CN209494585U - A kind of paste filling hydraulic bracket isolation board - Google Patents

A kind of paste filling hydraulic bracket isolation board Download PDF

Info

Publication number
CN209494585U
CN209494585U CN201920100358.XU CN201920100358U CN209494585U CN 209494585 U CN209494585 U CN 209494585U CN 201920100358 U CN201920100358 U CN 201920100358U CN 209494585 U CN209494585 U CN 209494585U
Authority
CN
China
Prior art keywords
isolation
jack
seal
filling hydraulic
isolating seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920100358.XU
Other languages
Chinese (zh)
Inventor
胡艳峰
刘刚
杜文柱
张心峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd
Original Assignee
XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd filed Critical XUZHOU CUMT BACKFILL TECHNOLOGY Co Ltd
Priority to CN201920100358.XU priority Critical patent/CN209494585U/en
Application granted granted Critical
Publication of CN209494585U publication Critical patent/CN209494585U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of paste filling hydraulic bracket isolation board belongs to a kind of filling hydraulic support.The isolation board is divided into, neutralizes lower three isolation, and upper isolation and lower isolation are connected with sealing strip, and as the setting prop of bracket and the stretching of lower isolation telescopic jack seal area's Seam Roof And Floor to be filled, lateral flexible stretch out seals adjacent stent gap up and down.Upper isolation, which rises, squeezes gap between upper isolating seal seal isolation tail boom and upper isolation, seal roof, isolating seal is depressed under lower isolation seals seat earth, upper side of isolation stretches out adjacent two frame gap at sealing top plate, lower side of isolation stretches out adjacent two frame gap at seal base, upper, the lower isolation relative movement of neutralization is suitable for mining thickness variation, and sealing roof is fast implemented using jack as power.Advantage: can mechanically realize and quickly isolate to filling mining working face, reduce artificial laying sealing strip workload, improve filling efficiency of isolation, and can be effective against lotion lateral pressure;Reduce hand labor.

Description

A kind of paste filling hydraulic bracket isolation board
Technical field
The utility model relates to a kind of filling hydraulic support, especially a kind of paste filling hydraulic bracket isolation board.
Background technique
For paste body filling technology as one of Green Technique in Coal Mining system, main purpose is to solve " three next on " pressure Coal improves coal resource recovery ratio, extends mine service-life.
Currently, the isolation Lost circulation problems in area to be filled are one of the Major Difficulties for restricting exhibition paste body filling production technique.If Isolation plugging operation is carried out using manual type merely, not only cumbersome, labor intensity of workers is big, and time-consuming, low efficiency, And traditional fully mechanized mining supporter is not provided with the isolating device of sealing filling slurry, also needs to build isolation gear using manual type Wall, mechanization degree is low, the serious raising for restricting coal mine paste filling coal mining efficiency.
Therefore, isolation preparation mechanization degree is not high in paste body filling production technique, and inefficiency becomes this field Technical staff's urgent problem to be solved.
Utility model content
In order to solve the above-mentioned technical problem, the purpose of this utility model is to provide for a kind of paste filling hydraulic bracket isolation Plate, solution is to be filled in coal mine filling to separate, mechanization degree low problem slow from speed.
The purpose of this utility model is achieved in that the paste filling hydraulic bracket isolation board includes: upper isolation, interval From, it is lower isolation, upper side of isolation is stretched, upper isolating seal, upside pushes away jack, lower side of isolation is stretched, limit plate, it is lower isolation stretch it is very heavy Top, lower isolating seal, downside push away jack;
Upper isolation upper end is connected with isolating seal;
Lower isolation lower end is connected with lower isolating seal;
Isolation during upper isolation is embedded;
The embedded lower isolation of middle isolation;
Upside pushes away the hingedly upper isolation of jack one end, and the other end hingedly stretch by upper side of isolation;
Upper side of isolation, which is stretched, to be nested in isolation;
Limit board ends are separately connected isolation and middle isolation, connect different holes on limit plate and realize isolation and middle isolation Relative movement;
Isolation during lower isolation telescopic jack one end is hinged, the other end hingedly lower isolation, stretches with lower isolation telescopic jack It is isolated in contracting realization and lower isolation relatively moves;
Downside pushes away jack one end, and hingedly lower isolation is flexible, the other end hingedly lower isolation;
Pack hole is provided in upper isolation;
It is filling hydraulic support tail boom above upper isolating seal, upper isolation, which rises, to be squeezed upper isolating seal and seal tail boom and upper Gap between isolation.
Box-structure or frame structure are isolated on described;Box-structure or frame structure are isolated into described;Institute It states down and is isolated into box-structure or frame structure.
The embedded lower isolation of the lower isolation is flexible.
The connection type of the upper isolation and upper isolating seal is hinged, bolt or cementing;The lower isolation is under The connection type of isolating seal is hinged, bolt or cementing.
The hingedly upper isolation of described lower isolation telescopic jack one end, the hinged lower isolation of the other end.
The utility model has the advantages that by adopting the above scheme, the isolation board be divided into, neutralize it is lower three isolation, it is upper isolation and under every From sealing strip is connected with, is stretched out with the setting prop of bracket and lower isolation telescopic jack and seal area's Seam Roof And Floor to be filled, on Lower lateral flexible stretch out seals adjacent stent gap;Upper isolation, which rises, squeezes upper isolating seal seal isolation tail boom and upper isolation Between gap, seal roof, isolating seal depressed under lower isolation and seals seat earth, upper side of isolation is stretched out at sealing top plate Adjacent two frame gap, lower side of isolation stretch out adjacent two frame gap at seal base, and upper, the lower isolation relative movement of neutralization is suitable for Mining thickness variation, sealing roof is fast implemented using jack as power, is effectively shortened and is filled the preparation time, subtracts Few hand labor, improves paste body filling whole work efficiency.
Advantage: can mechanically realize and quickly isolate to filling mining working face, reduce artificial laying sealing strip work It measures, improves filling efficiency of isolation, and lotion lateral pressure can be effective against;Cancel the work for manually building isolation template Make, reduces hand labor.
Detailed description of the invention
Fig. 1 is the utility model structure front view.
Fig. 2 is the utility model structural side view.
In figure, 1, upper isolation;2, middle isolation;3, lower isolation;4, upper side of isolation is stretched;5, upper isolating seal;6, upside pushes away thousand Jin top;7, lower side of isolation is stretched;8, limit plate;9, lower isolation telescopic jack;11, lower isolating seal;12, downside pushes away advance.
Specific embodiment
Embodiment 1: the paste filling hydraulic bracket isolation board includes: 1, middle isolation 2, lower isolation 3, upper side of isolation of upper isolation Stretch 4, upper isolating seal 5, upside pushes away jack 6, lower side of isolation stretches 7, limit plate 8, lower isolation telescopic jack 9, it is lower isolation it is close Envelope 11, downside push away jack 12.
1 upper end of upper isolation is connected with isolating seal 5.
3 lower ends of lower isolation are connected with lower isolating seal 11.
Isolation 2 during upper isolation 1 is embedded.
The middle embedded lower isolation 3 of isolation 2.
Upside pushes away the hingedly upper isolation 1 of 6 one end of jack, and hingedly upper side of isolation stretches 4 to the other end.
Upper side of isolation is stretched 4 and is nested in isolation 1.
8 both ends of limit plate are separately connected isolation 1 and middle isolation 2, connect different holes on limit plate 8 and realize and 1 He is isolated Middle 2 relative movement of isolation.
Isolation 2 during lower 9 one end of isolation telescopic jack is hinged, the other end hingedly lower isolation 3, with lower isolation telescopic jack 3 relative movement of isolation 2 and lower isolation in 9 flexible realizations.
Downside pushes away the hingedly lower isolation flexible 7 of 12 one end of jack, the other end hingedly lower isolation 3.
Pack hole 101 is provided in upper isolation 1.
It is filling hydraulic support tail boom 10 above upper isolating seal 5, upper isolation 1 rises the upper isolating seal 5 of extruding and seals tail Gap between beam 10 and upper isolation 1.
The upper isolation 1 is box-structure or frame structure;The middle isolation 2 is box-structure or frame structure; The lower isolation 3 is box-structure or frame structure.
The embedded lower isolation flexible 7 of the lower isolation 3.
The connection type of the upper isolation 1 and upper isolating seal 5 is hinged, bolt or cementing;The lower isolation 3 with The connection type of lower isolating seal 11 is hinged, bolt or cementing.
The hingedly upper isolation 1 of described lower 9 one end of isolation telescopic jack, the hinged lower isolation 3 of the other end.
Specifically, this paste filling hydraulic bracket isolation board, stretch 4 using upper isolation 1, lower isolation 3, upper side of isolation, under every 7 are stretched from side, upper isolation 1 and paste filling hydraulic bracket are hinged, increase with bracket and squeeze the upper sealing of isolating seal 5 roof; Under the effect of lower isolation telescopic jack 9, lower isolation 3 squeezes lower isolating seal 11 and seals seat earth;Upper side of isolation stretches 4 under Side of isolation stretches gap between 7 stretchings sealing adjacent stent.

Claims (5)

1. a kind of paste filling hydraulic bracket isolation board, it is characterised in that: paste filling hydraulic bracket isolation board include: on every From, it is middle isolation, it is lower isolation, upper side of isolation is stretched, upper isolating seal, upside pushes away jack, lower side of isolation is stretched, limit plate, lower isolation Telescopic jack, lower isolating seal, downside push away jack;
Upper isolation upper end is connected with isolating seal;
Lower isolation lower end is connected with lower isolating seal;
Isolation during upper isolation is embedded;
The embedded lower isolation of middle isolation;
Upside pushes away the hingedly upper isolation of jack one end, and the other end hingedly stretch by upper side of isolation;
Upper side of isolation, which is stretched, to be nested in isolation;
Limit board ends are separately connected isolation and middle isolation, connect different holes on limit plate and realize that isolation and middle isolation are opposite It is mobile;
Isolation during lower isolation telescopic jack one end is hinged, the other end hingedly lower isolation are flexible real with lower isolation telescopic jack Isolation and lower isolation relative movement in existing;
Downside pushes away jack one end, and hingedly lower isolation is flexible, the other end hingedly lower isolation;
Pack hole is provided in upper isolation;
It is filling hydraulic support tail boom above upper isolating seal, upper isolation, which rises, squeezes upper isolating seal sealing tail boom and upper isolation Between gap.
2. paste filling hydraulic bracket isolation board according to claim 1, it is characterised in that: be isolated into box on described Structure or frame structure;Box-structure or frame structure are isolated into described;Box-structure or frame are isolated under described Structure.
3. paste filling hydraulic bracket isolation board according to claim 1, it is characterised in that: under the lower isolation is embedded Isolation is flexible.
4. paste filling hydraulic bracket isolation board according to claim 1, it is characterised in that: the upper isolation on every It from the connection type of sealing is hinged, bolt or cementing;The connection type of the lower isolation and lower isolating seal is hinged, spiral shell Bolt is cementing.
5. paste filling hydraulic bracket isolation board according to claim 1, it is characterised in that: the lower isolation flexible thousand The hingedly upper isolation of jin top one end, the hinged lower isolation of the other end.
CN201920100358.XU 2019-01-22 2019-01-22 A kind of paste filling hydraulic bracket isolation board Active CN209494585U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920100358.XU CN209494585U (en) 2019-01-22 2019-01-22 A kind of paste filling hydraulic bracket isolation board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920100358.XU CN209494585U (en) 2019-01-22 2019-01-22 A kind of paste filling hydraulic bracket isolation board

Publications (1)

Publication Number Publication Date
CN209494585U true CN209494585U (en) 2019-10-15

Family

ID=68155694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920100358.XU Active CN209494585U (en) 2019-01-22 2019-01-22 A kind of paste filling hydraulic bracket isolation board

Country Status (1)

Country Link
CN (1) CN209494585U (en)

Similar Documents

Publication Publication Date Title
CN204646285U (en) A kind of coal mine paste filling exploitation high efficiency isolation liquid pressure support
CN204186424U (en) A kind of coal mine filling exploitation end hydraulic support spacer assembly
CN202788936U (en) Self-moving type telescopic frame wall for blocking off
CN208966359U (en) A kind of coal mine paste filling exploitation hydraulic isolation bracket
CN103670508B (en) A kind of swing type spacer assembly of coal mine paste filling exploitation and partition method
CN209494585U (en) A kind of paste filling hydraulic bracket isolation board
CN202402072U (en) Floating retractable filling isolation board
CN204186410U (en) A kind of coal mine filling transversal end hydraulic support
CN109057846B (en) Colliery lotion filling exploitation hydraulic pressure isolation support
CN209011874U (en) A kind of paste body filling continuous flexible sealing device
CN201539278U (en) Filling formwork support
CN203655316U (en) Top isolating device for coal mine filling bracket
CN209604057U (en) Paste filling hydraulic bracket is efficiently isolated in a kind of coal mine
CN209483388U (en) A kind of coal mine paste filling end hydraulic support
CN210217787U (en) Contractibility power transmission connecting device suitable for primary support of large-deformation tunnel
CN103075188B (en) Downhole waste rock filling equipment and filling method using same
CN209483423U (en) A kind of paste body filling end hydraulic support isolation board
CN208996751U (en) A kind of paste filling hydraulic bracket isolating device
CN209976564U (en) Three-stage isolation paste filling type hydraulic support
CN209483407U (en) A kind of coal mine paste filling exploitation isolation hydraulic support
CN211975008U (en) Quick isolating device for paste filling hydraulic support
CN204283455U (en) Novel thin coal seam filling hydraulic support
CN102086771A (en) Filling template bracket
CN109252891B (en) Paste filling continuous flexible sealing device and isolation method
CN203412607U (en) Hydraulic support for realizing placing top coal and filling operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant