CN209468704U - A kind of diversion tunnel template - Google Patents
A kind of diversion tunnel template Download PDFInfo
- Publication number
- CN209468704U CN209468704U CN201822169964.5U CN201822169964U CN209468704U CN 209468704 U CN209468704 U CN 209468704U CN 201822169964 U CN201822169964 U CN 201822169964U CN 209468704 U CN209468704 U CN 209468704U
- Authority
- CN
- China
- Prior art keywords
- perpendicular support
- diversion tunnel
- fixedly installed
- template
- loop bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to diversion tunnel mould plate technique fields, and disclose a kind of diversion tunnel template, including perpendicular support, the opposite side of the perpendicular support is fixedly installed with stull, the bottom of the perpendicular support is fixedly installed with connecting rod, the bottom of the connecting rod is fixedly installed with idler wheel, is fixedly installed with crossbeam at the top of the perpendicular support.The diversion tunnel template, by the way that perpendicular support is arranged, when carrying out the transfer of diversion tunnel template, it is moved by idler wheel, and the connection between diversion tunnel template and perpendicular support, it is that two first stretch rods are stretched to the first stretch rod to resist the first loop bar, then cooperated by connection frame, to which diversion tunnel template is fixedly connected with perpendicular support, it is clamped again by the sliding of the second stretch rod and extension spring and the second loop bar, keep diversion tunnel template and perpendicular support more firm, the vibration generated in moving process is avoided to damage caused by the connection of simple supporting metal, cause connection structure unstable, stable connection is achieved the purpose that.
Description
Technical field
The utility model relates to diversion tunnel mould plate technique field, specially a kind of diversion tunnel template.
Background technique
Diversion tunnel template can be all applied in the engineerings such as railway, highway, diversion tunnel, refer to the one of template and supporting template
A whole set of tectonic system, wherein contact concrete simultaneously controls predetermined size, and shape, the construction portion of position are known as template, support and
Rod piece, truss, connecting piece, metal-ware and work suspension bridge of fixed form etc. constitute supporting system.
When the engineerings such as traditional railway, highway, diversion tunnel are constructed, only template and simple support system into
Row support is all manually to carry, enhances the working strength of worker when carrying out the transfer of position, and between template
Support be with metal-wares such as steel alloys, the mechanical oscillation generated on the move can damage support construction, to lead
Cause connection unstable, we have proposed a kind of diversion tunnel templates to solve the above-mentioned problems.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of diversion tunnel template, has the advantages that stable connection,
It solves since the support between template is with metal-wares such as steel alloys, the mechanical oscillation generated on the move can tie support
It is configured to damage, so as to cause unstable problem is connected.
(2) technical solution
To realize above-mentioned stable connection purpose, the utility model is provided the following technical solutions: a kind of diversion tunnel template, including
Perpendicular support, the opposite side of the perpendicular support are fixedly installed with stull, and the bottom of the perpendicular support is fixedly installed with connecting rod, the connecting rod
Bottom be fixedly installed with idler wheel, crossbeam is fixedly installed at the top of the perpendicular support, top is fixedly installed at the top of the crossbeam
Bar, is fixedly installed with template group at the top of the mandril, there are four the template group and the opposite side of perpendicular support are fixedly mounted
Connection frame, the inside of the connection frame is movably installed with first rotating shaft two-by-two, and the lateral wall of the first rotating shaft is solid two-by-two
Dingan County is equipped with the first stretch rod, is socketed with the first loop bar between first stretch rod two-by-two, the inner wall of the template group and position
Mounting plate is fixedly installed with above connection frame, the opposite side of the mounting plate is movably installed with standing screw, the template
Group is fixedly installed with the second shaft with the perpendicular top supportted opposite side and be located at mounting plate, and second shaft is outer two-by-two
Side wall is fixedly installed with the second stretch rod, and the lateral wall of second stretch rod is socketed with extension spring two-by-two, two-by-two institute
It states and is socketed with the second loop bar between the second stretch rod.
Preferably, the perpendicular support no less than two, and erected between support two-by-two and be mounted on stull.
Preferably, the template group is arch sheet, and is respectively mounted that there are four connection frames between the perpendicular support of template group and two.
Preferably, sliding slot is offered inside first loop bar, the length summation of two first stretch rods, which is less than, to be slided
The length of slot.
Preferably, there are six the mounting plates, and two of them mounting plate is located at two opposite sides of perpendicular support.
Preferably, the inside of second loop bar offers sliding slot, and second stretch rod and extension spring are with second
Loop bar sliding clamping.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of diversion tunnel template, have it is following the utility model has the advantages that
The diversion tunnel template is moved when carrying out the transfer of diversion tunnel template by idler wheel by the way that perpendicular support is arranged,
And the connection between diversion tunnel template and perpendicular support, it is that two first stretch rods are stretched to the first stretch rod to resist the first loop bar,
Then cooperated by connection frame, so that diversion tunnel template is fixedly connected with perpendicular support, then pass through the second stretch rod and extension spring
Sliding with the second loop bar is clamped, and is kept diversion tunnel template and perpendicular support more firm, is avoided the vibration pair generated in moving process
It is damaged caused by simple supporting metal connection, causes connection structure unstable, achieved the purpose that stable connection, and two are erected support
Between connection there are two stull, crossbeam and mandril, supporting in this way are installed between the top and diversion tunnel template of perpendicular support
Mode enhances the stable connection of perpendicular support and diversion tunnel template.
Detailed description of the invention
Fig. 1 is the utility model structural front view;
Fig. 2 is schematic enlarged-scale view at the utility model A;
Fig. 3 is schematic enlarged-scale view at the utility model B.
In figure: 1 perpendicular support, 2 stulls, 3 connecting rods, 4 idler wheels, 5 crossbeams, 6 mandrils, 7 template groups, 8 connection frames, 9 first rotating shafts,
10 first stretch rods, 11 first loop bars, 12 mounting plates, 13 standing screws, 14 second shafts, 15 second stretch rods, 16 stretch bullet
Spring, 17 second loop bars.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, a kind of diversion tunnel template, including perpendicular support 1 are please referred to, the opposite side of perpendicular support 1 is fixedly installed with stull 2, erects
Support 1 no less than two, and erected between support 1 two-by-two and be mounted on stull 2, the bottom of perpendicular support 1 is fixedly installed with connecting rod 3, connects
The bottom of bar 3 is fixedly installed with idler wheel 4, and the top of perpendicular support 1 is fixedly installed with crossbeam 5, and the top of crossbeam 5 is fixedly installed with mandril
6, the top of mandril 6 is fixedly installed with template group 7, template group 7 is fixedly mounted with 1 opposite side of perpendicular support there are four connection frame
8, template group 7 is arch sheet, and is respectively mounted that there are four connection frames 8 between the perpendicular support 1 of template group 7 and two, and connection frame 8 is interior two-by-two
Portion is movably installed with first rotating shaft 9, and the lateral wall of first rotating shaft 9 is fixedly installed with the first stretch rod 10 two-by-two, and two-by-two
It is socketed with the first loop bar 11 between one stretch rod 10, sliding slot, the length of two first stretch rods 10 are offered inside the first loop bar 11
Spend summation be less than sliding slot length, the inner wall of template group 7 and be located at connection frame 8 top be fixedly installed with mounting plate 12, install
The opposite side of plate 12 is movably installed with standing screw 13, and there are six mounting plates 12, and two of them mounting plate 12 is located at two
1 opposite side of the perpendicular support of root, the side opposite with perpendicular support 1 of template group 7 and is fixedly installed with the positioned at the top of mounting plate 12
Two shafts 14, the lateral wall of the second shaft 14 is fixedly installed with the second stretch rod 15 two-by-two, and the second stretch rod 15 is outer two-by-two
Side wall is socketed with extension spring 16, is socketed with the second loop bar 17, the inside of the second loop bar 17 between the second stretch rod 15 two-by-two
Offer sliding slot, the second stretch rod 15 and extension spring 16 are slided with the second loop bar 17 and are clamped, by the way that perpendicular support 1 is arranged, into
When the transfer of row diversion tunnel template, moved by idler wheel 4, and the connection between diversion tunnel template and perpendicular support 1, it is by two
First stretch rod 10 is stretched to the first stretch rod 10 and resists the first loop bar 11, is then cooperated by connection frame 8, thus by diversion tunnel
Template is fixedly connected with perpendicular support 1, then is clamped by the sliding of the second stretch rod 15 and extension spring 16 and the second loop bar 17, makes to draw
Water hole template and perpendicular support 1 are more firm, avoid the vibration generated in moving process to damage caused by the connection of simple supporting metal
Evil, causes connection structure unstable, has achieved the purpose that stable connection, and there are two stulls 2 for connection between two perpendicular supports 1, erect
Crossbeam 5 and mandril 6 be installed between the top and diversion tunnel template of support 1, support pattern in this way, enhance perpendicular support 1 with
The stable connection of diversion tunnel template.
In conclusion the diversion tunnel template, by the way that perpendicular support 1 is arranged, when carrying out the transfer of diversion tunnel template, by idler wheel
4 are moved, and the connection between diversion tunnel template and perpendicular support 1, are that two first stretch rods 10 are stretched to the first stretch rod
10 resist the first loop bar 11, are then cooperated by connection frame 8, so that diversion tunnel template is fixedly connected with perpendicular support 1, then pass through the
The sliding of two stretch rods 15 and extension spring 16 and the second loop bar 17 is clamped, and is kept diversion tunnel template and perpendicular support 1 more firm, is avoided
Damage caused by the vibration generated in moving process connects simple supporting metal, causes connection structure unstable, reaches
The purpose of stable connection, and there are two stulls 2 for connection between two perpendicular supports 1, install between the top and diversion tunnel template of perpendicular support 1
There are crossbeam 5 and mandril 6, support pattern in this way enhances the stable connection of perpendicular support 1 and diversion tunnel template, solves
Since the support between template is with metal-wares such as steel alloys, the mechanical oscillation generated on the move can cause support construction
Damage, so as to cause unstable problem is connected.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of diversion tunnel template, including perpendicular support (1), it is characterised in that: the opposite side of the perpendicular support (1) is fixedly installed with stull
(2), the bottom of the perpendicular support (1) is fixedly installed with connecting rod (3), and the bottom of the connecting rod (3) is fixedly installed with idler wheel
(4), it is fixedly installed with crossbeam (5) at the top of the perpendicular support (1), is fixedly installed with mandril (6), institute at the top of the crossbeam (5)
It states and is fixedly installed at the top of mandril (6) template group (7), the template group (7) side opposite with perpendicular support (1) is fixedly mounted
There are four connection frame (8), and the inside of the connection frame (8) is movably installed with first rotating shaft (9) two-by-two, and described first turn two-by-two
The lateral wall of axis (9) is fixedly installed with the first stretch rod (10), is socketed with first between first stretch rod (10) two-by-two
Loop bar (11), the inner wall of the template group (7) and be located at connection frame (8) above be fixedly installed with mounting plate (12), the peace
The opposite side of loading board (12) is movably installed with standing screw (13), the template group (7) and perpendicular support (1) opposite side and is located at
The top of mounting plate (12) is fixedly installed with the second shaft (14), two-by-two the fixed peace of the lateral wall of second shaft (14)
Equipped with the second stretch rod (15), the lateral wall of second stretch rod (15) is socketed with extension spring (16) two-by-two, two-by-two institute
It states and is socketed with the second loop bar (17) between the second stretch rod (15).
2. a kind of diversion tunnel template according to claim 1, it is characterised in that: the perpendicular support (1) is no less than two, and two
Stull (2) are mounted between two perpendicular supports (1).
3. a kind of diversion tunnel template according to claim 2, it is characterised in that: the template group (7) is arch sheet, and mould
There are four being respectively mounted between board group (7) and two perpendicular supports (1) connection frame (8).
4. a kind of diversion tunnel template according to claim 1, it is characterised in that: offered inside first loop bar (11)
Sliding slot, the length summation of two first stretch rods (10) are less than the length of sliding slot.
5. a kind of diversion tunnel template according to claim 1, it is characterised in that: there are six the mounting plates (12), and its
In two mounting plates (12) be located at two opposite sides of perpendicular support (1).
6. a kind of diversion tunnel template according to claim 1, it is characterised in that: the inside of second loop bar (17) opens up
There is sliding slot, second stretch rod (15) and extension spring (16), which are slided with the second loop bar (17), to be clamped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822169964.5U CN209468704U (en) | 2018-12-24 | 2018-12-24 | A kind of diversion tunnel template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822169964.5U CN209468704U (en) | 2018-12-24 | 2018-12-24 | A kind of diversion tunnel template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209468704U true CN209468704U (en) | 2019-10-08 |
Family
ID=68089462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822169964.5U Expired - Fee Related CN209468704U (en) | 2018-12-24 | 2018-12-24 | A kind of diversion tunnel template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209468704U (en) |
-
2018
- 2018-12-24 CN CN201822169964.5U patent/CN209468704U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208441235U (en) | A kind of easy-disassembling-assembling two layers of steel construction room | |
CN209468704U (en) | A kind of diversion tunnel template | |
CN206406318U (en) | A kind of attaching/detaching apparatus of mould | |
CN207534312U (en) | A kind of shaped steel assembly assist device | |
CN219081027U (en) | Concrete placement auxiliary device | |
CN208934441U (en) | A kind of English truss assembly tooling | |
CN212600168U (en) | Header tube panel modularization manufacturing device | |
CN212224667U (en) | Roof steel truss assembling jig frame | |
CN210236845U (en) | Adjustable hanger for component steel reinforcement cage | |
CN111636678A (en) | Manufacturing method of detachable toilet hanging mold supporting tool | |
CN206091292U (en) | Template structure is pour to back timber | |
CN206375388U (en) | A kind of tire discharging bounce-proof device | |
CN201755828U (en) | Universal idle station apparatus for automatic stamping line production | |
CN214942308U (en) | Universal straight stay bar in aluminum mould system | |
CN212095060U (en) | Welding tool for built-in side wall plate | |
CN220369681U (en) | Supporting frame | |
CN221031313U (en) | Indoor scaffold for building construction | |
CN215573660U (en) | Freely combined tool assembly for vibration test of rail transit air conditioning unit | |
CN215522265U (en) | Steam distribution pipe installation device | |
CN214565479U (en) | Transfer device convenient to steel structural component | |
CN216810768U (en) | Folding supporting member for indoor suspension table top | |
CN213573173U (en) | Building module support | |
CN214993116U (en) | Deformation-preventing box girder template | |
CN211682063U (en) | Mould placing rack | |
CN212736523U (en) | Cement mortar stirring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191008 Termination date: 20211224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |