CN209494588U - A kind of fixed device of cantilever for partition door of subway - Google Patents

A kind of fixed device of cantilever for partition door of subway Download PDF

Info

Publication number
CN209494588U
CN209494588U CN201822191871.2U CN201822191871U CN209494588U CN 209494588 U CN209494588 U CN 209494588U CN 201822191871 U CN201822191871 U CN 201822191871U CN 209494588 U CN209494588 U CN 209494588U
Authority
CN
China
Prior art keywords
partition door
fixed
cantilever
fixed device
latch closure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822191871.2U
Other languages
Chinese (zh)
Inventor
陈庆
雷木根
陈少诚
郑晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingyuan Guangsheng Civil Engineering Co Ltd
Original Assignee
Qingyuan Guangsheng Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingyuan Guangsheng Civil Engineering Co Ltd filed Critical Qingyuan Guangsheng Civil Engineering Co Ltd
Priority to CN201822191871.2U priority Critical patent/CN209494588U/en
Application granted granted Critical
Publication of CN209494588U publication Critical patent/CN209494588U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to partition door of subway technical field more particularly to a kind of fixed devices of cantilever for partition door of subway, for being connected and fixed between partition door and tunnel wall, including partition door pedestal, tunnel surbase and sissy bar;It is provided with lug on the partition door pedestal, and is connect in the form of hole axle with one end of the sissy bar by bolt;The tunnel surbase includes the latch closure of the substrate being fixedly connected sequentially, support and semi-annular shape;The substrate is fixed in the tunnel wall;The other end of the sissy bar is sheathed on the latch closure.The purpose of the invention of the present invention is to provide a kind of fixed devices of cantilever for partition door of subway, solved using technical solution provided by the utility model causes safety device to loosen between existing partition door of subway and tunnel wall there is no effective bindiny mechanism, and partition door is caused to there is technical issues that.

Description

A kind of fixed device of cantilever for partition door of subway
Technical field
The utility model relates to partition door of subway technical fields more particularly to a kind of cantilever for partition door of subway to fix Device.
Background technique
Civil air defense constructions and installations is civil air defense projects, is also civil air defense works, is referred to ensure wartime personnel and goods and materials masking, the people The wartime that air defense control, medical aid and the underground protective structure individually built and combined ground building are built can be used for preventing Empty basement.
Underground space subway main track equally has the function of hidden and people's air defense, is equipped with partition door, main track in main track section Interval partition door is usually opened, and the used time closes, and open-type is located at tunnel side, parallel with current of traffic.Partition door bottom There is jack safety device, jack is fixed on partition door, is headed into downwards in the pre-buried base holes in bottom surface, is played weighing and is fixed Effect generates stronger Piston Action Wind when passing through because of train, and door height is generally higher than 4500mm, and upper cantilever arm vibrates larger, lower part Jack safety device will appear loosening situation, leave security risk to train operation.
The steel pipe of different length is welded according to the two spacing between partition door top and tunnel wall at present or fashioned iron rises and fixes The effect of partition door, but more difficulty is disconnected in the used time, influence the use of partition door.
Utility model content
The purpose of the invention of the present invention is to provide a kind of fixed devices of cantilever for partition door of subway, using this reality Solving with the technical solution of novel offer causes between existing partition door of subway and tunnel wall there is no effective bindiny mechanism Safety device loosens, and partition door is caused to there is technical issues that.
In order to solve the above-mentioned technical problem, on the one hand the utility model provides a kind of cantilever for partition door of subway and fixes Device, for being connected and fixed between partition door and tunnel wall, including the partition being fixedly installed on the door leaf of the partition door The peace of door pedestal, the tunnel surbase being fixedly installed in tunnel wall and connection the partition door pedestal and tunnel surbase Full pull rod;Be provided with lug on the partition door pedestal, and by bolt in the form of hole axle with one end of the sissy bar Connection;The tunnel surbase includes the latch closure of the substrate being fixedly connected sequentially, support and semi-annular shape;The substrate is fixed on In the tunnel wall;The other end of the sissy bar is sheathed on the latch closure.
Based on the fixed device of above-mentioned cantilever, on the other hand the utility model also provides a kind of construction method, including following step It is rapid:
After S100, installation partition door, partition door pedestal is welded in the design position of the fixed device of partition door door leaf upper cantilever;
S200, the position corresponding with partition door pedestal in tunnel wall, pass through base expanding and base expanding anchor bolt fixed substrate;
S300, after one end of sissy bar is set on latch closure, the both ends of latch closure are passed through into support, and will by nut Latch closure is fixed on the support;
S400, support is fixed on substrate by high-strength bolt;
S500, the other end of sissy bar is placed on the lug of partition door pedestal, by the insertion of bolt be connected to every On disconnected door pedestal, the installation of the fixed device of cantilever is completed.
From the foregoing, it will be observed that using the fixed device of the cantilever provided by the utility model for partition door of subway and its construction method Available following the utility model has the advantages that subway main track interval partition door is reset, safety device is easy to install, and operation is reliable, and performance is stablized; The security risk for eliminating the operation of subway special train, obtains good effect;Anchorage technology is extended using bottom, is in concrete knot Carry out reinforcing the best anchorage style for the use that supplies a gap in structure.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be practical to this Attached drawing needed in the description of new embodiment or the prior art is briefly described.It should be evident that being described below In attached drawing be only that a part of the embodiment of the utility model is not paying wound for those of ordinary skill in the art Under the premise of the property made is laborious, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the fixed device installation condition schematic diagram of the utility model embodiment cantilever.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts Every other embodiment obtained, fall within the protection scope of the utility model.
Partition door is installed in subway main track section, stronger Piston Action Wind is generated when passing through because of train, is caused under partition door Portion's jack safety device will appear loosening situation, leave security risk to train operation.
For this reason, it may be necessary to give subway main track interval partition door resetting safety device, the present embodiment provides a kind of English subways The fixed device of the cantilever of partition door.Since partition door is in the open state usually, door leaf leans against at tunnel wall after opening, therefore The fixed device of cantilever provided by the utility model, for being connected and fixed between partition door and tunnel wall.
Referring to Figure 1, specifically, the fixed device of cantilever includes the partition door base being fixedly installed on the door leaf of partition door 10 Seat 30, the tunnel surbase 40 that is fixedly installed in tunnel wall 20 and connection partition door pedestal 30 and tunnel surbase 40 Sissy bar 50.
Wherein partition door pedestal 30 is fixed on partition door 10 towards on the door leaf of tunnel wall 20, and fixed form can have more Kind, it is the integrality for not destroying door leaf, uses and be welded and fixed herein.Lug 31 is provided on partition door pedestal 30, the lug 31 are connect in the form of hole axle with one end of sissy bar 50 by bolt 32.Although it should be noted that lug 31 and peace herein One end connection of full pull rod 50, but its description is only connection structure, in the construction process, between lug 31 and sissy bar 50 Connection be final step, and after completing the connection of lug 31 and sissy bar 50, split pin 33 is plugged on bolt 32, Prevent bolt 32 from falling off.
Tunnel surbase 40 includes the latch closure 43 of the substrate 41, support 42 and the semi-annular shape that are fixedly connected sequentially, wherein base Plate 41 is fixed in tunnel wall 20.Here, between substrate 41 and tunnel wall 20, between support 42 and substrate 41 and latch closure Between 43 and support 42, a variety of fixed forms are equally existed, welding manner can be used to weld tunnel surbase 40 integral, It is welded in tunnel wall 20 again.
Because original load wall of tunnel wall 20 is completed, on the basis of not damaging former main structure, as preferred one Kind of fixed form, the present embodiment using anchor bolt it is fixed by the way of fixation is realized to tunnel surbase 40, specifically, substrate 41 is in leaning on The position of proximal edge is fixed in tunnel wall 20 by several base expanding and base expanding anchor bolts 44, which is pre- base expanding and base expanding anchor bolt 44, is By dedicated reaming tool (reaming bit) the preparatory reaming in anchor hole bottom expanding anchor bolt, since pre- base expanding and base expanding anchor bolt 44 exists After extension, with anchor hole inner sidewall there is no squeezing, the swelling stress at anchor hole is substantially zeroed, therefore pre-expansion hole anchor is very safe Reliably;It is formed with the deep gouge for being equipped with nut 45 on support 42, offers through-hole in deep gouge bottom;It is equal at the both ends of latch closure 43 It is formed with screw thread, the both ends of latch closure 43 are penetrated in deep gouge by through-hole, and are fixed on support 42 by nut 45;Support 42 is logical High-strength bolt 46 is crossed to be fixed on substrate 41.
In above-mentioned 40 work progress of tunnel surbase, construction procedure first consolidates substrate 41 as described in above-mentioned structural order It is scheduled in tunnel wall 20, then latch closure 43 is fixed on support 42, finally complete the fixation between support 42 and substrate 41.Due to The other end of sissy bar 50 is sheathed on latch closure 43, before latch closure 43 is fixed on support 42, first by the another of sissy bar 50 One end is sheathed on latch closure 43, then carries out the fixation between latch closure 43 and support 42.
Tunnel surbase 40 complete installation after, the center of circle of latch closure 43 in horizontal direction, and the lug 31 of partition door pedestal 30, Sissy bar 50 and latch closure 43 are located at same axis.Sissy bar 50 is mounted on the lug 31 of partition door pedestal 30 by pin shaft On, sissy bar 50 links up with adjustable-tightness, and sissy bar 50 is made to be constantly in tightening state, that is, completes the fixed dress of entire cantilever The installation procedure set.
In order to further increase the stable connection between partition door 10 and tunnel wall 20, cantilever provided in this embodiment is solid Determine device and is distributed between partition door 10 and tunnel wall 20 along the vertical direction including two with two or more.
Based on the fixed device of above-mentioned cantilever, on the other hand construction method that the utility model embodiment also provides, including with Lower step:
After S100, installation partition door, partition door pedestal is welded in the design position of the fixed device of partition door door leaf upper cantilever;
S200, the position corresponding with partition door pedestal in tunnel wall, pass through base expanding and base expanding anchor bolt fixed substrate;
S300, after one end of sissy bar is set on latch closure, the both ends of latch closure are passed through into support, and will by nut Latch closure is fixed on the support;
S400, support is fixed on substrate by high-strength bolt;
S500, the other end of sissy bar is placed on the lug of partition door pedestal, by the insertion of bolt be connected to every On disconnected door pedestal, the installation of the fixed device of cantilever is completed.
In conclusion the fixed device of cantilever provided in this embodiment and its construction method, easy to install, operation is reliable, performance Stablize;The security risk for eliminating the operation of subway special train, obtains good effect;Anchorage technology is extended using bottom, is mixed Carry out reinforcing the best anchorage style for the use that supplies a gap in Xtah Crude Clay structure.
Embodiments described above does not constitute the restriction to the technical solution protection scope.It is any in above-mentioned implementation Made modifications, equivalent substitutions and improvements etc., should be included in the protection model of the technical solution within the spirit and principle of mode Within enclosing.

Claims (8)

1. a kind of fixed device of cantilever for partition door of subway, special for being connected and fixed between partition door and tunnel wall Sign is: including the partition door pedestal being fixedly installed on the door leaf of the partition door, the tunnel being fixedly installed in tunnel wall The sissy bar of surbase and connection the partition door pedestal and tunnel surbase;It is provided on the partition door pedestal Lug, and connect in the form of hole axle with one end of the sissy bar by bolt;The tunnel surbase includes successively fixing The latch closure of the substrate of connection, support and semi-annular shape;The substrate is fixed in the tunnel wall;The sissy bar it is another End cap is set on the latch closure.
2. the fixed device of cantilever according to claim 1, it is characterised in that: the substrate passes through in the position by proximal edge Several base expanding and base expanding anchor bolts are fixed in the tunnel wall.
3. the fixed device of cantilever according to claim 2, it is characterised in that: be formed on the support and be equipped with nut Deep gouge, offer through-hole in the deep gouge bottom;It is each formed with screw thread at the both ends of the latch closure, the both ends of the latch closure are logical It crosses the through-hole to penetrate in the deep gouge, and is fixed on the support by nut;The support is solid by high-strength bolt Due on the substrate.
4. the fixed device of cantilever according to claim 2, it is characterised in that: between the latch closure and support and described Between support and substrate, it is welded and fixed.
5. the fixed device of cantilever according to claim 2, it is characterised in that: the base expanding and base expanding anchor bolt is pre- base expanding and base expanding anchor bolt.
6. the fixed device of cantilever according to any one of claims 1-5, it is characterised in that: the partition door pedestal connects After ear is connect by bolt with one end of the sissy bar, split pin is plugged on the bolt.
7. the fixed device of cantilever according to claim 6, it is characterised in that: the center of circle of the latch closure in horizontal direction, and Lug, sissy bar and the latch closure of the partition door pedestal are located at same axis.
8. the fixed device of cantilever according to claim 7, it is characterised in that: the fixed device of the cantilever includes two with two It is distributed between the partition door and tunnel wall along the vertical direction more than a.
CN201822191871.2U 2018-12-25 2018-12-25 A kind of fixed device of cantilever for partition door of subway Active CN209494588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822191871.2U CN209494588U (en) 2018-12-25 2018-12-25 A kind of fixed device of cantilever for partition door of subway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822191871.2U CN209494588U (en) 2018-12-25 2018-12-25 A kind of fixed device of cantilever for partition door of subway

Publications (1)

Publication Number Publication Date
CN209494588U true CN209494588U (en) 2019-10-15

Family

ID=68153712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822191871.2U Active CN209494588U (en) 2018-12-25 2018-12-25 A kind of fixed device of cantilever for partition door of subway

Country Status (1)

Country Link
CN (1) CN209494588U (en)

Similar Documents

Publication Publication Date Title
JP6200550B1 (en) Temporary deadline method, temporary deadline structure
CN206769354U (en) A kind of steel structure hoisting platform
CN204781884U (en) Prop builder's jack of structure down
CN107152078B (en) Hinge device and construction method for releasing welding internal stress of steel gallery by using hinge device
CN205188797U (en) Concrete tied arch bridge jib casts anchor and holds connection structure
CN109680619A (en) A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions
CN109972623A (en) A kind of construction method and device carrying out pipeline suspension using Bailey beam
CN209494588U (en) A kind of fixed device of cantilever for partition door of subway
CN207793941U (en) Dismountable fixed road stake
CN105804416B (en) The attachment structure of prefabrication tower crane
CN109208620A (en) A kind of geotechnical slope bracing means
CN109578073A (en) A kind of fixed device of cantilever for partition door of subway and its construction method
CN204384761U (en) A kind of bridge construction tower crane pile foundation sustaining wall
CN107313790A (en) A kind of symmetrical trouble hole supporting construction and its construction method
CN208633170U (en) A kind of axle power monitoring auxiliary device for foundation pit steel support
CN208815540U (en) Deep foundation pit support structure
CN207633795U (en) A kind of foundation pit suspension lane device
CN208166431U (en) A kind of bracket hoisting mechanism and Lift-on/Lift-off System
CN212375879U (en) Combined foundation pit supporting beam string
CN109750825A (en) The construction method of foundation pit suspension type riding track
CN213112246U (en) Manual hole digging pile lifting portal frame for rectangular slide-resistant pile
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN211371492U (en) Formula antidetonation pipeline bracket sways
CN207846435U (en) The short support construction of steel for station accessory structure foundation pit Force transmission parts
CN209339136U (en) A kind of anchoring system