CN209468912U - Multi-functional leveling component - Google Patents

Multi-functional leveling component Download PDF

Info

Publication number
CN209468912U
CN209468912U CN201822036717.8U CN201822036717U CN209468912U CN 209468912 U CN209468912 U CN 209468912U CN 201822036717 U CN201822036717 U CN 201822036717U CN 209468912 U CN209468912 U CN 209468912U
Authority
CN
China
Prior art keywords
pendant
hanging portion
hanging
main body
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822036717.8U
Other languages
Chinese (zh)
Inventor
呼国生
呼卫红
李江
李国敏
周玉辉
李占魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Sanyang Building Materials Technology Co Ltd
Original Assignee
Henan Sanyang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Sanyang Building Materials Technology Co Ltd filed Critical Henan Sanyang Building Materials Technology Co Ltd
Priority to CN201822036717.8U priority Critical patent/CN209468912U/en
Application granted granted Critical
Publication of CN209468912U publication Critical patent/CN209468912U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of multi-functional leveling components, it is intended to solve main joist, cover surface keel, plasterboard one part installation bring large labor intensity, the technical problem that human cost is high, construction efficiency is low in ceiling construction.It includes the first pendant and the second pendant, and first pendant is L-shaped, including the first pendant main body and the first hanging portion, and multiple first positioning holes being arranged alternately and leveling opening are distributed on the different height of the first pendant main body;Second pendant includes the second hanging portion, third hanging portion and the second pendant main body, and the second pendant main body is equipped with multiple second location holes;The first hanging portion hanging is fixedly connected in leveling opening and through first positioning hole with second location hole.In the utility model between suspended ceiling modeling component be fixedly connected can ground at the construction field (site) complete, batch production may further be passed through, customize and complete, labor intensity is reduced, reduce human cost, improve construction efficiency.

Description

Multi-functional leveling component
Technical field
The utility model relates to furred ceiling technical fields, and in particular to a kind of multi-functional leveling component.
Background technique
Program of existing structure interior decoration during ceiling construction be hang spring is first installed, then main joist is installed, then Main joist is leveled, then cover surface keel is installed, then plasterboard is installed.During installing plasterboard, construction personnel needs to hold in the palm It lifts plasterboard and is fixed on cover surface keel, while plasterboard being needed to be adjusted to suitable position, since two hands will be held in the palm It lifts plasterboard to be difficult to see the position of plasterboard clearly again, be lifted along with plasterboard is heavier arduously, this is a very arduous link.
And the suspended ceiling modeling component (including main joist, cover surface keel, plasterboard etc.) during existing ceiling construction The installation of a part is required, and is aerial work, therefore the large labor intensity in work progress at the scene, human cost Height, construction efficiency are extremely low.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of multi-functional leveling components, to solve in ceiling construction Main joist, cover surface keel, plasterboard one part installation bring large labor intensity, the technology that human cost is high, construction efficiency is low Problem.
In order to solve the above technical problems, the utility model adopts the following technical solution:
A kind of multi-functional leveling component, including the first pendant and the second pendant are designed, first pendant includes the first extension Multiple the first positioning being arranged alternately are distributed in part main body and the first hanging portion on the different height of the first pendant main body Hole and leveling opening, first hanging portion are equipped with the first hanging hole;Second pendant is hung including the second pendant main body, second Extension portion and third hanging portion, the second pendant main body are equipped with multiple second location holes, and the third hanging portion is equipped with and second The third hanging hole of location hole horizontal alignment, plane and the second pendant body parallel where the third hanging hole;Described first Hanging portion hanging is fixedly connected in leveling opening and through first positioning hole with second location hole.
Preferably, first pendant is L-shaped.
Preferably, second hanging portion and third hanging portion are L-shaped.
Further, second hanging portion is equipped with the second hanging hole, place plane and the second pendant body normal.
Preferably, the first positioning hole and second location hole are one time punching molded circular opening.
Preferably, the leveling opening is one time punching molded square aperture.
Compared with prior art, the advantageous effects of the utility model are:
Main joist, cover surface keel, being fixedly connected between plasterboard can at the construction field (site) during ceiling construction Ground is completed, and may further be completed by batch production, customization, be reduced labor intensity, reduce human cost, improve effect of constructing Rate.
Detailed description of the invention
Fig. 1 is a kind of multi-functional structural schematic diagram for leveling the first pendant in component.
Fig. 2 is a kind of multi-functional structural schematic diagram for leveling the second pendant in component.
Fig. 3 is a kind of multi-functional leveling component structure diagram.
In figure, 1 is the first pendant main body, and 2 be leveling opening, and 3 be first positioning hole, and 4 be the first hanging portion, and 5 be first Hanging hole, 6 be the second pendant main body, and 7 be the second hanging portion, and 8 be third hanging portion, and 9 be second location hole, and 10 be the second hanging Hole, 11 be third hanging hole.
Specific embodiment
Illustrate specific embodiment of the present utility model with reference to the accompanying drawings and examples, but following embodiment only uses It is described in detail the utility model, does not limit the scope of the utility model in any way.
Components involved in following embodiment are then unless otherwise instructed conventional commercial product.
Embodiment 1: a kind of multi-functional leveling component, including the first pendant and the second pendant, referring to Fig. 1-3, the first pendant It is L-shaped, including the first pendant main body 1 and the first hanging portion 4.Multiple friendships are distributed on the different height of the first pendant main body 1 For setting at a distance of the first positioning hole 3 of 2cm and leveling opening 2, first positioning hole 3 is one time punching molded circular opening, is adjusted Being opened flat mouth 2 is one time punching molded square aperture.First hanging portion 4 is equipped with the first hanging that other connectors can be allowed to pass through Hole 5.
Second pendant includes the second hanging portion 7, third hanging portion 8 and the second pendant main body 6, the second hanging portion 7 and third Hanging portion 8 is L-shaped.Second pendant main body 6 is equipped with multiple second location holes 9 at a distance of 2cm, is one time punching molded circle Shape aperture, the second hanging portion 7 are equipped with the second hanging hole 10 that other connectors can be allowed to pass through, place plane and the second pendant Main body 6 is vertical, and third hanging portion 8 is equipped with the third hanging hole 11 with 9 horizontal alignment of second location hole, place plane and second Pendant main body 6 is parallel.
By the second hanging portion 7 hanging in the second pendant to constitute multi-functional tune in the leveling opening 2 in the first pendant Then flat component is fixedly connected by first positioning hole 3 with second location hole 9 with bolt.
The specification of multi-functional leveling pendant requires to be adjusted according to existing design, and material is metal material.
When using the utility model, suspended ceiling modeling component (is not drawn into, including main joist, cover surface keel, plasterboard) in figure Between be fixedly connected can ground at the construction field (site) complete, batch production may further be passed through, customize and complete.Then lead to It crosses the second hanging portion 8 connection main joist and fastening is connected with by second location hole 9 and third hanging hole 11, then second hang Part and following suspended ceiling modeling component connect into an entirety.Then the first pendant by the first hanging hole 5 and is fixed on roof Screw rod (being not drawn into figure) connection is secured with nuts, the level height of the first pendant is determined by the cap nut on screw rod.Most The second hanging portion 7 is hung in leveling opening 2 afterwards, fastening is connected with by first positioning hole 3 and second location hole 9, It may further be fixed by the second furred ceiling hole 10 and screw rod, then entire suspended ceiling modeling component is installed.
The utility model is described in detail above in conjunction with drawings and examples, still, the skill of technical field Art personnel, can also be to each specific in above-described embodiment it is understood that without departing from the purpose of the present invention Parameter changes, and forms multiple specific embodiments, is the common variation range of the utility model, no longer detailed one by one herein It states.

Claims (6)

1. a kind of multi-functional leveling component, which is characterized in that including the first pendant and the second pendant, first pendant includes the Multiple first be arranged alternately are distributed in one pendant main body and the first hanging portion on the different height of the first pendant main body Location hole and leveling opening, first hanging portion are equipped with the first hanging hole;Second pendant includes the second pendant main body, the Two hanging portions and third hanging portion, the second pendant main body be equipped with multiple second location holes, the third hanging portion be equipped with The third hanging hole of second location hole horizontal alignment, plane and the second pendant body parallel where the third hanging hole;It is described The hanging of first hanging portion is fixedly connected in leveling opening and through first positioning hole with second location hole.
2. multi-functional leveling component according to claim 1, which is characterized in that first pendant is L-shaped.
3. multi-functional leveling component according to claim 1, which is characterized in that second hanging portion and third hanging portion It is L-shaped.
4. multi-functional leveling component according to claim 1, which is characterized in that second hanging portion is equipped with the second hanging Hole, place plane and the second pendant body normal.
5. multi-functional leveling component according to claim 1, which is characterized in that the first positioning hole and second location hole It is one time punching molded circular opening.
6. multi-functional leveling component according to claim 1, which is characterized in that the leveling opening is one time punching molded Square aperture.
CN201822036717.8U 2018-12-06 2018-12-06 Multi-functional leveling component Expired - Fee Related CN209468912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822036717.8U CN209468912U (en) 2018-12-06 2018-12-06 Multi-functional leveling component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822036717.8U CN209468912U (en) 2018-12-06 2018-12-06 Multi-functional leveling component

Publications (1)

Publication Number Publication Date
CN209468912U true CN209468912U (en) 2019-10-08

Family

ID=68088344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822036717.8U Expired - Fee Related CN209468912U (en) 2018-12-06 2018-12-06 Multi-functional leveling component

Country Status (1)

Country Link
CN (1) CN209468912U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287378A (en) * 2020-04-03 2020-06-16 湖南工学院 Ceiling with adjustable height and construction method thereof
CN111305450A (en) * 2020-04-03 2020-06-19 湖南工学院 Hanging piece for suspended ceiling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287378A (en) * 2020-04-03 2020-06-16 湖南工学院 Ceiling with adjustable height and construction method thereof
CN111305450A (en) * 2020-04-03 2020-06-19 湖南工学院 Hanging piece for suspended ceiling

Similar Documents

Publication Publication Date Title
CN209468912U (en) Multi-functional leveling component
CN204126102U (en) A kind of sheet material fast-assembling ceiling structure
CN104481075B (en) A kind of mounting system of furred ceiling
CN104328851B (en) Curtain wall
CN107217775B (en) Integral method is installed in the design of the reversed support system structure of furred ceiling
CN205955100U (en) It constructs to have single hook pendant panel fixed knot
CN209468909U (en) It is easily installed the ceiling structure of leveling
CN204059718U (en) Openable metal sheet furred ceiling
CN203947655U (en) A kind of hanging piece for low floor height Integral ceiling
CN205296536U (en) Joint formula keel connecting piece
CN205206120U (en) Furred ceiling suspended structure
CN205509388U (en) Three cascades climbing crane span structure
CN204609092U (en) A kind of combined type conversion layer connector
CN105963981B (en) Large-scale dome magnetic building blocks
CN208685895U (en) Snap ring-type sunpender quick coupling
CN203307983U (en) Ceiling keel component
CN206016033U (en) Adjustable lifting is held court from behind a screen variola
CN208252006U (en) A kind of wooden garden door
CN205896639U (en) TV set pendant of variable -spacing adjustment
CN207392569U (en) A kind of adjustable Hanging type installation ceiling structure
CN203256990U (en) Rain groove support and greenhouse
CN203846648U (en) Stone hanging part
CN205296535U (en) Integrated furred ceiling card formula fossil fragments mounting structure
CN104896390B (en) Glass column lamp decoration modeling structure
CN203514609U (en) Ceiling stone pendant and ceiling stone hanging system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191008

Termination date: 20211206

CF01 Termination of patent right due to non-payment of annual fee