CN209481043U - A fixture for hoisting H-shaped steel beams - Google Patents
A fixture for hoisting H-shaped steel beams Download PDFInfo
- Publication number
- CN209481043U CN209481043U CN201822144583.1U CN201822144583U CN209481043U CN 209481043 U CN209481043 U CN 209481043U CN 201822144583 U CN201822144583 U CN 201822144583U CN 209481043 U CN209481043 U CN 209481043U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- shaped steel
- steel
- hook
- fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型属于建筑施工装备技术领域,尤其涉及一种吊运H型钢钢梁用卡具。The utility model belongs to the technical field of building construction equipment, in particular to a fixture for hoisting H-shaped steel girders.
背景技术Background technique
针对钢结构工程安装中,存在一些H型钢梁构件制作及安装,即大量H型钢钢梁构件的倒运及安装,卡具使用较频繁和数量多。实际中,配备的标准卡具往往因价格贵,以致数量有限,并且操作要求高而影响工作效率。For the installation of steel structure engineering, there are some H-shaped steel girder components produced and installed, that is, the unloading and installation of a large number of H-shaped steel girder components, the fixtures are used frequently and in large quantities. In practice, the equipped standard jigs are often expensive, so that the quantity is limited, and the operation requirements are high, which affects work efficiency.
目前市面上流通的卡具有很多的种类,大体上可以分为三大类:链式吊具、钳式吊具以及起重吸盘,在建筑生产施工领域应用较为广泛的是链式吊具,根据吊运的物体需要可以针对性的选择相应的钩头,但目前现有的钩头中针对H型钢钢梁的吊运的专属吊具比较缺乏,现场施工时,往往使用吊装带进行吊运,比较费时费力。There are many types of cards currently on the market, which can be roughly divided into three categories: chain spreaders, clamp spreaders and lifting suction cups. Chain spreaders are widely used in the field of construction production and construction. According to The object to be lifted needs to be able to select the corresponding hook head in a targeted manner. However, there is a lack of special spreaders for the lifting of H-shaped steel beams in the existing hook heads. During on-site construction, lifting belts are often used for lifting. It is time-consuming and labor-intensive.
中国专利,公布号:CN208071099U,公布日:2018.11.19,公开了一种专用H型钢卡具,由上部吊装环、矩形开口卡板、上部加固条组成,其特点是采用半圆弧形矩形开口卡板,由 25mm厚钢板制成,矩形开口处采用20mm厚钢板条加固,上部吊装环采用25mm厚钢板制成,矩形开口卡板与上部吊装环成90度垂直焊接连接在一起,两只卡具对称卡在H型钢上翼缘板,钢丝绳穿过上部吊环,把两组卡具连接到一起,进行吊装作业。该卡具需要垂直焊接连接,机动性较差,吊装效率较低。Chinese patent, publication number: CN208071099U, publication date: 2018.11.19, discloses a special H-shaped steel fixture, which consists of an upper hoisting ring, a rectangular opening clamping plate, and an upper reinforcement strip, and is characterized in that it adopts a semicircular arc rectangular opening clamp The plate is made of 25mm thick steel plate, and the rectangular opening is reinforced with 20mm thick steel strips. The upper hoisting ring is made of 25mm thick steel plate. It is symmetrically clamped on the upper flange of the H-shaped steel, and the wire rope passes through the upper ring to connect the two sets of clamps together for hoisting. The jig requires vertical welding connection, poor maneuverability and low hoisting efficiency.
实用新型内容Utility model content
1.实用新型要解决的技术问题1. The technical problems to be solved by the utility model
针对现有技术中存在的H型钢钢梁吊装费时费力、机动性差的问题,本实用新型提供了一种吊运H型钢钢梁用卡具。它通过矩形开口钩状的卡槽对H型钢钢梁直接进行卡扣后吊装,有极强的机动灵活性,吊装效率高,省时省力。Aiming at the problems of time-consuming and laborious hoisting of H-shaped steel girders and poor maneuverability in the prior art, the utility model provides a fixture for hoisting H-shaped steel girders. It directly buckles the H-shaped steel girder through the hook-shaped slot of the rectangular opening and then lifts it. It has strong maneuverability, high lifting efficiency, and saves time and effort.
2.技术方案2. Technical solution
为达到上述目的,本实用新型提供的技术方案为:In order to achieve the above object, the technical solution provided by the utility model is:
一种吊运H型钢钢梁用卡具,应用于H型钢钢梁的吊运,包括钢丝绳和在H型钢钢梁上对称分布的吊装卡具;所述吊装卡具呈矩形开口钩状,包括吊装孔和连接呈一体的卡槽与钩持端;所述卡槽契合H型钢钢梁两侧的钢梁翼缘板远端的形状和厚度,卡接于钢梁翼缘板远端,并通过吊装孔和钢丝绳的钢丝绳分股连接,所述钩持端配合卡槽扣紧在钢梁翼缘板远端底部。通过对称分布的矩形开口钩状的吊装卡具将H型钢钢梁卡扣后,再通过钢丝绳吊装,操作机动灵活,吊装效率高,省时省力。A jig for hoisting H-shaped steel girders, which is applied to the lifting of H-shaped steel girders, including steel wire ropes and lifting jigs symmetrically distributed on the H-shaped steel girders; the lifting jigs are in the shape of rectangular opening hooks, including The hoisting hole and the connection are integrated into the card slot and the hook end; the card slot fits the shape and thickness of the far end of the steel beam flange plate on both sides of the H-shaped steel beam, and is clamped to the far end of the steel beam flange plate, and passes through the hoisting hole and The steel wire ropes of the steel wire rope are connected in strands, and the hooking end is fastened to the bottom of the far end of the flange plate of the steel girder in cooperation with the card slot. The H-shaped steel girder is buckled by the symmetrically distributed rectangular opening hook-shaped hoisting fixture, and then hoisted by the wire rope. The operation is flexible, the hoisting efficiency is high, and time and effort are saved.
优选地,钩持端的上表面设置有均匀分布的钩口槽纹,以提高吊装卡具对H型钢钢梁的钩持附着力。Preferably, evenly distributed hook grooves are provided on the upper surface of the hooking end to improve the hooking adhesion of the hoisting fixture to the H-shaped steel beam.
优选地,吊装卡具为偶数对,可对称式卡扣,根据H型钢钢梁的规格进行适应性的数量应用;选用Q345C的钢材,取材容易,制作方便,还可以废物再利用,应用于H500以上的大规格H型钢钢梁吊装,只需要进行相应的数量应用即可。Preferably, the hoisting clamps are even-numbered pairs, which can be buckled symmetrically, and are applied in an adaptive quantity according to the specifications of the H-shaped steel beams; Q345C steel is selected, which is easy to obtain materials, convenient to manufacture, and can also be reused by waste. It is applied to H500 The hoisting of the above large-scale H-shaped steel beams only needs to be applied in corresponding quantities.
一种吊运H型钢钢梁用卡具的吊运方法,步骤为:A hoisting method for hoisting fixtures used for hoisting H-shaped steel girders, the steps are:
步骤一、将H型钢钢梁呈“工”字形扶正,方便吊装卡具的对称式卡扣;Step 1, straighten the H-shaped steel beam in the shape of "I" to facilitate the symmetrical buckle of the hoisting fixture;
步骤二、将吊装卡具与H型钢钢梁两侧的钢梁翼缘板远端对称式卡接,避免因偏重而失衡;Step 2. Connect the hoisting clamps symmetrically to the far ends of the steel beam flange plates on both sides of the H-shaped steel beam to avoid imbalance due to overweight;
步骤三、将钢丝绳的两股钢丝绳分股分别连接于吊装孔,套牢后方便起吊;Step 3. Connect the two strands of the steel wire rope to the hoisting holes respectively, so that it is easy to lift after being locked up;
步骤四、通过吊车的吊钩吊起钢丝绳吊运,整个过程操作方便,机动灵活,效率高。Step 4: Lift the steel wire rope through the hook of the crane for hoisting. The whole process is easy to operate, flexible and efficient.
一种吊运H型钢钢梁用双钩卡具,应用于H型钢钢梁的吊运,包括钢丝绳和挂持在H型钢钢梁两端的吊装卡具;所述吊装卡具呈双V形钩,底部为2个钩持端,双V形钩之间通过吊装连接部连接呈一个整体,所述钢丝绳的钢丝绳分股连接于吊装连接部,针对长度相对短,宽度相对较大的H型钢钢梁,方便从两头进行钩持,结合H型钢钢梁有对称式钢梁翼缘板的结构特点,将双V形钩钩牢在双钢梁翼缘板的底部,操作方便。A double-hook jig for hoisting H-shaped steel girders, which is applied to the lifting of H-shaped steel girders, includes steel wire ropes and hoisting jigs hung on both ends of the H-shaped steel girder; the lifting jigs are double V-shaped hooks, The bottom is two hook holding ends, and the double V-shaped hooks are connected as a whole through the hoisting connection part. The steel wire ropes of the steel wire rope are connected to the hoisting connection part in strands, for H-shaped steel beams with relatively short length and relatively large width , It is convenient to hook from both ends, combined with the structural characteristics of the symmetrical steel beam flange plate of the H-shaped steel beam, the double V-shaped hook is fastened to the bottom of the double steel beam flange plate, and the operation is convenient.
优选地,2个钩持端间距为略大于H型钢钢梁的腹板的厚度,比如可大于5mm~10mm,方便钩牢,避免钩持端钩挂时离位。Preferably, the distance between the two hooking ends is slightly greater than the thickness of the web of the H-shaped steel girder, for example, greater than 5 mm to 10 mm, which is convenient for hooking and avoiding the hooking ends from being out of position when hooked.
优选地,2个钩持端间距略大于H型钢钢梁的宽度与腹板的厚度之和,结合H型钢钢梁的特殊结构,可以组合式钩挂吊运,进一步提高吊运效率。Preferably, the distance between the two hooking ends is slightly greater than the sum of the width of the H-shaped steel beam and the thickness of the web plate. Combined with the special structure of the H-shaped steel beam, it can be hoisted by combined hooks to further improve the hoisting efficiency.
优选地,钩持端上表面设置有均匀分布的钩口槽纹,以提高吊装卡具对H型钢钢梁的钩持附着力。Preferably, evenly distributed hook grooves are provided on the upper surface of the hooking end to improve the hooking adhesion of the hoisting fixture to the H-shaped steel beam.
优选地,吊装卡具选用Q345C的钢管加工制作,取材容易,制作方便,还可以废物再利用,应用于H500以下的小规格H型钢钢梁吊装,长度相对小,方便钩挂两端。Preferably, the hoisting jig is made of Q345C steel pipe, which is easy to obtain materials, convenient to manufacture, and can also be used for the hoisting of small-sized H-shaped steel beams below H500. The length is relatively small, and it is convenient to hook both ends.
一种吊运H型钢钢梁用双钩卡具的吊运方法,步骤为:A hoisting method for hoisting H-shaped steel girders with a double-hook fixture, the steps are:
步骤一、将2段H型钢钢梁呈“工”字形并排扶正,并预留腹板厚度的间隙,再将另一段H型钢钢梁穿过该间隙,其顶部搭接在并排扶正的2段H型钢钢梁的上表面,3段H型钢钢梁的钢梁翼缘板呈“品”字形排列,充分利用H型钢钢梁的特殊结构进行组合,再结合本实用新型特殊的双钩卡具的结构,可有效提高吊运效率;Step 1. Put two sections of H-shaped steel girders side by side in the shape of "I" and set aside a gap in the thickness of the web, then pass another section of H-shaped steel beams through the gap, and its top overlaps the two sections of side-by-side straightening On the upper surface of the H-shaped steel girder, the steel girder flange plates of the three H-shaped steel girders are arranged in the shape of "pin", which is combined by making full use of the special structure of the H-shaped steel girder, and combined with the special structure of the double-hook fixture of the utility model, It can effectively improve the lifting efficiency;
步骤二、将2个吊装卡具分别钩持于H型钢钢梁的两端,每个吊装卡具的2个钩持端分别钩持于并排扶正的2段H型钢钢梁的外挂直角处;Step 2. Hook the two hoisting fixtures to the two ends of the H-shaped steel beam respectively, and the two hooking ends of each hoisting fixture are respectively hooked to the external right angles of the two sections of H-shaped steel beams that are set side by side;
步骤三、将钢丝绳的两股钢丝绳分股分别连接于吊装连接部;Step 3. Connect the two steel wire rope sub-strands of the steel wire rope to the hoisting connection part respectively;
步骤四、通过吊车的吊钩吊起钢丝绳吊运,整个过程操作方便,机动灵活,进一步提高了吊运效率。Step 4: The wire rope is hoisted by the hook of the crane for hoisting. The whole process is easy to operate and flexible, which further improves the hoisting efficiency.
3.有益效果3. Beneficial effect
采用本实用新型提供的技术方案,与现有技术相比,具有如下有益效果:Compared with the prior art, the technical solution provided by the utility model has the following beneficial effects:
(1)本实用新型的吊运H型钢钢梁用卡具,通过对称分布的矩形开口钩状的吊装卡具将结合H型钢钢梁的特定形状卡扣后,再通过钢丝绳吊装,操作机动灵活,吊装效率高,省时省力;(1) The fixture for hoisting H-shaped steel girders of the utility model is hook-shaped lifting fixtures with rectangular openings that are symmetrically distributed. After the specific shape of the H-shaped steel beams is buckled, it is hoisted by wire ropes, and the operation is flexible and flexible. , high hoisting efficiency, saving time and effort;
(2)本实用新型的一种吊运H型钢钢梁用卡具,均匀分布的钩口槽纹可以提高吊装卡具对H型钢钢梁的钩持附着力;(2) A clamp for hoisting H-shaped steel beams of the present utility model, the evenly distributed hook grooves can improve the hooking adhesion of the lifting clamps to H-shaped steel beams;
(3)本实用新型的一种吊运H型钢钢梁用卡具,吊装卡具为偶数对,可对称式卡扣,根据H型钢钢梁的规格进行适应性的数量应用;选用Q345C的钢材,取材容易,制作方便,还可以废物再利用,应用于H500以上的大规格H型钢钢梁吊装,只需要进行相应的数量适配式应用即可;(3) A clamp for hoisting H-shaped steel girders of the present utility model, the lifting clamps are even pairs, which can be buckled symmetrically, and the adaptive quantity application is carried out according to the specifications of H-shaped steel girders; the steel material of Q345C is selected , It is easy to obtain materials, convenient to make, and can also reuse waste. It is applied to the hoisting of large-scale H-shaped steel beams above H500, and only needs to be applied in a corresponding quantity-adaptive manner;
(4)本实用新型的一种吊运H型钢钢梁用卡具的吊运方法,整个过程操作方便,机动灵活,效率高;(4) A kind of hoisting method of the clamp used for hoisting H-shaped steel girder of the present utility model, the whole process is easy to operate, flexible and efficient;
(5)本实用新型的一种吊运H型钢钢梁用双钩卡具,针对长度相对短,宽度相对较大的H型钢钢梁,方便从两头进行钩持,结合H型钢钢梁有对称式钢梁翼缘板的结构特点,将双V形钩钩牢在双钢梁翼缘板的底部,操作方便;(5) A double-hook fixture for hoisting H-shaped steel beams of the present utility model is aimed at H-shaped steel beams with relatively short length and relatively large width, which is convenient for hooking from both ends. Combined with H-shaped steel beams, there is a symmetrical Due to the structural characteristics of the steel beam flange plate, the double V-shaped hooks are fastened to the bottom of the double steel beam flange plate, which is easy to operate;
(6)本实用新型的一种吊运H型钢钢梁用双钩卡具,2个钩持端间距为略大于H型钢钢梁的腹板的厚度,方便钩牢,避免钩持端钩挂时离位;(6) A double-hook fixture for lifting H-shaped steel girders of the present utility model, the distance between the two hook holding ends is slightly greater than the thickness of the web of the H-shaped steel steel girder, which is convenient for hooking and avoiding when the hook holding ends are hooked. out of position;
(7)本实用新型的一种吊运H型钢钢梁用双钩卡具,2个钩持端间距略大于H型钢钢梁的宽度与腹板的厚度之和,结合H型钢钢梁的特殊结构,可以组合式钩挂吊运,进一步提高吊运效率;(7) A double-hook fixture for hoisting H-shaped steel girders of the present utility model, the distance between the two hook ends is slightly larger than the sum of the width of the H-shaped steel girder and the thickness of the web, combined with the special structure of the H-shaped steel girder , it can be hoisted with a combined hook to further improve the hoisting efficiency;
(8)本实用新型的一种吊运H型钢钢梁用双钩卡具,吊装卡具选用Q345C的钢管加工制作,取材容易,制作方便,还可以废物再利用,应用于H500以下的小规格H型钢钢梁吊装,长度相对小,方便钩挂两端;(8) A double-hook fixture for hoisting H-shaped steel girders of the present utility model. The hoisting fixture is made of Q345C steel pipes. It is easy to obtain materials, easy to make, and can also reuse waste. Steel girder hoisting, the length is relatively small, convenient for hooking both ends;
(9)本实用新型的吊运H型钢钢梁用双钩卡具的吊运方法,整个过程操作方便,机动灵活,进一步提高了吊运效率。(9) The hoisting method of the double-hook fixture for hoisting H-shaped steel girders of the present utility model is easy to operate in the whole process, flexible and flexible, and further improves the hoisting efficiency.
附图说明Description of drawings
图1为本实用新型的吊运H型钢钢梁用卡具结构示意图;Fig. 1 is the utility model hoisting H-shaped steel girder clamp structural representation;
图2为本实用新型的吊运H型钢钢梁用卡具局部放大后示意图;Fig. 2 is the partially enlarged schematic diagram of the fixture for hoisting and transporting H-shaped steel girders of the present invention;
图3为本实用新型的吊运H型钢钢梁用双钩卡具结构示意图;Fig. 3 is the structural schematic diagram of the double-hook fixture for hoisting and transporting H-shaped steel girders of the present invention;
图4为本实用新型的吊运H型钢钢梁用双钩卡具吊运状态图;Fig. 4 is the hoisting status diagram of the double-hook fixture for hoisting H-shaped steel girders of the present utility model;
图5为实施例5的吊运H型钢钢梁用双钩卡具吊运状态图。Fig. 5 is a hoisting status diagram of the double-hook fixture used for hoisting the H-shaped steel girder in embodiment 5.
示意图中的标号说明:1、H型钢钢梁;2、吊装卡具;3、钢丝绳;11、钢梁翼缘板远端;12、腹板;13、外挂直角;21、吊装孔;22、吊装连接部;23、卡槽;24、钩持端;31、钢丝绳分股;241、钩口槽纹。Explanation of the labels in the schematic diagram: 1. H-shaped steel beam; 2. Hoisting fixture; 3. Steel wire rope; 11. The far end of the flange plate of the steel beam; 12. Web plate; 13. External hanging right angle; 21. Hoisting hole; 22. Hoisting connection 23, card slot; 24, hook end; 31, wire rope split; 241, hook groove.
具体实施方式Detailed ways
为进一步了解本实用新型的内容,结合附图对本实用新型作详细描述。In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings.
实施例1Example 1
本实施例的一种吊运H型钢钢梁用卡具,如图1、2所示,包括钢丝绳3和在H型钢钢梁1上对称分布的吊装卡具2;所述吊装卡具2呈矩形开口钩状,包括吊装孔21和连接呈一体的卡槽23与钩持端24;所述卡槽23契合H型钢钢梁1两侧的钢梁翼缘板远端11的形状和厚度,卡接于钢梁翼缘板远端11,并通过吊装孔21和钢丝绳3的钢丝绳分股31连接,所述钩持端24配合卡槽23扣紧在钢梁翼缘板远端11底部。A clamp for hoisting H-shaped steel beams of this embodiment, as shown in Figures 1 and 2, includes steel wire ropes 3 and lifting clamps 2 symmetrically distributed on H-shaped steel beams 1; the lifting clamps 2 are Rectangular opening hook shape, including hoisting hole 21 and connecting slot 23 and hook end 24; the slot 23 fits the shape and thickness of the far end 11 of the steel beam flange plate on both sides of the H-shaped steel beam 1, and is clamped. It is connected to the far end 11 of the steel beam flange plate and is connected with the steel wire rope strand 31 of the steel wire rope 3 through the hoisting hole 21 .
本实施例的一种吊运H型钢钢梁用卡具,应用于H型钢钢梁1的吊运,通过对称分布的矩形开口钩状的吊装卡具2将H型钢钢梁1卡扣后,再通过钢丝绳3吊装,操作机动灵活,吊装效率高,省时省力。A jig for hoisting H-shaped steel girders in this embodiment is applied to hoisting H-shaped steel girders 1. After the H-shaped steel girders 1 are buckled through symmetrically distributed rectangular opening hook-shaped lifting jigs 2, Then hoisting by the steel wire rope 3, the operation is flexible, the hoisting efficiency is high, and time and effort are saved.
实施例2Example 2
本实施例的一种吊运H型钢钢梁用卡具,基本结构同实施例1,改进之处在于:钩持端 24的上表面设置有均匀分布的钩口槽纹241,以提高吊装卡具2对H型钢钢梁1的钩持附着力。吊装卡具2为偶数对,可对称式卡扣,根据H型钢钢梁1的规格进行适应性的数量应用,比如如果长度6m时,需要布局至少3对吊装卡具2,对称式均匀卡扣在H型钢钢梁1两侧的钢梁翼缘板远端11;吊装卡具2选用Q345C的钢材,取材容易,制作方便,还可以废物再利用。A fixture for hoisting H-shaped steel girders in this embodiment has the same basic structure as in Embodiment 1, and the improvement is that evenly distributed hook grooves 241 are arranged on the upper surface of the hook end 24 to improve the height of the lifting clamp. Tool 2 is hook-holding adhesion to the H-shaped steel girder 1. There are even pairs of hoisting fixtures 2, which can be buckled symmetrically, and can be applied in an adaptive quantity according to the specifications of the H-shaped steel beam 1. For example, if the length is 6m, at least 3 pairs of hoisting fixtures 2 need to be laid out, symmetrically and evenly buckled. The far end 11 of the steel girder flange plate on both sides of the H-shaped steel girder 1; the steel material of Q345C is selected for the hoisting jig 2, which is easy to obtain materials, convenient to manufacture, and can also reuse waste.
本实施例的一种吊运H型钢钢梁用卡具,可应用于H500以上的大规格H型钢钢梁吊装,比如H500或600,即高度在500mm或600mm,只需要进行相应的数量应用即可,吊运步骤为:A fixture for hoisting H-shaped steel girders of this embodiment can be applied to the hoisting of large-scale H-shaped steel girders above H500, such as H500 or 600, that is, the height is 500mm or 600mm, and only the corresponding quantity needs to be applied. Yes, the lifting steps are:
步骤一、将H型钢钢梁1呈“工”字形扶正,方便吊装卡具2的对称式卡扣;Step 1, straightening the H-shaped steel beam 1 in the shape of "I" to facilitate the symmetrical buckle of the hoisting fixture 2;
步骤二、将3对吊装卡具2与H型钢钢梁1两侧的钢梁翼缘板远端11对称式卡接,避免因偏重而失衡;Step 2: Connect three pairs of hoisting fixtures 2 to the far ends 11 of the steel beam flange plates on both sides of the H-shaped steel beam 1 in a symmetrical manner to avoid imbalance due to overweight;
步骤三、将钢丝绳3的两股钢丝绳分股31分别连接于吊装孔21,套牢后方便起吊;Step 3, connect the two steel wire rope sub-strands 31 of the steel wire rope 3 to the hoisting holes 21 respectively, so that it is convenient to lift after being locked in;
步骤四、通过吊车的吊钩吊起钢丝绳3吊运,整个过程操作方便,机动灵活,效率高。Step 4, the steel wire rope 3 is hoisted by the hook of the crane, and the whole process is easy to operate, flexible and efficient.
相较于现有技术在进行工业厂房H型钢钢梁吊装时,根据施工需要原采用吊带锁具,效率缓慢,而且采用钢丝绳吊装易对吊车梁产生不可修复的边缘破坏,且松吊带、钢丝绳时危险性较大,严重制约了现场的安全、进度管理。本实施例的一种吊运H型钢钢梁用卡具及吊运方法,吊装卡具2在吊装H型钢钢梁应用于钢镀锌线高跨厂房时进行了采用,使现场的吊装效率大大提高,同时也保障了现场的施工安全。Compared with the existing technology, when hoisting the H-shaped steel beams of industrial plants, the sling locks are originally used according to the construction needs, and the efficiency is slow, and the hoisting of the wire ropes is easy to cause irreparable edge damage to the crane beams, and it is dangerous to loosen the slings and wire ropes. The risk is relatively high, which seriously restricts the safety and progress management of the site. A fixture and lifting method for hoisting H-shaped steel girders in this embodiment, the hoisting fixture 2 is adopted when hoisting H-shaped steel girders and applied to high-span workshops of steel galvanizing lines, so that the hoisting efficiency on site is greatly improved Improve, but also ensure the construction site safety.
实施例3Example 3
本实施例的一种吊运H型钢钢梁用双钩卡具,如图3、4所示,包括钢丝绳3和挂持在H 型钢钢梁1两端的吊装卡具2;所述吊装卡具2呈双V形钩,底部为2个钩持端24,双V形钩之间通过吊装连接部22连接呈一个整体,所述钢丝绳3的钢丝绳分股31连接于吊装连接部22。A kind of double-hook jig for hoisting H-shaped steel girder of the present embodiment, as shown in Figure 3, 4, comprises steel wire rope 3 and the hoisting jig 2 that hangs on H-shaped steel girder 1 two ends; Said hoisting jig 2 It is a double V-shaped hook with two hooking ends 24 at the bottom. The double V-shaped hooks are connected as a whole through the hoisting connection part 22 .
本实施例的一种吊运H型钢钢梁用双钩卡具,应用于H型钢钢梁1的吊运,针对长度相对短,比如1m以下,高度为500mm以下,比如H400或300或150mm等,宽度相对较大的 H型钢钢梁1,方便从两头进行钩持,结合H型钢钢梁1有对称式钢梁翼缘板的结构特点,将双V形钩钩牢在双钢梁翼缘板的底部,操作方便。A double-hook fixture for hoisting H-shaped steel girders in this embodiment is applied to the lifting of H-shaped steel girders 1. For relatively short lengths, such as less than 1 m, and heights of less than 500 mm, such as H400 or 300 or 150 mm, etc., The H-shaped steel girder 1 with a relatively large width is convenient for hooking from both ends. Combined with the structural characteristics of the symmetrical steel girder flange plate of the H-shaped steel girder 1, the double V-shaped hooks are fastened to the bottom of the double steel girder flange plate, and the operation convenient.
实施例4Example 4
本实施例的一种吊运H型钢钢梁用双钩卡具,具体结构同实施例3,不同和改进之处在于:2个钩持端24间距为略大于H型钢钢梁1的腹板12的厚度,比如可大于5mm~10mm,方便钩牢,避免钩持端24钩挂时离位。A double-hook fixture for hoisting H-shaped steel girders of this embodiment has the same specific structure as that of Embodiment 3, the difference and improvement being that the distance between the two hook ends 24 is slightly larger than the web 12 of the H-shaped steel girder 1 For example, the thickness can be greater than 5 mm to 10 mm, which is convenient for hooking and avoiding the hooking end 24 from leaving its position when hooking.
本实施例的吊运H型钢钢梁用双钩卡具的吊运方法,步骤为:The hoisting method of the double-hook jig for hoisting the H-shaped steel girder of the present embodiment, the steps are:
步骤一、将H型钢钢梁1呈“工”字形扶正;Step 1, straighten the H-shaped steel girder 1 in the shape of "I";
步骤二、将2个吊装卡具2分别钩持于H型钢钢梁1的两端,每个吊装卡具2的2个钩持端24分别钩持于H型钢钢梁1的外挂直角13处;Step 2. Hook the two hoisting fixtures 2 on the two ends of the H-shaped steel beam 1 respectively, and the two hooking ends 24 of each hoisting fixture 2 are respectively hooked to the external right angle 13 of the H-shaped steel beam 1 ;
步骤三、将钢丝绳3的两股钢丝绳分股31分别连接于吊装连接部22;Step 3: Connect the two steel wire rope sub-strands 31 of the steel wire rope 3 to the hoisting connection part 22 respectively;
步骤四、通过吊车的吊钩吊起钢丝绳3吊运,整个过程操作方便,机动灵活,提高了吊运效率。Step 4: Lift the steel wire rope 3 through the hook of the crane for lifting. The whole process is easy to operate and flexible, which improves the lifting efficiency.
实施例5Example 5
本实施例的一种吊运H型钢钢梁用双钩卡具,具体结构同实施例4,不同和改进之处在于:2个钩持端24间距略大于H型钢钢梁1的宽度与腹板12的厚度之和,可大5mm左右,方便穿插;结合H型钢钢梁1的特殊结构,可以组合式钩挂吊运,提高了吊运效率。A double-hook fixture for hoisting H-shaped steel girders in this embodiment has the same specific structure as that in Embodiment 4, the difference and improvement being that the distance between the two hook ends 24 is slightly larger than the width and web of the H-shaped steel girder 1 The sum of the thicknesses of 12 can be increased by about 5mm, which is convenient for insertion; combined with the special structure of the H-shaped steel beam 1, it can be hoisted by combined hooks, which improves the hoisting efficiency.
本实施例的吊运H型钢钢梁用双钩卡具的吊运方法,步骤为:The hoisting method of the double-hook jig for hoisting the H-shaped steel girder of the present embodiment, the steps are:
步骤一、如图5所示,将2段H型钢钢梁1呈“工”字形并排扶正,并预留腹板12厚度的间隙,再将另一段H型钢钢梁1穿过该间隙,其顶部搭接在并排扶正的2段H型钢钢梁 1的上表面,3段H型钢钢梁1的钢梁翼缘板呈“品”字形排列,充分利用H型钢钢梁1的特殊结构进行组合,再结合本实用新型特殊的双钩卡具的结构,可有效提高吊运效率;Step 1, as shown in Figure 5, straighten two sections of H-shaped steel beams 1 side by side in the shape of "I", and reserve a gap in the thickness of the web 12, and then pass another section of H-shaped steel beam 1 through the gap, and The top is lapped on the upper surface of the two sections of H-shaped steel beams 1 side by side, and the steel beam flange plates of the three sections of H-shaped steel beams 1 are arranged in the shape of "pin", which is combined by making full use of the special structure of the H-shaped steel beams 1. Combined with the structure of the special double-hook fixture of the utility model, the lifting efficiency can be effectively improved;
步骤二、将2个吊装卡具2分别钩持于H型钢钢梁1的两端,每个吊装卡具2的2个钩持端24分别钩持于并排扶正的2段H型钢钢梁1的外挂直角13处;Step 2. Hook the two hoisting fixtures 2 on both ends of the H-shaped steel beam 1 respectively, and the two hooking ends 24 of each hoisting fixture 2 are respectively hooked on the two sections of H-shaped steel beams 1 side by side. There are 13 places at right angles to the plug-in;
步骤三、将钢丝绳3的两股钢丝绳分股31分别连接于吊装连接部22;Step 3: Connect the two steel wire rope sub-strands 31 of the steel wire rope 3 to the hoisting connection part 22 respectively;
步骤四、通过吊车的吊钩吊起钢丝绳3吊运,整个过程操作方便,机动灵活,进一步提高了吊运效率。Step 4: Lift the wire rope 3 through the hook of the crane for lifting. The whole process is easy to operate and flexible, which further improves the lifting efficiency.
本实施例的吊运H型钢钢梁用双钩卡具的吊运方法,应用于H500以下的小规格H型钢钢梁1的吊装:在仓库进行收发料时,小规格的热轧H型钢钢梁1往往是成包进场的,使用传统的钢丝绳收发料,易对吊车梁产生不可修复的边缘破坏;使用传统的吊带收发料,收发料效率较低;同时在使用钢丝绳或吊带收发料过程中,穿和收钢丝绳或吊带时危险性较高,不利于施工和生产。本实施例的吊运H型钢钢梁用双钩卡具在公司仓库H型钢钢梁1收发料中广泛的进行了采用,使小规格的H型钢钢梁1的收发料效率大大的提高,同时也保障了收发料过程中的安全。The hoisting method of the double-hook fixture for hoisting H-shaped steel girders of this embodiment is applied to the hoisting of small-sized H-shaped steel girders 1 below H500: when receiving and receiving materials in the warehouse, the small-sized hot-rolled H-shaped steel girders 1. It is often brought into the site in packages. Using traditional steel wire ropes for sending and receiving materials is easy to cause irreparable edge damage to the crane beam; using traditional slings for sending and receiving materials, the efficiency of sending and receiving materials is low; at the same time, during the process of using steel wire ropes or slings , The risk is higher when wearing and receiving the wire rope or sling, which is not conducive to construction and production. The double-hook jig for hoisting the H-shaped steel girder of the present embodiment has been widely adopted in the receiving and dispatching of the H-shaped steel girder 1 in the warehouse of the company, which greatly improves the receiving and receiving efficiency of the small-sized H-shaped steel girder 1, and also The safety in the process of sending and receiving materials is guaranteed.
实施例6Example 6
本实施例的一种吊运H型钢钢梁用双钩卡具,具体结构同实施例3,不同和改进之处在于:钩持端24上表面设置有均匀分布的钩口槽纹241,以提高吊装卡具2对H型钢钢梁1的钩持附着力。吊装卡具2选用Q345C的钢管加工制作,取材容易,制作方便,还可以废物再利用,应用于H500以下的小规格H型钢钢梁吊装,长度相对小,方便钩挂两端。A double-hook fixture for hoisting H-shaped steel girders in this embodiment has the same specific structure as in Embodiment 3, the difference and improvement are that the upper surface of the hook end 24 is provided with evenly distributed hook grooves 241 to improve The hook holding adhesion of the hoisting fixture 2 to the H-shaped steel beam 1. The hoisting fixture 2 is made of Q345C steel pipe, which is easy to obtain materials, convenient to manufacture, and can also reuse waste. It is applied to the hoisting of small-sized H-shaped steel beams below H500. The length is relatively small, and it is convenient to hook both ends.
以上示意性的对本实用新型及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本实用新型的实施方式之一,实际的结构并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本实用新型的保护范围。The above schematically describes the utility model and its implementation, which is not restrictive, and what is shown in the accompanying drawings is only one implementation of the utility model, and the actual structure is not limited thereto. Therefore, if a person of ordinary skill in the art is inspired by it, without departing from the purpose of the present invention, without creatively designing a structural method and embodiment similar to the technical solution, it shall be protected by the utility model scope.
Claims (3)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822144583.1U CN209481043U (en) | 2018-12-20 | 2018-12-20 | A fixture for hoisting H-shaped steel beams |
| CN201921479477.7U CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822144583.1U CN209481043U (en) | 2018-12-20 | 2018-12-20 | A fixture for hoisting H-shaped steel beams |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921479477.7U Division CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209481043U true CN209481043U (en) | 2019-10-11 |
Family
ID=68126619
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921479477.7U Expired - Fee Related CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
| CN201822144583.1U Expired - Fee Related CN209481043U (en) | 2018-12-20 | 2018-12-20 | A fixture for hoisting H-shaped steel beams |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921479477.7U Expired - Fee Related CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
Country Status (1)
| Country | Link |
|---|---|
| CN (2) | CN210594893U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109573813A (en) * | 2018-12-20 | 2019-04-05 | 安徽马钢工程技术集团有限公司 | A kind of handling H profile steel girder steel fixture and its handling method |
-
2018
- 2018-12-20 CN CN201921479477.7U patent/CN210594893U/en not_active Expired - Fee Related
- 2018-12-20 CN CN201822144583.1U patent/CN209481043U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109573813A (en) * | 2018-12-20 | 2019-04-05 | 安徽马钢工程技术集团有限公司 | A kind of handling H profile steel girder steel fixture and its handling method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN210594893U (en) | 2020-05-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209455933U (en) | A kind of spreader for lamination board hoisting | |
| CN109095343A (en) | Assembled hanger | |
| CN205296844U (en) | Precast box girder steel strand wires hoisting point | |
| CN215107470U (en) | Regularization platform of unloading suitable for core section of thick bamboo steel attaches frame structure | |
| CN209481043U (en) | A fixture for hoisting H-shaped steel beams | |
| CN108675170A (en) | Roofing monorail crane and its construction method | |
| CN204281030U (en) | A kind of special hanger lifting section bar | |
| CN216038140U (en) | Assembly type house PC hoisting stair structure | |
| CN222273900U (en) | A steel plate lifting tool | |
| CN221027152U (en) | Silo wall lifting frame for silo construction | |
| CN109573813A (en) | A kind of handling H profile steel girder steel fixture and its handling method | |
| CN209780257U (en) | Steel structure high altitude construction device | |
| CN202967862U (en) | Lifting appliance for beam channel reinforcement cage | |
| CN217376980U (en) | double-T-beam self-balancing hoisting sling | |
| CN211521358U (en) | Hoist for prefabricated hollow slab | |
| CN206158207U (en) | Construction is with platform of unloading | |
| CN210914945U (en) | Hoisting device for upper structure of aluminum electrolytic cell | |
| CN211998435U (en) | Tool type aerated brick hopper | |
| CN221876316U (en) | Quick mounting and dismounting lifting appliance for crane beam mounting | |
| CN108706438B (en) | Lifting appliance for construction of large I-shaped structure | |
| CN208948679U (en) | Assembled hanger | |
| CN216377199U (en) | Hoisting tool for travelling crane beam | |
| CN209778062U (en) | An extension spreader for hoisting steel pipe arch bridge lattice girders | |
| CN221165582U (en) | A lifting device for lifting large diameter concrete pipe pile sections | |
| CN208087049U (en) | A lifting tool for power cables |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191011 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |