CN209481770U - A kind of convergent belt high speed Tu Xiji - Google Patents

A kind of convergent belt high speed Tu Xiji Download PDF

Info

Publication number
CN209481770U
CN209481770U CN201920010861.6U CN201920010861U CN209481770U CN 209481770 U CN209481770 U CN 209481770U CN 201920010861 U CN201920010861 U CN 201920010861U CN 209481770 U CN209481770 U CN 209481770U
Authority
CN
China
Prior art keywords
ducting assembly
xiji
component
convergent belt
high speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920010861.6U
Other languages
Chinese (zh)
Inventor
方礼敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920010861.6U priority Critical patent/CN209481770U/en
Application granted granted Critical
Publication of CN209481770U publication Critical patent/CN209481770U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rotary Pumps (AREA)

Abstract

The utility model discloses a kind of convergent belt high speed Tu Xiji, including, preparation unit, including bearing assembly, painting tin component and the first transmission component, the painting tin component and transmission component are arranged in bearing assembly;And, cooling unit, divide into the first ducting assembly, guide wheel radiating subassembly and the second ducting assembly, first ducting assembly and the second ducting assembly are all set in the bearing assembly side, and first ducting assembly is arranged in parallel with second ducting assembly, the guide wheel radiating subassembly is set to above the bearing assembly.The first ducting assembly, guide wheel radiating subassembly, the second ducting assembly and the air-cooled component of the utility model setting, quickly the convergent belt of Tu Xihou can be cooled down, so as to effectively improve the production efficiency of Tu Xiji, using reliable, and the tuyere of the first ducting assembly and the second ducting assembly is presented 45 °, 45 ° of guiding can be constituted to cooling wind direction, air quantity maximization can be played.

Description

A kind of convergent belt high speed Tu Xiji
Technical field
The utility model relates to convergent belt production technical field more particularly to a kind of convergent belt high speed Tu Xiji.
Background technique
Convergent belt (item), also referred to as painting (plating) tin copper strips collect for connecting solar-energy photo-voltaic cell, transmit photovoltaic cell The composite electric conductor of component generation current.Manufacturing in the capital equipment of convergent belt has painting (plating) tin machine.It is applied at present using convergent belt There are two types of tin machine equipments: 1, low speed Tu Xiji, applies solder speed 2m/min or so;2, high speed Tu Xiji apply solder speed The high speed Tu Xiji of 50m/min or so real meaning, 100m/min efficiency should be able to be realized by applying solder speed, if applying solder speed only It is able to achieve the so-called high speed Tu Xiji of 50m/min, intend claiming middling speed Tu Xiji, the course of work of Tu Xiji: copper strips passes through scaling powder The high temperature preheating for passing through 80 degree to 100 degree after processing, enables scaling powder sufficiently to activate and plays a role, carry out using tin melting furnace Tin plating operation, surface cooling is carried out from tin furnace again out, and final rewinding is packaged to be finished product convergent belt;However it is existing at present The cooling system of Tu Xiji cannot satisfy the use demand, and cooling effect is not in place, and then seriously affect convergent belt high speed and apply tin Working efficiency.
Utility model content
The purpose of this section is to summarize some aspects of the embodiments of the present invention and briefly introduce it is some preferably Embodiment.It may do a little simplified or be omitted to keep away in this part and the summary of the description of the application and utility model title The purpose for exempting to make this part, abstract of description and utility model title is fuzzy, and this simplification or omission cannot be used for limitation originally The range of utility model.
In view of above-mentioned existing convergent belt high speed apply tin machine there are the problem of, propose the utility model.
Therefore, the utility model aim is to provide a kind of convergent belt high speed Tu Xiji, can be quickly to the remittance of Tu Xihou Stream band is cooled down, so as to effectively improve the production efficiency of Tu Xiji, and the first ducting assembly and the second ducting assembly Tuyere is presented 45 °, can constitute 45 ° of guiding to cooling wind direction, air quantity maximization can be played, to make convergent belt in high-speed cruising When can be adequately cooled.
In order to solve the above technical problems, the utility model provides the following technical solutions: a kind of convergent belt high speed Tu Xiji, packet It includes, preparation unit, including bearing assembly, painting tin component and the first transmission component, the painting tin component and transmission component are respectively provided with In bearing assembly;And cooling unit, the first ducting assembly, guide wheel radiating subassembly and the second ducting assembly are divided into, it is described First ducting assembly and the second ducting assembly are all set in the bearing assembly side, and first ducting assembly and described the Two ducting assemblies are arranged in parallel, and the guide wheel radiating subassembly is set to above the bearing assembly, and guide wheel radiating subassembly and the One ducting assembly is connected by air guide member.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: first air duct group Part and the second ducting assembly include concave ventilation case, air inlet and tuyere, and the air inlet is set to the concave ventilation case On, the equidistant inside for being symmetricly set on the concave ventilation case of the tuyere.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: the tuyere with it is described The medial surface of concave ventilation case is at 45 °.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: the guide wheel heat dissipation group Part includes transmission wheel, heat transmission fin and support frame, and the heat transmission fin is set to the clamping plate periphery of the transmission wheel, the support Set up the one end for being placed in the transmission wheel.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: the cooling unit, also Including air-cooled component, the air-cooled component is set to the lower section of second ducting assembly,
Wherein, the air-cooled component includes fan and the second driving member, and the fan is set to second driving member Top.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: the cooling unit is also Including Power Component, the Power Component is set to the bearing assembly other side.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: the Power Component, packet Include the first air feed part and the second air feed part, the first air feed part and the second air feed part respectively with the second ducting assembly and the first wind The air inlet of road component connects.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: the second air feed part Including blower and cooling tube, the blower is connected with cooling tube.
A kind of preferred embodiment as convergent belt high speed Tu Xiji described in the utility model, in which: the air guide member is by PVC Material is made.
The utility model has the beneficial effects that the utility model is designed reasonably, compact-sized, the first ducting assembly of setting, Guide wheel radiating subassembly, the second ducting assembly and air-cooled component can quickly cool down the convergent belt of Tu Xihou, so as to The production efficiency for effectively improving Tu Xiji, using reliable, and the tuyere of the first ducting assembly and the second ducting assembly is presented 45 °, 45 ° of guiding can be constituted to cooling wind direction, air quantity maximization can be played, so that convergent belt be enable to obtain in high-speed cruising It is fully cooled, and then economizes on resources, be conducive to quantization type, scale manufactures mode.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical solution of the utility model embodiment The attached drawing used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the utility model Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.Wherein:
Fig. 1 is the whole front view that the utility model convergent belt high speed applies tin machine one embodiment.
Fig. 2 is that the utility model convergent belt high speed applies tin machine one embodiment entirety side view.
Fig. 3 is that the utility model convergent belt high speed applies B area enlarged structure schematic diagram described in tin machine one embodiment.
Fig. 4 is that the utility model convergent belt high speed applies the first ducting assembly structural representation described in second embodiment of tin machine Figure.
Fig. 5 is that the utility model convergent belt high speed applies the first ducting assembly structural representation described in second embodiment of tin machine Figure.
Fig. 6 is that the utility model convergent belt high speed applies a-quadrant structural schematic diagram described in second embodiment of tin machine.
Fig. 7 is that the utility model convergent belt high speed applies the signal of guide wheel heat radiation assembly structure described in second embodiment of tin machine Figure.
Fig. 8 is that the utility model convergent belt high speed applies heat transmission fin structural schematic diagram described in second embodiment of tin machine.
Fig. 9 is Power Component structural schematic diagram described in the utility model convergent belt high speed Tu Xiji third embodiment.
Specific embodiment
It is attached below with reference to specification to keep the above objects, features, and advantages of the utility model more obvious and easy to understand Figure is described in detail specific embodiment of the present utility model.
Many details are explained in the following description in order to fully understand the utility model, but this is practical new Type can also be implemented using other than the one described here other way, and those skilled in the art can be without prejudice to this reality With doing similar popularization in the case where novel intension, therefore the utility model is not limited by the specific embodiments disclosed below.
Secondly, " one embodiment " or " embodiment " referred to herein, which refers to, may be included at least one reality of the utility model A particular feature, structure, or characteristic in existing mode." in one embodiment " that different places occur in the present specification is not The same embodiment is referred both to, nor the individual or selective embodiment mutually exclusive with other embodiments.
Thirdly, the utility model combination schematic diagram is described in detail, when the utility model embodiment is described in detail, for just In explanation, the sectional view of announcer modular construction can disobey general proportion and make partial enlargement, and the schematic diagram is example, Its range that should not limit the utility model protection herein.In addition, should include the three of length, width and depth in actual fabrication Dimension space size.
Referring to Fig.1~3, it is the utility model one embodiment, provides the entirety of convergent belt high speed Tu Xiji a kind of Structural schematic diagram, such as Fig. 1, it includes preparation unit 100 and cooling unit 200, preparation unit that a kind of convergent belt high speed, which applies tin machine, 100, including bearing assembly 101, painting tin component 102 and the first transmission component 103, it applies tin component 102 and transmission component 103 is all provided with It sets in bearing assembly 101;And cooling unit 200, divide into the first ducting assembly 201, guide wheel radiating subassembly 202 and Two ducting assemblies 203, the first ducting assembly 201 and the second ducting assembly 203 are all set in 101 side of bearing assembly, and first Ducting assembly 201 is arranged in parallel with the second ducting assembly 203, and guide wheel radiating subassembly 202 is set to 101 top of bearing assembly, and Guide wheel radiating subassembly 202 is connect with the first ducting assembly 201 by air guide member 201a.
Specifically, the utility model main structure includes preparation unit 100 and cooling unit 200, the two cooperates, can Realize the working efficiency for effectively improving Tu Xiji, further, preparation unit 100, including bearing assembly 101, painting tin component 102 With the first transmission component 103, bearing assembly 101 plays carrying in the present invention and applies tin component 102, the first transmission component 103 and cooling unit 200 effect, by stainless steel, plastic and glass establishment be made, the first transmission component 103 plays biography Dynamic effect is driven wheel, and applies tin component 102, plays carry out tin plating effect to flat copper band in the present invention, It is arranged in bearing assembly 101 with transmission component 103, wherein applying tin component 102 includes pre- heat channel and tin melting furnace, work Process: flat copper band passes through 80 degree to 100 degree of high temperature preheating after the scaling powder processing of pre- heat channel, keeps scaling powder abundant Activation plays a role, and carries out using tin melting furnace tin plating;And cooling unit 200, it plays and the semi-finished product confluence after tin plating is brought into The effect of the cooling processing of row, divides into the first ducting assembly 201, guide wheel radiating subassembly 202, the second ducting assembly 203 and wind Cold component 204, the first ducting assembly 201, guide wheel radiating subassembly 202, the second ducting assembly 203 and air-cooled component 204 successively have Ordered pair semi-finished product convergent belt is cooled down, and rapid cooling can be realized, so as to effectively improve the production efficiency for improving Tu Xiji.
Wherein, air-cooled component 204 is the final step process of cooling convergent belt, and air-cooled component 204 is located at the second wind The lower section of road component 203, and it is fixed on bearing assembly 101, further, and air-cooled component 204 include fan 204a and Second driving member 204b, the second driving member 204b is driven wheel, and for sending out finished product header box, and fan 204a is used for There is provided room temperature cold wind, and driven wheel number is all larger than equal to three, number only refers in figure, convergent belt be successively wound around from On driving wheel, fan 204a is set to the top of the second driving member 204b, cools down to the convergent belt of conveying.
Further, the first ducting assembly 201 and the second ducting assembly 203 are bolted on bearing assembly 101 1 Side, and the first ducting assembly 201 is arranged in parallel with the second ducting assembly 203, and guide wheel radiating subassembly 202 is set to bearing assembly 101 tops, and guide wheel radiating subassembly 202 is connect with the first ducting assembly 201 by air guide member 201a, working principle: air-cooled Guide wheel radiating subassembly 202 is transferred to by air guide member 201a to cool down, then is cooled down by guide wheel radiating subassembly 202 to convergent belt Purpose, preferably, air guide member 201a are made of PVC material, and PVC is the abbreviation of polyvinyl chloride, soft or hard property strong with plasticity Can be appropriate, and cost is few, meets and uses needs.
It is second embodiment of the utility model referring to Fig. 4~8, which is different from one embodiment: First ducting assembly 201 and the second ducting assembly 203 include concave ventilation case 201b, air inlet 201c and tuyere 201d, and Guide wheel radiating subassembly 202 includes transmission wheel 202a, heat transmission fin 202b and support frame 202c.Specifically, referring to Fig. 1, main body Structure includes preparation unit 100 and cooling unit 200, and the two cooperates, it can be achieved that effectively improve the working efficiency of Tu Xiji, Further, preparation unit 100, including bearing assembly 101, painting tin component 102 and the first transmission component 103, bearing assembly 101 Play the role of carrying in the present invention and apply tin component 102, the first transmission component 103 and cooling unit 200, by not Rust steel, plastic and glass establishment are made, and it is driven wheel that the first transmission component 103, which plays the role of transmission, and applies tin component 102, it plays carry out tin plating effect to flat copper band in the present invention, and transmission component 103 is arranged at bearing assembly In 101, wherein applying tin component 102 includes pre- heat channel and tin melting furnace, and the course of work: flat copper band passes through the scaling powder of pre- heat channel Pass through 80 degree to 100 degree of high temperature preheating after processing, so that scaling powder is sufficiently activated and play a role, using tin melting furnace into Row is tin plating;And cooling unit 200, play the role of carrying out the semi-finished product convergent belt after tin plating cooling processing, divides into the One ducting assembly 201, guide wheel radiating subassembly 202, the second ducting assembly 203 and air-cooled component 204, the first ducting assembly 201 are led Taking turns radiating subassembly 202, the second ducting assembly 203 and air-cooled component 204, successively ordered pair semi-finished product convergent belt is cooled down It realizes and is quickly cooled down, so as to effectively improve the production efficiency for improving Tu Xiji.
Wherein, air-cooled component 204 is the final step process of cooling convergent belt, and air-cooled component 204 is located at the second wind The lower section of road component 203, and it is fixed on bearing assembly 101, further, and air-cooled component 204 include fan 204a and Second driving member 204b, the second driving member 204b is driven wheel, and for sending out finished product header box, and fan 204a is used for There is provided room temperature cold wind, and driven wheel number is all larger than equal to three, number only refers in figure, convergent belt be successively wound around from On driving wheel, fan 204a is set to the top of the second driving member 204b, cools down to the convergent belt of conveying.
Further, the first ducting assembly 201 and the second ducting assembly 203 are bolted on bearing assembly 101 1 Side, and the first ducting assembly 201 is arranged in parallel with the second ducting assembly 203, and guide wheel radiating subassembly 202 is set to bearing assembly 101 tops, and guide wheel radiating subassembly 202 is connect with the first ducting assembly 201 by air guide member 201a, working principle: air-cooled Guide wheel radiating subassembly 202 is transferred to by air guide member 201a to cool down, then is cooled down by guide wheel radiating subassembly 202 to convergent belt Purpose, preferably, air guide member 201a are made of PVC material, and PVC is the abbreviation of polyvinyl chloride, soft or hard property strong with plasticity Can be appropriate, and cost is few, meets and uses needs.And the first ducting assembly 201 and the second ducting assembly 203 are led including concave Crust of weathering 201b, air inlet 201c and tuyere 201d, concave ventilation case 201b are the carriers of the utility model gas storage, and concave is presented Structure, for being cooled down in all directions to semi-finished product convergent belt, preferably, concave ventilation case 201b is made of aluminium alloy, air inlet Mouth 201c is provided on concave ventilation case 201b, and tuyere 201d is air outlet, and trapezium structure is presented in it, specifically, tuyere The equidistant inside for being symmetricly set on concave ventilation case 201b 201d, further, tuyere 201d and concave ventilation case 201b's Medial surface is at 45 °, can constitute 45 ° of guiding to cooling wind direction, air quantity maximization can be played, to make convergent belt in high-speed cruising When can be adequately cooled, and economize on resources.
Further, guide wheel radiating subassembly 202 includes transmission wheel 202a, heat transmission fin 202b and support frame 202c, thermally conductive Fin 202b plays the role of cold and hot exchange and carries out cooling to the semi-finished product convergent belt of Tu Xihou, is bolted on The clamping plate periphery of transmission wheel 202a, it is preferred that heat transmission fin 202b is made of muti-piece aluminium alloy vane, has heat conduction and heat radiation performance High speciality, and support frame 202c plays the role of supporting transmission wheel 202a, is L-type structure, one end is arranged in transmission wheel On 202a, the other end is fixed on the top of bearing assembly 101.
It is the third embodiment of the utility model referring to Fig. 9, which is different from one embodiment: cold But unit 200 further includes Power Component 205.Specifically, main structure includes preparation unit 100 and cooling unit referring to Fig. 1 200, the two cooperates, it can be achieved that effectively improve the working efficiency of Tu Xiji, further, preparation unit 100, including carrying Component 101 applies tin component 102 and the first transmission component 103, and bearing assembly 101 plays carrying in the present invention and applies tin group The effect of part 102, the first transmission component 103 and cooling unit 200 is made, first of stainless steel, plastic and glass establishment Transmission component 103 plays the role of transmission, is driven wheel, and applies tin component 102, is played in the present invention to flat copper band Tin plating effect is carried out, and transmission component 103 is arranged in bearing assembly 101, wherein applying tin component 102 includes preheating Slot and tin melting furnace, the course of work: flat copper band is pre- by 80 degree to 100 degree of high temperature after the scaling powder processing of pre- heat channel Heat enables scaling powder sufficiently to activate and plays a role, and carries out using tin melting furnace tin plating;And cooling unit 200, it plays to after tin plating Semi-finished product convergent belt carry out the effect of cooling processing, divide into the first ducting assembly 201, guide wheel radiating subassembly 202, second Ducting assembly 203 and air-cooled component 204, the first ducting assembly 201, guide wheel radiating subassembly 202, the second ducting assembly 203 and wind Successively ordered pair semi-finished product convergent belt is cooled down cold component 204, and rapid cooling can be realized, and is applied so as to effectively improve to improve The production efficiency of tin machine.
Wherein, air-cooled component 204 is the final step process of cooling convergent belt, and air-cooled component 204 is located at the second wind The lower section of road component 203, and it is fixed on bearing assembly 101, further, and air-cooled component 204 include fan 204a and Second driving member 204b, the second driving member 204b is driven wheel, and for sending out finished product header box, and fan 204a is used for There is provided room temperature cold wind, and driven wheel number is all larger than equal to three, number only refers in figure, convergent belt be successively wound around from On driving wheel, fan 204a is set to the top of the second driving member 204b, cools down to the convergent belt of conveying.
Further, the first ducting assembly 201 and the second ducting assembly 203 are bolted on bearing assembly 101 1 Side, and the first ducting assembly 201 is arranged in parallel with the second ducting assembly 203, and guide wheel radiating subassembly 202 is set to bearing assembly 101 tops, and guide wheel radiating subassembly 202 is connect with the first ducting assembly 201 by air guide member 201a, working principle: air-cooled Guide wheel radiating subassembly 202 is transferred to by air guide member 201a to cool down, then is cooled down by guide wheel radiating subassembly 202 to convergent belt Purpose, preferably, air guide member 201a are made of PVC material, and PVC is the abbreviation of polyvinyl chloride, soft or hard property strong with plasticity Can be appropriate, and cost is few, meets and uses needs.And cooling unit 200 further includes Power Component 205, Power Component 205 is for mentioning Supply cold wind is set to 101 other side of bearing assembly, further, Power Component 205, including the first air feed part 205a and Two air feed part 205b, and the second air feed part 205b and the first air feed part 205a pass through F type ventilation duct and the first ducting assembly respectively 201 are connected with the air inlet 201c of the second ducting assembly 203, i.e. the second air feed part 205b air-supply to the first ducting assembly 201, And the first air feed part 205a blows to the second ducting assembly 203, the first air feed part 205a is air blower, cold for providing room temperature Wind.
Wherein, the second air feed part 205b includes blower 205b-1 and cooling tube 205b-2, blower 205b-1 and cooling tube 205b-2 is connected, and the water inlet of cooling tube 205b-2 is connect with external water inlet pipe and outlet pipe respectively with water outlet, uses In conveying cold water, can cool down to the blower 205b-1 room temperature cold wind blown out, so that the cold wind of cooling is transported to the first wind In road component 201, cold wind is sent away by tuyere 201d, and then to the mesh that the height temperate zone of fresh baked is rapidly cooled , preferably, cooling tube 205b-2 is sleeve type structure, is satisfied the use demand.
It is important that, it should be noted that the construction and arrangement of the application shown in multiple and different exemplary implementation schemes is only It is illustrative.Although several embodiments are only described in detail in this disclosure, refering to the personnel of the displosure content It should be easily understood that many changes under the premise of substantially without departing from the novel teachings and advantage of theme described in this application Type is possible (for example, size, scale, structure, shape and the ratio of various member components and parameter value are (for example, temperature, pressure Power etc.), mounting arrangements, the use of material, color, the variation of orientation etc.).It can be with for example, being shown as integrally formed first component It being made of multiple portions or first component, the position of first component can be squeezed or change in other ways, and discrete first component Property or number or position can be altered or changed.Therefore, all such remodeling are intended to be comprised in the model of the utility model In enclosing.It can be according to the change of the embodiment of substitution or the order or sequence of resequence any process or method and step.It is weighing During benefit requires, the clause of any " device adds function ", which is intended to, is covered on the structure described herein for executing the function, And it is not only structure and is equal but also is equivalent structure.It, can be in example under the premise of without departing substantially from the scope of the utility model Property the design of embodiment, operation conditions and arrangement in make other replacements, remodeling, change and omit.Therefore, the utility model It is not limited to specific embodiment, but extends to a variety of remodeling still fallen within the scope of the appended claims.
In addition, all spies of actual implementation scheme can not be described in order to provide the terse description of exemplary implementation scheme Sign (that is, those incoherent features of optimal mode with the execution the utility model currently considered, or in realization the utility model Those incoherent features).
It should be understood that in the development process of any actual implementation mode, it, can such as in any engineering or design object A large amount of specific embodiment is made to determine.Such development effort may be complicated and time-consuming, but for those benefits For the those of ordinary skill of the displosure content, do not need excessively to test, the development effort will be one design, manufacture and The routine work of production.
It should be noted that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although reference The utility model is described in detail in preferred embodiment, those skilled in the art should understand that, it can be to this reality It is modified or replaced equivalently with novel technical solution, without departing from the spirit and scope of the technical scheme of the present invention, It should all cover in the scope of the claims of the utility model.

Claims (9)

1. a kind of convergent belt high speed Tu Xiji, it is characterised in that: including,
Preparation unit (100), including bearing assembly (101), painting tin component (102) and the first transmission component (103), the painting tin Component (102) and transmission component (103) are arranged in bearing assembly (101);And
Cooling unit (200) divides into the first ducting assembly (201), guide wheel radiating subassembly (202) and the second ducting assembly (203), first ducting assembly (201) and the second ducting assembly (203) are all set in the bearing assembly (101) side, And first ducting assembly (201) is arranged in parallel with second ducting assembly (203), the guide wheel radiating subassembly (202) It is set to above the bearing assembly (101), and guide wheel radiating subassembly (202) and the first ducting assembly (201) pass through air guide member (201a) connection.
2. convergent belt high speed Tu Xiji as described in claim 1, it is characterised in that: first ducting assembly (201) and Two ducting assemblies (203) include concave ventilation case (201b), air inlet (201c) and tuyere (201d), the air inlet (201c) is set on the concave ventilation case (201b), and the tuyere (201d) is equidistant to be symmetricly set on the concave wind-guiding The inside of shell (201b).
3. convergent belt high speed Tu Xiji as claimed in claim 2, it is characterised in that: the tuyere (201d) is led with the concave The medial surface of the crust of weathering (201b) is at 45 °.
4. convergent belt high speed Tu Xiji as claimed in claim 1 or 3, it is characterised in that: guide wheel radiating subassembly (202) packet Transmission wheel (202a), heat transmission fin (202b) and support frame (202c) are included, the heat transmission fin (202b) is set to the transmission The clamping plate periphery of (202a) is taken turns, support frame as described above (202c) is set to one end of the transmission wheel (202a).
5. convergent belt high speed Tu Xiji as claimed in claim 4, it is characterised in that: the cooling unit (200), further includes wind Cold component (204), the air-cooled component (204) are set to the lower section of second ducting assembly (203),
Wherein, the air-cooled component (204) includes fan (204a) and the second driving member (204b), fan (204a) setting In the top of second driving member (204b).
6. claims 1 to 3 and 5 it is any as described in convergent belt high speed Tu Xiji, it is characterised in that: the cooling unit It (200) further include Power Component (205), the Power Component (205) is set to the bearing assembly (101) other side.
7. convergent belt high speed Tu Xiji as claimed in claim 6, it is characterised in that: the Power Component (205), including first Air feed part (205a) and the second air feed part (205b), the first air feed part (205a) and the second air feed part (205b) are respectively with The connection of the air inlet (201c) of two ducting assemblies (203) and the first ducting assembly (201).
8. convergent belt high speed Tu Xiji as claimed in claim 7, it is characterised in that: the second air feed part (205b) includes wind Machine (205b-1) and cooling tube (205b-2), the blower (205b-1) are connected with cooling tube (205b-2).
9. convergent belt high speed Tu Xiji as claimed in claim 8, it is characterised in that: the air guide member (201a) is by PVC material It is made.
CN201920010861.6U 2019-01-04 2019-01-04 A kind of convergent belt high speed Tu Xiji Expired - Fee Related CN209481770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920010861.6U CN209481770U (en) 2019-01-04 2019-01-04 A kind of convergent belt high speed Tu Xiji

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920010861.6U CN209481770U (en) 2019-01-04 2019-01-04 A kind of convergent belt high speed Tu Xiji

Publications (1)

Publication Number Publication Date
CN209481770U true CN209481770U (en) 2019-10-11

Family

ID=68130075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920010861.6U Expired - Fee Related CN209481770U (en) 2019-01-04 2019-01-04 A kind of convergent belt high speed Tu Xiji

Country Status (1)

Country Link
CN (1) CN209481770U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115287572A (en) * 2022-10-08 2022-11-04 苏州科思拓机械科技有限公司 Solder strip tin-coating processing equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115287572A (en) * 2022-10-08 2022-11-04 苏州科思拓机械科技有限公司 Solder strip tin-coating processing equipment

Similar Documents

Publication Publication Date Title
CN103717036B (en) Radio remote unit (RRU) and communication device
CN202712232U (en) Novel solar battery board with heat radiation
CN209481770U (en) A kind of convergent belt high speed Tu Xiji
CN211903827U (en) Copper pipe cooling water route convenient to even thermal energy
CN208336947U (en) A kind of efficient radiating apparatus of electrical engineering
CN207369502U (en) A kind of industrial recirculated water cooling electrical cabinet
CN211782202U (en) Efficient Stirling cold guide structure
CN205356793U (en) High heat dissipation circuit board
CN208949320U (en) A kind of high reliability cooling device
CN207993851U (en) Microelectronics heat exchanger based on earthworm microcosmic surface
CN210602822U (en) Cooling structure and sintering furnace
CN207698842U (en) A kind of circuit board conveyor convenient for heat dissipation
CN208955517U (en) A kind of dedusting radiator structure of electrical cabinet
CN207840366U (en) A kind of novel welding device
CN207600030U (en) A kind of air-cooled water cooling integral engine Machining of Connecting Rod cooling equipment
CN202396131U (en) Inserting fin type radiator
CN202127583U (en) System for promoting power density in machine room
CN201601178U (en) Battery group and battery module
CN221472036U (en) Air-cooled cooling control system of ball mill
CN215162922U (en) Integrated Y-shaped online cooling air supply bellows
CN210951953U (en) Cooling body after antistatic coiled material pressfitting of PVC
CN110026695A (en) A kind of copper foil laser opening system and hole opening technology
CN217948231U (en) Photovoltaic solder strip tin coating machine
CN213125519U (en) Bus duct with high-efficient heat radiation structure
CN207347398U (en) A kind of air-blast device suitable for glass mirror production line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191011

Termination date: 20210104