CN209481043U - A kind of handling H profile steel girder steel fixture - Google Patents
A kind of handling H profile steel girder steel fixture Download PDFInfo
- Publication number
- CN209481043U CN209481043U CN201822144583.1U CN201822144583U CN209481043U CN 209481043 U CN209481043 U CN 209481043U CN 201822144583 U CN201822144583 U CN 201822144583U CN 209481043 U CN209481043 U CN 209481043U
- Authority
- CN
- China
- Prior art keywords
- steel
- handling
- profile steel
- hook
- profile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 292
- 239000010959 steel Substances 0.000 title claims abstract description 292
- 238000010276 construction Methods 0.000 abstract description 10
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 16
- 239000000463 material Substances 0.000 description 12
- 238000010586 diagram Methods 0.000 description 6
- 239000000725 suspension Substances 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 239000000853 adhesive Substances 0.000 description 4
- 230000001070 adhesive effect Effects 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- BYACHAOCSIPLCM-UHFFFAOYSA-N 2-[2-[bis(2-hydroxyethyl)amino]ethyl-(2-hydroxyethyl)amino]ethanol Chemical compound OCCN(CCO)CCN(CCO)CCO BYACHAOCSIPLCM-UHFFFAOYSA-N 0.000 description 1
- 238000005246 galvanizing Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 210000001364 upper extremity Anatomy 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of handling H profile steel girder steel fixtures, belong to construction equipment technology field.The handling H profile steel girder steel fixture of the utility model, applied to the handling of H profile steel girder steel, including wirerope and symmetrical hoisting gripping member on H profile steel girder steel;The hoisting gripping member is hook-shaped in rectangular aperture, holds end in the card slot and hook of one including hole for hoist and connection;The card slot agrees with the shape and thickness of the steel beam flange plate distal end of H profile steel girder steel two sides, is connected in steel beam flange plate distal end, and connect with the wirerope share split of wirerope by hole for hoist, and the hook holds end cooperation card slot fastening in steel beam flange plate distal bottom.After H profile steel girder steel being buckled by the hook-shaped hoisting gripping member of symmetrical rectangular aperture, then by wirerope lifting, operate maneuverability, lifting is high-efficient, time saving and energy saving.Solve the problems, such as that H profile steel steel beam lifting existing in the prior art is time-consuming and laborious, mobility is poor.
Description
Technical field
The utility model belongs to construction equipment technology field more particularly to a kind of handling H profile steel girder steel fixture.
Background technique
For in structural steelwork installation, there are the production of some H profile steel beams and installation, i.e., a large amount of H profile steel girder steel structures
Part being had bad luck and installing, and fixture uses more compared with frequent and quantity.In practice, the standard fixture of outfit is often because of price, so that
Limited amount, and high operation requirements and influence working efficiency.
The card to circulate on the market at present has many types, can generally be divided into three categories: Chained lifting appliance, tong crane
Tool and hoisting suction cup, widely used in architecture production construction field is Chained lifting appliance, according to the object needs of handling
Corresponding gib head can be targetedly selected, but at present in existing gib head for the exclusive suspender ratio of the handling of H profile steel girder steel
Compared with shortage, when site operation, handling often is carried out using hanging belt, it is more time-consuming.
Chinese patent, publication No.: CN208071099U, date of publication: 2018.11.19 discloses a kind of Special H section steel card
Tool, is made of top hoisting ring, rectangular aperture snap-gauge, top reinforcing strip, its main feature is that using semicircular arc rectangular aperture snap-gauge,
It is made of 25mm thick steel plate, is reinforced at rectangular aperture using 20mm thick steel plate item, top hoisting ring uses 25mm thick steel plate system
At rectangular aperture snap-gauge links together with top hoisting ring at 90 degree of vertical weldings, and two fixtures are symmetrically stuck in H profile steel upper limb
Listrium, steel wire penetrating upper ring connect together two groups of fixtures, carry out lifting operation.The fixture needs vertical welding
Connection, mobility is poor, and lifting efficiency is lower.
Utility model content
1. utility model technical problems to be solved
For the problem that H profile steel steel beam lifting existing in the prior art is time-consuming and laborious, mobility is poor, the utility model is mentioned
For a kind of handling H profile steel girder steel fixture.After it directly buckles H profile steel girder steel by the hook-shaped card slot of rectangular aperture
Lifting has extremely strong maneuverability, and lifting is high-efficient, time saving and energy saving.
2. technical solution
In order to achieve the above objectives, technical solution provided by the utility model are as follows:
A kind of handling H profile steel girder steel fixture, applied to the handling of H profile steel girder steel, including wirerope and in H profile steel girder steel
Upper symmetrical hoisting gripping member;The hoisting gripping member is hook-shaped in rectangular aperture, including hole for hoist and connection in integrated card slot
End is held with hook;The card slot agrees with the shape and thickness of the steel beam flange plate distal end of H profile steel girder steel two sides, is connected in steel beam flange
Plate distal end, and connected by hole for hoist with the wirerope share split of wirerope, the hook holds end cooperation card slot fastening in steel beam flange
Plate distal bottom.After H profile steel girder steel being buckled by the hook-shaped hoisting gripping member of symmetrical rectangular aperture, then pass through wirerope
Lifting operates maneuverability, and lifting is high-efficient, time saving and energy saving.
Preferably, the upper surface that hook holds end is provided with equally distributed mouth of hook groove, to improve hoisting gripping member to H profile steel steel
The hook of beam holds adhesive force.
Preferably, hoisting gripping member is even-even, symmetrical can be buckled, and carries out adaptability according to the specification of H profile steel girder steel
Quantity application;The steel of Q345C are selected, materials are easy, and it is easy to make, it can be with refuse reclamation, applied to H500's or more
Big specification H profile steel steel beam lifting, it is only necessary to carry out corresponding quantity application.
A kind of handling method of handling H profile steel girder steel fixture, step are as follows:
Step 1: the righting in the shape of an " I " of H profile steel girder steel is facilitated the symmetrical buckle of hoisting gripping member;
Step 2: avoiding the symmetrical clamping in steel beam flange plate distal end of hoisting gripping member and H profile steel girder steel two sides because laying particular stress on
And it is unbalance;
Step 3: two strand steel wire rope share splits of wirerope are connected to hole for hoist, facilitate lifting after entangling firm;
Step 4: slinging wirerope handling by the suspension hook of crane, whole process is easy to operate, and maneuverability is high-efficient.
A kind of handling H profile steel girder steel double hook fixture, applied to the handling of H profile steel girder steel, including wirerope and hanging support are in H
The hoisting gripping member at fashioned iron girder steel both ends;The hoisting gripping member is in double shackle links, and bottom is that 2 hooks hold end, is passed through between double shackle links
Lifting interconnecting piece connection is in an entirety, and the wirerope share split of the wirerope is connected to lifting interconnecting piece, opposite for length
Short, the relatively large H profile steel girder steel of width is convenient to hold from both ends progress hook, has symmetrical steel beam flange plate in conjunction with H profile steel girder steel
Design feature, it is easy to operate by double shackle link hooks jail in the bottom of double steel beam flange plates.
Preferably, 2 hooks hold end spacing be slightly over H profile steel girder steel web thickness, such as can be greater than 5mm~
10mm, convenient hanger jail avoid hook from holding when end hook is hung and off normal.
Preferably, 2 hooks hold end spacing slightly larger than the sum of the width of H profile steel girder steel and thickness of web, in conjunction with H profile steel steel
The special construction of beam can hook handling with combined type, further increase handling efficiency.
Preferably, hook holds end upper surface and is provided with equally distributed mouth of hook groove, to improve hoisting gripping member to H profile steel girder steel
Hook hold adhesive force.
Preferably, hoisting gripping member selects the steel pipe processing and fabricating of Q345C, and materials are easy, easy to make, can be with waste again
It utilizes, is applied to H500 small dimension H profile steel steel beam lifting below, length is relatively small, facilitates and hooks both ends.
A kind of handling method of handling H profile steel girder steel double hook fixture, step are as follows:
Step 1: by the righting side by side in the shape of an " I " of 2 sections of H profile steel girder steels, and the gap of reserved web thickness, then will be another
Section H profile steel girder steel passes through the gap, and top is overlapped on the upper surface of 2 sections of H profile steel girder steels of righting side by side, 3 sections of H profile steel girder steels
The arrangement in the shape of " pin " of steel beam flange plate, make full use of the special construction of H profile steel girder steel to be combined, it is practical new in conjunction with this
The structure of the special double hook fixture of type, can effectively improve handling efficiency;
Step 2: by 2 hoisting gripping members, hook is held in the both ends of H profile steel girder steel respectively, and 2 hooks of each hoisting gripping member hold end
Hook is held in the plug-in right angle of 2 sections of H profile steel girder steels of righting side by side respectively;
Step 3: two strand steel wire rope share splits of wirerope are connected to lifting interconnecting piece;
Step 4: slinging wirerope handling by the suspension hook of crane, whole process is easy to operate, maneuverability, further
Improve handling efficiency.
3. beneficial effect
Using technical solution provided by the utility model, compared with prior art, have the following beneficial effects:
(1) the handling H profile steel girder steel fixture of the utility model, passes through the hook-shaped lifting card of symmetrical rectangular aperture
After tool buckles the specific shape of combination H profile steel girder steel, then by wirerope lifting, maneuverability is operated, lifts high-efficient, province
Shi Shengli;
(2) lifting can be improved in a kind of handling H profile steel girder steel fixture of the utility model, equally distributed mouth of hook groove
Fixture holds adhesive force to the hook of H profile steel girder steel;
(3) a kind of handling H profile steel girder steel fixture of the utility model, hoisting gripping member is even-even, symmetrical can be buckled,
The quantity application of adaptability is carried out according to the specification of H profile steel girder steel;The steel of Q345C are selected, materials are easy, and it is easy to make, also
It can big specification H profile steel steel beam lifting with refuse reclamation, applied to H500 or more, it is only necessary to carry out corresponding quantity adapter type
Using;
(4) the handling method of a kind of handling H profile steel girder steel fixture of the utility model, whole process is easy to operate, machine
It is dynamic flexible, it is high-efficient;
(5) a kind of handling H profile steel girder steel double hook fixture of the utility model, relatively short for length, width is relatively
Big H profile steel girder steel, it is convenient to be held from both ends progress hook, there is the design feature of symmetrical steel beam flange plate in conjunction with H profile steel girder steel, it will
Double shackle link hooks jail is easy to operate in the bottom of double steel beam flange plates;
(6) a kind of handling H profile steel girder steel double hook fixture of the utility model, 2 hooks hold end spacing and are slightly over H profile steel
The thickness of the web of girder steel, convenient hanger jail avoid hook from holding when end hook is hung and off normal;
(7) a kind of handling H profile steel girder steel double hook fixture of the utility model, 2 hooks hold end spacing slightly larger than H profile steel steel
The sum of width and the thickness of web of beam can hook handling with combined type, further mention in conjunction with the special construction of H profile steel girder steel
High handling efficiency;
(8) a kind of handling H profile steel girder steel double hook fixture of the utility model, hoisting gripping member select the steel pipe of Q345C to add
Work production, materials are easy, easy to make, can be hung with refuse reclamation applied to H500 small dimension H profile steel girder steel below
Dress, length is relatively small, facilitates and hooks both ends;
(9) the handling method of the handling H profile steel girder steel double hook fixture of the utility model, whole process is easy to operate, machine
It is dynamic flexible, further improve handling efficiency.
Detailed description of the invention
Fig. 1 is the handling H profile steel girder steel fixture structure schematic diagram of the utility model;
Fig. 2 is schematic diagram after the handling H profile steel girder steel fixture partial enlargement of the utility model;
Fig. 3 is the handling H profile steel girder steel double hook fixture structure schematic diagram of the utility model;
Fig. 4 is the handling H profile steel girder steel double hook fixture handling state diagram of the utility model;
Fig. 5 is the handling H profile steel girder steel double hook fixture handling state diagram of embodiment 5.
Label declaration in schematic diagram: 1, H profile steel girder steel;2, hoisting gripping member;3, wirerope;11, steel beam flange plate distal end;
12, web;13, plug-in right angle;21, hole for hoist;22, interconnecting piece is lifted;23, card slot;24, hook holds end;31, wirerope share split;
241, mouth of hook groove.
Specific embodiment
For the content for further appreciating that the utility model, the utility model is described in detail in conjunction with attached drawing.
Embodiment 1
A kind of handling H profile steel girder steel fixture of the present embodiment, as shown in Figure 1, 2, including wirerope 3 and in H profile steel steel
Symmetrical hoisting gripping member 2 on beam 1;The hoisting gripping member 2 is hook-shaped in rectangular aperture, including hole for hoist 21 and connection are in one
Card slot 23 and hook hold end 24;The card slot 23 agrees with the shape and thickness of the steel beam flange plate distal end 11 of 1 two sides of H profile steel girder steel
Degree is connected in steel beam flange plate distal end 11, and is connected by the wirerope share split 31 of hole for hoist 21 and wirerope 3, and the hook is held
24 cooperation card slot 23 fastening of end is in 11 bottoms of steel beam flange plate distal end.
A kind of handling H profile steel girder steel fixture of the present embodiment, applied to the handling of H profile steel girder steel 1, by symmetrical
Rectangular aperture hook-shaped hoisting gripping member 2 H profile steel girder steel 1 is buckled after, then lifted by wirerope 3, operate maneuverability, hang
Fill it is high-efficient, it is time saving and energy saving.
Embodiment 2
A kind of handling H profile steel girder steel fixture of the present embodiment, basic structure are theed improvement is that with embodiment 1: hook is held
The upper surface at end 24 is provided with equally distributed mouth of hook groove 241, is held with to improve hoisting gripping member 2 to the hook of H profile steel girder steel 1 attached
Put forth effort.Hoisting gripping member 2 is even-even, symmetrical can buckle, the quantity application of adaptability is carried out according to the specification of H profile steel girder steel 1,
For example if need to be laid out at least 3 pairs of hoisting gripping members 2, the symmetrical steel for being uniformly buckled in 1 two sides of H profile steel girder steel when length 6m
Beam flange plate distal end 11;Hoisting gripping member 2 selects the steel of Q345C, and materials are easy, easy to make, can be with refuse reclamation.
A kind of handling H profile steel girder steel fixture of the present embodiment, the big specification H profile steel girder steel that can be applied to H500 or more are hung
Dress, such as H500 or 600, i.e., height is in 500mm or 600mm, it is only necessary to carry out corresponding quantity application, handling step
Are as follows:
Step 1: the righting in the shape of an " I " of H profile steel girder steel 1 is facilitated the symmetrical buckle of hoisting gripping member 2;
Step 2: the symmetrical clamping in steel beam flange plate distal end 11 of 3 pairs of hoisting gripping members 2 and 1 two sides of H profile steel girder steel is kept away
Exempt from unbalance because of weighting;
Step 3: two strand steel wire rope share splits 31 of wirerope 3 are connected to hole for hoist 21, facilitate lifting after entangling firm;
Step 4: slinging 3 handling of wirerope by the suspension hook of crane, whole process is easy to operate, maneuverability, efficiency
It is high.
Compared to the prior art when carrying out industrial premises H profile steel steel beam lifting, needed according to construction former using suspender belt lock
Tool, efficiency is slow, and easily generates the edge damage of unrepairable to crane girder using wirerope lifting, and loose suspender belt, steel wire
Risk is larger when rope, seriously constrains safety, the progress control at scene.A kind of handling H profile steel girder steel card of the present embodiment
Tool and handling method, hoisting gripping member 2 are applied to be used when galvanizing steel line height is across workshop, make existing in lifting H profile steel girder steel
The lifting efficiency of field greatly improves, while also having ensured the construction safety at scene.
Embodiment 3
A kind of handling H profile steel girder steel double hook fixture of the present embodiment, as shown in Figure 3,4, including wirerope 3 and hanging support exist
The hoisting gripping member 2 at 1 both ends of H fashioned iron girder steel;The hoisting gripping member 2 is in double shackle links, and bottom is that 2 hooks hold end 24, double shackle links it
Between by lifting interconnecting piece 22 connection be in an entirety, the wirerope share split 31 of the wirerope 3 be connected to lifting interconnecting piece 22.
A kind of handling H profile steel girder steel double hook fixture of the present embodiment, applied to the handling of H profile steel girder steel 1, for length
It is relatively short, for example 1m is hereinafter, height is 500mm hereinafter, such as H400 or 300 or 150mm etc., the relatively large H profile steel of width
Girder steel 1, it is convenient to be held from both ends progress hook, there is the design feature of symmetrical steel beam flange plate in conjunction with H profile steel girder steel 1, by double shackle links
Hook jail is easy to operate in the bottom of double steel beam flange plates.
Embodiment 4
A kind of handling H profile steel girder steel double hook fixture of the present embodiment, specific structure are different and improvement with embodiment 3
It is in and holds the thickness that 24 spacing of end are slightly over the web 12 of H profile steel girder steel 1 in: 2 hooks, for example 5mm~10mm, side can be greater than
Just hook jail avoids hook from holding when end 24 hooks and offs normal.
The handling method of the handling H profile steel girder steel double hook fixture of the present embodiment, step are as follows:
Step 1: by the righting in the shape of an " I " of H profile steel girder steel 1;
Step 2: by 2 hoisting gripping members 2, hook is held in the both ends of H profile steel girder steel 1,2 hooks of each hoisting gripping member 2 respectively
Holding end 24, hook is held at the plug-in right angle 13 of H profile steel girder steel 1 respectively;
Step 3: two strand steel wire rope share splits 31 of wirerope 3 are connected to lifting interconnecting piece 22;
Step 4: slinging 3 handling of wirerope by the suspension hook of crane, whole process is easy to operate, and maneuverability improves
Handling efficiency.
Embodiment 5
A kind of handling H profile steel girder steel double hook fixture of the present embodiment, specific structure are different and improvement with embodiment 4
Be in and hold 24 spacing of end slightly larger than the width of H profile steel girder steel 1 and the sum of the thickness of web 12 in: 2 hooks, can big 5mm or so, side
Just intert;In conjunction with the special construction of H profile steel girder steel 1, handling can be hooked with combined type, improve handling efficiency.
The handling method of the handling H profile steel girder steel double hook fixture of the present embodiment, step are as follows:
Step 1: as shown in figure 5, by the righting side by side in the shape of an " I " of 2 sections of H profile steel girder steels 1, and reserved 12 thickness of web
Gap, then another section of H profile steel girder steel 1 is passed through into the gap, top is overlapped on the upper of 2 sections of H profile steel girder steels 1 of righting side by side
Surface, the steel beam flange plate arrangement in the shape of " pin " of 3 sections of H profile steel girder steels 1 make full use of the special construction of H profile steel girder steel 1 to carry out
Combination, in conjunction with the structure of the special double hook fixture of the utility model, can effectively improve handling efficiency;
Step 2: by 2 hoisting gripping members 2, hook is held in the both ends of H profile steel girder steel 1,2 hooks of each hoisting gripping member 2 respectively
Holding end 24, hook is held at the plug-in right angle 13 of 2 sections of H profile steel girder steels 1 of righting side by side respectively;
Step 3: two strand steel wire rope share splits 31 of wirerope 3 are connected to lifting interconnecting piece 22;
Step 4: slinging 3 handling of wirerope by the suspension hook of crane, whole process is easy to operate, maneuverability, further
Improve handling efficiency.
The handling method of the handling H profile steel girder steel double hook fixture of the present embodiment is applied to H500 small dimension H-type below
The lifting of steel girder steel 1: when warehouse carries out transmitting-receiving material, the hot rolled H-shaped girder steel 1 of small dimension is often to march into the arena at packet, is used
Traditional wirerope receives and dispatches material, and the edge damage of unrepairable is easily generated to crane girder;Material, transmitting-receiving are received and dispatched using traditional suspender belt
Expect that efficiency is lower;Simultaneously during using wirerope or suspender belt transmitting-receiving material, risk is higher when wearing and receive wirerope or suspender belt,
It is unfavorable for constructing and produces.The handling H profile steel girder steel of the present embodiment, which is received and dispatched with double hook fixture in company's warehouse H profile steel girder steel 1, expects
In widely used, greatly improve the transmitting-receiving material efficiency of the H profile steel girder steel 1 of small dimension, while also having ensured receipts
Safety during material issuance.
Embodiment 6
A kind of handling H profile steel girder steel double hook fixture of the present embodiment, specific structure are different and improvement with embodiment 3
It is in and holds 24 upper surfaces of end in: hook and be provided with equally distributed mouth of hook groove 241, to improve hoisting gripping member 2 to H profile steel girder steel 1
Hook hold adhesive force.Hoisting gripping member 2 selects the steel pipe processing and fabricating of Q345C, and materials are easy, easy to make, can be with waste again
It utilizes, is applied to H500 small dimension H profile steel steel beam lifting below, length is relatively small, facilitates and hooks both ends.
Schematically the utility model and embodiments thereof are described above, description is not limiting, attached drawing
Shown in be also one of the embodiments of the present invention, actual structure is not limited to this.So if this field
Those of ordinary skill enlightened by it, without departing from the spirit of the invention, not inventively design with should
The similar frame mode of technical solution and embodiment, all should belong to the protection range of the utility model.
Claims (3)
1. a kind of handling H profile steel girder steel fixture, it is characterised in that: be applied to the handling of H profile steel girder steel (1), including wirerope
(3) the symmetrical hoisting gripping member (2) and on H profile steel girder steel (1);The hoisting gripping member (2) is hook-shaped in rectangular aperture, including
Hole for hoist (21) and connection are in that the card slot (23) of one and hook hold end (24);The card slot (23) agrees with H profile steel girder steel (1) two sides
Steel beam flange plate distal end (11) shape and thickness, be connected in steel beam flange plate distal end (11), and by hole for hoist (21) and
The wirerope share split (31) of wirerope (3) connects, and the hook holds end (24) cooperation card slot (23) fastening in steel beam flange plate distal end
(11) bottom.
2. handling H profile steel girder steel fixture according to claim 1, it is characterised in that: the hook holds the upper table at end (24)
Face is provided with equally distributed mouth of hook groove (241).
3. handling H profile steel girder steel fixture according to claim 1, it is characterised in that: the hoisting gripping member (2) is even number
It is right, the steel of Q345C are selected, the big specification H profile steel steel beam lifting applied to H500 or more.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822144583.1U CN209481043U (en) | 2018-12-20 | 2018-12-20 | A kind of handling H profile steel girder steel fixture |
CN201921479477.7U CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822144583.1U CN209481043U (en) | 2018-12-20 | 2018-12-20 | A kind of handling H profile steel girder steel fixture |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921479477.7U Division CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209481043U true CN209481043U (en) | 2019-10-11 |
Family
ID=68126619
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822144583.1U Expired - Fee Related CN209481043U (en) | 2018-12-20 | 2018-12-20 | A kind of handling H profile steel girder steel fixture |
CN201921479477.7U Expired - Fee Related CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921479477.7U Expired - Fee Related CN210594893U (en) | 2018-12-20 | 2018-12-20 | Double-hook clamp for hoisting H-shaped steel beam |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN209481043U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109573813A (en) * | 2018-12-20 | 2019-04-05 | 安徽马钢工程技术集团有限公司 | A kind of handling H profile steel girder steel fixture and its handling method |
-
2018
- 2018-12-20 CN CN201822144583.1U patent/CN209481043U/en not_active Expired - Fee Related
- 2018-12-20 CN CN201921479477.7U patent/CN210594893U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109573813A (en) * | 2018-12-20 | 2019-04-05 | 安徽马钢工程技术集团有限公司 | A kind of handling H profile steel girder steel fixture and its handling method |
Also Published As
Publication number | Publication date |
---|---|
CN210594893U (en) | 2020-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109095343A (en) | Assembled hanger | |
CN109573813A (en) | A kind of handling H profile steel girder steel fixture and its handling method | |
CN209481043U (en) | A kind of handling H profile steel girder steel fixture | |
CN203667797U (en) | Simple lifting appliance tooling for SK-2 type double-block sleepers | |
CN108675170A (en) | Roofing monorail crane and its construction method | |
CN203513086U (en) | Special lifting appliance for long-bundle-shaped material | |
CN201228196Y (en) | Special slings for rolling mill working roll | |
CN203513082U (en) | Special combined lifting appliance of excavator | |
CN215331379U (en) | Elevator shaft lifting operation platform | |
CN109081235A (en) | A kind of steel truss beam element hoisting method applied under single suspension centre lifting pattern | |
CN201027144Y (en) | Steel plate clamps | |
CN211037773U (en) | Hanging basket suspension device | |
CN209685121U (en) | A kind of suspender with the main hanging beam of truss-like | |
CN204281030U (en) | A kind of special hanger lifting section bar | |
CN208948679U (en) | Assembled hanger | |
CN209242475U (en) | A kind of suspender | |
CN205616430U (en) | Railway T beam mold board dismouting hoist and hang and move device | |
CN107473070A (en) | The Electromagnetic slings for lifting loads and its adjusting method of a kind of adjustable angle | |
CN208293434U (en) | Gallus-type large-tonnage box beam hanger structure | |
CN208009260U (en) | A kind of special hoisting sling of prefabricated bridge | |
CN206857962U (en) | The boom hoisting of excavator | |
CN206278817U (en) | A kind of lifting beam device for handling sheet material | |
CN218453900U (en) | A stone tongs for heterotypic foraminiferous work piece | |
CN211521358U (en) | Hoist for prefabricated hollow slab | |
CN209778062U (en) | Lengthening lifting appliance for lifting lattice beam of steel pipe arch bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191011 |
|
CF01 | Termination of patent right due to non-payment of annual fee |