CN209481283U - A kind of integration MBR sewage-treatment plant - Google Patents

A kind of integration MBR sewage-treatment plant Download PDF

Info

Publication number
CN209481283U
CN209481283U CN201920055095.5U CN201920055095U CN209481283U CN 209481283 U CN209481283 U CN 209481283U CN 201920055095 U CN201920055095 U CN 201920055095U CN 209481283 U CN209481283 U CN 209481283U
Authority
CN
China
Prior art keywords
fixedly installed
mbr film
mbr
treatment box
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920055095.5U
Other languages
Chinese (zh)
Inventor
张伟
张全东
黄飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Green Bank Construction Engineering Co Ltd
Original Assignee
Anhui Green Bank Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Green Bank Construction Engineering Co Ltd filed Critical Anhui Green Bank Construction Engineering Co Ltd
Priority to CN201920055095.5U priority Critical patent/CN209481283U/en
Application granted granted Critical
Publication of CN209481283U publication Critical patent/CN209481283U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Apparatus For Disinfection Or Sterilisation (AREA)

Abstract

The utility model discloses a kind of integration MBR sewage-treatment plants, more particularly to field of sewage treatment, including main body cover, there are two the first water pumps for the inside two sides fixed installation of the main body cover, being internally located between two the first water pumps for the main body cover is fixedly installed with treatment box, if the inside of the treatment box is fixedly installed with dry plate MBR film, if MBR film described in dry plate is in arranged in parallel, the MBR film is internally provided with connecting tube, the bottom of the treatment box is provided with kerve, the top of the treatment box is fixedly installed with cleaning pipe, the top of the main body cover is fixedly installed with the second water pump, the side of the treatment box is fixedly installed with cylinder.The utility model passes through setting MBR film, connecting tube, motion bar and limited block, when needing to clean MBR film, MBR film can be pulled by cylinder, if dry plate MBR film is unfolded along connecting tube, make that there is biggish space between every two panels MBR film, is convenient for cleaning.

Description

A kind of integration MBR sewage-treatment plant
Technical field
The utility model relates to field of sewage treatment, more specifically, originally practical to be related to a kind of integration MBR sewage Processing unit.
Background technique
MBR sewage treatment is a kind of usual way of Modern sewage processing, and using membrane Bio-reactor Technology is biology A kind of new technology that processing technique is combined with membrane separation technique, instead of the secondary settling tank in traditional handicraft, it can be efficiently It is separated by solid-liquid separation, water in the stabilization directly used.
The patent of patent application publication CN206872512U discloses MBR sewage-treatment plant, due to floating stuffing area The oxygen not utilized using the area Shi MBR, in the limited situation of air demand, anoxic shape can be presented in floating stuffing area partial region State, while biomembrane transmits the influence be obstructed due to oxygen, can also show anaerobic condition inside biomembrane, reactor entire in this way Inside both having there is aerobic region, there is also anoxic zones, and the function of synchronous nitration and denitrification may be implemented, and reach preferable denitrogenation effect.
But it is in actual use, if being filtered as formed a whole inside equipment by dry plate MBR film, but clear It is difficult to be rinsed every MBR film when washing, to reduce cleaning effect.
Utility model content
In order to overcome the drawbacks described above of the prior art, the embodiments of the present invention are provided at a kind of integration MBR sewage Device is managed, gas can be passed through when needing to clean MBR film by setting MBR film, connecting tube, motion bar and limited block Cylinder pulls MBR film, if dry plate MBR film is unfolded along connecting tube, makes have biggish space between every two panels MBR film, is convenient for It is cleaned.
To achieve the above object, the utility model provides the following technical solutions: a kind of integration MBR sewage-treatment plant, Including main body cover, there are two the first water pump, the inside of the main body cover for the inside two sides fixed installation of the main body cover It is fixedly installed with treatment box between two the first water pumps, if the inside of the treatment box is fixedly installed with dry plate MBR film, if MBR film described in dry plate is in arranged in parallel, and the MBR film is internally provided with connecting tube, and the bottom of the treatment box is provided with bottom Slot, the top of the treatment box are fixedly installed with cleaning pipe, and the top of the main body cover is fixedly installed with the second water pump, described The side for the treatment of box is fixedly installed with cylinder, and the side of the main body cover is fixedly installed with disinfect box, the disinfect box it is upper End is fixedly installed with motor, and the bottom end of the motor is fixedly installed with grinding, the lower end for being internally located at grinding of the disinfect box It is fixedly installed with bottom plate, the side corner location of the MBR film is opened up there are four side opening, and four side openings are in rectangular arranged, The upper end of the MBR film is fixedly installed with restocking, and the inner wall two sides of the restocking offer several through-holes.
In a preferred embodiment, the inner wall of the connecting tube is fixedly installed with limited block, the connecting tube It is internally provided with motion bar, one end of the motion bar is fixedly connected with limit plate.
In a preferred embodiment, the outer surface of the bottom plate is provided with several filter openings, the bottom plate and mill The outer surface of piece is provided with metal ball.
In a preferred embodiment, one end of the cylinder is fixedly connected with the side of MBR film, the MBR film It is flexibly connected with treatment box.
In a preferred embodiment, one end of the cleaning pipe is fixedly connected with the second water pump, second water Pump is connected with treatment box by cleaning pipe.
In a preferred embodiment, the both ends of first water pump are fixedly connected to water pipe, first water Pump is connected with treatment box by water pipe.
The technical effect and advantage of the utility model:
1, by being equipped with MBR film, connecting tube, motion bar and limited block, when needing to clean MBR film, Ren Menke First to start cylinder, MBR film is pulled to side by cylinder, so that connecting tube is pulled out out of MBR film side opening, it will be several The expansion of piece MBR film makes have biggish space between every two panels MBR film, is convenient for cleaning, when MBR film is deployed by cylinder When the limit, the limited block in the limit plate meeting connected tube of motion bar one end is blocked, and then can star the second water pump, by clear water It is passed through by cleaning pipe in the restocking of MBR film, then is flowed into from the through-hole in restocking, sprayed, be sprayed at by the through-hole of restocking bottom end The outer surface of MBR film, because restocking inner wall two sides are provided with through-hole, clear water can be sprayed at the tow sides of MBR film simultaneously, The cleaning efficiency to MBR film is increased, the sewage after cleaning can flow into the kerve for the treatment of box, after cleaning, Ren Menke With by cylinder, by MBR film pushed home, connecting tube can be also incorporated into side opening;
2, by being equipped with disinfect box, bottom plate, grinding and filter opening, when needing to carry out disinfection to the water resource in disinfect box, People can first pour into bleaching powder on the bottom plate of disinfect box, then start motor, and the bottom end of motor is fixedly connected with grinding, Motor will drive grinding and be rotated, and bleaching powder on bottom plate is bulldozed, and fall into the water respectively from the filter opening on bottom plate, to make to float White powder is uniformly sprinkled into water, and grinding is provided with several metal balls, the drift of some larger particles with the outer surface on bottom plate White powder can be ground by being ground the rotation process on bottom plate, particle be worn into powdery, then fall into the water and reacted, be increased The reaction rate of bleaching powder is added;
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model entirety.
Fig. 2 is the structural schematic diagram of the utility model MBR film.
Fig. 3 is the cross-sectional view at the utility model A.
Fig. 4 is the structural schematic diagram of the utility model bottom plate.
Appended drawing reference are as follows: 1 main body cover, 2 first water pumps, 3 treatment boxes, 4 MBR films, 5 connecting tubes, 6 kerves, 7 cleaning pipes, 8 second water pumps, 9 cylinders, 10 disinfect boxes, 11 motors, 12 grindings, 13 bottom plates, 14 side openings, 15 restockings, 16 through-holes, 17 limited blocks, 18 motion bars, 19 filter openings.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of integration MBR sewage-treatment plant as shown in Figs 1-4, including main body cover 1, The inside two sides of the main body cover 1 are fixedly mounted there are two the first water pump 2, and the main body cover 1 is internally located at two the It is fixedly installed with treatment box 3 between one water pump 2, if the inside of the treatment box 3 is fixedly installed with dry plate MBR film 4, if dry plate institute MBR film 4 is stated in arranged in parallel, the MBR film 4 is internally provided with connecting tube 5, and the bottom of the treatment box 3 is provided with kerve 6, the top of the treatment box 3 is fixedly installed with cleaning pipe 7, and the top of the main body cover 1 is fixedly installed with the second water pump 8, The side of the treatment box 3 is fixedly installed with cylinder 9, and the side of the main body cover 1 is fixedly installed with disinfect box 10, described to disappear The upper end of malicious case 10 is fixedly installed with motor 11, and the bottom end of the motor 11 is fixedly installed with grinding 12, the disinfect box 10 The lower end for being internally located at grinding 12 is fixedly installed with bottom plate 13, and the side corner location of the MBR film 4 opens up that there are four side openings 14, four side openings 14 are in rectangular arranged, and the upper end of the MBR film 4 is fixedly installed with restocking 15, the inner wall of the restocking 15 Two sides offer several through-holes 16.
Further, the inner wall of the connecting tube 5 is fixedly installed with limited block 17, and the connecting tube 5 is internally provided with One end of motion bar 18, the motion bar 18 is fixedly connected with limit plate, when MBR film 4 is deployed into the limit by cylinder 9, activity Limited block 17 in the limit plate meeting connected tube 5 of 18 one end of bar blocks;
Further, the outer surface of the bottom plate 13 is provided with several filter openings 19, and the bottom plate 13 is outer with grinding 12 Surface is provided with metal ball, and grinding 12 can grind the bleaching powder of some larger particles in rotation process on base 13 Mill;
Further, one end of the cylinder 9 is fixedly connected with the side of MBR film 4, and the MBR film 4 and treatment box 3 are living Dynamic connection, starts cylinder 9, is pulled MBR film 4 to side by cylinder 9, thus by connecting tube 5 out of, MBR film 4 side opening 14 It pulls out, if dry plate MBR film 4 is unfolded;
Further, one end of the cleaning pipe 7 is fixedly connected with the second water pump 8, second water pump 8 and treatment box 3 It is connected by cleaning pipe 7, starts the second water pump 8, clear water is passed through in the restocking 15 of MBR film 4 by cleaning pipe 7;
Further, the both ends of first water pump 2 are fixedly connected to water pipe, and first water pump 2 and treatment box 3 are logical It crosses water pipe to be connected, is imported sewage in treatment box 3 by the first water pump 2.
Utility model works principle:
Referring to Figure of description 1-3, when needing to clean MBR film 4, people can first start cylinder 9, pass through gas Cylinder 9 pulls MBR film 4 to side, so that connecting tube 5 is pulled out out of MBR film 4 side opening 14, if dry plate MBR film 4 is unfolded, Make that there is biggish space between every two panels MBR film 4, is convenient for cleaning, it is living when MBR film 4 is deployed into the limit by cylinder 9 Limited block 17 in the limit plate meeting connected tube 5 of 18 one end of lever blocks, and then can star the second water pump 8, clear water is led to Over cleaning pipe 7 is passed through in the restocking 15 of MBR film 4, then is flowed into from the through-hole 16 in restocking 15, is sprayed by the through-hole 16 of 15 bottom end of restocking Out, it is sprayed at the outer surface of MBR film 4, because 15 inner wall two sides of restocking are provided with through-hole 16, clear water can be sprayed at simultaneously The tow sides of MBR film 4 increase the cleaning efficiency to MBR film 4, and the sewage after cleaning can flow into the kerve 6 for the treatment of box 3, After cleaning, people can be by cylinder 9 by 4 pushed home of MBR film, and connecting tube 5 can be also incorporated into side opening 14;
Referring to Figure of description 4, when needing to carry out disinfection to the water resource in disinfect box 10, people can be first by bleaching Powder pours on the bottom plate 13 of disinfect box 10, then starts motor 11, and the bottom end of motor 11 is fixedly connected with grinding 12, motor 11 It will drive grinding 12 to be rotated, bleaching powder on bottom plate 13 be bulldozed, is fallen into the water respectively from the filter opening 19 on bottom plate 13, thus It is sprinkled into bleaching powder uniformly in water, grinding 12 is provided with several metal balls with the outer surface on bottom plate 13, and grinding 12 exists The bleaching powder of some larger particles can be ground in rotation process on bottom plate 13, particle be worn into powdery, then fall into the water It is reacted, increases the reaction rate of bleaching powder.
The several points that should finally illustrate are: firstly, in the description of the present application, it should be noted that unless otherwise prescribed and It limits, term " installation ", " connected ", " connection " shall be understood in a broad sense, can be mechanical connection or electrical connection, be also possible to two Connection inside element, can be directly connected, and "upper", "lower", "left", "right" etc. are only used for indicating relative positional relationship, when The absolute position for being described object changes, then relative positional relationship may change;
Secondly: the utility model discloses in embodiment attached drawing, relates only to the structure being related to the embodiment of the present disclosure, His structure, which can refer to, to be commonly designed, and under not conflict situations, the utility model the same embodiment and different embodiments can be mutual Combination;
Last: the above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, all Within the spirit and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in practical Within novel protection scope.

Claims (6)

1. a kind of integration MBR sewage-treatment plant, including main body cover (1), it is characterised in that: the main body cover (1) Internal two sides are fixedly mounted there are two the first water pump (2), the main body cover (1) be internally located at two the first water pumps (2) it Between be fixedly installed with treatment box (3), the treatment box (3) if inside be fixedly installed with dry plate MBR film (4), if described in dry plate In arranged in parallel, the MBR film (4) is internally provided with connecting tube (5) MBR film (4), the bottom setting of the treatment box (3) Have kerve (6), the top of the treatment box (3) is fixedly installed with cleaning pipe (7), the fixed peace in the top of the main body cover (1) Equipped with the second water pump (8), the side of the treatment box (3) is fixedly installed with cylinder (9), and the side of the main body cover (1) is solid Dingan County is equipped with disinfect box (10), and the upper end of the disinfect box (10) is fixedly installed with motor (11), the bottom end of the motor (11) It being fixedly installed with grinding (12), the lower end for being internally located at grinding (12) of the disinfect box (10) is fixedly installed with bottom plate (13), The side corner location of the MBR film (4) is opened up there are four side opening (14), and four side openings (14) are described in rectangular arranged The upper end of MBR film (4) is fixedly installed with restocking (15), and the inner wall two sides of the restocking (15) offer several through-holes (16).
2. a kind of integration MBR sewage-treatment plant according to claim 1, it is characterised in that: the connecting tube (5) Inner wall is fixedly installed with limited block (17), and the connecting tube (5) is internally provided with motion bar (18), the motion bar (18) One end is fixedly connected with limit plate.
3. a kind of integration MBR sewage-treatment plant according to claim 1, it is characterised in that: the bottom plate (13) Outer surface is provided with several filter openings (19), and the bottom plate (13) and the outer surface for being ground (12) are provided with metal ball.
4. a kind of integration MBR sewage-treatment plant according to claim 1, it is characterised in that: the one of the cylinder (9) End is fixedly connected with the side of MBR film (4), and the MBR film (4) is flexibly connected with treatment box (3).
5. a kind of integration MBR sewage-treatment plant according to claim 1, it is characterised in that: the cleaning pipe (7) One end is fixedly connected with the second water pump (8), and second water pump (8) is connected with treatment box (3) by cleaning pipe (7).
6. a kind of integration MBR sewage-treatment plant according to claim 1, it is characterised in that: first water pump (2) Both ends be fixedly connected to water pipe, first water pump (2) is connected with treatment box (3) by water pipe.
CN201920055095.5U 2019-01-14 2019-01-14 A kind of integration MBR sewage-treatment plant Expired - Fee Related CN209481283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920055095.5U CN209481283U (en) 2019-01-14 2019-01-14 A kind of integration MBR sewage-treatment plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920055095.5U CN209481283U (en) 2019-01-14 2019-01-14 A kind of integration MBR sewage-treatment plant

Publications (1)

Publication Number Publication Date
CN209481283U true CN209481283U (en) 2019-10-11

Family

ID=68130870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920055095.5U Expired - Fee Related CN209481283U (en) 2019-01-14 2019-01-14 A kind of integration MBR sewage-treatment plant

Country Status (1)

Country Link
CN (1) CN209481283U (en)

Similar Documents

Publication Publication Date Title
CN208008576U (en) A kind of supply equipment purifier
CN104803512A (en) Ozone catalytic oxidation and self-cleaning ceramic membrane combined water treatment method and device
CN209815846U (en) Sewage filtering device
CN209481283U (en) A kind of integration MBR sewage-treatment plant
CN203154885U (en) V-shaped sedimentation tank
CN205473244U (en) A integration equipment for sewage treatment
CN206735985U (en) It is a kind of can fast filtering sewage sewage-treatment plant
CN203593679U (en) Magnetized degreaser
CN206549279U (en) A kind of circular type for environment protection type mechanical grate foul remover
CN105036497B (en) A kind of have a point sewage disposal device for water plate
CN207418518U (en) A kind of environment-friendly sewage handles vehicle
CN210631871U (en) Factory building structure that environmental protection was removed dust
CN208378609U (en) A kind of container-type water treatment equipment
CN106865822A (en) Integrated purification of mine drainage system
CN207713555U (en) Portable Industrial sewage treatment system
CN207371213U (en) A kind of deflector type sedimentation basin of sewage disposal
CN206521373U (en) A kind of small-sized immersion band shell earthenware slab film filter
CN213977234U (en) Coal mine waste water treatment retrieval and utilization facility
CN211328325U (en) Sewage solid impurity treatment device
CN204848509U (en) Mud water processing system
CN205917093U (en) Sewage treatment system
CN104785061A (en) Treatment tower, equipment and system for purifying dust exhaust gas
CN205007695U (en) Circulation stirring formula waste water purification device
CN205099557U (en) Multi -functional IBR synthesizes reactor
CN219860759U (en) Storage device for wastewater treatment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191011

CF01 Termination of patent right due to non-payment of annual fee