CN209468839U - A kind of rain sewage socket joint pipeline smoothly installs equipment - Google Patents
A kind of rain sewage socket joint pipeline smoothly installs equipment Download PDFInfo
- Publication number
- CN209468839U CN209468839U CN201822156701.0U CN201822156701U CN209468839U CN 209468839 U CN209468839 U CN 209468839U CN 201822156701 U CN201822156701 U CN 201822156701U CN 209468839 U CN209468839 U CN 209468839U
- Authority
- CN
- China
- Prior art keywords
- mounting seat
- socket joint
- snap ring
- rain sewage
- joint pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000010865 sewage Substances 0.000 title claims abstract description 27
- 230000007246 mechanism Effects 0.000 claims abstract description 16
- 230000003139 buffering effect Effects 0.000 claims description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 238000013016 damping Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 230000037023 motor activity Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 12
- 230000008901 benefit Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000004807 localization Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 229910001141 Ductile iron Inorganic materials 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000002407 reforming Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Manipulator (AREA)
Abstract
The utility model discloses a kind of rain sewage socket joint pipelines smoothly to install equipment, it includes mounting seat, pipe mounting seat, hoisting mechanism, the pipe mounting seat is mounted in mounting seat, the pipe mounting seat includes fixed mounting and active mount, the fixed mounting is equipped with upper snap ring and lower snap ring, the upper snap ring and lower snap ring are cooperatively connected, and the active mount is equipped with arc-shaped notch;The mounting seat is equipped with sliding slot, and the hoisting mechanism and sliding slot are fitted in mounting seat, and the hoisting mechanism includes movable plate, lifting cylinder, support rod, telescopic cylinder, motor and manipulator.The utility model structure is simple, easy to operate, and accurate positioning when Pipe installing, installation speed is fast, high-efficient.
Description
Technical field
The utility model belongs to pipe technology field, and in particular to a kind of rain sewage socket joint pipeline smoothly installs equipment.
Background technique
The discharge of present people's life moderate rain sewage is discharged by downcomer, the installation and use of sewer pipe and people
Life it is closely bound up.And the country is strengthening the construction of water conservancy facilities energetically at this stage, uses very extensive, packet to aqueduct
Include GRP pipe, ductile iron pipeline, concrete duct, steel pipeline and PCCP cementitious composite pipeline, the above pipeline
Flexible socket joint is mostly used to connect greatly;And the above Pipe installing is without a kind of conveniently installation tool at present, now greatly
Traditional bottle gouard moved by hands or hand cord-tightening device is mostly used to pull in mounting means, installation effectiveness is low, and time-consuming and laborious, civilization degree is low,
There is no modern science and technology content.
Pipe installing still has several drawbacks at present, such as will use a large amount of labour in pipe laying, secondly may be used also
The position installed inaccuracy can occur, and use after mounting ineffective, while install there are also most of equipment
Do not have damping device when pipeline, many pipelines is caused to make pipeline broken due to violent collision during installation
Damage, to cause unnecessary waste.
Existing assembling pipe joint comprising hydraulic power unit, double-act-ing hydraulic J-Horner, connector and remote control device, connection
Part is movably connected between double-act-ing hydraulic J-Horner and bell-and-spigot pipe, and remote control device controls hydraulic power unit operating, hydraulic power unit driving
Double-act-ing hydraulic J-Horner running, connector includes earrings and pin, and earrings is equipped with multiple, is respectively provided at bell-and-spigot pipe and double acting liquid
On compressing cylinder, pin is plugged in the earrings on bell-and-spigot pipe, and is plugged in the corresponding earrings on double-act-ing hydraulic J-Horner.
Device position inaccurate in Pipe installing, not can guarantee pipe level.
Summary of the invention
For overcome it is above-mentioned there are deficiency, the inventor of the utility model passes through long-term explorations trial and multiple reality
It tests and effort, keeps reforming and innovate, propose a kind of rain sewage socket joint pipeline and equipment is smoothly installed, Pipe installing positioning is quasi-
Really, installation speed is fast, high-efficient.
To achieve the above object the technical scheme adopted by the utility model is to provide a kind of rain sewage socket joint pipeline smooth
Equipment is installed comprising mounting seat, pipe mounting seat, hoisting mechanism, the pipe mounting seat are mounted in mounting seat, institute
Stating pipe mounting seat includes fixed mounting and active mount, and fixed mounting and active mount are located on same axis,
The fixed mounting is equipped with upper snap ring and lower snap ring, and the upper snap ring and lower snap ring are cooperatively connected, the active mount
It is equipped with arc-shaped notch;The mounting seat is equipped with sliding slot, and the hoisting mechanism and sliding slot are fitted to mounting seat
On, the hoisting mechanism includes movable plate, lifting cylinder, support rod, telescopic cylinder, motor and manipulator, on the movable plate
Equipped with sliding block, sliding block and sliding slot are cooperatively connected, and the lifting cylinder is fixed on movable plate, and the support rod and lifting cylinder are solid
Fixed connection, the motor activity are connected on support rod, and the telescopic cylinder is fixedly connected with motor, the manipulator with stretch
Cylinder connection.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
It include 2 or 2 or more active mounts in the mounting base.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
It is fixedly installed with the first rubber pad on the inside of the upper snap ring, is fixedly installed with the second rubber pad on the inside of the lower snap ring.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
The upper snap ring is fixedly connected with lower snap ring by screw.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
The support rod two sides are welded with reinforcing rib, and support rod is fixedly connected by reinforcing rib with movable plate.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
The telescopic cylinder includes level-one telescopic cylinder and second level telescopic cylinder, and the level-one telescopic cylinder is fixedly connected with motor, institute
Second level telescopic cylinder is stated to connect by steel wire with motor top.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
The second level telescopic cylinder is connected with manipulator.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
The manipulator includes strap and buffering fixture block, and the buffering fixture block is mounted on strap.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
Damping spring is installed inside the strap.
Equipment is smoothly installed according to rain sewage socket joint pipeline described in the utility model, further technical solution is:
The buffering fixture block internal activity connection rolls ball.
Compared with prior art, the technical solution of the utility model have the following advantages that/the utility model has the advantages that
The utility model structure is simple, easy to operate, and Pipe installing accurate positioning, Pipe installing speed is fast, high-efficient, people
Work labor intensity is low, is suitble to large-scale popularization.
By setting active mount and fixed mounting, a pipeline can be fixed, then by another pipeline with
Fixed -piping carries out socket joint connection, it can be ensured that in pipe installation process, pipeline will not be moved, and pipeline is not easy to misplace when connecting.
And active mount and fixed mounting are located on same axis, and structure is designed with circle, allow axis between pipeline and pipeline
The heart is identical, positions pipeline quickly, and localization method is simply accurate, mitigates labor intensity, reduces Pipe installing error.
It can be by pipeline by manipulator clamping and by going up and down by being provided with that hoisting mechanism realizes in pipe laying
Air cylinder lifting, so as to greatly reduce the use of labour, by pipe mounting seat realize can location and installation effect, thus
The possibility for avoiding installation dislocation improves the efficiency of work, while realizing and installing by damping spring and buffering fixture block
When play certain buffering effect, and then the function that impact severity plays protective conduit can be reduced.
Detailed description of the invention
It, below will be to required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
The attached drawing used is briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore not
It should be considered as the restriction to range, for those of ordinary skill in the art, without creative efforts,
It can also be obtained according to these attached drawings other relevant attached drawings.
Fig. 1 is the schematic perspective view of the utility model.
Fig. 2 is the schematic perspective view of the utility model.
Fig. 3 is the structural schematic diagram of hoisting mechanism in the utility model.
Fig. 4 is the structural schematic diagram of snap ring in the utility model.
Figure acceptance of the bid note is respectively as follows: mounting seat 100, sliding slot 101, active mount 110, arc-shaped notch 111, fixed peace
Fill seat 120, upper snap ring 121, lower snap ring 122, screw 123, the first rubber pad 124, the second rubber pad 125;
Movable plate 201, lifting cylinder 202, support rod 203, reinforcing rib 204, motor 205, level-one telescopic cylinder 206, two
Grade telescopic cylinder 207, manipulator 208, reinforcing bar 209, sliding block 210, fixed plate 211, damping spring 212, buffering fixture block 213, rolling
Turn pearl 214.
Specific embodiment
To keep the utility model aim, technical solution and advantage clearer, below in the utility model embodiment
Technical solution be clearly and completely described, it is clear that described embodiment is a part of embodiment party of the utility model
Formula, rather than whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making
Every other embodiment obtained under the premise of creative work out, fall within the protection scope of the utility model.Therefore, with
The detailed description of the embodiments of the present invention of lower offer is not intended to limit the range of claimed invention,
But it is merely representative of the selected embodiment of the utility model.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, then it further can not be defined and explained in subsequent attached drawing.
Embodiment:
As shown in Figure 1-3, a kind of rain sewage socket joint pipeline smoothly installs equipment comprising mounting seat 100, Pipe installing
Seat, hoisting mechanism, the pipe mounting seat are mounted in mounting seat 100, and the pipe mounting seat includes fixed mounting 120
With active mount 110,3 active mount 110 and 1 fixed mountings 120, and fixed mounting are set in the present embodiment
120 between active mount 110, and fixed mounting 120 and active mount 110 are located on same axis, allows pipe
Axle center is identical between road and pipeline, positions pipeline quickly, and localization method is simply accurate, can reduce labor intensity, subtracts
Small pipeline installation error.
Fixed mounting 120 is equipped with upper snap ring 121 and lower snap ring 122, the upper snap ring 121 and the cooperation of lower snap ring 122
It connects, is fixedly installed with the first rubber pad 124 on the inside of upper snap ring 121, is fixedly installed with the second rubber on the inside of the lower snap ring 122
Pad 125, upper snap ring 121 is fixedly connected with lower snap ring 122 by screw 123 in the present embodiment, is set on the active mount 110
There is arc-shaped notch 111.
The mounting seat 100 is equipped with sliding slot 101, and the hoisting mechanism and sliding slot 101 are fitted to mounting seat
On 100, the hoisting mechanism includes movable plate 201, lifting cylinder 202, support rod 203, telescopic cylinder, motor 205 and machinery
Hand 208, the movable plate 201 are equipped with sliding block 210, and sliding block 210 and sliding slot 101 are cooperatively connected, and the lifting cylinder 202 is fixed
On movable plate 201, the support rod 203 is fixedly connected with lifting cylinder 202, and 203 two sides of support rod are welded with reinforcing rib
204, support rod 203 is fixedly connected by reinforcing rib 204 with movable plate 201, and the motor 205 is movably connected in support rod 203
On, the telescopic cylinder is fixedly connected with motor 205, and the manipulator 208 is connect with telescopic cylinder.
The telescopic cylinder includes level-one telescopic cylinder 206 and second level telescopic cylinder 207, the level-one telescopic cylinder 206
It is fixedly connected with motor 205, the second level telescopic cylinder 207 is connected by steel wire 209 with 205 top of motor, and the second level is stretched
Contracting cylinder 207 and manipulator 208 connect, and manipulator 208 includes strap 211 and buffering fixture block 213, the buffering fixture block
213 are mounted on strap 211, and damping spring 212 is equipped with inside strap 211, and buffering 213 internal activity of fixture block connects
It connects and rolls ball 214.
It can be by pipeline by manipulator clamping and by going up and down by being provided with that hoisting mechanism realizes in pipe laying
Air cylinder lifting, so as to greatly reduce the use of labour, by pipe mounting seat realize can location and installation effect, thus
The possibility for avoiding installation dislocation improves the efficiency of work, while realizing and installing by damping spring and buffering fixture block
When play certain buffering effect, and then the function that impact severity plays protective conduit can be reduced
When using the device, first a pipeline is fixed on fixed mounting, then by utilizing hoisting mechanism to another
Pipeline carries out promotion movement, is moved on active mount corresponding with fixed mounting, while when transferring pipeline by subtracting
Shake spring plays certain buffering effect to pipeline, to can avoid making piping failure due to colliding acutely, plays protection
The effect of pipeline.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width
Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside",
The orientation or positional relationship of the instructions such as " clockwise ", " counterclockwise " be based on the orientation or positional relationship shown in the drawings, be only for
Convenient for description the utility model and simplify description, rather than the equipment of indication or suggestion meaning or element must have specifically
Orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be
Mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary
The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis
Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature the "upper" of second feature or it
"lower" may include that the first and second features directly contact, and also may include that the first and second features are not direct contacts but lead to
Cross the other characterisation contact between them.Moreover, fisrt feature includes above the second feature " above ", " above " and " above "
One feature is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.First is special
Sign is directly below and diagonally below the second feature including fisrt feature under the second feature " below ", " below " and " below ", or only
Indicate that first feature horizontal height is less than second feature.
Above are merely preferred embodiments of the utility model, it is noted that above-mentioned preferred embodiment should not regard
For limitations of the present invention, the protection scope of the utility model should be defined by the scope defined by the claims..For
For those skilled in the art, without departing from the spirit and scope of the utility model, it can also make several
Improvements and modifications, these improvements and modifications also should be regarded as the protection scope of the utility model.
Claims (10)
1. a kind of rain sewage socket joint pipeline smoothly installs equipment, which is characterized in that including mounting seat, pipe mounting seat, promotion
Mechanism, the pipe mounting seat are mounted in mounting seat, and the pipe mounting seat includes fixed mounting and active mount,
Fixed mounting and active mount are located on same axis, and the fixed mounting is equipped with upper snap ring and lower snap ring, described
Upper snap ring and lower snap ring are cooperatively connected, and the active mount is equipped with arc-shaped notch;The mounting seat is equipped with sliding slot,
The hoisting mechanism and sliding slot are fitted in mounting seat, and the hoisting mechanism includes movable plate, lifting cylinder, support
Bar, telescopic cylinder, motor and manipulator, the movable plate are equipped with sliding block, and sliding block and sliding slot are cooperatively connected, the lifting cylinder
It is fixed on movable plate, the support rod is fixedly connected with lifting cylinder, and the motor activity is connected on support rod, described to stretch
Contracting cylinder is fixedly connected with motor, and the manipulator is connect with telescopic cylinder.
2. rain sewage socket joint pipeline according to claim 1 smoothly installs equipment, which is characterized in that wrapped in the mounting base
2 or 2 or more active mounts are included.
3. rain sewage socket joint pipeline according to claim 1 smoothly installs equipment, which is characterized in that on the inside of the upper snap ring
It is fixedly installed with the first rubber pad, is fixedly installed with the second rubber pad on the inside of the lower snap ring.
4. rain sewage socket joint pipeline according to claim 3 smoothly installs equipment, which is characterized in that the upper snap ring is under
Snap ring is fixedly connected by screw.
5. rain sewage socket joint pipeline according to claim 1 smoothly installs equipment, which is characterized in that the support rod two sides
It is welded with reinforcing rib, support rod is fixedly connected by reinforcing rib with movable plate.
6. rain sewage socket joint pipeline according to claim 1 smoothly installs equipment, which is characterized in that the telescopic cylinder packet
Level-one telescopic cylinder and second level telescopic cylinder are included, the level-one telescopic cylinder is fixedly connected with motor, the second level telescopic cylinder
It is connected by steel wire with motor top.
7. rain sewage socket joint pipeline according to claim 6 smoothly installs equipment, which is characterized in that the second level is stretched gas
Cylinder is connected with manipulator.
8. rain sewage socket joint pipeline according to claim 7 smoothly installs equipment, which is characterized in that the manipulator includes
Strap and buffering fixture block, the buffering fixture block are mounted on strap.
9. rain sewage socket joint pipeline according to claim 8 smoothly installs equipment, which is characterized in that in the strap
Portion is equipped with damping spring.
10. rain sewage socket joint pipeline according to claim 8 smoothly installs equipment, which is characterized in that the buffering fixture block
Internal activity connection rolls ball.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822156701.0U CN209468839U (en) | 2018-12-21 | 2018-12-21 | A kind of rain sewage socket joint pipeline smoothly installs equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822156701.0U CN209468839U (en) | 2018-12-21 | 2018-12-21 | A kind of rain sewage socket joint pipeline smoothly installs equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209468839U true CN209468839U (en) | 2019-10-08 |
Family
ID=68090477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822156701.0U Expired - Fee Related CN209468839U (en) | 2018-12-21 | 2018-12-21 | A kind of rain sewage socket joint pipeline smoothly installs equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209468839U (en) |
-
2018
- 2018-12-21 CN CN201822156701.0U patent/CN209468839U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209468839U (en) | A kind of rain sewage socket joint pipeline smoothly installs equipment | |
CN202992383U (en) | Oil pipe support, oil pipe installation structure and vehicle | |
CN101614082A (en) | Counter weight type communication iron tower | |
CN208501732U (en) | A kind of piping lane cast-in-place construction integral movable type mould bases | |
CN213061799U (en) | Vehicle restriction device for bridge engineering | |
CN215332834U (en) | Hopper for pouring reverse well wall | |
CN100507210C (en) | Double-layer structured round tunnel with deformation control device | |
CN212129954U (en) | Assembled construction equipment for municipal building | |
CN210254871U (en) | Steel member welding position device | |
CN209080443U (en) | A kind of large size PC plate placement bracket | |
CN206831352U (en) | A kind of lamppost tower | |
CN219530367U (en) | Inspection track and inspection equipment | |
CN206387080U (en) | Water storage device and precision air conditioner | |
CN218400557U (en) | PE pipeline transfer device for municipal construction | |
CN217175114U (en) | Drainage pipe erecting device for municipal works | |
CN216201185U (en) | Purify engineering with a gallows of water supply pipe | |
CN201507139U (en) | Counter weight type communication iron tower | |
CN217679256U (en) | Supporting device for jacking pipe gallery and pipe culvert | |
CN212835162U (en) | Electric three-wheel high-pressure cleaning vehicle | |
CN216881200U (en) | Fixed numerical control bending machine for machining bicycle frame steel pipe | |
CN217923974U (en) | Sewage pipeline winding displacement device | |
CN2646119Y (en) | Lifting device for microporous aerator | |
CN211340851U (en) | Longitudinal and transverse reinforcing device in box body | |
CN220284979U (en) | Road construction structure | |
CN220268644U (en) | Water supply and drainage pipeline installation structure for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191008 |