CN209466195U - A kind of anchor pole machine bearing assembly and disassembly device - Google Patents
A kind of anchor pole machine bearing assembly and disassembly device Download PDFInfo
- Publication number
- CN209466195U CN209466195U CN201822070360.5U CN201822070360U CN209466195U CN 209466195 U CN209466195 U CN 209466195U CN 201822070360 U CN201822070360 U CN 201822070360U CN 209466195 U CN209466195 U CN 209466195U
- Authority
- CN
- China
- Prior art keywords
- erector
- mounting head
- bolter
- roof
- diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of anchor pole machine bearing assembly and disassembly device, including support locator and erector, the support locator is placed on the lower section of roof-bolter for roof-bolter to be supported and positioned, the top that roof-bolter is arranged in the erector is used for the installation of anchor pole machine bearing, the both ends of the shaft of the roof-bolter is respectively equipped with first bearing and second bearing, the first bearing is towards support locator, and the second bearing is towards erector.Roof-bolter is supported and is positioned using support locator, then the bearing on roof-bolter is assembled and disassembled by erector, improves the speed of roof-bolter maintenance maintenance.
Description
Technical field
The utility model belongs to roof-bolter maintenance technology field, and in particular to a kind of anchor pole machine bearing assembly and disassembly device.
Background technique
Currently, major coal mine, in mining process, the loss of roof-bolter is very big, in order to not influence production, it is right in time to need
The roof-bolter of abrasion or damage is repaired and is replaced, the special construction and installation position in replacement process, due to roof-bolter
It sets, causes the disassembly of roof-bolter and maintenance all very inconvenient, seriously affected the maintenance and repair efficiency of roof-bolter, affected life
Production progress.
Utility model content
Utility model aims to solve above-mentioned problems existing in the prior art, provide a kind of anchor pole machine bearing dress
With provision for disengagement, roof-bolter is supported and is positioned using support locator, then by erector to the axis on roof-bolter
It holds and is assembled and disassembled, improve the speed of roof-bolter maintenance maintenance.
The utility model is achieved through the following technical solutions:
A kind of anchor pole machine bearing assembly and disassembly device, including support locator and erector, the support locator are placed
In the lower section of roof-bolter for roof-bolter to be supported and positioned, the top of roof-bolter is arranged in for anchor pole in the erector
The installation of machine bearing, the both ends of the shaft of the roof-bolter are respectively equipped with first bearing and second bearing, the first bearing direction
Locator is supported, the second bearing is towards erector.Roof-bolter is supported and is positioned using support locator, is then led to
It crosses erector to assemble and disassemble the bearing on roof-bolter, improves the speed of roof-bolter maintenance maintenance.
The support locator includes bottom plate, the first support portion and the second support portion, first support portion and second
Support part is vertically set on bottom plate, and the top surface of first support portion is equipped with the first counterbore, the top surface of second support portion
It is equipped with the second counterbore, is distributed between first support portion and the second support portion with set distance.Two support portions are arranged
On the same bottom plate, positioning support is formed to roof-bolter, in roof-bolter maintenance, is capable of providing firm support, and energy
It is enough that shaft on roof-bolter is positioned, improve maintenance efficiency and maintenance precision.
Wheelbase between the distance between first support portion and the second support portion and two shafts of roof-bolter is equal.
Wheelbase between the distance between first support portion and the second support portion and two shafts of roof-bolter is equal, it can be right respectively
Two shafts of roof-bolter are supported respectively, improve support strength.
The erector includes the first erector, the second erector and third erector that can be used alone, and described first
Erector, the second erector and third erector are selected according to the difference of bearing designation.By erector respectively according to different
Bearing designation be arranged to the different erector of shape and size, and different sizes are set, meet the disassembly of different model bearing
And installation.
First erector includes the first fixed link and the first mounting head, and one end of first fixed link is freely
End, the other end of first fixed link are equipped with the first mounting head, and the diameter of first mounting head is greater than the first fixed link
Diameter.The mounting head bottom of first erector is plane, is suitble to the installation of bearing, can pass through the first installation in bearing installation
The plane of head ensures balance when bearing installation, avoids bearing from generating stress during the installation process, influences the service life of bearing.
The height of first fixed link is 85mm~105mm, and the diameter of first fixed link is 30mm~36mm, institute
The height for stating the first mounting head is 25mm~36mm, and the diameter of first mounting head is 46mm~64mm.
Second erector includes the second fixed link and the second mounting head, and one end of second fixed link is freely
End, the other end of second fixed link are equipped with the second mounting head, and the diameter of second mounting head is greater than the second fixed link
The end face of diameter, second mounting head is equipped with the second mounting hole.The second mounting hole is arranged in the bottom of second mounting head, can
Shaft is put into, when installing bearing, the limitation of shaft can be got rid of, bearing is smoothly weighed to the shaft shoulder position of shaft,
Ensure in bearing installation process steadily and to neutrality.
The height of second fixed link is 100mm~120mm, and the diameter of second fixed link is 35mm~40mm,
The height of second mounting head is 35mm~45mm, and the diameter of second mounting head is 55mm~65mm, second peace
The diameter for filling hole is 28mm~32mm.
The third erector includes columnar third mounting head, and one end of the third mounting head is installed equipped with third
Hole.Third erector is arranged to column, and third mounting hole is set in the third mounting head bottom of third erector, meets anchor
The bearing of bar machine is installed.
The height of the third mounting head is 150mm~170mm, and the diameter of the third mounting head is 45mm~50mm,
The diameter of the third mounting hole is 43mm~47mm.
Compared with prior art, the utility model has the beneficial effects that
1, a kind of anchor pole machine bearing assembly and disassembly device of the utility model props up roof-bolter using support locator
Support and positioning, then assemble and disassemble the bearing on roof-bolter by erector, improve the speed of roof-bolter maintenance maintenance;
2, two support portions are arranged in the same bottom plate a kind of anchor pole machine bearing assembly and disassembly device of the utility model
On, positioning support is formed to roof-bolter, in roof-bolter maintenance, is capable of providing firm support, and can be on roof-bolter
Shaft positioned, improve maintenance efficiency and maintenance precision, by the distance between the first support portion and the second support portion and anchor
Wheelbase between two shafts of bar machine is equal, can be supported respectively to two shafts of roof-bolter respectively, improves support
Intensity;
3, a kind of anchor pole machine bearing assembly and disassembly device of the utility model, by erector respectively according to different bearing types
Number it is arranged to the different erector of shape and size, and different sizes is set, meets the disassembly and installation of different model bearing;
4, a kind of anchor pole machine bearing assembly and disassembly device of the utility model, the mounting head bottom of the first erector is flat
Face is suitble to the installation of bearing, balance when can ensure bearing installation by the plane of the first mounting head in bearing installation,
It avoids bearing from generating stress during the installation process, influences the service life of bearing;
5, a kind of anchor pole machine bearing assembly and disassembly device of the utility model, the second installation of bottom setting of the second mounting head
Shaft can be put by hole, when installing bearing, can get rid of the limitation of shaft, bearing smoothly be weighed to the axis of shaft
Shoulder position, it is ensured that steadily and to neutrality in bearing installation process;
6, third erector is arranged to column by a kind of anchor pole machine bearing assembly and disassembly device of the utility model, and
Third mounting hole is arranged in the third mounting head bottom of third erector, meets the bearing installation of roof-bolter.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the utility model, attached drawing needed in description will be made below
Simply introduce, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention, for this field
For those of ordinary skill, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the support locator overlooking structure diagram of the utility model;
Fig. 3 is the support locator the schematic diagram of the section structure of the utility model;
Fig. 4 is the first erector structural schematic diagram of the utility model;
Fig. 5 is the second erector structural schematic diagram of the utility model;
Fig. 6 is the third erector structural schematic diagram of the utility model;
Wherein, 1, support locator, 2, first bearing, 3, shaft, 4, second bearing, 5, erector, 11, bottom plate, 12,
First support portion, the 13, first counterbore, the 14, second support portion, the 15, second counterbore, the 511, first fixed link, the 512, first installation
Head, the 521, second fixed link, the 522, second mounting head, the 523, second mounting hole, 531, third mounting head, 532, third installation
Hole.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As shown in Figure 1, a kind of anchor pole machine bearing assembly and disassembly device, including support locator 1 and erector 5, the branch
Support locator 1 is placed on the lower section of roof-bolter for roof-bolter to be supported and positioned, and the erector 5 is arranged in roof-bolter
Top be used for the installation of anchor pole machine bearing, 3 both ends of shaft of the roof-bolter are respectively equipped with first bearing 2 and second bearing 4,
The first bearing 2 is towards support locator 1, and the second bearing 4 is towards erector 5.Using support locator
1 pair of roof-bolter is supported and positions, and is then assembled and disassembled by erector 5 to the bearing on roof-bolter, improves roof-bolter dimension
Repair the speed of maintenance.
As Figure 2-3, the support locator 1 includes bottom plate 11, the first support portion 12 and the second support portion 14, institute
It states the first support portion 12 and the second support portion 14 is vertically set on bottom plate 11, the top surface of first support portion 12 is equipped with the
The top surface of one counterbore 13, second support portion 14 is equipped with the second counterbore 15, first support portion 12 and the second support portion
It is distributed between 14 with set distance.Two support portions are arranged on the same bottom plate 11, positioning support is formed to roof-bolter,
In roof-bolter maintenance, it is capable of providing firm support, and can position to the shaft 3 on roof-bolter, improves maintenance
Efficiency and maintenance precision.In the application, the size of bottom plate 11 is long L=150mm, wide W=100mm, plate thickness T=10mm, first
The diameter of support portion 12 is Φ D41=61mm, internal diameter Φ d42=34mm, the diameter of phi D42=51mm of the second support portion 14, interior
Diameter Φ d42=30mm.
Wheelbase between the distance between first support portion 12 and the second support portion 14 and two shafts 3 of roof-bolter
It is equal.Wheelbase between the distance between first support portion 12 and the second support portion 14 and two shafts 3 of roof-bolter is equal,
Two shafts 3 of roof-bolter can be supported respectively respectively, improve support strength.
The erector 5 includes the first erector, the second erector and the third erector that can be used alone, and described first
Erector, the second erector and third erector are selected according to the difference of bearing designation.By erector 5 respectively according to different
Bearing designation be arranged to the different erector 5 of shape and size, and different sizes are set, meet the disassembly of different model bearing
And installation.
As shown in figure 4, first erector includes the first fixed link 511 and the first mounting head 512, described first is solid
One end of fixed pole 511 is free end, and the other end of first fixed link 511 is equipped with the first mounting head 512, first installation
First 512 diameter is greater than the diameter of the first fixed link 511.The mounting head bottom of first erector is plane, is suitble to the peace of bearing
Dress, balance when can ensure bearing installation by the plane of the first mounting head 512 in bearing installation, avoids bearing from pacifying
Stress is generated during dress, influences the service life of bearing.
The height H1 of first fixed link 511 is 85mm~105mm, the diameter of phi d1=of first fixed link 511
For 30mm~36mm, the height h1 of first mounting head 512 is 25mm~36mm, the diameter of phi of first mounting head 512
D1 is 46mm~64mm.In the application, the first erector includes three kinds, the size of the first are as follows: first fixed link 511
Height be 100mm, the diameter of first fixed link 511 is 30mm, and the height of first mounting head 512 is 26mm, institute
The diameter for stating the first mounting head 512 is 46mm;Second of size are as follows: the height of first fixed link 511 is 115mm, institute
The diameter for stating the first fixed link 511 is 36mm, and the height of first mounting head 512 is 36mm, first mounting head 512
Diameter is 49mm;The third size are as follows: the height of first fixed link 511 is 85mm, first fixed link 511
Diameter is 35mm, and the height of first mounting head 512 is 25mm, and the diameter of first mounting head 512 is 64mm.
As shown in figure 5, second erector includes the second fixed link 521 and the second mounting head 522, described second is solid
One end of fixed pole 521 is free end, and the other end of second fixed link 521 is equipped with the second mounting head 522, second installation
First 522 diameter is greater than the diameter of the second fixed link 521, and the end face of second mounting head 522 is equipped with the second mounting hole
523.The second mounting hole 523 is arranged in the bottom of second mounting head 522, can be put into shaft 3, when installing bearing, can put
The limitation of de- shaft 3, bearing is smoothly weighed to the shaft shoulder position of shaft 3, it is ensured that steady and centering in bearing installation process
Property.
The height H2 of second fixed link 521 is 100mm~120mm, and the diameter of phi D2 of second fixed link 521 is
35mm~40mm, the height h2 of second mounting head 522 are 35mm~45mm, the diameter of phi d2 of second mounting head 522
For 55mm~65mm, the diameter of phi d21 of second mounting hole 523 is 28mm~32mm.In the application, second fixed link
521 height is 110mm, and the diameter of second fixed link 521 is 40mm, and the height of second mounting head 522 is 40mm,
The diameter of second mounting head 522 is 60mm, and the diameter of second mounting hole 523 is 30mm.
As shown in fig. 6, the third erector includes columnar third mounting head 531, the one of the third mounting head 531
End is equipped with third mounting hole 532.Third erector is arranged to column, and in 531 bottom of third mounting head of third erector
Third mounting hole 532 is set, the bearing installation of roof-bolter is met.
The height H3 of the third mounting head 531 is 150mm~170mm, and the diameter of phi D3 of the third mounting head 531 is
45mm~50mm, the diameter of phi D31 of the third mounting hole 532 are 43mm~47mm.In the application, the third mounting head
531 height is 160mm, and the diameter of the third mounting head 531 is 48mm, and the diameter of the third mounting hole 532 is
46mm, the depth h3 of third mounting hole 532 are 110mm.
Above-mentioned technical proposal is a kind of embodiment of the utility model, for those skilled in the art,
On the basis of the utility model discloses application method and principle, it is easy to various types of improvement or deformation are made, without
It is only limitted to method described in the above-mentioned specific embodiment of the utility model, therefore previously described mode is only preferred, and
Not restrictive meaning.
Claims (10)
1. a kind of anchor pole machine bearing assembly and disassembly device, which is characterized in that including support locator and erector, the support is fixed
Position device is placed on the lower section of roof-bolter for roof-bolter to be supported and positioned, and the top of roof-bolter is arranged in the erector
For the installation of anchor pole machine bearing, the both ends of the shaft of the roof-bolter is respectively equipped with first bearing and second bearing, and described first
Bearing is towards support locator, and the second bearing is towards erector.
2. a kind of anchor pole machine bearing assembly and disassembly device according to claim 1, which is characterized in that the support locator
Including bottom plate, the first support portion and the second support portion, first support portion and the second support portion are vertically set on bottom plate, institute
The top surface for stating the first support portion is equipped with the first counterbore, and the top surface of second support portion is equipped with the second counterbore, and described first
It is distributed between support portion and the second support portion with set distance.
3. a kind of anchor pole machine bearing assembly and disassembly device according to claim 2, which is characterized in that first support portion
And second wheelbase between two shafts of roof-bolter of the distance between support portion it is equal.
4. a kind of anchor pole machine bearing assembly and disassembly device according to claim 1, which is characterized in that the erector includes
The first erector, the second erector and the third erector that can be used alone, first erector, the second erector and third
Erector is selected according to the difference of bearing designation.
5. a kind of anchor pole machine bearing assembly and disassembly device according to claim 4, which is characterized in that first erector
Including the first fixed link and the first mounting head, one end of first fixed link is free end, first fixed link it is another
End is equipped with the first mounting head, and the diameter of first mounting head is greater than the diameter of the first fixed link.
6. a kind of anchor pole machine bearing assembly and disassembly device according to claim 5, which is characterized in that first fixed link
Height be 85mm~105mm, the diameter of first fixed link is 30mm~36mm, and the height of first mounting head is
25mm~36mm, the diameter of first mounting head are 46mm~64mm.
7. a kind of anchor pole machine bearing assembly and disassembly device according to claim 4, which is characterized in that second erector
Including the second fixed link and the second mounting head, one end of second fixed link is free end, second fixed link it is another
End is equipped with the second mounting head, and the diameter of second mounting head is greater than the diameter of the second fixed link, the end of second mounting head
Face is equipped with the second mounting hole.
8. a kind of anchor pole machine bearing assembly and disassembly device according to claim 7, which is characterized in that second fixed link
Height 100mm~120mm, the diameter of second fixed link is 35mm~40mm, and the height of second mounting head is
35mm~45mm, the diameter of second mounting head are 55mm~65mm, and the diameter of second mounting hole is 28mm~32mm.
9. a kind of anchor pole machine bearing assembly and disassembly device according to claim 4, which is characterized in that the third erector
Including columnar third mounting head, one end of the third mounting head is equipped with third mounting hole.
10. a kind of anchor pole machine bearing assembly and disassembly device according to claim 9, which is characterized in that the third installation
The height of head is 150mm~170mm, and the diameter of the third mounting head is 45mm~50mm, the diameter of the third mounting hole
For 43mm~47mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822070360.5U CN209466195U (en) | 2018-12-10 | 2018-12-10 | A kind of anchor pole machine bearing assembly and disassembly device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822070360.5U CN209466195U (en) | 2018-12-10 | 2018-12-10 | A kind of anchor pole machine bearing assembly and disassembly device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209466195U true CN209466195U (en) | 2019-10-08 |
Family
ID=68090406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822070360.5U Active CN209466195U (en) | 2018-12-10 | 2018-12-10 | A kind of anchor pole machine bearing assembly and disassembly device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209466195U (en) |
-
2018
- 2018-12-10 CN CN201822070360.5U patent/CN209466195U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109138444B (en) | Light steel structure | |
CN209466195U (en) | A kind of anchor pole machine bearing assembly and disassembly device | |
CN105179920A (en) | Structural building material tube | |
CN102485919B (en) | Method for installing dummy shaft of converter connecting rod suspension system | |
CN102380643A (en) | Novel guide cover fixed collar drilling tooling of wind driven generator | |
CN204140599U (en) | Split shaft block ring | |
CN204222234U (en) | For the electric-controlled type high-precision rotary swager of material forming | |
CN204382694U (en) | For the high-precision rotary swager of material forming | |
CN200999702Y (en) | Novel tower barrel of wind generating set | |
CN205544695U (en) | Motor cabinet and unmanned helicopter | |
CN202064972U (en) | Mine adjustable directional supporting mechanism | |
CN109531086A (en) | One kind is for Big Diameter Flange bolt hole guiding alignment mechanical device and method | |
CN202117170U (en) | Support structure capable of sliding freely | |
CN204628329U (en) | The support device of large-size ball mill transmission system jack shaft | |
CN204222247U (en) | For the fluid pressure type high-mechanic rotating material-pressing machine of material forming | |
CN202913754U (en) | Large pipe diameter rod tower with internally arranged reinforcing rings | |
CN202087848U (en) | Upper bearing support structure of high-speed electric spindle | |
CN204208933U (en) | The pinch roller elevating mechanism of arbor press | |
CN202744688U (en) | Symmetric sectional packing spinning machine frame | |
CN204276576U (en) | Transmission mechanism in straightener pressing wheel Lift Part | |
CN203740791U (en) | Elevator speed limiter connecting support | |
CN202622289U (en) | Torpedo tank car wheel set bearing mounting traction device | |
CN203599550U (en) | Balance weight structure of cross beam | |
CN203857131U (en) | Embedded saddle | |
CN202467306U (en) | Adjustable herringbone column of hyperbolic natural ventilation cooling tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |