides.Here in transformer room Inner back side is arranged secondary cable and passes in and out line passage 9, passes in and out secondary cable ditch 3 convenient for secondary cable.
As shown in attached drawing 1,2, the inner front side in the transformer room is equipped with the first cable incoming-outgoing wires of front and back perforation Channel 10 and the second cable incoming-outgoing line passages 11, the first cable incoming-outgoing line passages 10 and secondary cable pass in and out line passage Cable duct 5 in 9 left sides is connected, 9 right side of the second cable incoming-outgoing line passages 11 and secondary cable disengaging line passage No. one time cable duct 5 is connected.Here the first cable incoming-outgoing line passages 10 and the second cable incoming-outgoing line passages 11 are convenient for Cable duct 5 of cable incoming-outgoing.
As needed, the secondary cable trench cover 4 and a cable channel cover plate 6 are reinforced concrete cover plate.
The above technical characteristic constitutes the most preferred embodiment of the utility model, with stronger adaptability and best implementation Effect can increase and decrease non-essential technical characteristic, according to actual needs to meet the needs of different situations.

Claims (6)

1. a kind of easily construction transformer room, it is characterised in that including transformer room, the first switchboard of transformer room's inner front side is arranged in Cabinet, the second switchboard cabinet that transformer room's inner back side is arranged in, form secondary between the first switchboard cabinet and the second switchboard cabinet Cable duct, being provided on secondary cable ditch can be by the secondary cable trench cover that secondary cable ditch seals, the first switchboard cabinet and It is all provided with once cable duct on the outside of two switchboard cabinets, the primary electricity that a cable duct can be sealed is provided on a cable duct Cable trench cover, the first switchboard cabinet in secondary cable ditch and a cable duct and is all provided on the side of the second switchboard cabinet There is cable aperture.
2. easy construction transformer room according to claim 1, it is characterised in that the first switchboard in secondary cable ditch It is equipped with concave station on the side of cabinet and the side of the second switchboard cabinet, the both ends of secondary cable trench cover are mounted on concave station.
3. easy construction transformer room according to claim 1 or 2, it is characterised in that the inner back side in the transformer room is equipped with The secondary cable disengaging line passage that front and back penetrates through and is connected with secondary cable ditch, secondary cable pass in and out the right side and a left side of line passage Side is distributed with the first switchboard cabinet and a cable duct, and secondary cable passes in and out line passage and a cable duct of the left and right sides is equal It is not connected to.
4. easy construction transformer room according to claim 3, it is characterised in that the inner front side of the transformer room is equipped with front and back The first cable incoming-outgoing line passages of perforation and the second cable incoming-outgoing line passages, the first cable incoming-outgoing line passages with A cable duct on the left of secondary cable disengaging line passage is connected, and the second cable incoming-outgoing line passages and secondary cable pass in and out A cable duct on the right side of line passage is connected.
5. easy construction transformer room according to claim 1 or 2 or 4, it is characterised in that the secondary cable trench cover and one Secondary cable channel cover plate is reinforced concrete cover plate.
6. easy construction transformer room according to claim 3, it is characterised in that the secondary cable trench cover and a cable Trench cover is reinforced concrete cover plate.
CN201920479487.4U 2019-04-10 2019-04-10 Easily construction transformer room Active CN209497168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920479487.4U CN209497168U (en) 2019-04-10 2019-04-10 Easily construction transformer room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920479487.4U CN209497168U (en) 2019-04-10 2019-04-10 Easily construction transformer room

Publications (1)

Publication Number Publication Date
CN209497168U true CN209497168U (en) 2019-10-15

Family

ID=68157604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920479487.4U Active CN209497168U (en) 2019-04-10 2019-04-10 Easily construction transformer room

Country Status (1)

Country Link
CN (1) CN209497168U (en)

Similar Documents

Publication Publication Date Title
CN207176738U (en) A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN209497168U (en) Easily construction transformer room
CN204144762U (en) Combined intelligent transformer station
CN215594116U (en) Cross pivot cabin connected with circular comprehensive pipe gallery
CN211859518U (en) Insulating waterproof bus duct
CN213328718U (en) Whole culvert of pin-connected panel
CN212427205U (en) Assembled underground pipe gallery is connected to dry-type
CN212002594U (en) Modular embrace pole with basic bottom piece
CN212277424U (en) Subway comprehensive grounding grid system utilizing building envelope to be naturally grounded
CN204578002U (en) A kind of Exhibition Architecture exhibition position cable laying system
CN206947896U (en) Ready-package low-voltage cable support
CN212046927U (en) Box-type charging station
CN206517022U (en) A kind of dual-open type cable trench box
CN208478908U (en) Container prefabricated cabin formula resistor box
CN213341591U (en) Y-shaped cable trench
CN112018709A (en) Groove type prefabricated assembly type cable duct bank
CN210393564U (en) Auxiliary installation equipment for electric power engineering
CN210482359U (en) Special-shaped foundation structure of 10kV switch cabinet
CN208996077U (en) A kind of double cabin piping lane import and export mixes in underground
CN221221863U (en) Buried connection pipe with reduced thickness
CN217563284U (en) Novel compound assembled electric power operation pipeline
CN110318420A (en) A kind of prefabricated assembled underground pipe gallery
CN214365233U (en) Assembled power distribution room
CN217642363U (en) Semi-buried transformer substation with slope-shaped cable channel