CN209443811U - A kind of house construction engineering support device - Google Patents
A kind of house construction engineering support device Download PDFInfo
- Publication number
- CN209443811U CN209443811U CN201821577556.7U CN201821577556U CN209443811U CN 209443811 U CN209443811 U CN 209443811U CN 201821577556 U CN201821577556 U CN 201821577556U CN 209443811 U CN209443811 U CN 209443811U
- Authority
- CN
- China
- Prior art keywords
- support
- bar
- support bar
- beam column
- loop bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of house construction engineering support devices, it is related to technical field of building construction, its technical solution includes the support frame being arranged in the two sides of beam column, support frame as described above includes two being parallel to each other and horizontally disposed first support bar on the ground, the wherein one end of the first support bar abuts the lower end of beam column, the first support bar is rotatably connected to second support bar far from one end of beam column, it is linked together between two second support bars by connecting shaft, the first support bar is provided with third support rod between one end and the second support bar of beam column, it is rotatablely connected between the third support rod and the second support bar, clasp joint between the first support bar and the third support rod;The accommodating cavity for first support bar and second support bar overturning storage is offered in the second support bar.The utility model has the advantages that storage is convenient, space, convenient transportation are saved.
Description
Technical field
The utility model relates to technical field of building construction, in particular to a kind of house construction engineering support device.
Background technique
Building engineering refers to all kinds of building constructions and its affiliated facility and route matched with its, pipeline, equipment peace
Fill engineering and indoor and outdoor decoration engineering." building construction ", which refers to, to be had top cover, beam column, wall, basis and is capable of forming inner space,
Meet the engineering of the needs such as people's production, inhabitation, study, public activity.The general abbreviation architectural engineering of building engineering, refers to
Prospecting, planning, design, construction, installation and the maintenance etc. that newly-built, reconstruction or enlarging building construction and auxiliary construction are carried out
The engineering entity of every technical work and its completion.
Beam column in the construction process, needs the first casting concrete on beam column, makes to connect between its bottom end and house earth surface
It is even closer, consolidate beam column more firm, and after pouring, enhancing can be reached after needing that concrete is waited to dry
The effect of support strength needs support device temporarily to support beam column that it is made to keep stability, the prior art in this process
In support device volume it is larger, occupied area is more, it has not been convenient to storage simultaneously it is also not convenient for transportation.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of house construction engineering support dresses
It sets, its advantage is that first support bar and third support rod can be accommodated into second support bar, storage is convenient, saves space, side
Just it transports.
The above-mentioned purpose of the utility model has the technical scheme that a kind of house construction engineering support dress
Set, including for beam column is supported and beam column two sides setting support frame, support frame as described above include two be parallel to each other and
Horizontally disposed first support bar on the ground, the wherein one end of the first support bar abut the lower end of beam column, and described the
One support rod is rotatably connected to second support bar far from one end of beam column, is connected to one by connecting shaft between two second support bars
It rises, the first support bar is provided with third support rod, the third between one end and the second support bar of beam column
It is rotatablely connected between support rod and the second support bar, clasp joint between the first support bar and the third support rod;
The accommodating cavity for first support bar and second support bar overturning storage is offered in the second support bar.
By using above-mentioned technical proposal, first support bar is arranged on the ground, and wherein one end is connected to the lower end of beam column
Portion, second support bar abut the side wall of beam column far from one end of first support bar, and three support rods enclose triangle, thus real
Now to the supporting role of beam column, beam column is avoided to generate skew during casting concrete and before concrete is not dry, protected
The stability for holding beam column separates first support bar and third support rod after the completion of the support device use, then by first
Support rod and third support rod are rotated towards the direction close to second support bar, are overturn and are accommodated into accommodating cavity, thus
Can reduce the occupied space of the device, it is convenient that storage storage is carried out to the support device, while also can convenient transportation, it is convenient
It carries.
The utility model is further arranged to: the accommodating cavity includes accommodation groove and the storage for storing first support bar
The accommodating groove of three support rods;
The first support bar is fixedly connected with grab far from described second support bar one end, and the third support rod is separate
One end level of the second support bar is fixedly installed raised line, and the grab is stuck on the raised line.
By using above-mentioned technical proposal, when in use, keep first support bar horizontal positioned, by the grab of first support bar
The raised line for blocking third support rod abuts to second support bar on beam column far from one end of first support bar;When not in use, make
Grab is detached from raised line, first support bar and third support rod is rotated towards the direction close to second support bar, by first
Support rod is rotated into accommodation groove, and third support rod is turned in accommodating groove, can be saved storage space, be facilitated storage and fortune
It is defeated.
The utility model is further arranged to: the angle between the second support bar and beam column can be adjusted.
By using above-mentioned technical proposal, by adjusting the angle between second support bar and beam column, so as to change
Second support bar vertical direction standoff height, so as to adjust second support bar far from first according to the height of beam column
Maximum supporting role is played to beam column in the position of the abutted beam column in one end of support rod.
The utility model is further arranged to: the third support rod is fixedly connected with cunning close to one end of second support bar
Block, the sliding block are located in the accommodating groove, and sliding block can rotate in accommodating groove and can be along the length direction of accommodating groove
Sliding;
The limit assembly limited to the sliding block along accommodating groove glide direction is additionally provided in the second support bar;
The first support bar is retractable support lever.
By using above-mentioned technical proposal, when needing to adjust the angle between second support bar and beam column, limit is opened
Component slides third support rod along accommodating groove, while adjusting the length of first support bar, and second support bar is made always can
Beam column is pushed against, after regulating angle, limit assembly limitation third support rod continues to slide, easy to operate, strong applicability.
The utility model is further arranged to: the limit assembly includes vertically opening up with the side of notch in accommodating groove
Limit hole, the limit hole internal screw thread are connected with caging bolt.
By using above-mentioned technical proposal, caging bolt is turned, caging bolt can be made to push against sliding block, and then reach limitation
The purpose of sliding block sliding.
The utility model is further arranged to: the first support bar includes the first loop bar, the second loop bar and is located at the
First connecting rod between one loop bar and the second loop bar;
Wherein one end of first loop bar and the second support bar are hinged, wherein one end spiral shell of the first connecting rod
Line is connected in the first loop bar, and the other end is threaded in the second loop bar.
By using above-mentioned technical proposal, when needing to adjust the length of first support bar, first connecting rod is rotated, makes the
One loop bar and the second loop bar direction are located remotely from each other or direction movement close to each other, so as to adjust the length of first support bar
Degree is easy to operate simple.
The utility model is further arranged to: the third support rod is adjustable length support rod.
By using above-mentioned technical proposal, the adjustable in length of third support rod can be supported to second to a greater extent
The angle of bar and beam column is adjusted, and the support device is made to can adapt to the beam column of different height, practical.
The utility model is further arranged to: the third support rod includes third loop bar, the 4th loop bar and is located at the
The second connecting rod between three loop bars and the 4th loop bar;
Wherein one end of the third loop bar and the second support bar are rotatablely connected, and wherein the one of second connecting rod
End is threaded in third loop bar, and the other end is threaded in the 4th loop bar.
By using above-mentioned technical proposal, when needing to adjust the length of third support rod, the second connecting rod is rotated, makes the
Three loop bars and the 4th loop bar direction are located remotely from each other or direction movement close to each other, so as to adjust the length of third support rod
Degree is easy to operate simple.
The utility model is further arranged to: the third support rod offers recessing groove close to the one end on ground, described
Raised line is rotatably connected in the recessing groove.
By using above-mentioned technical proposal, when not using raised line, rotation raised line is accommodated into inside recessing groove.
The utility model is further arranged to: the first support bar is fixedly installed the first rubber far from one end of hinged end
Blob of viscose, the third support rod are fixedly installed the second rubber block far from one end of sliding block.
It may when first support bar and third support rod are accommodated into accommodating cavity by using above-mentioned technical proposal
It is slid from accommodating cavity, the setting of the first rubber block and the second rubber block can make first support bar and third support rod card
It in second support bar, does not fall off, stores more convenient, reduction occupied space.
In conclusion the utility model has the following beneficial effects:
1, first support bar and third support rod can be accommodated into the accommodating cavity of second support bar, and storage is convenient, be saved
Space, convenient transportation;
2, the angle adjustable between second support bar and beam column can adjust the second support according to the actual height of beam column
The position of the abutted beam column of bar, is optimal support effect.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the schematic diagram that the utility model embodies support frame;
Fig. 3 is the enlarged drawing in the portion A in Fig. 2;
Fig. 4 is the enlarged drawing in the portion B in Fig. 2.
Appended drawing reference: 1, beam column;2, support frame;21, first support bar;211, grab;212, the first loop bar;213, second
Loop bar;214, first connecting rod;215, the first rubber block;22, second support bar;221, accommodating cavity;2211, accommodation groove;2212,
Accommodating groove;23, third support rod;231, raised line;232, third loop bar;233, the 4th loop bar;234, the second connecting rod;235, it allows
Position slot;236, the second rubber block;24, connecting shaft;25, sliding block;26, limit assembly;261, limit hole;262, caging bolt.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components
Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper", "lower", " bottom
Face " and " top surface " refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements geometry
The direction at center.
Embodiment: a kind of house construction engineering support device, as shown in Figure 1, include for beam column 1 carry out temporary support and
The support frame 2 of 1 two sides of beam column is set.
The setting of support frame 2 is prevented in 1 two sides of beam column in order to carry out interim Auxiliary support to also completely not firm beam column 1
Only skew occurs in it.
As shown in Fig. 2, support frame 2 includes two being parallel to each other and horizontal positioned first support bar 21 on the ground, first
Wherein one end of support rod 21 is connected to the bottom end of beam column 1, is hinged with second far from one end of beam column 1 in first support bar 21
Strut 22, second support bar 22 are connected to beam column 1(far from one end of first support bar 21 and see Fig. 1) upper end, at two second
Connecting shaft 24 is fixedly connected between strut 22, to connect into an entirety.It is rotatablely connected in second support bar 22
There is third support rod 23, clasp joint is together between third support rod 23 and first support bar 21.First support bar 21, second supports
Triangle is enclosed between bar 22 and third support rod 23, it is made to keep stability.To play certain support to beam column 1
Effect, prevents beam column 1 from skew occurs.
As shown in Figures 2 and 3, being horizontally disposed in third support rod 23 close to the one end on ground has raised line 231, at first
Strut 21 is fixedly connected with grab 211 far from one end of second support bar 22, and grab 211 can be hooked on raised line 231, to make
An entirety is connected between first support bar 21 and third support rod 23.
As shown in Fig. 2, the support device is stored and transported for convenience, energy is offered in second support bar 22
Enough store the accommodating cavity 221 of first support bar 21 and third support rod 23.Side of the accent of accommodating cavity 221 towards close ground
To.
Accommodating cavity 221 includes the accommodation groove 2211 of storage first support bar 21, rotates first support bar 21, makes the first support
Grab 211 on bar 21 is detached from the raised line 231 on third support rod 23, and then the rotation of first support bar 21 is accommodated into accommodation groove
In 2211.
Accommodating cavity 221 further includes the accommodating groove 2212 for storing third support rod 23.In third support rod 23 close to
One end of two support rods 22 is fixedly connected with sliding block 25, and sliding block 25 is slidably connected in accommodating groove 2212, and third support rod 23
It can overturn and be accommodated into accommodating groove 2212.Sliding block 25 slides in accommodating groove 2212 in order to prevent, so that third support rod 23
It is unstable, therefore, the limit limited to sliding block 25 along 2212 glide direction of accommodating groove is provided in second support bar 22
Component 26(is shown in Fig. 3).
As shown in Figure 2 and Figure 4, limit assembly 26 includes the limit hole for being provided with side adjacent with 2212 notch of accommodating groove
261, it is connected with caging bolt 262 in 261 internal screw thread of limit hole, caging bolt 262 is tightened, it is made to hold out against sliding block 25, it can either
Anti- limited slip block 25 slides in accommodating groove 2212.
When needing for the overturning of third support rod 23 to be accommodated into accommodating groove 2212, caging bolt 262 is adjusted, itself and cunning are made
Block 25 separates, and rotates third support rod 23, is accommodated into accommodating groove 2212.It is easy to operate, it is convenient for collecting, subtract
Few occupied space and being capable of convenient transportation.
As shown in Fig. 2, since beam column 1(is shown in Fig. 1) it is vertical highly different, in order to enable the support device to play preferably
Support effect, the angle between second support bar 22 and beam column 1 can be adjusted.
First support bar 21 is including the first loop bar 212, the second loop bar 213 and is located at the first loop bar 212 and the second loop bar
First connecting rod 214 between 213.Wherein one end of first loop bar 212 and second support bar 22 are hinged, other end and first
Connecting rod 214 is threadedly coupled, and the one end of first connecting rod 214 far from the first loop bar 212 is threadedly coupled with the second loop bar 213.The
The screw thread that one connecting rod 214 is connect with the first loop bar 212 and the second loop bar 213 is reverse thread.
As depicted in figs. 1 and 2, when needing to adjust the angle between second support bar 22 and beam column 1, caging bolt is turned
262(is shown in Fig. 4), so that caging bolt 262 is detached from sliding block 25, slide sliding block 25 in accommodating groove 2212, rotates second at this time
Strut 22 makes second support bar 22 push against beam column 1 always close to one end of beam column 1, while rotating first connecting rod 214, adjusts
The length of first support bar 21 makes first support bar 21, second support bar 22 and third support rod 23 enclose triangle always
Shape after regulating the angle between second support bar 22 and beam column 1, tightens caging bolt 262, caging bolt 262 is made to hold out against cunning
Block 25 makes the support device keep stability.
As shown in Fig. 2, seeing Fig. 1 in order to adjust second support bar 22 and beam column 1(to a greater extent) between angle,
The length of third support rod 23 can also be adjusted.
Third support rod 23 is including third loop bar 232, the 4th loop bar 233 and is located at third loop bar 232 and the 4th loop bar
The second connecting rod 234 between 233.Wherein one end of third loop bar 232 is fixedly connected with sliding block 25, the second connecting rod 234
Wherein threaded one end is connected in third loop bar 232, and the other end is threaded in the 4th loop bar 233.Second connecting rod 234 with
Third loop bar 232 and the screw thread of the 4th loop bar 233 connection are reverse thread.
The second connecting rod 234 is rotated, makes third loop bar 232 and the 4th loop bar 233 towards being located remotely from each other or close to each other
Direction movement, it is easy to operate simple so as to adjust the length of third support rod 23.
It is accommodated into accommodating groove 2212 as shown in figure 3, influencing third support rod 23 to make raised line 231 not, in third branch
Strut 23 offers recessing groove 235 close to one end of raised line 231, and raised line 231 is rotatably connected in recessing groove 235.Rotate raised line
231, raised line 231 can be accommodated in recessing groove 235.
As shown in Figures 2 and 3, when first support bar 21 and third support rod 23 to be received into second support bar 22,
First support bar 21 and third support rod 23 are skidded off from accommodating cavity 221 in order to prevent, in first support bar 21 far from hinged end
One end be fixed with the first rubber block 215, be fixed with the second rubber block 236 far from one end of sliding block 25 in third support rod 23.
In this way, when first support bar 21 and third support rod 23 are accommodated into accommodating cavity 221, the first rubber block 215 and
23 card column of first support bar 21 and third support rod can be prevented it from skidding off from accommodating cavity 221 by two rubber blocks 236.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (10)
1. a kind of house construction engineering support device, it is characterized in that: including for being supported to beam column (1) and in beam column (1) two
The support frame (2) of side setting, support frame as described above (2) include two being parallel to each other and horizontally disposed first support bar on the ground
(21), the wherein one end of the first support bar (21) abuts the lower end of beam column (1), and the first support bar (21) is far from beam
One end of column (1) is rotatably connected to second support bar (22), is connected between two second support bars (22) by connecting shaft (24)
Together, the first support bar (21) is provided with third branch between the one end and the second support bar (22) of beam column (1)
Strut (23) is rotatablely connected, the first support bar between the third support rod (23) and the second support bar (22)
(21) clasp joint between the third support rod (23);
The accommodating for first support bar (21) and second support bar (22) overturning storage is offered on the second support bar (22)
Chamber (221).
2. a kind of house construction engineering support device according to claim 1, it is characterized in that: the accommodating cavity (221) includes
It stores the accommodation groove (2211) of first support bar (21) and stores the accommodating groove (2212) of third support rod (23);
The first support bar (21) is fixedly connected with grab (211), the third far from the second support bar (22) one end
Support rod (23) is fixedly installed raised line (231) far from one end level of the second support bar (22), grab (211) card
On the raised line (231).
3. a kind of house construction engineering support device according to claim 1, it is characterized in that: the second support bar (22) with
Angle between beam column (1) can be adjusted.
4. a kind of house construction engineering support device according to claim 2, it is characterized in that: the third support rod (23) leans on
One end of nearly second support bar (22) is fixedly connected with sliding block (25), and the sliding block (25) is located in the accommodating groove (2212),
Sliding block (25) can be rotated in accommodating groove (2212) and can be slided along the length direction of accommodating groove (2212);
It is additionally provided on the second support bar (22) and the sliding block (25) is limited along accommodating groove (2212) glide direction
Limit assembly (26);The first support bar (21) is retractable support lever.
5. a kind of house construction engineering support device according to claim 4, it is characterized in that: the limit assembly (26) includes
In the limit hole (261) that accommodating groove (2212) is vertically opened up with the side of notch, limit hole (261) the internal screw thread connection is limited
Position bolt (262).
6. a kind of house construction engineering support device according to claim 4, it is characterized in that: the first support bar (21) is wrapped
Include the first loop bar (212), the second loop bar (213) and the first company between the first loop bar (212) and the second loop bar (213)
Extension bar (214);
Wherein one end of first loop bar (212) and the second support bar (22) hingedly, the first connecting rod (214)
Wherein threaded one end is connected in the first loop bar (212), and the other end is threaded in the second loop bar (213).
7. a kind of house construction engineering support device according to claim 3, it is characterized in that: the third support rod (23) is
Adjustable length support rod.
8. a kind of house construction engineering support device according to claim 7, it is characterized in that: the third support rod (23) wraps
Include third loop bar (232), the 4th loop bar (233) and the second company between third loop bar (232) and the 4th loop bar (233)
Extension bar (234);
Wherein one end and the second support bar (22) of the third loop bar (232) are rotatablely connected, second connecting rod
(234) wherein threaded one end is connected in third loop bar (232), and the other end is threaded in the 4th loop bar (233).
9. a kind of house construction engineering support device according to claim 2, it is characterized in that: the third support rod (23) leans on
Subaerial one end offers recessing groove (235), and the raised line (231) is rotatably connected in the recessing groove (235).
10. a kind of house construction engineering support device according to claim 1, it is characterized in that: the first support bar (21)
One end far from hinged end is fixedly installed the first rubber block (215), and the one of the third support rod (23) separate sliding block (25)
End is fixedly installed the second rubber block (236).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821577556.7U CN209443811U (en) | 2018-09-26 | 2018-09-26 | A kind of house construction engineering support device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821577556.7U CN209443811U (en) | 2018-09-26 | 2018-09-26 | A kind of house construction engineering support device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209443811U true CN209443811U (en) | 2019-09-27 |
Family
ID=68009240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821577556.7U Expired - Fee Related CN209443811U (en) | 2018-09-26 | 2018-09-26 | A kind of house construction engineering support device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209443811U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924695A (en) * | 2019-10-29 | 2020-03-27 | 中建四局第六建设有限公司 | Supporting structure and supporting method of house sound insulation wallboard |
CN112332347A (en) * | 2020-11-16 | 2021-02-05 | 湖南宇尚电力建设有限公司 | Temporary power utilization cable support for construction site of power transmission and transformation project |
CN112630301A (en) * | 2020-12-22 | 2021-04-09 | 宁波市产城生态建设集团有限公司 | Bridge maintenance of detecting a flaw equipment |
CN113349567A (en) * | 2021-06-03 | 2021-09-07 | 安吉舒惠健康科技有限公司 | Multifunctional shared bedside cabinet and control system thereof |
-
2018
- 2018-09-26 CN CN201821577556.7U patent/CN209443811U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924695A (en) * | 2019-10-29 | 2020-03-27 | 中建四局第六建设有限公司 | Supporting structure and supporting method of house sound insulation wallboard |
CN112332347A (en) * | 2020-11-16 | 2021-02-05 | 湖南宇尚电力建设有限公司 | Temporary power utilization cable support for construction site of power transmission and transformation project |
CN112630301A (en) * | 2020-12-22 | 2021-04-09 | 宁波市产城生态建设集团有限公司 | Bridge maintenance of detecting a flaw equipment |
CN112630301B (en) * | 2020-12-22 | 2024-01-23 | 宁波市产城生态建设集团有限公司 | Bridge inspection maintenance equipment |
CN113349567A (en) * | 2021-06-03 | 2021-09-07 | 安吉舒惠健康科技有限公司 | Multifunctional shared bedside cabinet and control system thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209443811U (en) | A kind of house construction engineering support device | |
US10654689B2 (en) | Structure installation system with vehicle having hangers to support a wall | |
CN209324006U (en) | A kind of assembling type steel structure building | |
CN205664829U (en) | Graphometric square | |
CN207911569U (en) | A kind of ornamental trees and shrubs fixing device | |
CN209861744U (en) | Ornamental pergola is used in municipal administration | |
CN110074615B (en) | It is a kind of to fold anti-down spectacle frame | |
CN207567953U (en) | A kind of full-scale container type human assistance Collapsible house | |
CN205822802U (en) | A kind of exterior angle bracing means of concrete cast in housing construction | |
CN213869233U (en) | Garden guardrail | |
CN208899978U (en) | A kind of safe construction guardrail | |
CN208967394U (en) | A kind of architectural engineering detection tripod | |
CN207692485U (en) | A kind of wooden flower stand | |
CN207487674U (en) | One kind is used for topographic portable rack | |
CN207460908U (en) | A kind of liftable green plant culture apparatus | |
CN207526394U (en) | A kind of overturning-preventing double ladder | |
CN208597446U (en) | A kind of arbor-vitae ancient tree support frame | |
CN207590262U (en) | Music easel | |
CN207639275U (en) | Plant support frame | |
CN208885114U (en) | A kind of construction guardrail | |
CN209579506U (en) | A kind of civil engineering pipeline rack convenient for adjusting | |
CN220807321U (en) | Measuring tool bin for architectural design | |
CN207902504U (en) | A kind of library's cart | |
CN216202064U (en) | Support for field surveying and mapping | |
CN209226568U (en) | A kind of bottled water runing rest |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190927 Termination date: 20200926 |